Categories
Base Metals Energy Junior Mining Metallic Group Precious Metals Stillwater Critical Minerals

Stillwater Critical Minerals Partners with Cornell University on Hydrometallurgy and Carbon Sequestration Initiatives for its Stillwater West Ni-PGE-Cu-Co + Au Project in Montana, USA

VANCOUVER, BC / ACCESSWIRE / February 14, 2023 / Stillwater Critical Minerals (TSX.V:PGE)(OTCQB:PGEZF)(FSE:5D32) (the “Company” or “SWCM”) is pleased to announce it has partnered with Cornell University under the MINER program, funded by the U.S. Department of Energy (“DOE”) via the Advanced Research Projects Agency program (“ARPA-E”). Test work, led by Dr. Greeshma Gadikota, will focus on novel hydrometallurgical techniques and carbon capture, with the objective of increasing the extraction of critical minerals using reduced energy for a carbon negative mining future.

Cornell University is the recipient of a federal grant from ARPA-E as part of a program entitled “Supercritical CO2-Based Mining for Carbon-Negative Critical Mineral Recovery”. Cornell University seeks to advance CO2-sourced hydrometallurgical pathways for recovering energy critical metals, including nickel, cobalt, platinum and palladium, coupled to the carbon mineralization of calcium and magnesium components to produce calcium and magnesium carbonates. Novel functional materials for the selective capture and recovery of these energy critical metals will be developed. Various sources for CO2 will be investigated including air for metal recovery coupled to carbon mineralization. These approaches will be specifically tuned to the mineralogy of the Company’s Stillwater West project in Montana.

Stillwater Critical Minerals, Tuesday, February 14, 2023, Press release picture
Stillwater Critical Minerals, Tuesday, February 14, 2023, Press release picture

Dr. Greeshma Gadikota

Dr. Greeshma Gadikota stated, “The U.S. imports the great majority of its energy critical metals from mines all over the world, leaving the U.S. quite vulnerable. Our research is all about decarbonizing the mining industry and developing an independent, domestic supply chain of these critical metals. It’s important for U.S. manufacturing, green energy, national security, and competitiveness.”

Relating to the Cornell University partnership, Company President and CEO, Michael Rowley, will join Dr. Gadikota at the ARPA-E MINER kick-off event in Austin, Texas on February 14 and 15, 2023. Other presenters and attendees include Tesla Motors, major mining companies, top US government officials and financial institutions. More information on the MINER program is available here: https://arpa-e.energy.gov/technologies/programs/miner.

Michael Rowley, Stillwater Critical Minerals President & CEO, stated, “We are very pleased to be selected as the industry partner for Dr. Gadikota’s cutting-edge work and to work closely with her team toward our shared vision of securing the future domestic supply of the critical minerals the US so urgently needs. Our Stillwater West project is rapidly advancing as a potential large-scale, low-carbon source of nickel, copper, cobalt, palladium, platinum and rhodium. Located in an active and expanding US mining district with a long history of critical minerals production and demonstrated world-class scale and grade, Stillwater West is on a very short list of assets with the potential to play a significant role in realizing the goals set out in the bipartisan Inflation Reduction Act, and other ongoing initiatives. It is our belief that mining can do more than supply minerals by conventional means, and that partnerships such as this are the path toward more sustainable practices.”

About Dr. Greeshma Gadikota

Dr. Greeshma Gadikota is an Assistant Professor and Croll Sesquicentennial Fellow in the School of Civil and Environmental Engineering with a field appointment in the Smith School of Chemical and Biomolecular Engineering at Cornell University. Dr. Gadikota directs the Sustainable Energy and Resource Recovery Group. She held postdoctoral research associate appointments at Princeton University and Columbia University, and a research associate appointment at the National Institute of Standards and Technology (NIST). Her PhD in Chemical Engineering and MS degrees in Chemical Engineering and Operations Research are from Columbia University. Her BS in Chemical Engineering is from Michigan State University. She is a recipient of the DOE, NSF and ARO CAREER Awards, Sigma Xi Young Investigator Award, Cornell Engineering Research Excellence Award, Inaugural Cornell Rising Women Innovator Award, and AICHE Sabic Award for Young Professionals from the Particle Technology Forum. Dr. Gadikota received her PhD in Chemical Engineering and earned her MS degrees in Chemical Engineering and Operations Research, from Columbia University. Her BS in Chemical Engineering is from Michigan State University.

Research Interests

With more than 80% of our energy resources recovered from the subsurface environments which requires about 50 billion cubic meters of fresh water and contributes to more than 75% of global CO2 emissions, our grand societal challenge lies in meeting our growing demand for energy and resources while reducing environmental impact. Addressing these earth-scale challenges requires us to develop novel technologies to engineer targeted physico-chemical interactions in complex engineered and natural environments. Enabling emergent technologies for a sustainable earth requires us to advance the cross-scale science of fluid-solid interactions in complex and extreme environments. With this perspective, our research is directed towards applications that involve (i) engineering the natural environment for sustainable energy and resource recovery and (ii) designing novel chemical pathways for advancing low carbon and negative emissions technologies.

About ARPA-E

The Advanced Research Projects Agency-Energy (ARPA-E advances high-potential, high-impact energy technologies that are too early for private-sector investment. ARPA-E awardees are unique because they are developing entirely new ways to generate, store, and use energy. ARPA-E projects have the potential to radically improve U.S. economic prosperity, national security, and environmental well-being. We focus on transformational energy projects that can be meaningfully advanced with a small amount of funding over a defined period of time. Our streamlined awards process enables us to act quickly and catalyze cutting-edge areas of energy research.

ARPA-E empowers America’s energy researchers with funding, technical assistance, and market readiness. Our rigorous program design, competitive project selection process, and active program management ensure thoughtful expenditures. ARPA-E Program Directors serve for limited terms to ensure a constant infusion of fresh thinking and new perspectives. To learn more visit: https://arpa-e.energy.gov/.

About Stillwater Critical Minerals Corp.

Stillwater Critical Minerals (TSX.V: PGE | OTCQB: PGEZF) is a mineral exploration company focused on its flagship Stillwater West Ni-PGE-Cu-Co + Au project in the iconic and famously productive Stillwater mining district in Montana, USA. With the recent addition of two renowned Bushveld and Platreef geologists to the team, the Company is well positioned to advance the next phase of large-scale critical mineral supply from this world-class American district, building on past production of nickel, copper, and chromium, and the on-going production of platinum group and other metals by neighboring Sibanye-Stillwater. Per an expanded NI 43-101 mineral resource estimate released January 2023, the Platreef-style nickel and copper sulphide deposits at Stillwater West contain 1.6 billion pounds of nickel, copper and cobalt, and 3.8 million ounces of palladium, platinum, rhodium, and gold, in a compelling suite of critical minerals and are open for expansion along trend and at depth.

Stillwater Critical Minerals also holds the high-grade Black Lake-Drayton Gold project adjacent to Treasury Metals’ development-stage Goliath Gold Complex in northwest Ontario, currently under an earn-in agreement with Heritage Mining, and the Kluane PGE-Ni-Cu-Co critical minerals project on trend with Nickel Creek Platinum‘s Wellgreen deposit in Canada‘s Yukon Territory.

Note 1: References to adjoining properties are for illustrative purposes only and are not necessarily indicative of the exploration potential, extent or nature of mineralization or potential future results of the Company’s projects.

Note 2: Magmatic Ore Deposits in Layered Intrusions-Descriptive Model for Reef-Type PGE and Contact-Type Cu-Ni-PGE Deposits, Michael Zientek, USGS Open-File Report 2012-1010.

FOR FURTHER INFORMATION, PLEASE CONTACT:

Michael Rowley, President, CEO & Director

Email: info@criticalminerals.com Phone: (604) 357 4790

Web: http://criticalminerals.com Toll Free: (888) 432 0075

Forward-Looking Statements

Forward Looking Statements: This news release includes certain statements that may be deemed “forward-looking statements”. All statements in this release, other than statements of historical facts including, without limitation, statements regarding potential mineralization, historic production, estimation of mineral resources, the realization of mineral resource estimates, interpretation of prior exploration and potential exploration results, the timing and success of exploration activities generally, the timing and results of future resource estimates, permitting time lines, metal prices and currency exchange rates, availability of capital, government regulation of exploration operations, environmental risks, reclamation, title, and future plans and objectives of the company are forward-looking statements that involve various risks and uncertainties. Although Stillwater Critical Minerals believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in the forward-looking statements. Forward-looking statements are based on a number of material factors and assumptions. Factors that could cause actual results to differ materially from those in forward-looking statements include failure to obtain necessary approvals, unsuccessful exploration results, changes in project parameters as plans continue to be refined, results of future resource estimates, future metal prices, availability of capital and financing on acceptable terms, general economic, market or business conditions, risks associated with regulatory changes, defects in title, availability of personnel, materials and equipment on a timely basis, accidents or equipment breakdowns, uninsured risks, delays in receiving government approvals, unanticipated environmental impacts on operations and costs to remedy same, and other exploration or other risks detailed herein and from time to time in the filings made by the companies with securities regulators. Readers are cautioned that mineral resources that are not mineral reserves do not have demonstrated economic viability. Mineral exploration and development of mines is an inherently risky business. Accordingly, the actual events may differ materially from those projected in the forward-looking statements. For more information on Stillwater Critical Minerals and the risks and challenges of their businesses, investors should review their annual filings that are available at www.sedar.com.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

SOURCE: Stillwater Critical Minerals

Categories
Base Metals Energy Junior Mining Precious Metals

Bravo Discovers New Nickel-rich Zone in Luanga’s Central Sector and Extends Footprint of Nickel/Copper-rich Zone in Luanga’s North Sector

Highlights include 27.7m @ 0.62g/t PGM+Au, 0.62% Ni (Including 4.6m @ 1.12g/t PGM+Au plus 1.12% Ni),

And: 25.3m @ 1.14g/t PGM+Au, 0.42% Ni, 0.34% Cu (Including 3.4m @ 2.12g/t PGM+Au, 0.84% Ni, 0.34% Cu)

VANCOUVER, BC, Feb. 14, 2023 /CNW/ – Bravo Mining Corp. (TSXV: BRVO) (OTCQX: BRVMF), (“Bravo” or the “Company“) announced that it has received assay results from eight diamond drill holes (“DDH”) in the Central and North Sectors  highlighting the nickel sulphide potential of its 100% owned Luanga palladium + platinum + rhodium + gold + nickel project (“Luanga” or “Luanga PGM+Au+Ni Project“), located in the Carajás Mineral Province, state of Pará, Brazil. Two DDH in the Central Sector have identified a new zone and style of nickel sulphide mineralization. Follow up drilling to the previously announced massive sulphide intercept in the North Sector (August 16th, 2022 news release) has intersected higher-grade nickel sulphide 50m to the north and south, with evidence indicating potential extensions toward the south.

“Today’s results demonstrate the potential for higher-grade nickel ± copper sulphides at Luanga, underlie the existing ~8.1km strike of PGM+Au+Ni mineralization intersected in shallow historic drilling,” said Luis Azevedo, Chairman and CEO of Bravo. “We are at the early stages of understanding the distribution of, and controls on, this potential new style of nickel ± copper sulphide mineralization, which has now been intersected in both the North and Central Sectors,” he said. “We are very positive about the potential below Luanga and have deployed geophysical tools aimed at detecting this style of mineralization. Work is continuing and aims to drill test future geophysical targets in 2023.”

Highlights Include:

  • Follow up, step-out drilling to the massive nickel/copper sulphides intercepted in DDH22LU047 (August 16th, 2022 news release) intersected nickel/copper sulphides along strike, 50m to the north and to the south. Electromagnetics (EM) has identified conductors trending to the south where surface EM is ongoing.
  • Drilling in the Central Sector of Luanga has intersected a new zone and style of nickel sulphide mineralization, potentially magmatic nickel sulphide mineralization. It occurs within a different rock-type than the PGM+Au+Ni mineralization at Luanga – further increasing the exploration prospectivity of Luanga. EM surveying is expected to begin shortly.
  • A noticeable change in PGM chemistry (significantly higher rhodium to palladium ratio) has been identified in most assay results from both nickel sulphide zones. This also points to a new style of mineralization and provides another possible vector into higher nickel sulphide zones.
HOLE-IDFrom(m)To(m)Thickness
(m)
Pd(g/t)Pt(g/t)Rh(g/t)Au (g/t)PGM + Au (g/t)Ni (% Sulphide)Cu (%)Sector
DDH22LU039128.2155.927.70.400.100.110.010.620.42Cent.
Including128.2132.84.60.740.120.250.011.121.12Cent.
Including130.2131.21.01.080.250.510.011.852.08Cent.
DDH22LU04949.674.925.30.680.220.130.121.140.400.23North
Including66.970.33.41.180.520.290.122.120.840.34North
DDH22LU052151.0158.17.10.690.040.300.111.130.820.45North
Including151.0153.82.80.760.020.390.011.181.090.22North
DDH22LU061102.4103.61.20.550.040.310.151.051.18Cent.
DDH22LU073136.9155.818. 90.960.290.020.021.300.41North
Including150.8153.83.02.570.500.040.023.141.15North
DDH22LU077169.4175.56.10.570.040.330.020.960.63North
Including169.4171.31.91.330.050.84*0.042.27*1.47North
Including170.6171.30.71.540.04>1.0*0.012.59*2.27North
Notes:  All ‘From’, ‘To’ depths, and ‘Thicknesses’ are downhole.
             All intercepts were in fresh rock.
             Given the orientation of the hole and the mineralization, the intercepts are estimated to be 85% to 100% of true thickness.
             * Includes Rh >1.00g/t result. Overlimit analyses pending.
             North = North Sector. Cent. = Central Sector.
           ** Bravo’s nickel grades are sulphide nickel, and do not include non-recoverable silicate nickel, unlike historic total nickel assays.

Central Sector Magmatic Nickel Sulphide Exploration Upside

Drilling in the Central Sector (holes DDH22LU039 and DDH22LU061) identified a second zone of more concentrated magmatic sulphides, a style of mineralization not previously observed at Luanga in historic drilling. This style of mineralization features net-textures typical of magmatic nickel sulphide mineralization (Figure 1).

Figure 1: Core photos from Central Sector (039) and North Sector (049 and 052) with nickel ± copper sulphide mineralization. (CNW Group/Bravo Mining Corp.)
Figure 1: Core photos from Central Sector (039) and North Sector (049 and 052) with nickel ± copper sulphide mineralization. (CNW Group/Bravo Mining Corp.)

The Central Sector higher-grade magmatic nickel sulphide mineralization appears to be coincident with the main Luanga PGM mineralization but appears to have increasing concentrations of nickel sulphides to depth, while historic nickel-in-soil geochemistry (Figure 2) indicates that nickel sulphide mineralization may be gently diverging away from the strike of the PGM+Au mineralization. This style of mineralization has only been identified in this area of the Luanga deposit to date and is hosted in the basal sequence of harzburgites (ultramafic rocks) that underlie the dominant Luanga orthopyroxenite PGM+Au host rock.

Surface EM completed by Bravo in late 2022 is being extended to the southeast to look deeper into the basal harzburgite sequence (Figure 3) that underlies the main PGM+Au+Ni mineralization, beyond the extent of current drilling.

The Central Zone assay results (reported in this news release) from drill holes DDH22LU039 and DDH22LU061 demonstrate a noticeable change in PGM chemistry, where the Pd:Rh ratios range from 4:1 to <2:1. This is a significant divergence from the majority of existing drill holes across the 8.1km of the main Luanga PGM+Au mineralized zone, where the Pd:Rh ratio is typically ~10:1. There could also be a relationship between magmatic nickel and rhodium (high rhodium values highlighted in the table above). This, combined with the identification of a different host rock, is further supporting evidence of a new style or phase of mineralization that is more typically associated with magmatic nickel sulphide deposits. Mineralization remains open at depth (Figure 3) and along strike.

Figure 2: Nickel sulphide zone in the Central Sector, shown over historic Ni-in-soil geochemistry. (CNW Group/Bravo Mining Corp.)
Figure 2: Nickel sulphide zone in the Central Sector, shown over historic Ni-in-soil geochemistry. (CNW Group/Bravo Mining Corp.)

DDH22LU039 is shown in the section below (Figure 3), where the concentration of magmatic nickel sulphides and nickel assay grades increase (from west to east) from DDH22LU054 where fresh rock mineralization has no significant nickel to report, to DDH22LU039 where magmatic nickel sulphides and assay grades reach their current peak.

Figure 3: Central Zone cross section showing the increase in nickel grade to the southeast (open at depth). (CNW Group/Bravo Mining Corp.)
Figure 3: Central Zone cross section showing the increase in nickel grade to the southeast (open at depth). (CNW Group/Bravo Mining Corp.)

Follow Up on North Sector Massive Magmatic Nickel ± Copper Sulphide Discovery

Follow up drilling to the north and south of the previously announced massive magmatic nickel ± copper sulphide mineralization in DDH22LU047 (August 16th, 2022 news release) in the North Sector has continued to intersect magmatic nickel sulphide mineralization.

New drill results indicate that the nickel ± copper mineralization is coincident with the main Luanga PGM+Au+Ni deposit, but that higher concentrations of nickel and copper are at depth. Alternatively, this mineralization style may be unrelated to the emplacement of the PGM portion of Luanga and related to a different, as yet unidentified, phase of mineralization at depth.

Higher-grade sulphide mineralization and EM anomalism is open to the south (Figure 4) but appears to taper off to the north. Like the Central Sector above, it may also be diverging away from the strike of the PGM+Au mineralization and occur below historic drilling to the south. This interpretation is supported to the southern limit of the current EM survey and is coincident with historic nickel-in-soil geochemistry (Figures 4 and 5).

Most assay results demonstrate the same noticeable change in PGM chemistry as the higher-grade magmatic sulphide mineralization intersected in the Central Zone, with Pd:Rh ratios ranging from to 5:1 to <2:1. As highlighted above this may indicate potential for a different phase or style of mineralization at depth.

Figure 4: Nickel ± copper sulphide zone in the North Sector, shown over historic Ni-in-soil geochemistry. (CNW Group/Bravo Mining Corp.)
Figure 4: Nickel ± copper sulphide zone in the North Sector, shown over historic Ni-in-soil geochemistry. (CNW Group/Bravo Mining Corp.)
Figure 5: North Sector Cross Section showing new drill holes DDH22LU052 and DDH22LU049 (open at depth). (CNW Group/Bravo Mining Corp.)
Figure 5: North Sector Cross Section showing new drill holes DDH22LU052 and DDH22LU049 (open at depth). (CNW Group/Bravo Mining Corp.)

Luanga Drill Program Progress

A total of 144 drill holes (9 in 2023) have been completed by Bravo to date, for 23,950 metres (94% of the planned 25,500 metre Phase 1 Drilling Program), including all 8 planned twin holes (results for 2 twin holes outstanding) and all 8 metallurgical holes (not for routine assaying). Results have been reported for 60 Bravo drill holes to date.

Results for 76 Bravo drill holes are currently outstanding.

The Phase 1 diamond drill program is close to completion, with 1,550m remaining before the commencement of the Phase 2 diamond drill program. The Phase 2 program will be focused on step out drilling (with the objective of extending known zones of PGM+Au+Ni mineralization to depth), follow-up on the newly identified higher-grade nickel ± copper magmatic sulphide mineralization styles, as well as exploration of new targets.

Aside from systematic step-out drilling, the Phase 2 program is designed to support a more intensive approach to exploration, with work to focus on exploring for magmatic nickel ± copper sulphides. This program will commence with an extensive program of geophysics consisting of ground EM, ground micro-gravity and ground magnetics. Targets generated would be drill tested during the Phase 2 program. Phase 2 will also include ongoing metallurgical test work designed to confirm and optimize metallurgical results reported by Vale SA., Luanga’s previous owner.

The key deliverable expected from the Phase 1 program is Luanga’s maiden NI 43-101 Mineral Resource Estimate (MRE). Approximately 3,600m of priority drilling remains to be completed to facilitate this work, including the balance of the Phase 1 program and a portion of the Phase 2 program. Completion of the maiden MRE remains on track for H2/2023.

Complete Table of Recent Intercepts

HOLE-IDFrom(m)To(m)Thickness
(m)
Pd(g/t)Pt(g/t)Rh(g/t)Au
(g/t)
PGM + Au
(g/t)
Ni (%
Sulphide)
Cu
(%)
TYPE
DDH22LU03941.261.221.00.540.190.000.110.830.15FR
And80.1106.226.10.560.220.000.140.920.20FR
Including91.298.27.00.441.110.010.171.720.32FR
And128.2155.927.70.400.100.110.010.620.42FR
Including128.2132.84.60.740.120.250.011.121.12FR
Including130.2131.21.01.080.250.510.011.852.08FR
And161.9166.95.00.350.150.070.010.580.23FR
DDH22LU0498.716.78.00.710.260.020.101.08NAOx
And49.674.925.30.680.220.130.121.140.400.23FR
Including49.658.38.70.790.190.090.191.260.380.36FR
Also Including66.970.33.41.180.520.290.122.120.840.34FR
And78.492.414.00.420.140.040.080.680.230.22FR
DDH22LU052151.0158.17.10.690.040.300.111.130.820.45FR
Including151.0153.82.80.760.020.390.011.181.090.22FR
Also Including154.3158.13.80.730.050.270.191.240.730.68FR
And161.9164.52.60.580.060.280.010.940.720.26FR
And199.0215.216.20.400.460.030.010.890.320.09FR
DDH22LU06159.365.86.50.490.190.000.130.810.09FR
And88.591.53.00.900.300.000.241.440.19FR
And102.4103.61.20.550.040.310.151.051.18FR
And121.3127.36.00.260.140.030.090.520.21FR
And139.0150.811.80.270.100.020.020.410.18FR
DDH22LU06839.542.53.01.350.730.100.012.180.07FR
And54.462.27.80.330.100.020.010.450.30FR
DDH22LU073113.6116.83.20.890.440.030.011.370.39FR
And127.8129.51.70.895.110.050.016.060.32FR
And136.9155.818. 90.960.290.020.021.300.41FR
Including150.8153.83.02.570.500.040.023.141.15FR
DDH22LU077169.4175.56.10.570.040.330.020.960.63FR
And169.4171.31.91.330.050.84*0.042.27*1.47FR
Including170.6171.30.71.540.04>1.0*0.012.59*2.27FR
And204.1207.13.00.270.010.000.010.280.29FR
And220.1232.112.00.280.130.020.030.460.12FR
DDH22LU079179.3199.320.00.230.110.040.010.390.19FR
including196.3199.33.00.580.180.120.010.880.51FR
Notes:  All ‘From’, ‘To’ depths, and ‘Thicknesses’ are downhole.
             Given the orientation of the hole and the mineralization, the intercepts are estimated to be 85% to 100% of true thickness.
             Type: Ox = Oxide. LS = Low Sulphur. FR = Fresh Rock. Recovery methods and results will differ based on the type of mineralization.
             * = Includes Rh >1.00g/t result. Overlimit analyses pending.
** = Bravo’s nickel grades are sulphide nickel, and do not include non-recoverable silicate nickel, unlike historic total nickel assays
Figure 6: Location of Bravo Drilling Reported in this News Release (CNW Group/Bravo Mining Corp.)
Figure 6: Location of Bravo Drilling Reported in this News Release (CNW Group/Bravo Mining Corp.)

About Bravo Mining Corp.

Bravo is a Canada and Brazil-based mineral exploration and development company focused on advancing its Luanga PGM+Au+Ni Project in the world-class Carajás Mineral Province of Brazil.

The Luanga Project benefits from being in a location close to operating mines, with excellent access and proximity to existing infrastructure, including road, rail and clean and renewable hydro grid power. The project area was previously de-forested for agricultural grazing land. Bravo’s current Environmental, Social and Governance activities includes replanting trees in the project area, hiring and contracting locally, and ensuring protection of the environment during its exploration activities.

Technical Disclosure

Technical information in this news release has been reviewed and approved by Simon Mottram, F.AusIMM (Fellow Australia Institute of Mining and Metallurgy), President of Bravo Mining Corp. who serves as the Company’s “qualified person”, as defined in National Instrument 43-101 Standards of Disclosure for Mineral Projects (“NI 43-101“). Mr. Mottram has verified the technical data and opinions contained in this news release.

Forward Looking Statements

This news release contains forward-looking information which is not comprised of historical facts. Forward-looking information is characterized by words such as “rich”, “extends”, “new zone”, “potential”, “higher-grade”, “very positive”, “concentrated“, “noticeable change”, “majority”, new style“, “significant“, “intensive approach“, “extensive“, “optimize“, “yet unidentified”, “objective” and other similar words, phrases, or statements that certain events or conditions “may”, “should”, “will” or “would” occur. This news release contains forward-looking information pertaining to the Company’s ongoing re-sampling and drill programs and the results thereof; the expected completion of geophysical surveys and the results of such surveys; the potential for the definition o new styles of mineralization and extensions to depth and the Company’s plans in respect thereof. Forward-looking information involves risks, uncertainties and other factors that could cause actual events, results, and opportunities to differ materially from those expressed or implied by such forward-looking information. Factors that could cause actual results to differ materially from such forward-looking information include, but are not limited to, unexpected results from exploration programs, changes in the state of equity and debt markets, fluctuations in commodity prices, delays in obtaining required regulatory or governmental approvals, environmental risks, limitations on insurance coverage; and other risks and uncertainties involved in the mineral exploration and development industry. Forward-looking information in this news release is based on the opinions and assumptions of management considered reasonable as of the date hereof, including, but not limited to, the assumption that the assay results confirm that the interpreted mineralization contains significant values of nickel, PGMs and Au; that the mineralization remains open to depth, that grades are improving to depth, that final drill and assay results will be in line with management’s expectations; that activities will not be adversely disrupted or impeded by regulatory, political, community, economic, environmental and/or healthy and safety risks; that the Luanga Project will not be materially affected by potential supply chain disruptions; and general business and economic conditions will not change in a materially adverse manner. Although the Company believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information. The Company disclaims any intention or obligation to update or revise any forward-looking information, other than as required by applicable securities laws.

Schedule 1: Drill Hole Collar Details

HOLE-IDCompanyEast (m)North (m)RL (m)DatumDepth (m)AzimuthDipSector
DDH22LU039Bravo658669.939340730.09262.74SIRGAS2000 UTM22S177.70330.00-60.00Central
DDH22LU049Bravo659975.119342475.00270.59SIRGAS2000 UTM22S159.3090.00-60.00North
DDH22LU052Bravo659825.809342475.01274.16SIRGAS2000 UTM22S233.2090.00-60.00North
DDH22LU061Bravo658595.919340659.10271.55SIRGAS2000 UTM22S191.00330.00-60.00Central
DDH22LU068Bravo659900.119342525.01280.91SIRGAS2000 UTM22S251.0090.00-60.00North
DDH22LU073Bravo659900.099342425.00273.40SIRGAS2000 UTM22S270.8590.00-60.00North
DDH22LU077Bravo659824.969342524.96279.74SIRGAS2000 UTM22S264.2090.00-60.00North
DDH22LU079Bravo659822.309342425.01270.84SIRGAS2000 UTM22S250.5090.00-60.00North


Schedule 2: Assay Methodologies and QAQC

Samples follow a chain of custody between collection, processing, and delivery to the ALS laboratory in Parauapebas, state of Pará, Brazil. The drill core is delivered to the core shack at Bravo’s Luanga site facilities and processed by geologists who insert certified reference materials, blanks, and duplicates into the sampling sequence. Drill core is half cut and placed in secured polyurethane bags, then in security-sealed sacks before being delivered directly from the Luanga site facilities to the Parauapebas ALS laboratory by Bravo staff. Additional information about the methodology can be found on the ALS global website (ALS) in the analytical guides.

Quality Assurance and Quality Control (“QAQC“) is maintained internally at the lab through rigorous use of internal certified reference materials, blanks, and duplicates. An additional QAQC program is administered by Bravo using certified reference materials, duplicate samples and blank samples that are blindly inserted into the sample batch. If a QAQC sample returns an unacceptable value an investigation into the results is triggered and when deemed necessary, the samples that were tested in the batch with the failed QAQC sample are re-tested.

Bravo ALS
PreparationMethodMethodMethodMethodMethod
For All ElementsPt, Pd, AuRhNi-SulphideCuTrace Elements
PREP-31DHPGM-ICP27Rh-MS25Ni-ICP05OG-62ME-ICP61
Bravo Mining LOGO (CNW Group/Bravo Mining Corp.)
Bravo Mining LOGO (CNW Group/Bravo Mining Corp.)

SOURCE Bravo Mining Corp.

Categories
Base Metals Energy Junior Mining Nevada Copper

Nevada Copper Provides Update in Pumpkin Hollow Project

Nevada Copper Corp.
Nevada Copper Corp.

Capital Projects Construction Contract Awarded to Dumas Mining

YERINGTON, Nev., Feb. 13, 2023 (GLOBE NEWSWIRE) — Nevada Copper (TSX: NCU) (OTC: NEVDF) (FSE: ZYTA) (“Nevada Copper” or the “Company”) is pleased to provide an update on restart and operational activities for its Pumpkin Hollow underground copper mine (the “Underground Mine”).

Randy Buffington, President & CEO of Nevada Copper, stated, “Our Pumpkin Hollow team is focused on advancing the restart project quickly and safely. We are building on the momentum of the recent achievements by the underground crews as they have progressed through the dike structure and are advancing into the EN Zone in anticipation of the underground development contractor arriving on site and commencing development. The technical and leadership teams are in place and committed to executing this restart plan. We are targeting a mill restart in the third quarter with a quick ramp up to nameplate capacity by the end of 2023.”

Production Restart Highlights

  • Clear line of site to full-scale production
    • Simple and low-risk pathway to full-scale production established, comprising:
      • Phase 1 Q4 2022 to Q1 2023: Finalize dike crossings to access EN Zone initial stoping area (complete), confirm all key technical hires for restart (complete), and award capital projects contract (complete).
      • Phase 2 Q2 2023: Prioritized development of higher-grade EN Zone stope area.
      • Phase 3 Q3 to Q4 2023: Restart of proven mill, with surface and underground ore feed developed and short ramp-up to nameplate capacity.
  • Phase 1 Restart Milestones Achieved
    • Development into the EN Zone has demonstrated that rock quality is consistent with our geotechnical model, which predicted competent ground within the EN Zone, and development is progressing at full round lengths and standard ground support.
    • Definition drilling and assaying of all initial EN Zone stopes planned for extraction in 2023 is complete representing approximately 210K tons of stope ore, providing significant visibility on quality and grade of ore feed.
    • Contract awarded for completion of capital projects to debottleneck restart of development and underground operations.
    • Development mining contract award well progressed.
    • All key technical positions in place, with substantially strengthened operational leadership team on-site.
  • Operations significantly de-risked
    • Completion of both critical dike headings, securing the Underground Mine with full access to the primary EN Zone stope area. The third dike crossing is progressing well and, while it is not required to meet 2023 operating objectives, is expected to be completed in the first half of 2023.
    • Building planned surface stockpile of approximately 150K tons of run-of-mine ore ahead of mill start-up provides substantial operating buffer for milling operations.
    • Debottlenecking capital projects front-ended to provide additional operating flexibility.

Further Details on Production Restart

Underground Development Proceeding as Planned

The Nevada Copper operations team continues to make rapid progress on all underground activities including mine development, hoisting, stope preparation, and underground projects.

The historically reported dike crossings that provide initial stope top and bottom access into the EN Zone were fully established and completed in December 2022, and development is progressing toward stoping areas. Both key development drives that have crossed the dike have encountered ground conditions at or better than expectation, confirming the geotechnical model that predicted higher quality rock. Definition drilling of the initial stopes to feed the restart of milling operations in Q3 2023 have been completed and assayed, and confirm rock quality, grade and geometry represented by the geologic and reserve models.

Underground Development Contractor Update

The Company has completed the bid process for the development mining contractor and is in the final stages of negotiations for a unit rate contract with an internationally recognized major mining services contractor.

Key components of the development contract include:

  • 72,000 feet of lateral capital development over a 24-month contract period;
  • Delivery of full development stopes by Q3 2023 to provide sufficient faces and stopes to restart and maintain nameplate milling operations (approximately 5,000 tpd); and
  • Nevada Copper’s operating team will perform all stope mining starting in Q3 2023.

Critical Construction Projects Progressing

The Company awarded Dumas Contracting USA, Inc. (“Dumas”) a $12 million construction contract to complete critical capital projects including the coarse ore bin and installation of an underground jaw crusher, permanent dewatering system, vent shaft stripping and surface fans. Dumas is a leading full-service underground mining contractor providing mine construction, development, production mining, mine services and engineering early-stage projects through well-established operating mines throughout the Americas.

Vent Shaft – Final stripping of the vent shaft commenced in January in preparation for connection of the surface fans, which are expected to be commissioned in early Q2 2023. The stripping is planned to be completed ahead of development contractor mobilization and the vent shaft is expected to provide the necessary ventilation for the life of the mine.

Ore Handling System – The additional ore handling system allows for increased ore throughput rates to the shaft hoisting system, enabling operations to ultimately exceed nameplate production. Engineering for ore handling system has been completed, and all long-lead items are on-site including the jaw crusher. Excavation is underway and planning for the installation of the system has already commenced.

Dewatering System – The pumps for the permanent dewatering system are on site and ready for installation. Once installed, the additional pumps are expected to provide all dewatering requirements for the life of the mine.

Regional Exploration Opportunities

The Company has completed a thorough review of regional mapping for its Pumpkin Hollow land position and several high-quality targets of interest have been identified. Surface sampling results from the Copper Ridge area have indicated the high-grade potential, highlighted by grades including 5.03% and 5.43% copper (see table below for additional assay information) that warrant additional investigation. In 2023, detailed mapping, interpretation of recent geophysical analysis and surface sampling are planned to follow-up on other identified high-potential targets on the Nevada Copper land position. The grades identified are conceptual in nature as there has been insufficient exploration to define a mineral resource and it is uncertain if further exploration will result in the delineation of a mineral resource. Grades were determined through third-party labs, as detailed below under “Quality Assurance and Quality Control”.

Table of Assays (samples greater than 1%)
Sample IDEasting (m)Northing (m)Elevation (m)Cu (%)Au (ppm)Ag (ppm)
533857318720431651014512.310.0360.5
533861318751431651214582.360.008<0.2
533862318766431651214591.540.1300.2
1615147319706431702314433.350.0304.8
1615150319603431707214443.650.0110.4
1615178319087431678215172.020.1195.4
1669223319621431708214422.650.0452.7
1669224319678431703314443.100.0564.4
1669225318483431651514131.601.4302.7
1669229318639431648114371.190.1800.8
1669232318607431663714401.030.1041.1
M59971*319729431702014405.030.15010.0
M59982*318739431652714465.430.07516.0
M59984*318789431660114704.100.0558.0
M59994*318438431650714052.871.4906.0

* Historic sample

Board Changes

Ms. Kate Southwell will be stepping down as a member of the Board of Directors effective February 28, 2023 to pursue other career opportunities. Stephen Gill, Chairman of the Board stated, “The Board and management team appreciate Kate’s valuable input during her tenure, particularly with regard to financing and commercial matters and as Chair of the Sustainability Committee and wish her well in her future endeavors”. The Nominating Committee of the Board is in the process of identifying qualified candidates to fill the vacant role at or prior to this year’s annual shareholder meeting.

Qualified Person

The technical information and data in this news release has been reviewed by Steven Newman, Registered Member – SME, Vice President, Technical Services for Nevada Copper, and Greg French, C.P.G., VP Exploration of Nevada Copper, who are non-independent Qualified Persons within the meaning of NI 43-101.

Quality Assurance and Quality Control

The analytical work was performed by American Assay Labs (AAL) located in Sparks, Nevada. AAL is an ISO/IEC 17025 accredited laboratory. The Samples were crushed so that >80% passes 10 mesh, followed by pulverizing to >90% passes 75 < 150 mesh. Prepared samples were run using a three-acid digestion process and conventional ICP-AES analysis. Gold determination was via standard atomic absorption (AA) finish 30-gram fire-assay (FA) analysis. Blank, standard and duplicate samples were routinely inserted and monitored for quality assurance and quality control.

The historic analytical work was performed by Chemex Labs Inc., currently ALS Geochemistry (ALS) located in, Nevada. ALS is an ISO/IEC 17025 accredited laboratory. The samples were crushed so that >80% passes 10 mesh, followed by pulverizing split to < 150 mesh. Prepared samples were run using an acid digestion process and conventional ICP-AES analysis. Gold determination was via standard atomic absorption (AA) finish 30-gram fire-assay (FA) analysis.

Nevada Copper detected no significant QA/QC issues during review of the data and is not aware of any sampling or other factors that could materially affect the accuracy or reliability of the data referred to herein.

About Nevada Copper

Nevada Copper (TSX: NCU) is a copper producer and owner of the Pumpkin Hollow copper project. Located in Nevada, USA, Pumpkin Hollow has substantial reserves and resources including copper, gold and silver. Its two fully permitted projects include the high-grade Underground Mine and processing facility, which is now in the production stage, and a large-scale open pit PFS stage project.

Randy Buffington
President & CEO

For additional information, please see the Company’s website at www.nevadacopper.com, or contact:

Tracey Thom Vice President, IR and Community Relations
tthom@nevadacopper.com
+1 775 391 9029

Cautionary Language on Forward Looking Statements
This news release contains “forward-looking information” and “forward-looking statements” within the meaning of applicable Canadian securities laws. All statements in this news release, other than statements of historical facts, are forward-looking statements. Such forward-looking information and forward-looking statements specifically include, but are not limited to, statements that relate to development and ramp-up plans and activities at the Underground Mine and the timing in respect thereof.

Forward-looking statements and information include statements regarding the expectations and beliefs of management. Often, but not always, forward-looking statements and forward-looking information can be identified by the use of words such as “plans”, “expects”, “potential”, “is expected”, “anticipated”, “is targeted”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates”, or “believes” or the negatives thereof or variations of such words and phrases or statements that certain actions, events or results “may”, “could”, “would”, “might” or “will” be taken, occur or be achieved. Forward-looking statements or information should not be read as guarantees of future performance and results. They are subject to known and unknown risks, uncertainties and other factors which may cause the actual results and events to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements or information.

Such risks and uncertainties include, without limitation, those relating to: requirements for additional capital and no assurance can be given regarding the availability thereof; the outcome of discussions with vendors; the ability of the Company to complete the ramp-up of the Underground Mine within the expected cost estimates and timeframe; the impact of COVID-19 on the business and operations of the Company; the state of financial markets; history of losses; dilution; adverse events relating to milling operations, construction, development and ramp-up, including the ability of the Company to address underground development and process plant issues; ground conditions; cost overruns relating to development, construction and ramp-up of the Underground Mine; loss of material properties; interest rate increases; global economy; limited history of production; future metals price fluctuations; speculative nature of exploration activities; periodic interruptions to exploration, development and mining activities; environmental hazards and liability; industrial accidents; failure of processing and mining equipment to perform as expected; labour disputes; supply problems; uncertainty of production and cost estimates; the interpretation of drill results and the estimation of mineral resources and reserves; changes in project parameters as plans continue to be refined; possible variations in ore reserves, grade of mineralization or recovery rates from management’s expectations and the difference may be material; legal and regulatory proceedings and community actions; accidents; title matters; regulatory approvals and restrictions; increased costs and physical risks relating to climate change, including extreme weather events, and new or revised regulations relating to climate change; permitting and licensing; dependence on management information systems and cyber security risks; volatility of the market price of the Company’s securities; insurance; competition; hedging activities; currency fluctuations; loss of key employees; other risks of the mining industry as well as those risks discussed in the Company’s Management’s Discussion and Analysis in respect of the year ended December 31, 2021 and the quarter ended September 30, 2022 and in the section entitled “Risk Factors” in the Company’s Annual Information Form dated March 31, 2022. The forward-looking statements and information contained in this news release are based upon assumptions management believes to be reasonable, including, without limitation: no adverse developments in respect of the property or operations at the project; no material changes to applicable laws; the ramp-up of operations at the Underground Mine in accordance with management’s plans and expectations; no worsening of the current COVID-19 related work restrictions; reduced impacts of COVID-19 going forward; the Company will be able to obtain sufficient additional funding to complete the ramp-up, no material adverse change to the price of copper from current levels; and the absence of any other factors that could cause actions, events or results to differ from those anticipated, estimated or intended.

The forward-looking information and statements are stated as of the date hereof. The Company disclaims any intent or obligation to update forward-looking statements or information except as required by law. Although the Company has attempted to identify important factors that could cause actual actions, events, or results to differ materially from those described in forward-looking information and statements, there may be other factors that could cause actions, events or results not to be as anticipated, estimated or intended. Specific reference is made to “Risk Factors” in the Company’s Management’s Discussion and Analysis in respect of the year ended December 31, 2021 and the quarter ended September 30, 2022 and “Risk Factors” in the Company’s Annual Information Form dated March 31, 2022, for a discussion of factors that may affect forward-looking statements and information. Should one or more of these risks or uncertainties materialize, should other risks or uncertainties materialize or should underlying assumptions prove incorrect, actual results and events may vary materially from those described in forward-looking statements and information. For more information on the Company and the risks and challenges of its business, investors should review the Company’s filings that are available at www.sedar.com.

The Company provides no assurance that forward-looking statements and information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements or information. Accordingly, readers should not place undue reliance on forward-looking statements or information.

Categories
Base Metals Exclusive Interviews Junior Mining Precious Metals Uncategorized

BOB MORIARTY – Are You Ready – Debt vs. Resources

Order Your Hardcover Here:

Nobody Knows Anything, Proven and Probable

The Best Video on Why and When to Buy and Sell Physical Precious Metals:

I’m a licensed broker for Miles Franklin Precious Metals InvestmentsThe Only Online Dealer that is Licensed and Bonded Period! Where we provide unlimited options to expand your precious metals portfolio, from:

Websitewww.provenandprobable.com
Call Me |855.505.1900 or email: Maurice@MilesFranklin.com
Precious Metals FAQ – https://www.milesfranklin.com/faq-maurice/

Categories
Junior Mining Lion One Metals Precious Metals

Lion One Receives US$23 Million from 1st Tranche of Nebari Financing Facility and Closes US$2 Million Equity Private Placement

North Vancouver, British Columbia–(Newsfile Corp. – February 10, 2023) – Lion One Metals Limited (TSXV: LIO) (OTCQX: LOMLF) (ASX: LLO) (“Lion One” or the “Company“) announces the Company has completed its previously announced debt and equity financing transaction and has received total proceeds of US$25 million from: i) the funding of the US$23 million 1st tranche (“Tranche 1“) of its previously announced US$37 million financing facility (the “Financing Facility“) provided by Nebari Gold Fund 1, LP, Nebari Natural Resources Credit Fund I, LP and Nebari Natural Resources Credit Fund II, LP (collectively, “Nebari“), and (ii) Nebari’s completion of a US$2 million equity private placement in the Company, for the development of Lion One’s 100% owned Tuvatu Alkaline Gold Project in Fiji (the “Equity Investment“).

In addition to Tranche 1, an additional US$12 million is available under the Financing Facility at Lion One’s option in up to two further tranches which may be drawn on by Lion One within 18 months of the date of the Financing Facility. The Equity Investment involved Nebari’s subscription for 3,125,348 common shares of Lion One (“Common Shares“) priced at CAD$0.86 per Common Share.

In connection with the funding of Tranche 1, 15,333,087 warrants (the “Warrants“) have been issued to Nebari with each Warrant exercisable into one Common Share at a price of CAD$1.49 for a period of 42 months from the date hereof. The Warrants are non-transferable and will be subject to an accelerator provision whereby the Borrower may accelerate the expiry date of up to 25% of the Warrants in the event that the volume weighted average trading price of the Common Shares exceeds 100% over the strike price for a period of twenty consecutive trading days on the TSX-V. Lion One has the option to accelerate the expiry of further 25% portions of the Warrants at four-month intervals, up to a maximum of 75% of the Warrants.

The Common Shares subscribed for pursuant to the Equity Investment and the Warrants will be subject to a hold period expiring May 11, 2023 in accordance with Canadian securities laws and policies of the TSX-V. Neither the Common Shares subscribed for pursuant to the Equity Investment nor the Warrants have been registered under the U.S. Securities Act of 1933, as amended, and may not be offered or sold in the United States absent registration or an applicable exemption from the registration requirements. This press release shall not constitute an offer to sell or the solicitation of an offer to buy nor shall there be any sale of the securities in any state in which such offer, solicitation or sale would be unlawful.

About Tuvatu
The Tuvatu Alkaline Gold Project is located on the island of Viti Levu in Fiji. The January 2018 mineral resource for Tuvatu as disclosed in the technical report “Technical Report and Preliminary Economic Assessment for the Tuvatu Gold Project, Republic of Fiji”, dated September 25, 2020, and prepared by Mining Associates Pty Ltd of Brisbane Qld, comprises 1,007,000 tonnes indicated at 8.50 g/t Au (274,600 oz. Au) and 1,325,000 tonnes inferred at 9.0 g/t Au (384,000 oz. Au) at a cut-off grade of 3.0 g/t Au. The technical report is available on the Lion One website at U and on the SEDAR website at www.sedar.com.

About Nebari
Nebari is a US-based investment manager specializing in privately offered pooled investment vehicles including Nebari Gold Fund 1, LP, Nebari Natural Resources Credit Fund I, LP and Nebari Natural Resources Credit Fund II, LP which are funding the Financing Facility to Lion One. The Nebari leadership team has deep experience with leading global mining companies and financial institutions and is known for partnering with motivated and capable management teams focused on achieving clear plan targets.

About Lion One Metals Limited
Lion One’s flagship asset is 100% owned, fully permitted high grade Tuvatu Alkaline Gold Project, located on the island of Viti Levu in Fiji. Lion One envisions a low-cost high-grade underground gold mining operation at Tuvatu coupled with exciting exploration upside inside its tenements covering the entire Navilawa Caldera, an underexplored yet highly prospective 7km diameter alkaline gold system. Lion One’s CEO Walter Berukoff leads an experienced team of explorers and mine builders and has owned or operated over 20 mines in 7 countries. As the founder and former CEO of Miramar Mines, Northern Orion, and La Mancha Resources, Walter is credited with building over $3 billion of value for shareholders.

On behalf of the Board of Directors of Lion One Metals Limited
Walter Berukoff“, Chairman and CEO

Contact Investor Relations
Toll Free (North America) Tel: 1-855-805-1250
Email: info@liononemetals.com
Website: www.liononemetals.com

Neither the TSX Venture Exchange nor its Regulation Service Provider accepts responsibility for the adequacy or accuracy of this release

This press release may contain statements that may be deemed to be “forward-looking statements” within the meaning of applicable Canadian securities legislation. All statements, other than statements of historical fact, included herein are forward-looking information. Generally, forward-looking information may be identified by the use of forward-looking terminology such as “plans”, “expects” or “does not expect”, “proposed”, “is expected”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates” or “does not anticipate”, or “believes”, or variations of such words and phrases, or by the use of words or phrases which state that certain actions, events or results may, could, would, or might occur or be achieved. This forward-looking information reflects Lion One Metals Limited’s current beliefs and is based on information currently available to Lion One Metals Limited and on assumptions Lion One Metals Limited believes are reasonable. These assumptions include, but are not limited to, the actual results of exploration projects being equivalent to or better than estimated results in technical reports, assessment reports, and other geological reports or prior exploration results. Forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of Lion One Metals Limited or its subsidiaries to be materially different from those expressed or implied by such forward-looking information. Such risks and other factors may include, but are not limited to: the stage development of Lion One Metals Limited, general business, economic, competitive, political and social uncertainties; the actual results of current research and development or operational activities; competition; uncertainty as to patent applications and intellectual property rights; product liability and lack of insurance; delay or failure to receive board or regulatory approvals; changes in legislation, including environmental legislation, affecting mining, timing and availability of external financing on acceptable terms; not realizing on the potential benefits of technology; conclusions of economic evaluations; and lack of qualified, skilled labour or loss of key individuals. Although Lion One Metals Limited has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. Accordingly, readers should not place undue reliance on forward-looking information. Lion One Metals Limited does not undertake to update any forward-looking information, except in accordance with applicable securities laws.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/154355

Categories
Base Metals Collective Mining Energy Junior Mining Precious Metals

Ari Sussman from Collective Mining to Present at OTC Markets Group Precious Metals Virtual Investor Conference on February 15th, 2023

TORONTO, Feb. 8, 2023 /CNW/ – Collective Mining Ltd. (TSXV: CNL) (OTCQX: CNLMF) (“Collective” or the “Company”) will be presenting at the OTC Markets Group Precious Metals Virtual Investor Conference on Wednesday, February 15, 2023, at 11:00am ET.

Using the link below, investors can register and listen to the presentation, and take part in a question and answer session at the end. The presentation is expected to last 30 minutes.

DATE: Wednesday, February 15, 2023
TIME: 11:00am ET – 11:30am ET
LINK: https://bit.ly/3JCTs89

Please log in 5-10 minutes early to register. An archived webcast will also be made available after the event.

Ari Sussman, Executive Chairman of Collective Mining will be providing an overview and will discuss the Company’s “Main Breccia” discovery at the Apollo target. The Main Breccia discovery is a high-grade and bulk tonnage, copper-silver-gold porphyry-related breccia system characterized by two main, yet distinct pulses of mineralized fluids flooding the breccia with metals.

The Company’s Guayabales project is located in the mining-friendly department of Caldas, Colombia, in the heart of a long-established mining camp with ten fully permitted and operating mines located within three kilometres of the project. As a result, the Guayabales project is blessed with excellent infrastructure with roads and hydroelectric powerlines traversing the project and an abundant labour force located nearby in the townships of Supia and Marmato.

The phase II drilling program is underway with three rigs currently operating focused on testing near surface mineralization and expanding the dimensions of the Main Breccia system. Assay results are expected in the near term for the final three holes of the 2022 program, including westwards step-out hole APC-28, which cut more than 600 metres of continuous mineralization. Additionally, the first hole of the Phase II program is now complete, and core has been dispatched to the lab for assaying.

About Collective Mining Ltd.

To see our latest corporate presentation and related information, please visit www.collectivemining.com

Founded by the team that developed and sold Continental Gold Inc. to Zijin Mining for approximately $2 billion in enterprise value, Collective Mining is a copper, silver and gold exploration company based in Canada, with projects in Caldas, Colombia. The Company has options to acquire 100% interests in two projects located directly within an established mining camp with ten fully permitted and operating mines.

The Company’s flagship project, Guayabales, is anchored by the Apollo target, which hosts the large-scale, bulk-tonnage and high-grade copper, silver and gold Main Breccia discovery. The Company’s near-term objective is to continue with expansion drilling of the Main Breccia discovery while increasing confidence in the highest-grade portions of the system.

Management, insiders and close family and friends own approximately 52% of the outstanding shares of the Company and as a result, are fully aligned with shareholders. The Company is listed on the TSXV under the trading symbol “CNL” and on the OTCQX under the trading symbol “CNLMF”.

Information Contact:

Follow Executive Chairman Ari Sussman (@Ariski) and Collective Mining (@CollectiveMini1) on Twitter

FORWARD-LOOKING STATEMENTS

This news release contains certain forward-looking statements, including, but not limited to, statements about the drill programs, including timing of results, and Collective’s future and intentions. Wherever possible, words such as “may”, “will”, “should”, “could”, “expect”, “plan”, “intend”, “anticipate”, “believe”, “estimate”, “predict” or “potential” or the negative or other variations of these words, or similar words or phrases, have been used to identify these forward-looking statements. These statements reflect management’s current beliefs and are based on information currently available to management as at the date hereof.

Forward-looking statements involve significant risk, uncertainties, and assumptions. Many factors could cause actual results, performance, or achievements to differ materially from the results discussed or implied in the forward-looking statements. These factors should be considered carefully, and readers should not place undue reliance on the forward-looking statements. Although the forward-looking statements contained in this news release are based upon what management believes to be reasonable assumptions, Collective cannot assure readers that actual results will be consistent with these forward-looking statements. These forward-looking statements are made as of the date of this news release, and Collective assumes no obligation to update or revise them to reflect new events or circumstances, except as required by law.

Neither the TSXV nor its Regulation Services Provider (as that term is defined in the policies of the TSXV) accepts responsibility for the adequacy or accuracy of this news release.

SOURCE Collective Mining Ltd.

Categories
Base Metals Dolly Varden Silver Energy Exclusive Interviews Junior Mining Precious Metals

Dolly Varden – Reports Highest-Grade Silver at 23,997 Grams Per Ton

Dolly Varden Silver Intersects 15.94 meters Averaging 1,499 g/t Silver Including 0.35 meters of 23,997 g/t Silver at the Wolf Deposit.

Dolly Varden Silver Corp: (TSX.V: DV | OTCQX: DOLLF)
Website: https://www.dollyvardensilver.com/
Fact Sheet: https://bit.ly/3RKRTa3
Corporate Presentation: https://bit.ly/3x1BEfq
Email: info@dollyvardensilver.com
Phone: 604-602-1440
Press Release: https://bit.ly/3l8dywx

The Best Video on Why and When to Buy and Sell Physical Precious Metals:

I’m a licensed broker for Miles Franklin Precious Metals InvestmentsThe Only Online Dealer that is Licensed and Bonded Period! Where we provide unlimited options to expand your precious metals portfolio, from:

Websitewww.provenandprobable.com
Call Me |855.505.1900 or email: Maurice@MilesFranklin.com
Precious Metals FAQ – https://www.milesfranklin.com/faq-maurice/

Categories
Base Metals Collective Mining Junior Mining Precious Metals

Collective Mining Hosts the Vice Minister of Mines of Colombia to its Project Facilities in Supia, Colombia

TORONTO, Feb. 6, 2023 /CNW/ – Collective Mining Ltd. (TSXV: CNL) (OTCQX: CNLMF) (“Collective” or the “Company”) is pleased to announce the Company had a recent opportunity to host the new Vice Minister of Mines of Colombia, Giovanni Franco, at its operation facilities in Supia, Colombia. The Vice Minister was visiting the region as part of the Ministry of Mines and Energy’s Social Mining Forum, which is a communication-based platform to discuss mining between the Ministry and municipalities.

During the visit, the Company had the opportunity to present its “Collective” model to mining, which is based on honesty, transparency, education and open dialogue with its stakeholders. The Company reviewed in detail its business and social approach within the area of influence of the Guayabales and San Antonio projects as it relates to various sustainability initiatives and exploration methodologies.

Upon completion of the visit, the Vice Minister of Mines recorded a short video summarizing his thoughts, which includes the following statement:

“What we see in the advances made by Collective Mining over the past three years is what we would like to have in Colombia. We wish to have 10, 50, 100 companies like Collective Mining all around Colombia to improve the geoscientific knowledge of the country, to improve the understanding of the subsoil resources that we have in Colombia to define public policies to improve the extraction of our subsoil resources.”

Please click on the link below to watch the full two-minute video testimony of the Vice Minister of Mines: https://youtu.be/-Ak3a_HJiPE

Figure 1 - Vice Minister of Mines Engaging with the Collective Mining Team in our Core Shack in Supía, Colombia (CNW Group/Collective Mining Ltd.)
Figure 1 – Vice Minister of Mines Engaging with the Collective Mining Team in our Core Shack in Supía, Colombia (CNW Group/Collective Mining Ltd.)

About Collective Mining Ltd.
To see our latest corporate presentation and related information, please visit www.collectivemining.com.

Founded by the team that developed and sold Continental Gold Inc. to Zijin Mining for approximately $2 billion in enterprise value, Collective Mining is a copper, silver and gold exploration company based in Canada, with projects in Caldas, Colombia. The Company has options to acquire 100% interests in two projects located directly within an established mining camp with ten fully permitted and operating mines.

The Company’s flagship project, Guayabales, is anchored by the Apollo target, which hosts the large-scale, bulk-tonnage and high-grade copper, silver and gold Main Breccia discovery. The Company’s near-term objective is to continue with expansion drilling of the Main Breccia discovery while increasing confidence in the highest-grade portions of the system.

Management, insiders and close family and friends own nearly 35% of the outstanding shares of the Company and as a result, are fully aligned with shareholders. The Company is listed on the TSXV under the trading symbol “CNL” and on the OTCQX under the trading symbol “CNLMF”.

Information Contact:

Follow Executive Chairman Ari Sussman (@Ariski) and Collective Mining (@CollectiveMini1) on Twitter

FORWARD-LOOKING STATEMENTS

This news release contains certain forward-looking statements, including, but not limited to Collective’s future and intentions. Wherever possible, words such as “may”, “will”, “should”, “could”, “expect”, “plan”, “intend”, “anticipate”, “believe”, “estimate”, “predict” or “potential” or the negative or other variations of these words, or similar words or phrases, have been used to identify these forward-looking statements. These statements reflect management’s current beliefs and are based on information currently available to management as at the date hereof.

Forward-looking statements involve significant risk, uncertainties, and assumptions. Many factors could cause actual results, performance, or achievements to differ materially from the results discussed or implied in the forward-looking statements. These factors should be considered carefully, and readers should not place undue reliance on the forward-looking statements. Although the forward-looking statements contained in this news release are based upon what management believes to be reasonable assumptions, Collective cannot assure readers that actual results will be consistent with these forward-looking statements. These forward-looking statements are made as of the date of this news release, and Collective assumes no obligation to update or revise them to reflect new events or circumstances, except as required by law.

Neither the TSXV nor its Regulation Services Provider (as that term is defined in the policies of the TSXV) accepts responsibility for the adequacy or accuracy of this news release.

SOURCE Collective Mining Ltd.

Categories
Base Metals Energy Junior Mining Precious Metals Silver Bullet Mines

Silver Bullet Mines Corp. Updates Copper Values at Black Copper

Burlington, Ontario–(Newsfile Corp. – January 31, 2023) – Silver Bullet Mines Corp. (TSXV: SBMI) (OTCQB: SBMCF) (‘SBMI’ or ‘the Company’) is pleased to update the assay results from its Black Copper occurrence, reported earlier on January 31, 2023.

In SBMI’s January 17, 2023 press release, SBMI advised third part geologic consultants including the QP had visited the Black Copper occurrence in late November and early December, 2022. Black Copper is situated on SBMI’s Black Diamond property roughly one point five kilometres south of the Buckeye Mine and is referred to in the January, 2021 Geologic Report. Samples from Black Copper were taken and reported the following results:

Sample numberAu (ppb)Cu ppm
342151615>1000
342152192>1000
342153941>1000
342154654>1000

The over-detection limit for copper on these samples was 1000 parts per million. These four samples were sent for further analysis which returned:

Sample numberCu ppmCu %
342151224002.24
342152374003.740
342153340003.400
342154549005.490

The press release from earlier today incorrectly stated the values in parts per million as a result of manual data entry into the press release. A copy of the Actlabs certificates for these samples is attached.

QAQC For SBMI

All the samples above were collected by Robert Komarechka and John Corkery. Samples were collected and placed in sample bags with their appropriate tag and personally taken to the courier and shipped to Actlabs in Thunder Bay, Ontario for assaying. Certified standards and blanks were used both by the Company and Actlabs.

All samples analyzed by Actlabs were by Fire Assay ICPOES (Induced coupled plasma arc with optical emission spectroscopy).

The multi-element analysis was by digestion with a combination of hydrochloric, nitric, perchloric and hydrofluoric acids.

Mr. Robert G. Komarechka, P.Geo., an independent consultant, has reviewed and verified SBMI’s work referred to herein, and is the Qualified Person for this release.

With respect to the Company’s press release concerning seeking an extension of the Warrants (as that term is defined in that release), SBMI advises it is seeking an extension on a total of 8,528,081 Warrants with new expiry dates ranging from February 6, 2024 to July 8, 2024.

For further information, please contact:

John Carter
Silver Bullet Mines Corp., CEO
cartera@sympatico.ca

+1 (905) 302-3843

Peter M. Clausi
Silver Bullet Mines Corp., VP Capital Markets
pclausi@brantcapital.ca
+1 (416) 890-1232

Cautionary and Forward-Looking Statements

This news release contains certain statements that constitute forward-looking statements as they relate to SBMI and its subsidiaries. Forward-looking statements are not historical facts but represent management’s current expectation of future events, and can be identified by words such as “believe”, “expects”, “will”, “intends”, “plans”, “projects”, “anticipates”, “estimates”, “continues” and similar expressions. Although management believes that the expectations represented in such forward-looking statements are reasonable, there can be no assurance that they will prove to be correct.

By their nature, forward-looking statements include assumptions, and are subject to inherent risks and uncertainties that could cause actual future results, conditions, actions or events to differ materially from those in the forward-looking statements. If and when forward-looking statements are set out in this new release, SBMI will also set out the material risk factors or assumptions used to develop the forward-looking statements. Except as expressly required by applicable securities laws, SBMI assumes no obligation to update or revise any forward-looking statements. The future outcomes that relate to forward-looking statements may be influenced by many factors, including but not limited to: the impact of SARS CoV-2 or any other global virus; reliance on key personnel; the thoroughness of its QA/QA procedures; the continuity of the global supply chain for materials for SBMI to use in the production and processing of ore; shareholder and regulatory approvals; activities and attitudes of communities local to the location of the SBMI’s properties; risks of future legal proceedings; income tax matters; fires, floods and other natural phenomena; the rate of inflation; availability and terms of financing; distribution of securities; commodities pricing; currency movements, especially as between the USD and CDN; effect of market interest rates on price of securities; and, potential dilution. SARS CoV-2 and other potential global pathogens create risks that at this time are immeasurable and impossible to define.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/153061

Categories
Base Metals Energy Junior Mining Precious Metals Silver Bullet Mines

Silver Bullet Mines Corp. Discovers New Sulphide Vein Structures at the Buckeye Mine and a New Gold Occurrence

Burlington, Ontario–(Newsfile Corp. – January 31, 2023) – Silver Bullet Mines Corp. (TSXV: SBMI) (OTCQB: SBMCF) (‘SBMI’ or ‘the Company’) is pleased to report results from its Buckeye Mine development, ongoing PGM (platinum group metals) study, assay results from its Black Copper occurrence and the discovery of a new gold occurrence on its Black Diamond Property.


 
Development drift intersecting a wall of sulphides at the Buckeye Mine, Jan. 28, 2023
 
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8464/153012_bf88da37d4d289e1_001full.jpg

As of this date, the development drift at the Buckeye Mine has advanced about 116 metres from the adit alongside the main vein with ongoing bolting and screening.

In its January 17, 2023 press release, the Company advised it “…next intends to drift along the vein to an area believed to contain higher grade mineralization (see page 8 of the Geologic Report dated January 8, 2021).” However, the Company believes it may have intercepted that area of higher grade mineralization sooner than expected.

Approximately 1 metre before turning into the anticipated intersection with the main vertical vein, a 0.6 metre thick horizontal fracture zone was encountered that contained bands of massive sulphides. Horizontal sulphide bands were also noted by the QP for this press release in the Treasure Room along with paper thin layers of high purity native silver, similar to the bands in the newly discovered fracture zone. While the Company expected to locate the area of higher grade mineralization, the placement of this 0.6 metre wide area of sulphide mineralization was a positive surprise to the Company.

A blast in the drift on January 27, 2023 exposed another wall of sulphides at the end of the drift. These sulphides were also encountered sooner than the Company expected. Samples of the sulphide material are being prepared to be sent for assaying and further petrographic examination.

Regarding the earlier reported PGM assays and as previously reported, check assay samples have been sent to three independent certified labs. SBMI is awaiting complete reporting of the assays from the three labs. In addition to these check assays, the Company has contracted Dr. Andy McDonald, Mineralogist, of the Harquail School of Earth Sciences, at Laurentian University in Sudbury, Ontario, Canada, to undertake sample preparation, petrographic and scanning electron microscope examination of two samples derived from the Buckeye Mine.

The first sample being analyzed by Dr. McDonald was taken by the QP in November, 2022. It was diabase from the floor of the Treasure Room of the Buckeye Mine containing a silvery ductile mineral, subsequently confirmed by Dr. McDonald to be high purity native silver. When this sample was examined with an uncalibrated handheld X-ray fluorescent unit, the presence of palladium at 29 and 21 parts per million was noted. The second sample provided to Dr. McDonald was a malformed dore bar poured by SBMI in September, 2022 derived from the Buckeye Mine, containing highly refractory “unknown material.”


 
Native silver in diabase rock sample collected from the floor of the Treasure Room, Buckeye Mine
 
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8464/153012_bf88da37d4d289e1_002full.jpg


 
Malformed refractory dore bar poured in September, 2022
 
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8464/153012_bf88da37d4d289e1_003full.jpg

Also in SBMI’s January 17, 2023 press release, SBMI advised third part geologic consultants including the QP had visited the Black Copper occurrence in late November and early December, 2022. Black Copper is situated on SBMI’s Black Diamond property roughly one point five kilometres south of the Buckeye Mine and is referred to in the January, 2021 Geologic Report. Samples from Black Copper were taken and reported the following results:

Sample numberAu (ppb)Cu ppm
342151615>1000
342152192>1000
342153941>1000
342154654>1000

The over-detection limit for copper on these samples was 1000 parts per million. These four samples were sent for further analysis which returned:

Sample numberCu ppmCu %
34215122402.24
34215237403.740
34215334003.400
34215454905.490

In addition, during this geological study, an area of broken rusty quartz float was observed by the QP near the trail to the Richmond Basin to the west of the McMorris and Buckeye Mines. This is the Company’s first testing of this area. These quartz fragments appeared to be segments of narrow quartz veins containing sulphides. Due to a soil cover of a few inches to a foot in this area, limited time prevented exposure of the underlying bedrock. Four samples were collected from surface and yielded the following gold assays:

Sample numberAu (ppb)Bi (ppm)
342109172
3421104450412
342111641600
342112716

A bismuth assay of 1600 ppm and a silver assay over 100 ppm was recorded in sample 342111. The QP of this press release highly recommends further evaluation of this new gold occurrence.


 
Sample 342110 assayed 4.45 g/t Au. from the new gold occurrence.
 
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8464/153012_bf88da37d4d289e1_004full.jpg

QAQC For SBMI

All the samples above were collected by Robert Komarechka and John Corkery. Samples were collected and placed in sample bags with their appropriate tag and personally taken to the courier and shipped to Actlabs in Thunder Bay, Ontario for assaying. Certified standards and blanks were used both by the Company and Actlabs.

All samples analyzed by Actlabs were by Fire Assay ICPOES (Induced coupled plasma arc with optical emission spectroscopy).

The multi-element analysis was by digestion with a combination of hydrochloric, nitric, perchloric and hydrofluoric acids.

Mr. Robert G. Komarechka, P.Geo., an independent consultant, has reviewed and verified SBMI’s work referred to herein, and is the Qualified Person for this release.

With respect to the Company’s press release concerning seeking an extension of the Warrants (as that term is defined in that release), SBMI advises it is seeking an extension on a total of 8,528,081 Warrants with new expiry dates ranging from February 6, 2024 to July 8, 2024.

For further information, please contact:

John Carter
Silver Bullet Mines Corp., CEO
cartera@sympatico.ca

+1 (905) 302-3843

Peter M. Clausi
Silver Bullet Mines Corp., VP Capital Markets
pclausi@brantcapital.ca
+1 (416) 890-1232

Cautionary and Forward-Looking Statements

This news release contains certain statements that constitute forward-looking statements as they relate to SBMI and its subsidiaries. Forward-looking statements are not historical facts but represent management’s current expectation of future events, and can be identified by words such as “believe”, “expects”, “will”, “intends”, “plans”, “projects”, “anticipates”, “estimates”, “continues” and similar expressions. Although management believes that the expectations represented in such forward-looking statements are reasonable, there can be no assurance that they will prove to be correct.

By their nature, forward-looking statements include assumptions, and are subject to inherent risks and uncertainties that could cause actual future results, conditions, actions or events to differ materially from those in the forward-looking statements. If and when forward-looking statements are set out in this new release, SBMI will also set out the material risk factors or assumptions used to develop the forward-looking statements. Except as expressly required by applicable securities laws, SBMI assumes no obligation to update or revise any forward-looking statements. The future outcomes that relate to forward-looking statements may be influenced by many factors, including but not limited to: the impact of SARS CoV-2 or any other global virus; reliance on key personnel; the thoroughness of its QA/QA procedures; the continuity of the global supply chain for materials for SBMI to use in the production and processing of ore; shareholder and regulatory approvals; activities and attitudes of communities local to the location of the SBMI’s properties; risks of future legal proceedings; income tax matters; fires, floods and other natural phenomena; the rate of inflation; availability and terms of financing; distribution of securities; commodities pricing; currency movements, especially as between the USD and CDN; effect of market interest rates on price of securities; and, potential dilution. SARS CoV-2 and other potential global pathogens create risks that at this time are immeasurable and impossible to define.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/153012