Categories
Base Metals Emx Royalty Energy Junior Mining Project Generators

EMX Executes Agreement to Sell its Svärdsjö Project in Sweden to District Metals


July 22, 2021

Related Document

Vancouver, British Columbia, July 22, 2021 (NYSE American: EMX; TSX Venture: EMX; Frankfurt: 6E9) – EMX Royalty Corporation (the “Company” or “EMX”) is pleased to announce the the execution of an agreement for the sale of its Svärdsjö polymetallic project (the “Project”) in Sweden to District Metals Corp. (TSX-V: DMX) (“District”). The agreement provides the Company with additional share equity in DMX that brings EMX’s ownership of District to 9.9%, annual advance royalty payments, a 2.5% Net Smelter Returns (“NSR”) royalty interest in the Project, and other consideration.

The Svärdsjö Project is located in the prolific Bergslagen mining region of southern Sweden, nearby District’s Tomtebo and Trollberget polymetallic VMS projects, which are also EMX royalty properties (see Figure 1). The Svärdsjö Project hosts multiple zones of polymetallic (copper-zinc-lead-silver-gold) volcanogenic massive sulfide (“VMS”) and carbonate replacement (“CRD”) style mineralization and is located in the vicinity of the historic Falun VMS mine and Boliden AB’s active Garpenberg mine, one of the largest and most efficient underground polymetallic mines in the world.

Svärdsjö has been the site of historical mining activity for over 500 years, with production continuing through to 1989. Most recently, Boliden AB explored and drilled extensively in the area from 2009 until 2019. Historical production records indicate that much of the production came prior to 1972 and focussed on silver rich copper-zinc-lead mineralization developed as zones of replacement in carbonate host rocks. These styles of mineralization are similar to that seen in the nearby Garpenberg mine. See www.EMXroyalty.com for further information on the Project.

The agreement with District represents another example of EMX’s execution of the royalty generation aspect of its business model. Although not available when first recognized during regional assessments, Svärdsjö remained on an EMX “watch list” for several years until coming available in 2020, when EMX quickly moved to secure the opportunity. EMX looks forward to working closely with District to further advance the Project.

Commercial Terms Overview. In accordance with the agreement, District will acquire a 100% interest in the Project subject to the following terms (all dollar amounts in CAD):

  • Upon closing, EMX will transfer the Svärdsjö exploration license to District.
  • Upon closing, EMX will receive $35,000 in cash and 1,400,000 common shares of DMX that increases EMX’s equity ownership in DMX to 9.9% (on a non-diluted basis).
  • EMX will receive a 2.5% NSR royalty interest in the Project. On or before the sixth anniversary after closing, DMX has the option to purchase 0.5% of the NSR on the Project by paying EMX $2,000,000.
  • EMX will receive annual advance royalty (“AAR”) payments of $25,000 for the Project commencing on the third anniversary of the closing, with the AAR payment increasing by $10,000 per year until reaching $75,000.
  • Payments of $275,000, payable in cash or shares of DMX, will be made to EMX upon the achievement of certain milestones, and District will be responsible for fulfilling work commitments on the Project.
  • To maintain its interest in the Project, within five years of the closing of the transaction, DMX will also: (i) spend a minimum of $1,000,000 on Project work expenditures with a minimum of $150,000 spent each year, and (ii) complete a minimum of 3,500 m of drilling.
  • Closing is subject to approval by the TSX Venture Exchange.

Overview of the Svärdsjö Project. The Project comprises 1,037 hectares within the prolific Bergslagen mining region in southern Sweden. In the Project area, copper-zinc-lead-silver-gold VMS and carbonate replacement style mineralization are associated with mid-Proterozoic age volcanic belts (refer to Figure 1). The Project is situated within a three-hour drive of Stockholm-Arlanda airport and has excellent year-round access, as well as nearby rail and power lines.

Mineralization at Svärdsjö is primarily developed as polymetallic sulfide replacements in dolomitic carbonate units accompanied by skarn minerals. Bodies of mineralization are enveloped within broader alteration zones typical of VMS systems, which in the case of Svärdsjö, provide well documented vectors that can be used to guide further exploration.

Historical production primarily came from three mining areas, which includes Kompanimalmen (“Company Ore”), Mellangruvan (“Middle Mine”), and Norramalmen (“Northern Ore”), with several of the historical zones remaining open and poorly explored at depth. Most recently, exploration between 2009-2019 delineated new lenses of mineralization to the west and southwest of the historical mining areas1. These, and other underexplored areas of the project will be targets for further exploration.

In addition, several additional exploration targets exist on the project, either defined by untested geophysical anomalies, or based upon trends of historical prospects and occurrences.

Notes on nearby mines and deposits. The nearby mines and deposits discussed in this news release provide context for EMX’s Project, which occurs in a similar geologic setting, but this is not necessarily indicative that the Project hosts similar mineralization.

Dr. Eric P. Jensen, CPG, a Qualified Person as defined by National Instrument 43-101 and employee of the Company, has reviewed, verified and approved the disclosure of the technical information contained in this news release.

About EMX. EMX is a precious, base and battery metals royalty company. EMX’s investors are provided with discovery, development, and commodity price optionality, while limiting exposure to risks inherent to operating companies. The Company’s common shares are listed on the NYSE American Exchange and TSX Venture Exchange under the symbol EMX. Please see www.EMXroyalty.com for more information.

For further information contact:

David M. Cole
President and Chief Executive Officer
Phone: (303) 979-6666
Dave@EMXroyalty.com

Scott Close
Director of Investor Relations
Phone: (303) 973-8585
SClose@EMXroyalty.com

Isabel Belger
Investor Relations (Europe)
Phone: +49 178 4909039
Ibelger@EMXroyalty.com

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Forward-Looking Statements
This news release may contain “forward looking statements” that reflect the Company’s current expectations and projections about its future results. These forward-looking statements may include statements regarding perceived merit of properties, exploration results and budgets, mineral reserves and resource estimates, work programs, capital expenditures, timelines, strategic plans, market prices for precious and base metal, or other statements that are not statements of fact. When used in this news release, words such as “estimate,” “intend,” “expect,” “anticipate,” “will”, “believe”, “potential”, “upside” and similar expressions are intended to identify forward-looking statements, which, by their very nature, are not guarantees of the Company’s future operational or financial performance, and are subject to risks and uncertainties and other factors that could cause the Company’s actual results, performance, prospects or opportunities to differ materially from those expressed in, or implied by, these forward-looking statements. These risks, uncertainties and factors may include, but are not limited to: unavailability of financing, failure to identify commercially viable mineral reserves, fluctuations in the market valuation for commodities, difficulties in obtaining required approvals for the development of a mineral project, increased regulatory compliance costs, expectations of project funding by joint venture partners and other factors.

Readers are cautioned not to place undue reliance on these forward-looking statements, which speak only as of the date of this news release or as of the date otherwise specifically indicated herein.  Due to risks and uncertainties, including the risks and uncertainties identified in this news release, and other risk factors and forward-looking statements listed in the Company’s MD&A for the year ended March 31, 2021 (the “MD&A”), and the most recently filed Annual Information Form (the “AIF”) for the year ended December 31, 2020, actual events may differ materially from current expectations.  More information about the Company, including the MD&A, the AIF and financial statements of the Company, is available on SEDAR at www.sedar.com and on the SEC’s EDGAR website at www.sec.gov.

1  A. Fahlvik, 2018: Hydrothermal alteration and lithogeochemical marker units at the Svärdsjö Zn-Pb-Cu deposit, Bergslagen, Sweden, and their implication for exploration.

Figure 1. Location map, major geologic features and mineral occurrences in the Svärdsjö area.

Categories
Base Metals Energy Granite Creek Copper Junior Mining

Granite Creek Copper Reports First Results from Phase 1 of 2021 Drill Program, Including 43.50 Meters of 1.40 % Copper Equivalent, at the Carmacks Copper-Gold-Silver Project in Yukon, Canada

Thu, July 22, 2021, 8:00 AMIn this article:

Explore the topics mentioned in this articleMy WatchlistMy WatchlistView my watchlists

VANCOUVER, BC / ACCESSWIRE / July 22, 2021 / Granite Creek Copper Ltd. (TSX.V:GCX)(OTCQB:GCXXF) (“Granite Creek” or the “Company“) is pleased to announce the first tranche of assays from Phase 1 of the Company’s 2021 drilling program on its 100%-owned Carmacks project. This recently completed first phase consisted of nineteen diamond drill holes, totalling 6355 meters, focused on the existing resource area with the goals of strengthening confidence in the resource model, evaluating opportunities for resource expansion and/or upgrading the sulphide portion of Zones 1 and 2000S from an inferred to indicated resource, and evaluating continuity of mineralization in Zone 13 (Figure 1).

Granite Creek President & CEO, Tim Johnson, commented, “The Company is extremely pleased with the progress of 2021 exploration program at Carmacks. A Phase 3 drilling program is under development and projected to commence in mid-August of this year. The addition of this third stage would expand the overall 2021 campaign to include a total of 10,000 meters of diamond drilling as well as 3000m of reverse circulation drilling. We expect this program will significantly expand the total contained metal on the project, resulting in a substantially and form the basis for a new Preliminary Economic Assessment.”

Table 1 – Highlights from first tranche of 2021 Diamond Drill Assays at the Carmacks Project

Drillhole
From(m)To(m)Length*(m)Cu(%)Mo(%)Au(g/t)Ag(g/t)CuEq** (%)Zone
CRM21-004323.50367.0043.501.120.030.203.411.40Zone 1
Including338.50367.0028.501.570.040.294.531.96
and including352.00†367.0015.001.800.070.334.812.31
CRM21-007222.52223.704.080.910.010.196.321.13
CRM21-010450.00513.4063.400.27BDL0.081.310.35
Including450.00482.2532.250.30BDL0.081.410.39
Including478.32482.253.930.580.010.202.850.78
Including488.90513.4024.500.30BDL0.091.470.39
including502.90509.756.850.410.010.161.930.57
2000 S
CRM21-003146.35†214.5068.150.590.030.143.690.830
Including161.40179.8018.040.810.030.214.801.13
CRM21-005137.05179.8043.240.740.050.163.821.06
Including142.05158.4016.351.200.030.266.111.58
CRM21-006194.40278.2083.800.640.010.133.230.81
Including229.20278.20490.870.020.173.881.10
Including248.76266.2017.441.210.030.225.111.53
CRM21-008195.80228.4032.60.800.020.173.881.02
Including201.55215.55141.100.020.244.861.40
CRM21-009190.50243.8553.350.590.010.142.710.75
Including191.30201.7010.40.87BDL0.253.701.09
and including209.00225.9516.950.620.010.132.760.77
and Including229.90235.255.351.210.060.284.881.68
https://s.yimg.com/rq/darla/4-8-0/html/r-sf-flx.html

** Copper equivalent (Cu Eq) values assume Cu $3.35/lb, Au $1600/oz, Ag $24/oz, Mo $12/lb and 100% recovery. *Weighted average intercepts shown. Estimated true widths vary but, based on geological interpretation of cross-sections, are estimated to be typically 60-70% of the intersected widths. † Zone has poor recovery

Figure 1 – Carmacks Copper Project Plan View

Zone 1

Eight holes were drilled in Zone 1 with the objective of increasing confidence in the inferred portion of the sulfide resource of this zone as well as evaluating the southern down-dip continuation of the inferred resource (Figure 2). The drilling was successful in achieving its objectives of delineating the depth extent of mineralization, expanding the mineralization below the current resource model and confirming the grade and anticipated thickness in the inferred portion of the sulphide resource in this zone.

Table 2 – Zone 1 mineral resource[1]

CategoryTonnes (000’s)Cu (%)Acid soluble Cu (%)Sulphide Cu (%)Au (g/t)Ag (g/t)
Measure & IndicatedOxide11,980,0001.070.860.210.464.58
Inferred Oxide90,0000.730.530.20.131.81
Measure & IndicatedSulfide4,340,0000.750.030.720.222.33
Inferred Sulfide4,031,0000.710.010.70.181.90

1 Mineral resource prepared by Dr. Gilles Arseneau, P.Geo., reported in JDS Energy and Mining Inc 2017 Ni 43-101 [1] JDS Energy and Mining. Feb 9, 2017. NI 43-101 Preliminary Economic Assessment Technical Report on the Carmacks Project, Yukon, Canada., with updated resource for Zones 2000S, 12 and 13 as reported in April 9, 2018 by Copper North Mining.

While the Preliminary Economic Assessment (“PEA”) published in 2017(1,2) only looked at the oxide material in Zones 1,4 & 7, work being conducted by Sedgman and Mining Plus (see news release dated May 18, 2021) is looking at various scenarios to process the sulfide portion of Zone 1 and other sulfide zones of the deposit building a basis for an updated PEA that would include both oxide and sulfide ore.

Figure 2– Long section of Zone 1 looking west

Zone 2000S

Zone 2000S, originally discovered in 2006 as the result of an IP survey, has the potential to add tonnage in the sulfide domain of resource category. The mineral resource on this zone is shown in Table 3, which was based on a 0.25% total copper grade cut-off.Six diamond drillholes were drilled in this zone are part of the first phase of drilling with the intent of evaluating the continuation of bornite-chalcopyrite mineralization down dip. The drilling was very successful in not only confirming the continuation of the high grade bornite-chalcopyrite mineralization but also extending mineralization well below the current block model as well as encountering significant molybdenite mineralization A technical hole (CRM21-018) was drilled subparallel to the mineralization to evaluate the geological concept of a southern W-E striking fault which post-dates and offsets mineralization.

Table 3 – Zone 2000S mineral resources1

CategoryTonnes (000’s)Cu (%)Acid soluble Cu (%)Sulphide Cu (%)Au (g/t)Ag (g/t)
Measure & IndicatedOxide410,8780.640.490.140.233.15
Inferred Oxide266,8940.570.340.240.142.66
Measure & IndicatedSulfide740,0000.700.070.630.173.28
Inferred Sulfide636,0000.730.050.680.183.50

1Mineral resource prepared by Dr. Gilles Arseneau, P.Geo., reported in JDS Energy and Mining Inc 2017 Ni 43-101 [1] JDS Energy and Mining. Feb 9, 2017. NI 43-101 Preliminary Economic Assessment Technical Report on the Carmacks Project, Yukon, Canada., with updated resource for Zones 2000S, 12 and 13 as reported in April 9, 2018 by Copper North Mining.

Figure 3 – Long section of 2000S

Zone 13

Three diamond drill holes were completed in Zone 13 with the intent of evaluating the northern continuity of sulfide mineralization, along strike and to infill an open area of the block model. Within 1000m of Zone 1, Zone 13 has the potential to add both oxide and sulfide resources to an updated mine plan. The sulfide portion remains open along strike and at depth. All assay results from Zone 13 are pending.

COVID-19 Protocols

Granite Creek has worked closely with the Yukon government to develop a COVID-19 safety plan that enables the Company to implement an effective work plan while maintaining the highest degree of safety of our workers and surrounding communities. The Company strictly adheres to mandates put in place by health authorities at the Federal and Territorial government level and hold the health and safety of our workers, and the citizens of the communities in which work in the highest regard.

[1] JDS Energy and Mining. Feb 9, 2017. NI 43-101 Preliminary Economic Assessment Technical Report on the Carmacks Project, Yukon, Canada. Contained metal based on 23.76 million tonnes of NI 43-101 compliant resources in the Measured and Indicated categories grading 0.85% Cu, 0.31 g/t Au, 3.14 g/t Ag.

[2] Arseneau Consulting Services, 2016 Independent Technical Report on the Carmacks Copper Project, Yukon, Canada.

About Granite Creek Copper

Granite Creek, a member of the Metallic Group of Companies, is a Canadian exploration company focused on the 176 square kilometer Carmacks project in the Minto copper district of Canada’s Yukon Territory. The project is on trend with the high-grade Minto copper-gold mine, operated by Minto Explorations Ltd, to the north and features excellent access to infrastructure with the nearby paved Yukon Highway 2, along with grid power within 12 km. More information about Granite Creek Copper can be viewed on the Company’s website at www.gcxcopper.com.

FOR FURTHER INFORMATION PLEASE CONTACT:

Timothy Johnson, President & CEO
Telephone: 1 (604) 235-1982
Toll Free: 1 (888) 361-3494
E-mail: info@gcxcopper.com
Website: www.gcxcopper.com

Qualified Person

Ms. Debbie James, P.Geo., a qualified person for the purposes of National Instrument 43-101, has reviewed and approved the technical disclosure contained in this news release.

Quality Control and Quality Assurance

Quality assurance and quality control procedures include the systematic insertion of duplicate, blank and standard samples, making up 12% of the sample stream. Drill core samples were sawn in half, labelled, placed in sealed bags and shipped directly to the Bureau Veritas preparation laboratory in Whitehorse. All geochemical analyses were performed by Bureau Veritas in Vancouver. Copper and silver analysis was performed by four-acid digestion with an ICP-ES finish. Non-sulphide copper was determined through a sulphuric acid leach with an AAS finish. Gold was analyzed by igniting a 15 g sample followed by an aqua regia digestion with an ICP-MS finish.

Forward-Looking Statements

This news release includes certain statements that may be deemed “forward-looking statements”. All statements in this release, other than statements of historical facts including, without limitation, statements regarding potential mineralization, historic production, estimation of mineral resources, the realization of mineral resource estimates, interpretation of prior exploration and potential exploration results, the timing and success of exploration activities generally, the timing and results of future resource estimates, permitting time lines, metal prices and currency exchange rates, availability of capital, government regulation of exploration operations, environmental risks, reclamation, title, and future plans and objectives of the company are forward-looking statements that involve various risks and uncertainties. Although Granite Creek Copper believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in the forward-looking statements. Forward-looking statements are based on a number of material factors and assumptions. Factors that could cause actual results to differ materially from those in forward-looking statements include failure to obtain necessary approvals, unsuccessful exploration results, changes in project parameters as plans continue to be refined, results of future resource estimates, future metal prices, availability of capital and financing on acceptable terms, general economic, market or business conditions, risks associated with regulatory changes, defects in title, availability of personnel, materials and equipment on a timely basis, accidents or equipment breakdowns, uninsured risks, delays in receiving government approvals, unanticipated environmental impacts on operations and costs to remedy same, and other exploration or other risks detailed herein and from time to time in the filings made by the companies with securities regulators. Readers are cautioned that mineral resources that are not mineral reserves do not have demonstrated economic viability. Mineral exploration and development of mines is an inherently risky business. Accordingly, the actual events may differ materially from those projected in the forward-looking statements. For more information on Granite Creek Copper and the risks and challenges of their businesses, investors should review their annual filings that are available at www.sedar.com.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

SOURCE: Granite Creek Copper Ltd.

Categories
Junior Mining Labrador Gold Precious Metals Uncategorized

Labrador Gold Intersects 276.56 g/t Gold Over 0.5 Metres at Big Vein, Kingsway Project

Labrador Gold Corp.Wed, July 21, 2021, 8:00 AMIn this article:

Figure 1

Big Vein Plan Map.
Big Vein Plan Map.
Big Vein Plan Map.

Figure 2

High-grade gold intercept in Hole K-21-31. Note photo is not intended to be representative of gold mineralization in Hole K-21-31.
High-grade gold intercept in Hole K-21-31. Note photo is not intended to be representative of gold mineralization in Hole K-21-31.
High-grade gold intercept in Hole K-21-31. Note photo is not intended to be representative of gold mineralization in Hole K-21-31.

Figure 3

Core photo of Hole K-21-31 from 0.0 to 12.86m showing high grade intersection. Note that this photo is not intended to be representative of mineralization in hole K-21-31.
Core photo of Hole K-21-31 from 0.0 to 12.86m showing high grade intersection. Note that this photo is not intended to be representative of mineralization in hole K-21-31.
Core photo of Hole K-21-31 from 0.0 to 12.86m showing high grade intersection. Note that this photo is not intended to be representative of mineralization in hole K-21-31.

TORONTO, July 21, 2021 (GLOBE NEWSWIRE) — Labrador Gold Corp. (TSX.V:LAB | OTCQX:NKOSF | FNR: 2N6) (“LabGold” or the “Company”) is pleased to announce further high-grade intercepts of near surface gold mineralization from its 100% controlled Kingsway project near Gander, Newfoundland. The Kingsway project is located in the highly prospective central Newfoundland gold belt.

The high-grade intersections are from holes K-21-29 and -31 that contain fine particles of visible gold in quartz vein that is typically vuggy, locally contains stylolites, and is similar to quartz veins containing high grade gold intersections reported previously (see news release dated June 3, 2021). Hole K-21-31 intersected 276.56 g/t Au over 0.5 metres which represents a “metal factor” (grade x width) of 138.28 g/t Au x m*, the highest value yet on the Kingsway Property. A second intersection in hole K-21-31 intersected 13.14g/t Au over 0.65m from 54.5m. Hole K-21-29 intersected two mineralized zones a near surface zone grading 16.44g/t over 0.5m and a deeper zone starting at 49.35m downhole grading 37.72g/t over 0.21m. A summary of the high-grade intersections, as well as other holes with assays received to date, are given in Table 1 below.
*width used to calculate metal factor is downhole width as there is insufficient information to calculate true width.

Table 1. Assay highlights

HoleFrom (m)To (m)Length (m)Au (g/t)
K-21-31**10.5110.5276.56
And**54.555.150.6513.14
K-21-29**88.50.516.44
And**49.3549.560.2137.72
K-21-20202111.03
K-21-19819111.03
and46.5492.51.09
and12413061.87
including125.5128.533.83
K-21-18111211.14
and138.231423.772.03
K-21-175555.60.61.51
K-21-1610.516.560.98
and106.5107.511.2
K-21-156.5169.50.95
and242840.69
and364041.93
and51.555.64.10.75
and10210311.08
K-21-132559.534.50.97
inc.4355121.46
incl.48.5512.52.05

**Interval contains visible gold. All intersections are downhole length as
there is insufficient Information to calculate true width.

“The Big Vein target continues to deliver near surface high grade gold mineralization shown by the grade x width value of 138.28 g/t Au x m in Hole-21-31, the highest value obtained so far from the Kingsway drilling,” said Roger Moss, President and CEO of the Company. “In addition to the drilling at Big Vein, our field crews continue to develop targets along the entire 12km strike length of Appleton Fault Zone covered by the property, including within the quartz vein corridor.”

Figure 1. Big Vein Plan Map.
https://www.globenewswire.com/NewsRoom/AttachmentNg/42ce11ce-b9a1-44b3-bfa0-e704c90e0168

Figure 2. High-grade gold intercept in Hole K-21-31.
Note photo is not intended to be representative of gold mineralization in Hole K-21-31.
https://www.globenewswire.com/NewsRoom/AttachmentNg/7adc67f0-8e1c-4057-90d4-be53a29a96fc

Figure 3. Core photo of Hole K-21-31 from 0.0 to 12.86m showing high grade intersection.
Note that this photo is not intended to be representative of mineralization in hole K-21-31.
https://www.globenewswire.com/NewsRoom/AttachmentNg/8790761f-97a6-4c33-bb55-9798161c94db

Table 2. Drill hole Collar details

Hole IDEastingNorthingAzimuthInclinationTotal Depth
K-21-31661596543521810557140
K-21-29661596543521810545110
K-21-20661596543521814052179
K-21-19661603543524914858200.7
K-21-18661596543521815645201
K-21-17661603.3543524914845251
K-21-16661596543521814858191
K-21-15661551543518014854191
K-21-13661551543518014845189

Big Vein target

The Big Vein target is an auriferous quartz vein exposed at surface that has been traced over 400 metres at surface along the Appleton Fault Zone. It lies within a larger northeast-southwest trending “quartz vein corridor” that stretches for over 7.5 kilometres as currently outlined with potential for expansion along the 12km strike length of the Appleton Fault Zone in both directions. Gold mineralization observed at Big Vein includes six occurrences of visible gold, assays of samples from which range from 1.87g/t to 1,065g/t gold. The visible gold is typically hosted in annealed and vuggy gray quartz, that is locally stylolitic with vugs often containing euhedral quartz infilling features characteristic of epizonal gold deposits.

The current drill program, recently increased to 50,000 metres, has only tested Big Vein over approximately 100 metres of strike length of the 400m surface exposure and to vertical depths of 50 metres. However, drilling has already produced visible gold in six drill holes giving high grade intercepts as well as wide areas of gold mineralization associated with significant quartz veining and sulphide mineralization including arsenopyrite, pyrite and possible boulangerite noted along vein margins and as strong disseminations in the surrounding wall rocks.

QA/QC

True widths of the reported intersections have yet to be calculated. Assays are uncut. Samples of HQ split core are securely stored prior to shipping to Eastern Analytical Laboratory in Springdale, Newfoundland for assay. Eastern Analytical is an ISO/IEC17025 accredited laboratory. Samples are routinely analyzed for gold by standard 30g fire assay with ICP (inductively coupled plasma) finish with samples containing visible gold assayed by metallic screen/fire assay. The company submits blanks and certified reference standards at a rate of approximately 5% of the total samples in each batch.

Qualified Person

bGold, a Qualified Person in accordance with Canadian regulatory requirements as set out in NI 43-101, has read and approved the scientific and technical information that forms the basis for the disclosure contained in this release.

The Company gratefully acknowledges the Newfoundland and Labrador Ministry of Natural Resources’ Junior Exploration Assistance (JEA) Program for its financial support for exploration of the Kingsway property.

About Labrador Gold
Labrador Gold is a Canadian based mineral exploration

Roger Moss, PhD., P.Geo., President and CEO of La company focused on the acquisition and exploration of prospective gold projects in Eastern Canada.

In early March 2020, Labrador Gold acquired the option to earn a 100% interest in the Kingsway project in the Gander area of Newfoundland. The three licenses comprising the Kingsway project cover approximately 16km of the Appleton fault zone which is associated with gold occurrences in the region, including the New Found Gold discovery. Infrastructure in the area is excellent located just 18km from the town of Gander with road access to the project, nearby electricity and abundant local water. LabGold recently increased its 20,000 metre diamond drill program to 50,000 metres targeting high-grade epizonal gold mineralization following encouraging early results. The Company has approximately $36 million in working capital and is well funded to carry out the planned program.

The Hopedale property covers much of the Hunt River and Florence Lake greenstone belts that stretch over 80 km. The belts are typical of greenstone belts around the world but have been underexplored by comparison. Initial work by Labrador Gold during 2017 show gold anomalies in soils and lake sediments over a 3 kilometre section of the northern portion of the Florence Lake greenstone belt in the vicinity of the known Thurber Dog gold showing where grab samples assayed up to 7.8g/t gold. In addition, anomalous gold in soil and lake sediment samples occur over approximately 40 kilometres along the southern section of the greenstone belt (see news release dated January 25th 2018 for more details). Labrador Gold now controls approximately 57km strike length of the Florence Lake Greenstone Belt.

The Company has 150,577,206 common shares issued and outstanding and trades on the TSX Venture Exchange under the symbol LAB.

For more information please contact:

Roger Moss, President and CEO Tel: 416-704-8291

Or visit our website at: www.labradorgold.com

Twitter: @LabGoldCorp

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Forward-Looking Statements: This news release contains forward-looking statements that involve risks and uncertainties, which may cause actual results to differ materially from the statements made. When used in this document, the words “may”, “would”, “could”, “will”, “intend”, “plan”, “anticipate”, “believe”, “estimate”, “expect” and similar expressions are intended to identify forward-looking statements. Such statements reflect our current views with respect to future events and are subject to risks and uncertainties. Many factors could cause our actual results to differ materially from the statements made, including those factors discussed in filings made by us with the Canadian securities regulatory authorities. Should one or more of these risks and uncertainties, such as actual results of current exploration programs, the general risks associated with the mining industry, the price of gold and other metals, currency and interest rate fluctuations, increased competition and general economic and market factors, occur or should assumptions underlying the forward looking statements prove incorrect, actual results may vary materially from those described herein as intended, planned, anticipated, or expected. We do not intend and do not assume any obligation to update these forward-looking statements, except as required by law. Shareholders are cautioned not to put undue reliance on such forward-looking statements.

Categories
Base Metals Energy Junior Mining Metallic Group Precious Metals Stillwater Critical Minerals

Group Ten Metals Announces Arrival of Second Drill Rig, Provides Update on 10,000 Meter Drill Program at Stillwater West PGE-Ni-Cu-Co + Au Project in Montana, USA

VANCOUVER, BC / ACCESSWIRE / July 20, 2021 / Group Ten Metals Inc. (TSXV:PGE)(OTCQB:PGEZF)(FSE:5D32) (the “Company” or “Group Ten”) announces the arrival of the second drill rig at the Company’s flagship Stillwater West platinum group element, nickel, copper, cobalt, and gold (“PGE-Ni-Cu-Co + Au”) project in Montana, USA, and provides an update on progress of the planned 10,000 meter 2021 drill campaign. Drilling is now underway in the Chrome Mountain target area (see Figure 1), and a second rig will be installed in the Camp target area this week.

Picture 1
Picture 1

Figure 1 – Drilling in progress in the Chrome Mountain target area, Stillwater West PGE-Ni-Cu-Co + Au project

The primary objective of the 2021 program is: 1) the expansion of existing drill-defined kilometer-scale nickel and copper sulphide mineralization, enriched in palladium, platinum, rhodium, gold and cobalt, at the advanced Chrome Mountain, Camp and Iron Mountain target areas; and 2) step-out testing of adjacent priority targets identified in the 2020 Induced Polarization (“IP”) survey (see Figure 2 and April 19, 2021 news release). In addition, an expanded IP geophysical survey, mapping and prospecting programs are planned as part of this season’s program, with the aim of advancing earlier-stage targets to drill-ready status across Stillwater West’s 32-kilometer strike length.

Michael Rowley, President and CEO, commented, “We are very pleased to have initiated our most extensive drill campaign to date at Stillwater West, and to be accelerating advancement of the project towards its potential to become a major source of low-carbon battery, green, and precious metals in a premier US mining district. The 2021 campaign will focus on the most advanced target areas with the objective of expanding the initial resource estimates that are now in progress with release targeted for this summer. Our work to date, combined with the large, productive, and metal-rich nature of the district, highlights the terrific scale and expansion potential of the Stillwater West project. We look forward to further announcements in the near term.”

Figure 2 – Drilling in progress in the Chrome Mountain target area, Stillwater West PGE-Ni-Cu-Co + Au project

About Stillwater West

Group Ten is rapidly advancing the Stillwater West PGE-Ni-Cu-Co + Au project towards becoming a world-class source of low-carbon, sulphide-hosted nickel, copper, and cobalt, critical to the electrification movement, as well as key catalytic metals including platinum, palladium and rhodium used in catalytic converters, fuel cells, and the production of green hydrogen. Stillwater West positions Group Ten as the second-largest landholder in the Stillwater Complex, with a 100%-owned position adjoining and adjacent to Sibanye-Stillwater PGE mines in south-central Montana, USA1. The Stillwater Complex is recognized as one of the top regions in the world for PGE-Ni-Cu-Co mineralization, alongside the Bushveld Complex and Great Dyke in southern Africa, which are similar layered intrusions. The J-M Reef, and other PGE-enriched sulphide horizons in the Stillwater Complex, share many similarities with the highly prolific Merensky and UG2 Reefs in the Bushveld Complex. Group Ten’s work in the lower Stillwater Complex has demonstrated the presence of large-scale disseminated and high-sulphide battery metals and PGE mineralization, similar to the Platreef in the Bushveld Complex2. Drill campaigns by the Company, complemented by a substantial historic drill database, are driving 3D models of Platreef-style mineralization in the five most advanced target areas, three of which are expected to become formal mineral resources by mid-2021. Multiple earlier-stage Platreef-style and reef-type targets are being advanced across the rest of the 32-kilometer length of the project based on strong correlations seen in soil and rock geochemistry, geophysical surveys, geologic mapping, and drilling.

About Group Ten Metals Inc.

Group Ten Metals Inc. is a TSX-V-listed Canadian mineral exploration company focused on the development of high-quality platinum, palladium, nickel, copper, cobalt, and gold exploration assets in top North American mining jurisdictions. The Company’s core asset is the Stillwater West PGE-Ni-Cu-Co + Au project adjacent to Sibanye-Stillwater’s high-grade PGE mines in Montana, USA. Group Ten also holds the high-grade Black Lake-Drayton Gold project adjacent to Treasury Metals’ development-stage Goliath Gold Complex in northwest Ontario, and the Kluane PGE-Ni-Cu-Co project on trend with Nickel Creek Platinum‘s Wellgreen deposit in Canada‘s Yukon Territory.

About the Metallic Group of Companies

The Metallic Group is a collaboration of leading precious and base metals exploration companies, with a portfolio of large, brownfield assets in established mining districts adjacent to some of the industry’s highest-grade producers of silver and gold, platinum and palladium, and copper. Member companies include Metallic Minerals in the Yukon’s high-grade Keno Hill silver district and La Plata silver-gold-copper district of Colorado, Group Ten Metals in the Stillwater PGM-nickel-copper district of Montana, and Granite Creek Copper in the Yukon’s Minto copper district. The founders and team members of the Metallic Group include highly successful explorationists formerly with some of the industry’s leading explorers/developers and major producers. With this expertise, the companies are undertaking a systematic approach to exploration using new models and technologies to facilitate discoveries in these proven, but under-explored, mining districts. The Metallic Group is headquartered in Vancouver, BC, Canada, and its member companies are listed on the Toronto Venture, US OTC, and Frankfurt stock exchanges.

FOR FURTHER INFORMATION, PLEASE CONTACT:

Michael Rowley, President, CEO & Director
Email: info@grouptenmetals.com
Web: http://grouptenmetals.com
Phone: (604) 357 4790
Phone: (604) 357 4790

Forward-Looking Statements

Forward Looking Statements: This news release includes certain statements that may be deemed “forward-looking statements”. All statements in this release, other than statements of historical facts including, without limitation, statements regarding potential mineralization, historic production, estimation of mineral resources, the realization of mineral resource estimates, interpretation of prior exploration and potential exploration results, the timing and success of exploration activities generally, the timing of the timing and results of future resource estimates, permitting time lines, metal prices and currency exchange rates, availability of capital, government regulation of exploration operations, environmental risks, reclamation, titlefuture driling actiivities and the locations of such drilling, and future plans and objectives of the company are forward-looking statements that involve various risks and uncertainties. Although Group Ten believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in the forward-looking statements. Forward-looking statements are based on a number of material factors and assumptions. Factors that could cause actual results to differ materially from those in forward-looking statements include failure to obtain necessary approvals, unsuccessful exploration results, changes in project parameters as plans continue to be refined, results of future resource estimates, future metal prices, availability of capital and financing on acceptable terms, general economic, market or business conditions, risks associated with regulatory changes, defects in title, availability of personnel, materials and equipment on a timely basis, accidents or equipment breakdowns, uninsured risks, delays in receiving government approvals, unanticipated environmental impacts on operations and costs to remedy same, and other exploration or other risks detailed herein and from time to time in the filings made by the companies with securities regulators. Readers are cautioned that mineral resources that are not mineral reserves do not have demonstrated economic viability. Mineral exploration and development of mines is an inherently risky business. Accordingly, the actual events may differ materially from those projected in the forward-looking statements. For more information on Group Ten and the risks and challenges of their businesses, investors should review their annual filings that are available at www.sedar.com.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

SOURCE: Group Ten Metals Inc.

Categories
Base Metals Junior Mining Metallic Minerals Precious Metals

Metallic Minerals Announces Start of First Phase Drilling at La Plata Silver-Gold-Copper Project in Southwest Colorado, USA

VANCOUVER, BC / ACCESSWIRE / July 20, 2021 / Metallic Minerals (TSX.V:MMG |OTCQB:MMNGF) (“Metallic Minerals“, or the “Company“) is pleased to announce the start of the first phase of drilling of up to 2,000 meters at the La Plata silver-gold-copper project in southwest Colorado along with an update on exploration activities to date. This initial diamond core drill program is designed to test and confirm mineralization in the central porphyry system, which hosts an historical resource estimate, as the first steps toward developing a new NI 43-101 compliant resource estimate.

The road accessible La Plata project covers 33 km2 approximately 26 km northwest of Durango, Colorado within the historic high-grade La Plata mining district located at the southwest end of the prolific Colorado Mineral Belt. Mineralization is related to a large-scale precious-metals-rich porphyry copper system with associated high-grade silver and gold epithermal vein and replacement deposits.

Project Highlights

  • Drilling to date within the central porphyry system has defined a northeast trending, near vertical zone of copper-silver-gold mineralization covering an area of at least 3 km by 1 km with over 1 km of vertical relief that remains open to expansion along trend and to depth with excellent potential for additional discoveries (see Figure 1).
  • Surrounding the central porphyry system is an associated high-grade silver and gold-rich epithermal system measuring at least 8 km by 2 km that hosts 56 identified vein, replacement, and breccia structures.
  • Historical production from some of these high-grade structures exceeded 1,000 grams per tonne (“g/t”) silver and over 15 g/t gold with some of the richest deposits delivering true bonanza grades for silver and gold1.
  • Drill hole LP-03 intersected 395 m of porphyry style mineralization grading 0.57% copper equivalent (0.51% Cu, 6.3 g/t Ag, and 0.017 g/t Au) including 108 m grading 0.75% copper equivalent (0.65% Cu, 7.7 g/t Ag and 0.034 g/t Au) starting from surface and with the hole ending in mineralization.
  • Exploration in 2021 is designed to expand known zones of mineralization and to advance a new NI 43-101 compliant resource estimate for the central porphyry system.

Project History

The La Plata district has a long and rich history of mining with the first silver deposits discovered in the 1700s by Spanish explorers. High-grade silver and gold production has been documented from the 1870s through the early 1940s from vein structures, replacement bodies and breccia zones at over 90 individual mines and prospects1. From the 1950s to 1970s, major miners including Rio Tinto (Bear Creek) and Freeport-McMoRan (Phelps Dodge) explored in the La Plata district focusing on the significant potential for bulk-tonnage disseminated and stockwork hosted mineralization2. Freeport-McMoRan retained ownership of claims in the district until 2002 when they sold their holdings to the current underlying vendors during the lows of the last metal price cycle.

A total of 54 drill holes totaling 14,400 m have been drilled on the property since the 1950s which confirm the presence of large-scale, multi-phase porphyry system with significant silver, gold and copper (see Table 1). This large-scale mineralized system is associated with a 10 km2 strongly magnetic signature with intense hydrothermal alteration.

Metallic Minerals is the first company to complete significant exploration on the La Plata project in nearly 50 years applying modern technologies and deposit modeling techniques. The Company sees the potential to rapidly extend the size of the known mineralized system and to identify and expand the higher-grade zones within the broader porphyry and epithermal mineralized zones.

Fieldwork completed by Metallic Minerals at La Plata to date has focused on resampling of drill core and underground sampling, surface mapping, and soil sampling. In addition, the Company has flown airborne resistivity and magnetics, completed a preliminary ground-based induced polarization survey and analysis of multi-spectral remote sensing data to establish mineralized anomalies and domains for the various styles of mineralization. This work has identified at least 25 anomalous targets within four broader target zones showing excellent potential to extend resources outside of the main historically recognized mineralized areas.

Allard Zone

Drilling to date on the Allard zone within the central porphyry system has defined a northeast trending zone of copper-silver-gold mineralization that begins at surface and continues to a depth of at least 850 m and more than a kilometer of strike. Recent underground chip channel sampling by Metallic Minerals within the Allard tunnel has confirmed a true width of 98.2 m grading 0.55% Cu Eq. across the zone including 61.6 m grading 0.65% Cu Eq. Historical drill hole LP-03 intersected 395 m of porphyry style mineralization grading 0.57% copper equivalent (0.51% Cu, 6.3 g/t Ag, and 0.017 g/t Au) including 108 m grading 0.75% copper equivalent (0.65% Cu, 7.7 g/t Ag and 0.034 g/t Au) starting at surface with the hole ending in mineralization.

Copper Hill Zone

Copper Hill is one of several additional parallel zones of copper and precious metals mineralization have been intersected in drilling, located 1.5 km to the southeast of the Allard zone it is also associated with significant platinum and palladium mineralization. The Company completed systematic analyses of unsampled core from the Copper Hill target area which returned significant results in an area with little previous drilling. Two zones of copper and precious metals mineralization were encountered in this drilling with an upper zone grading 0.27% Cu Eq. over 207 m and a lower zone of mineralization grading 0.44% Cu Eq. over 44 m with associated gold, platinum, and palladium mineralization. The Copper Hill target area represents a significant platinum group element-enriched copper mineralized target more than a kilometer vertically below the high-grade surface mining at the Copper Hill prospect and is completely outside of the historic resource area.

Figure 1– La Plata Long Section

Greg Johnson, President and CEO of Metallic Minerals, stated, “Metallic is the first company to complete significant exploration on the La Plata silver-gold-copper project in nearly 50 years and we are very excited to be kicking off this inaugural drill campaign. Our work to date has confirmed the multi-kilometer scale of the mineralized porphyry and epithermal system at La Plata through surface sampling, geophysics and satellite based remote sensing. This initial work has demonstrated the potential for the La Plata system to be much larger than previously recognized, with excellent potential to expand zones of known mineralization and to make new discoveries. We have begun 3D modelling of drilling and geophysical data with the objective of advancing towards a NI 43-101 compliant resource estimate for the project. We look forward to providing additional updates on drilling and modelling work in coming weeks and months at La Plata, as well as updates from our on-going work on the high-grade Keno Silver project and alluvial projects in the Klondike Gold district.”

Table 1 – Highlight significant mineralized drill and underground sample results from La Plata porphyry system

Hole IDFrom mTo mWidthCuEq.%Cu %Au g/tAg g/tPt g/tPd g/t
LP-010.0854.4854.41, 20.2612
Including573.9828.4254.51, 20.4112
Including623.0638.215.20.450.360.0346.863,5
Including743.7764.420.71, 21.1512
LP-031.5396.8395.30.560.5116.263, 5
Including1.5109.1107.60.720.6517.693, 5
Including172.8199.927.10.860.76111.543, 5
LP-041.5304.8303.30.440.4014.683, 5
Including4.6102.898.20.740.6915.743, 5
Including69.5102.733.20.940.8618.703, 5
C-011.1416.9415.81, 20.2612
Including299.336363.71, 20.4212
CA-030.0304.8304.81, 20.3912
HEN-02076.476.40.50.310.2294.355
HEN-040.091.991.90.760.360.5205.505
95-1680.2887.5207.30.270.210.0302.140.030.025
995.21039.444.20.440.150.0301.460.140.105
1005.91027.221.30.50.210.0472.050.190.165
Allard UG48.6146..898.20.550.460.0304.764, 5
Including51.7113.361.60.650.550.0305.554, 5

Table notes: 1 – incomplete gold assay data; 2 – incomplete silver assay data; 3 – gold and silver assay data from sample composites 6.1 to 12.2 m in length; 4 – Allard tunnel sawn channel samples collected in 2020; 5 – Cu Eq. % calculated using $3.25 lbs. Cu, $1,650/oz Au, $20/oz Ag, $1,000/oz Pt and $2,000/oz Pd in US$.

OTC Metals and Mining Virtual Conference

Metallic Minerals will be presenting at the upcoming Green Energy and Precious Metals Investor Conference hosted by OTC Markets on July 29 at 2:30pm ET. Chairman & CEO, Greg Johnson, will provide a comprehensive overview of the Company, including an update on 2021 exploration activities to date and upcoming newsflow, followed by a Q&A. To register, click here.

Foot notes: 1) Eckel, USGS Prof Paper 219, Geology and Ore Deposits of the La Plata Mining District, 1949; 2) Bear Creek Mining (now Rio Tinto), Humble Oil (now Exxon) and Phelps Dodge (now Freeport-McMoRan) company reports; 3) Christoffersen, Geological report on the Allard deposit, La Plata Mining District, Durango, Colorado, 2005.

About Metallic Minerals

Metallic Minerals Corp. is a growth-stage exploration company, focused on high-grade silver and gold projects in underexplored, brownfields mining districts of North America. Our objective is to create shareholder value through a systematic, entrepreneurial approach to exploration in the Keno Hill silver district, La Plata silver-gold-copper district, and Klondike gold district through new discoveries and advancing resources to development. Metallic Minerals has consolidated the second-largest land position in the historic Keno Hill silver district of Canada’s Yukon Territory, directly adjacent to Alexco Resource Corp’s operations, with nearly 300 million ounces of high-grade silver in past-production and current M&I resources. In addition, exploration at the recently acquired La Plata silver-gold-copper project in southwestern Colorado is targeting a silver and gold-enriched copper porphyry and adjacent high-grade silver and gold epithermal systems. The Company also continues to add new production royalty leases on its holdings in the Klondike gold district in the Yukon. All three districts have seen significant mineral production and have existing infrastructure, including power and road access. Metallic Minerals is led by a team with a track record of discovery and exploration success on several major precious and base metal deposits, as well as having large-scale development, permitting and project financing expertise.

About the Metallic Group of Companies

The Metallic Group is a collaboration of leading precious and base metals exploration companies, with a portfolio of large, brownfields assets in established mining districts adjacent to some of the industry’s highest-grade producers of silver and gold, platinum and palladium, and copper. Member companies include Metallic Minerals in the Yukon’s high-grade Keno Hill silver district and La Plata silver-gold-copper district of Colorado, Group Ten Metals in the Stillwater PGM-nickel-copper district of Montana, and Granite Creek Copper in the Yukon’s Minto copper district. The founders and team members of the Metallic Group include highly successful explorationists formerly with some of the industry’s leading explorer/developers and major producers. With this expertise, the companies are undertaking a systematic approach to exploration using new models and technologies to facilitate discoveries in these proven, but under-explored, mining districts. The Metallic Group is headquartered in Vancouver, BC, Canada, and its member companies are listed on the Toronto Venture, US OTC, and Frankfurt stock exchanges.

FOR FURTHER INFORMATION, PLEASE CONTACT:

Website: mmgsilver.com

Email: cackerman@mmgsilver.com Toll Free: 1-888-570-4420
Phone: 604-629-7800

Forward-Looking Statements

Forward Looking Statements: This news release includes certain statements that may be deemed “forward-looking statements”. All statements in this release, other than statements of historical facts including, without limitation, statements regarding potential mineralization, historic production, estimation of mineral resources, the realization of mineral resource estimates, interpretation of prior exploration and potential exploration results, the timing and success of exploration activities generally, the timing and results of future resource estimates, permitting time lines, metal prices and currency exchange rates, availability of capital, government regulation of exploration operations, environmental risks, reclamation, title, and future plans and objectives of the company are forward-looking statements that involve various risks and uncertainties. Although Metallic Minerals believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in the forward-looking statements. Forward-looking statements are based on a number of material factors and assumptions. Factors that could cause actual results to differ materially from those in forward-looking statements include failure to obtain necessary approvals, unsuccessful exploration results, changes in project parameters as plans continue to be refined, results of future resource estimates, future metal prices, availability of capital and financing on acceptable terms, general economic, market or business conditions, risks associated with regulatory changes, defects in title, availability of personnel, materials and equipment on a timely basis, accidents or equipment breakdowns, uninsured risks, delays in receiving government approvals, unanticipated environmental impacts on operations and costs to remedy same, and other exploration or other risks detailed herein and from time to time in the filings made by the companies with securities regulators. Readers are cautioned that mineral resources that are not mineral reserves do not have demonstrated economic viability. Mineral exploration and development of mines is an inherently risky business. Accordingly, the actual events may differ materially from those projected in the forward-looking statements. For more information on Group Ten and the risks and challenges of their businesses, investors should review their annual filings that are available at www.sedar.com

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

SOURCE: Metallic Minerals Corp.

Categories
Junior Mining Precious Metals Rover Metals

Rover Metas | Recap: Early Results – Summer 2021 Phase 2 Exploration at Cabin Gold Project

Vancouver, British Columbia – (July 13, 2021) – Rover Metals Corp. (TSXV: ROVR) (OTCQB: ROVMF) (FRA:4X0) (“Rover” or the “Company”) Rover has now received its first batch of rush assays for its first diamond drill hole CL-21-10 from its summer campaign. Rover is reporting an average grade of 5.71 g/t Au over 3.4 meters (true width). The Company is still waiting on assays for over 10 meters of hole CL-21-10. The reported grades are 90% higher than historic hole DDH-88-61 that was drilled at a similar location in the Beaver Zone in the 1980s. New hole CL-21-10 is a 400 meter step-out to the previously defined Arrow Zone that reported 32 meters of 13.6 g/t Au in Q4-2020.

Judson Culter, CEO of Rover Metals states, “the Phase 2 Exploration Drill Program was planned to target historic zones on the Cabin Gold property that carried sulfide rich historic results. We’re very pleased that the preliminary results of our program at the historic Beaver Zone are proving that high-sulfides continue to be associated with high-grade gold. The fact that we continue to increase the average gold grades across the property shows the exploration potential of the Cabin Gold Project. Additionally, we’re reporting true width intercepts of 3.4 meters at hole CL-21-10 due to the angle of the sulfide intercepts. It’s still early in the program, and we remain very optimistic on defining an additional zone comparable to the Arrow Zone. The historic Andrew South Zone is also being targeted in this summer’s drill program.”

For further information, please contact:
Email: info@rovermetals.com
Phone: +1 (778) 754-2617

Statement Regarding Forward-Looking Information

This news release contains statements that constitute “forward-looking statements.” Such forward-looking statements involve known and unknown risks, uncertainties and other factors that may cause Rover’s actual results, performance or achievements, or developments in the industry to differ materially from the anticipated results, performance or achievements expressed or implied by such forward-looking statements. Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by the words “expects,” “plans,” “anticipates,” “believes,” “intends,” “estimates,” “projects,” “potential” and similar expressions, or that events or conditions “will,” “would,” “may,” “could” or “should” occur. There can be no assurance that such statements be prove to be accurate. Actual results and future events could differ materially from those anticipated in such statements, and readers are cautioned not to place undue reliance on these forward-looking statements. Any factor could cause actual results to differ materially from Rover’s expectations. Rover undertakes no obligation to update these forward-looking statements in the event that management’s beliefs, estimates or opinions, or other factors, should change.

THE FORWARD-LOOKING INFORMATION CONTAINED IN THIS NEWS RELEASE REPRESENTS THE EXPECTATIONS OF THE COMPANY AS OF THE DATE OF THIS NEWS RELEASE AND, ACCORDINGLY, IS SUBJECT TO CHANGE AFTER SUCH DATE. READERS SHOULD NOT PLACE UNDUE IMPORTANCE ON FORWARD-LOOKING INFORMATION AND SHOULD NOT RELY UPON THIS INFORMATION AS OF ANY OTHER DATE. WHILE THE COMPANY MAY ELECT TO, IT DOES NOT UNDERTAKE TO UPDATE THIS INFORMATION AT ANY PARTICULAR TIME EXCEPT AS REQUIRED IN ACCORDANCE WITH APPLICABLE LAWS.

Categories
Base Metals Energy Granite Creek Copper Junior Mining

Granite Creek Copper Completes IP Survey and Launches Phase 2 of Expanded Drill Program at Carmacks Copper-Gold Project in Yukon, Canada

July 14, 2021

Vancouver, B.C., Granite Creek Copper Ltd. (TSX.V: GCX | OTCQB: GCXXF) (“Granite Creek” or the “Company”) is pleased to announce that Simcoe Geophysics has completed a 20.8 line kilometer (“km”) induced polarization (IP) survey on the Company’s Carmacks North target area. Preliminary results from the survey have identified several near surface chargeability anomalies that have been prioritized as trenching and reverse circulation (“RC”) drill targets for Phase 2 of the 2021 season. 

Granite Creek further announces the completion of Phase 1 of its 2021 drilling program, which consisted of 19 holes totalling 6355 meters of diamond drilling on Zones 1, 2000S and 13 of the Carmacks deposit. The first tranche of assays from Phase 1 are expected very soon and will be released in batches as received and reviewed by the Company. With this initial stage of drilling completed, Vision Quest Exploration, based in Whitehorse, Yukon, has mobilized a reverse circulation (“RC”) drill rig to the property and commenced Phase 2 drilling which is expected to consist of approximately 3000 meters. 

Given the early start to the 2021 field season and encouraging early indications of success, Granite Creek has made the decision to expand the previously defined 10,000-meter program by adding a third phase which is expected to add an additional 2700 meters of diamond drilling to the overall program. Launch date for Phase 3 is tentatively targeted for early September, with potential to bring that forward to late August. The Company will provide further guidance in this regard in the ensuing weeks.

Granite Creek President & CEO, Tim Johnson, commented, “We are extraordinarily pleased with the progress we have made to date in advancing the Carmacks project. It is a testament to the strength and dedication of our team that we have been able to maintain a very aggressive pace as we move towards an updated 43-101 resource estimate and subsequent economic assessment. This drill campaign has been a showcase of professionalism from our site teams and contractors, and we are very much looking forward to carrying that momentum ahead through Phase 2 and the newly announced Phase 3. In total, we are now expecting to complete over 13,000 meters of drilling, data from which will be incorporated into the new resource update being targeted for Q4.”

Carmacks North Target Area

The Carmacks North Target area is comprised of Zones A-D, as well as additional targets currently being developed. Prior to the Granite Creek’s inaugural drill program completed last fall (see news release dated Feb 11, 2021), little work had been completed on the area since 1980. Historical high-grade copper intercepts of up to 2.52% Cu, 1.64 g/t Au, 12.84 g/t Ag over 19.81 meters were successfully followed up with intercepts of 4.31% Cu, 3.41 g/t Au, 23.78 Ag over 4.36 meters and 0.97% Cu, 0.32 g/t Au, 2.84 g/t Ag over 25 meters. Recognizing the discovery potential in the target area the Company is pleased to deploy modern, advanced exploration tools such as the Alpha Induced Polarization survey employed by Simcoe Geophysics. Capable of measuring the chargeability and resistivity of the rock up to 1000m below the surface these types of surveys greatly improves the chance of success with drilling. The use of a rapidly deployable drill rig such as the RC rig being supplied by Vision Quest along with excavator trenching allows for testing of multiple high priority targets during a single field season. 

OTCQB Metals and Mining Virtual Conference 

Granite Creek Copper will be presenting at the upcoming Green Energy and Precious Metals Investor Conference hosted by OTC Markets on July 29 at 1:30pm ET. President & CEO, Tim Johnson, will provide a comprehensive overview of the Company, including an update on 2021 exploration activities to date and upcoming newsflow. To register, click here

COVID-19 Protocols

Granite Creek has worked closely with the Yukon government to develop a COVID-19 safety plan that enables the Company to implement an effective work plan while maintaining the highest degree of safety of our workers and surrounding communities. The Company strictly adheres to mandates put in place by health authorities at the Federal and Territorial government level and holds the health and safety of our workers, and the citizens of the communities in which we work, in the highest regard. 

Figure 1: Oblique view of the UBC 2D DCIP inversion sections of the chargeability from 20.8 km of IP collected by Simcoe Geophysics over Carmacks North

Figure 2: 2D IP chargeability model of Line 3

About Granite Creek Copper

Granite Creek, a member of the Metallic Group of Companies, is a Canadian exploration company focused on the 176 square kilometer Carmacks project in the Minto copper district of Canada’s Yukon Territory. The project is on trend with the high-grade Minto copper-gold mine, operated by Minto Explorations Ltd, to the north and features excellent access to infrastructure with the nearby paved Yukon Highway 2, along with grid power within 12 km. More information about Granite Creek Copper can be viewed on the Company’s website at www.gcxcopper.com.

FOR FURTHER INFORMATION PLEASE CONTACT:

Timothy Johnson, President & CEO
Telephone:         1 (604) 235-1982
Toll Free:             1 (888) 361-3494
E-mail:       info@gcxcopper.com
Website:    www.gcxcopper.com
Metallic Group:  www.metallicgroup.ca   

Qualified Person

Ms. Debbie James, P.Geo., a qualified person for the purposes of National Instrument 43-101, has reviewed and approved the technical disclosure contained in this news release.

Forward-Looking Statements
This news release includes certain statements that may be deemed “forward-looking statements”. All statements in this release, other than statements of historical facts including, without limitation, statements regarding potential mineralization, historic production, estimation of mineral resources, the realization of mineral resource estimates, interpretation of prior exploration and potential exploration results, the timing and success of exploration activities generally, the timing and results of future resource estimates, permitting time lines, metal prices and currency exchange rates, availability of capital, government regulation of exploration operations, environmental risks, reclamation, title, and future plans and objectives of the company are forward-looking statements that involve various risks and uncertainties. Although Granite Creek Copper believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in the forward-looking statements. Forward-looking statements are based on a number of material factors and assumptions. Factors that could cause actual results to differ materially from those in forward-looking statements include failure to obtain necessary approvals, unsuccessful exploration results, changes in project parameters as plans continue to be refined, results of future resource esti-mates, future metal prices, availability of capital and financing on acceptable terms, general economic, market or business conditions, risks associated with regulatory changes, defects in title, availability of personnel, materials and equipment on a timely basis, accidents or equipment breakdowns, uninsured risks, delays in receiving government approvals, unanticipated environmental impacts on operations and costs to remedy same, and other exploration or other risks detailed herein and from time to time in the filings made by the companies with securities regulators. Readers are cautioned that mineral resources that are not mineral reserves do not have demonstrated economic viability. Mineral exploration and development of mines is an inherently risky business. Accordingly, the actual events may differ materially from those projected in the forward-looking statements. For more infor-mation on Granite Creek Copper and the risks and challenges of their businesses, investors should review their annual filings that are available at www.sedar.com.


Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Categories
Junior Mining Rover Metals

Rover Provides Update on Phase 2 Exploration at Cabin Gold Project, NT, Canada

VANCOUVER, British Columbia, July 13, 2021 (GLOBE NEWSWIRE) — Rover Metals Corp. (TSXV: ROVR) (OTCQB: ROVMF) (FRA:4X0) (“Rover” or the “Company”) further to its release of June 8, 2021, announcing the start of its Phase 2 Exploration Program at its 100% owned Cabin Gold Project, Rover has now received its first batch of rush assays for diamond drill hole CL-21-10 and is reporting an average grade of 5.71 g/t Au over 3.4 meters (true width). The Company is still waiting on assays for over 10 meters of hole CL-21-10. The reported grades are 90% higher than historic hole DDH-88-61 that was drilled at a similar location in the Beaver Zone in the 1980s.

Sample #FromToInterval (m)Au g/t
V74921945.645.90.322.4
V74921745.946.40.55.4
V74922146.446.70.38.33
V74922246.747.20.51.43
V74922347.247.70.50.42
V74922447.748.20.51.45
V74922548.2490.87.3

The Beaver Zone
The current drill holes at the historic Beaver Zone are 400 meter step-out holes to the Arrow Zone (formerly the Cabin Lake Zone) that reported 32 meters of 13.6 g/t Au in Q4-2020, with >30% sulfides, resulting in the Arrow Zone ore shoot discovery. The preliminary results coming from the Beaver Zone show that high-grade gold continues to be associated with high sulfide values. The Company is also pleased to announce that the core logging of new drill hole CL-21-13 (assays still at lab) has reported >30% sulfides, shearing, and quartz flooding.

Judson Culter, CEO of Rover Metals states, “the Phase 2 Exploration Drill Program was planned to target historic zones on the Cabin Gold property that carried sulfide rich historic results. We’re very pleased that the preliminary results of our program at the historic Beaver Zone are proving that high-sulfides continue to be associated with high-grade gold. The fact that we continue to increase the average gold grades across the property shows the exploration potential of the Cabin Gold Project. Additionally, we’re reporting true width intercepts of 3.4 meters at hole CL-21-10 due to the angle of the sulfide intercepts. It’s still early in the program, and we remain very optimistic on defining an additional zone comparable to the Arrow Zone. The historic Andrew South Zone is also being targeted in this summer’s drill program.

Rover is holding an informative webinar to discuss its exploration program on July 22, 2021 at 11:00am PST (Vancouver time) hosted by RBMG. Please contact Paul Lampoutis plampoutis@rbmilestone.com if you wish to register for this event.”

Technical Information
Drill core is cut with half sent to ALS Global Laboratories (ALS) for crushing to <2 mm with 250 g split pulverized to -75 µm (200#). ALS is an ISO 17025 accredited laboratory. A 30g change is fire assayed and analysed using AAS finish for Gold. Select samples with visible gold or high-grade mineralization are assayed by metallic screen prep and fire assay on a 1 kg sample.

True thickness of the intervals reported herein have not been calculated, therefore, all intervals are reported as drill core intervals and should be considered apparent thicknesses. All historic and 2021 program gold averages are reported at weighed averages.

Technical information in this news release has been approved by Raul Sanabria, M.Sc., P.Geo., Technical Advisor and shareholder of Rover Metals Corp. and a Qualified Person for the purposes of National Instrument 43-101.

About Rover Metals
Rover is a precious metals exploration company specialized in North American precious metal resources, that is currently advancing the gold potential of its existing projects in the Northwest Territories of Canada (60th parallel). The Company has recently re-branded, and has a new corporate logo, and has updated the look and feel of its website, and corporate documents.

You can follow Rover on its social media channels:

Twitter: https://twitter.com/rovermetals

LinkedIn: https://www.linkedin.com/company/rover-metals/

Facebook: https://www.facebook.com/RoverMetals/

for daily company updates and industry news, and

YouTube: https://www.youtube.com/channel/UCJsHsfag1GFyp4aLW5Ye-YQ?view_as=subscriber

for corporate videos.

Website: https://www.rovermetals.com/

ON BEHALF OF THE BOARD OF DIRECTORS
“Judson Culter”
Chief Executive Officer and Director

For further information, please contact:
Fern Turner
Email: fern@rovermetals.com
Phone: +1 (778) 754-2617

Statement Regarding Forward-Looking Information
This news release contains statements that constitute “forward-looking statements”. Such forward-looking statements involve known and unknown risks, uncertainties and other factors that may cause Rover’s actual results, performance or achievements, or developments in the industry to differ materially from the anticipated results, performance or achievements expressed or implied by such forward-looking statements. Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by the words “expects,” “plans,” “anticipates,” “believes,” “intends,” “estimates,” “projects,” “potential” and similar expressions, or that events or conditions “will,” “would,” “may,” “could” or “should” occur. There can be no assurance that such statements be prove to be accurate. Actual results and future events could differ materially from those anticipated in such statements, and readers are cautioned not to place undue reliance on these forward-looking statements. Any factor could cause actual results to differ materially from Rover’s expectations. Rover undertakes no obligation to update these forward-looking statements in the event that management’s beliefs, estimates or opinions, or other factors, should change.

THE FORWARD-LOOKING INFORMATION CONTAINED IN THIS NEWS RELEASE REPRESENTS THE EXPECTATIONS OF THE COMPANY AS OF THE DATE OF THIS NEWS RELEASE AND, ACCORDINGLY, IS SUBJECT TO CHANGE AFTER SUCH DATE. READERS SHOULD NOT PLACE UNDUE IMPORTANCE ON FORWARD-LOOKING INFORMATION AND SHOULD NOT RELY UPON THIS INFORMATION AS OF ANY OTHER DATE. WHILE THE COMPANY MAY ELECT TO, IT DOES NOT UNDERTAKE TO UPDATE THIS INFORMATION AT ANY PARTICULAR TIME EXCEPT AS REQUIRED IN ACCORDANCE WITH APPLICABLE LAWS.

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OF THIS RELEASE.

Categories
Base Metals Energy Junior Mining Nevada Copper

Nevada Copper Announces Further Progress with Underground Operations and Strategic Project Development

July 12, 2021View PDF

Yerington, NV – July 12, 2021 – Nevada Copper Corp. (TSX: NCU) (OTC: NEVDF) (“Nevada Copper” or the “Company”) is pleased to provide an update regarding the ramp-up of the Underground Mine and development activities for the Open Pit project at its 100%-owned, fully-permitted Pumpkin Hollow Project in Nevada.

Production Ramp-Up Update

  • Safe and effective penetration of dike structure: The Company is in the process of safely completing the dike crossing. As reported on May 17, 2021, ground and hydrological conditions associated with the dike reduced development rates for a temporary period while traversing the dike to allow for grouting and ground control. With the completion of the dike crossing within the next two weeks, the Company expects to see lateral development rates increase back to planned rates this month.
  • Underground ventilation commissioned on-schedule: All underground ventilation fans were installed and commissioned during May, as planned. The final surface fans continue to be planned for delivery in Q3 2021 and commissioning in Q4 2021. Consequently, achievement of steady-state production continues to be expected in Q4 2021.
  • Successful completion of process plant C5 Testing: During June, Sedgman successfully completed C5 testing of the processing plant for grind size and moisture.

Mike Ciricillo, Nevada Copper’s Chief Executive Officer, stated:

“I am pleased with the continued progress with the ramp-up from Pumpkin Hollow. The safe penetration of the dike and commissioning of the underground ventilation system are significant de-risking steps and facilitate increasing development and production rates, as we progress to steady-state. The longer-term mine planning work being advanced indicates future potential upside for both Underground and Open Pit projects.”

Project Development

  • Underground Mine Planning supports potential for higher long-term production rates: As part of its project development objectives reported on March 1, 2021, the Company has progressed its life-of-mine planning aimed at operating its underground mine at an ultimate production rate in excess of the originally contemplated 5,000 tons per day rate. Mine planning work during Q2 2021 further supports the potential for the mine, once ramped-up to steady-state, to operate at higher long-term rates of 6,500 tons per day milled, increasing long-term annual copper production. This additional production capacity would also support accelerated mining of the significant additional underground copper resources that exist over and above the current underground reserve. Further engineering work will be undertaken during H2 2021 to support the potential for a higher long-term production rate from the underground operation.
  • Open Pit Solar Power Study indicates potential to further reduce Open Pit power costs: The Company has also progressed the planned feasibility studies for a potential solar project, with renewables consulting group Sprout Associates, with the following initial conclusions. Further updates will be provided upon completion of the next phase of study work:
    • Pumpkin Hollow benefits from ample sun and land to support a large solar project with the capacity to meet a significant portion of the Open Pit project’s power requirements;
    • The solar potential at the site is up to 200MW;
    • Already low grid power costs in Nevada could be materially further reduced through an on-site solar plant; and
    • A third-party solar project provides an option to remove upfront power infrastructure costs from the Open Pit project.

Balance Sheet Update

  • Further to the Company’s announcement on May 17, 2021, Pala Investments Limited has agreed to provide additional financing of US$25 million through a promissory note (in addition to the fully drawn existing US$30 million credit facility), providing additional liquidity for the ramp-up and addressing the reduced development rates associated with the dike grouting program. The Company has drawn US$15 million under the promissory note, with subsequent draws available at the Company’s option, subject to agreed use of proceeds. The promissory note has a maturity date of June 30, 2022 and bears interest at 8% per annum on amounts drawn. The promissory note was reviewed and approved by the independent members of the Company’s board of directors. In addition, US$9 million remains available to draw under the Company’s working capital facility with its offtake partner, Concord Resources Limited.
  • The Company has received proceeds of CAD$1.4 million for exercise of warrants so far in 2021. The Company has the potential to receive a further CAD$65 million of warrant proceeds should all the outstanding warrants expiring in January 2022 with an exercise price of CAD$0.20 (the “January 2022 Warrants”) be exercised prior to maturity. In addition to the January 2022 Warrants, a further CAD$34 million of warrant exercise proceeds may be received should the outstanding warrants expiring in July 2022 with an exercise price of CAD$0.22 be exercised in full prior to maturity.
  • The Company’s senior lender, KfW IPEX-Bank (“KfW”), has provided the Company with a 60-day extension to the project completion longstop date from June 30, 2021 to August 31, 2021, while the parties agree on a revised completion test and longstop date for the project. The Company will provide a further update once a revised project completion test and longstop date has been agreed with KfW. While the Company expects to agree on an appropriate revised date with KfW, there can be no assurance this will be achieved.
  • The Company continues to undertake near-term mine planning to incorporate the recent impact of the dike on development rates and other factors that have slowed the production ramp-up. It is possible that such mine plan updates may indicate higher operating costs and additional development capital and working capital requirements for the ramp-up than previously contemplated.

Qualified Persons

The information and data in this news release was reviewed by Greg French, C.P.G., and Norm Bisson, P.Eng., for Nevada Copper, who are non-independent Qualified Persons within the meaning of NI 43-101.

About Nevada Copper

Nevada Copper (TSX: NCU) is a copper producer and owner of the Pumpkin Hollow copper project. Located in Nevada, USA, Pumpkin Hollow has substantial reserves and resources including copper, gold and silver. Its two fully permitted projects include the high-grade Underground Mine and processing facility, which is now in the production stage, and a large-scale Open Pit project, which is advancing towards feasibility status.

NEVADA COPPER CORP.

www.nevadacopper.com

Mike Ciricillo, President and CEO

For further information contact:
Rich Matthews, Investor Relations
Integrous Communications
rmatthews@integcom.us
+1 604 757 7179

Cautionary Language

This news release includes certain statements and information that constitute forward-looking information within the meaning of applicable Canadian securities laws. All statements in this news release, other than statements of historical facts are forward-looking statements. Such forward-looking statements and forward-looking information specifically include, but are not limited to, statements that relate to mine development plans, production and ramp-up plans and the expected timing and results thereof, equipment installation, and further discussions with KfW.

Often, but not always, forward-looking statements and forward-looking information can be identified by the use of words such as “plans”, “expects”, “potential”, “is expected”, “anticipated”, “is targeted”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates”, or “believes” or the negatives thereof or variations of such words and phrases or statements that certain actions, events or results “may”, “could”, “would”, “might” or “will” be taken, occur or be achieved. Forward-looking statements or information are subject to known or unknown risks, uncertainties and other factors which may cause the actual results and events to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements or information.

Forward-looking statements or information are subject to a variety of risks and uncertainties which could cause actual events or results to differ from those reflected in the forward-looking statements or information, including, without limitation, risks and uncertainties relating to: the ability of the Company to complete the ramp-up of the Underground Mine within the expected cost estimates and timeframe; requirements for additional capital and no assurance can be given regarding the availability thereof; the impact of COVID-19 on the business and operations of the Company; the state of financial markets; history of losses; dilution; adverse events relating to milling operations, construction, development and ramp-up, including the ability of the Company to address underground development and process plant issues; ground conditions; cost overruns relating to development, construction and ramp-up of the Underground Mine; loss of material properties; interest rates increase; global economy; limited history of production; future metals price fluctuations; speculative nature of exploration activities; periodic interruptions to exploration, development and mining activities; environmental hazards and liability; industrial accidents; failure of processing and mining equipment to perform as expected; labor disputes; supply problems; uncertainty of production and cost estimates; the interpretation of drill results and the estimation of mineral resources and reserves; changes in project parameters as plans continue to be refined; possible variations in ore reserves, grade of mineralization or recovery rates from management’s expectations and the difference may be material; legal and regulatory proceedings and community actions; accidents; title matters; regulatory approvals and restrictions; increased costs and physical risks relating to climate change, including extreme weather events, and new or revised regulations relating to climate change; permitting and licensing; volatility of the market price of the Company’s securities; insurance; competition; hedging activities; currency fluctuations; loss of key employees; other risks of the mining industry as well as those risks discussed in the Company’s Management’s Discussion and Analysis in respect of the year ended December 31, 2020 and in the section entitled “Risk Factors” in the Company’s Annual Information Form dated March 18, 2021. Should one or more of these risks and uncertainties materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those described in forward-looking statements or information. The forward-looking information and statements are stated as of the date hereof. The Company disclaims any intent or obligation to update forward-looking statements or information except as required by law.

The Company provides no assurance that forward-looking statements and information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements and information.