Categories
Base Metals Energy Junior Mining Rover Metals

Rover Metals to Temporarily Trade Under the Symbol (ROVMD) on OTCQB

Rover Metals Corp.
Rover Metals Corp.

VANCOUVER, British Columbia, Nov. 09, 2022 (GLOBE NEWSWIRE) — Rover Metals Corp. (TSXV: ROVR) (OTCQB: ROVMF) (FSE:4XO) (“Rover” or the “Company”) announces that further to its release of October 28, 2022, regarding its listed common share consolidation, per FINRA regulations in the United States, the Company will temporarily trade under ROVMD on the OTCQB. After November 28th, 2022, the Company will resume trading under its old symbol ROVMF.

Judson Culter, CEO at Rover Metals, states “a consolidation of our Company’s securities was necessary to position Rover for growth and success with our new critical mineral projects. Both the Let’s Go Lithium Project, Nevada, USA, and the IML Zinc-Copper Project, NT, Canada, require Phase 1 and Phase 2 Exploration Programs. Additionally, the Company’s existing gold projects require expanded Phase 2 Exploration Programs.”

About Rover Metals
Rover is a publicly traded junior mining company that trades on the TSXV under symbol ROVR, on the OTCQB under symbol ROVMF, and on the FSE under symbol 4XO. The Company is now developing a diverse portfolio of mineral resource projects: (1) Nevada Claystone Lithium; (2) Zinc-Copper-Lead-Silver in NT, Canada; as well as (3) Gold in NT, Canada. The Company is exclusive to the mining jurisdictions of the U.S. and Canada.

You can follow Rover on its social media channels:
Twitter: https://twitter.com/rovermetals
LinkedIn: https://www.linkedin.com/company/rover-metals/
Facebook: https://www.facebook.com/RoverMetals/
for daily company updates and industry news, and
YouTube: https://www.youtube.com/channel/UCJsHsfag1GFyp4aLW5Ye-YQ?view_as=subscriber
for corporate videos.
Subscribe to our Newsletter on our Website: https://www.rovermetals.com/

ON BEHALF OF THE BOARD OF DIRECTORS
“Judson Culter”
Chief Executive Officer and Director

For further information, please contact:
Email: info@rovermetals.com
Phone: +1 (778) 754-2617

Statement Regarding Forward-Looking Information
This news release contains statements that constitute “forward-looking statements.” Such forward-looking statements involve known and unknown risks, uncertainties and other factors that may cause Rover’s actual results, performance or achievements, or developments in the industry to differ materially from the anticipated results, performance or achievements expressed or implied by such forward-looking statements. Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by the words “expects,” “plans,” “anticipates,” “believes,” “intends,” “estimates,” “projects,” “potential” and similar expressions, or that events or conditions “will,” “would,” “may,” “could” or “should” occur. There can be no assurance that such statements prove to be accurate. Actual results and future events could differ materially from those anticipated in such statements, and readers are cautioned not to place undue reliance on these forward-looking statements. Any factor could cause actual results to differ materially from Rover’s expectations. Rover undertakes no obligation to update these forward-looking statements in the event that management’s beliefs, estimates or opinions, or other factors, should change.

THE FORWARD-LOOKING INFORMATION CONTAINED IN THIS NEWS RELEASE REPRESENTS THE EXPECTATIONS OF THE COMPANY AS OF THE DATE OF THIS NEWS RELEASE AND, ACCORDINGLY, IS SUBJECT TO CHANGE AFTER SUCH DATE. READERS SHOULD NOT PLACE UNDUE IMPORTANCE ON FORWARD-LOOKING INFORMATION AND SHOULD NOT RELY UPON THIS INFORMATION AS OF ANY OTHER DATE. WHILE THE COMPANY MAY ELECT TO, IT DOES NOT UNDERTAKE TO UPDATE THIS INFORMATION AT ANY PARTICULAR TIME EXCEPT AS REQUIRED IN ACCORDANCE WITH APPLICABLE LAWS.

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OF THIS RELEASE.

Categories
Gold Shore Resources Junior Mining

Goldshore Resources Inc. Invitation to Deutsch Goldmesse

Vancouver, British Columbia–(Newsfile Corp. – November 7, 2022) – Goldshore Resources Inc (TSXV: GSHR) will be participating in the Deutsche Goldmesse, which will take place on November 18th and 19th at The Westin Grand Frankfurt.

Members of the Goldshore Resources Inc management will be taking meetings throughout the day, and also present at 01:45pm CET on November 19th to an audience of European investors.

An online registration form is available, and investors can register to attend at: https://deutschegoldmesse.online/investor-registration/.

Kai Hoffmann, Managing Director of Soar Financial Partners, remarked, “We are excited to host our 3rd in-person premier mining investment event, bringing together carefully selected mining and exploration companies with the European investment community over the course of two days. We anticipate this to be our largest conference yet, and we are pleased to welcome again an astute line-up of keynote speakers.”

The Deutsche Goldmesse website is continuously being updated concerning attending companies, keynote speakers, agenda, etc.: www.deutschegoldmesse.com

About Goldshore Resources Inc

Goldshore Resources Inc. (TSXV: GSHR) (OTCQB: GSHRF) (FSE: 8X00F)Goldshore is an emerging well-financed junior gold developer, who acquired the Moss Lake Gold Project (Ontario, Canada) from Wesdome Gold Mines Ltd. In January 2021. The Moss Lake Project has a historical resource of c.1.5M oz Indicated and c.2.5M oz. Inferred and is conducting an extensive exploration strategy, including a 100,000m drilling program. As well, The Moss Lake Project has a historical copper mine (North Coldstream Mine) on its land package (operated by Noranda/Xstrata – 1954-1992), and significant other copper/gold targets to be tested going forward. Goldshore’s Moss Lake Project holds a large land package in North-western Ontario. The project displays significant resource potential, as Goldshore takes the project through its next stages of exploration and development, towards an updated mineral resource estimation (MRE) in Q4 2022; followed by updated preliminary economic assessment (PEA) in Q1 2023 and visibility towards feasibility study (FS) thereafter.

About Deutsche Goldmesse

Deutsche Goldmesse is Germany’s premier mining investment conference, based out of Frankfurt – one of Europe’s most important financial capitals. We bring together leading minds in the industry to foster new business opportunities and facilitate valuable relationships. The exclusive two-day event showcases industry-leading keynote speakers and up to 35 carefully considered companies in a range of commodities and stages from explorers to producers.

Hosted by Soar Financial Partners, we provide a platform where top company management can connect with a vast network of European institutional and HNW investors, retail investors, analysts, influencers, newsletter writers, media, and other local partners.

For further information:
Goldshore Resources Inc
Brett A Richards
Chief Executive Officer
19054491500
brett@brettrichards.org
www.goldshoreresources.com

Categories
Junior Mining Precious Metals

Provenance Completes NI 43-101 Technical Report on Its Eldorado Gold Property

Vancouver, British Columbia–(Newsfile Corp. – November 8, 2022) – Provenance Gold Corp. (CSE: PAU) (OTCQB: PVGDF) (the “Company” or “Provenance“) is pleased to announce that a NI 43-101 technical report has been filed on SEDAR for its Eldorado gold property in Malheur County, Oregon. The purpose of this report was to form a baseline for the property, which will be expanded further in 2023 following a confirmation drilling program planned by the Company. Eldorado has a historic drill hole database consisting of 242 drill holes that have outlined a large shallow open-ended gold system. This historical database is currently not sufficient as the basis for developing a current mineral resource, but work is underway to verify and bring current the historical data.

In 1990 the first mineral inventory was calculated by Pincock, Alan and Holt (PAH) a reputable engineering firm that was used industry wide for this type of work. PAH modeled 158 of the historic drill holes which identified approximately 52,896,000 tons that graded 0.578 g/t gold (0.0169 oz/t gold) at a cut-off of 0.274 grams per ton (0.008 oz/t) in the completely open-ended gold system. The Company is aware of a second historical resource estimate that was calculated by ICAN Minerals and a further projected resource estimate by ICAN from work completed between 1989 and 1997 where the tonnage and grade were substantially higher. The Company is not treating any of these estimates as current mineral resources and a qualified person has not done sufficient work to classify the estimates as current mineral resources. The estimates were prepared prior to the enactment of National Instrument 43-101 and should not be relied upon for investment decisions. The purpose of presenting this information is to show that the Eldorado property has potential to hold a large mineral inventory. Provenance plans to update these historical estimates into a current resource model. Near term work includes confirmation drilling by twinning a number of the historic holes, certifying and comparing assays between the old and new holes, validating all historic holes in the field with a GPS and confirming historic metallurgical test results. When the Company is comfortable with these upgrades in compliance, then a new stand-alone current resource can be calculated. Other than these, the Company is not aware of any more recent estimates prepared for the property.

Within the Eldorado mineralized area there are many higher-grade zones. For example, as quoted from the NI 43-101 report, ICAN Minerals’ hole R-96-C-1 intersected 1.51 g/t gold (0.0441 oz/t gold) over 196.9 meters (646 feet). The estimate predates and does not comply with current CIM Definition Standards but illustrates that the gold system is large and extends to depth, not just in area.

Examples of High Gold Intercepts in Some Drill Holes

Hole #From/To (m)Thickness (m)g/t Gold
(0.1 g CO)
High Assay
R-13622.9-157134.12.08 g
including111.3-150.839.65.0 g
including126.5-129.5330.48 g44.19 g
R-900-67673.23 g
including48.7-65.516.79.63 g40.5 g
R-260-70.1701.47 g36.0 g
R-13721.3-44.221.32.21 g24.9 g
Hole #From/To (ft)Thickness (ft)oz/t Gold
(0.1 ppm c/o)
High Assay
R-13675 to 5154400.06 opt
including365-4901300.147 opt
including415-425100.891 opt1.29 opt
R-900-2202200.094 opt
including160-215550.28 opt1.17 opt
R-260-2302300.043 opt1.05 opt
R-13770-145700.065 opt0.73 opt

Eldorado Geology and Historic Drill Holes


Figure 1

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/5654/143445_2f70f5f1047f0b76_001full.jpg

As stated within this new technical report:

“The Eldorado magmatic/hydrothermal system is interpreted as a classic porphyry gold system. Gold is found in veinlets, stockworks, fractures, and hydrothermal breccias. Mineralization is controlled by both strong fracture development and pyrite veining coincident with gold mineralization. Pyrite veining, or its oxidized equivalent, is common throughout all of the drill holes.”

The historic metallurgical work suggests the gold is largely recoverable by standard methods. Dawson Metallurgical Laboratories and Mountain States R&D International conducted metallurgical tests that were encouraging, and these tests will be duplicated using material obtained from the upcoming drill program.

“Dawson composited five unoxidized sulfide-bearing samples into a 13.15 kg test sample that assayed 1.233 g/t gold (0.036 oz/t gold). Pyrite was found to be the most common sulfide. Approximately 90% of the gold was recovered by two-stage gravity-flotation. Significant free gold was observed in both the gravity and flotation concentrates.”

Additionally.

“The Mountain States laboratory conducted a series of bottle-roll tests on composite sulfide samples from the Property. Three composite test samples yielded recoveries on unground rock that yielded 71%, 76%, and 77% recoveries. Grinding increased the recoveries to 92%, 86%, and 83%.”

Based on Historic Metallurgy, Gold in Both the Oxidized Rock (yellow) and Unoxidized Rock (grey) is Readily Recoverable by Conventional and Even Non-Chemical Methods



Figure 2

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/5654/143445_2f70f5f1047f0b76_002full.jpg

After review of the historic drilling and after surface inspection of the Eldorado Property, Provenance believes the gold system is open to expansion in all directions and will also expand with in-fill drilling. The Company believes that the area of mineralization extends far beyond initially thought, and the surface mineralization expands even further.

Steve Craig, Project Manager states, “With future drilling programs, this project will grow with step-out and infill drilling. Even in the central area, some major mineralized areas remain partially drilled. An important early additional plus is that the historic metallurgy by reputable laboratories indicated the gold is mostly recoverable even in the sulfide zone, by gravity and flotation in addition to standard chemical extraction. This is because the gold appears to have come in after the pyrite, so it’s exposed and accessible to recovery. This is unusual and very fortunate.”

The report concludes that the favorable geological setting of the Property, as well as mineralization intersected in historic drill programs indicate the presence of porphyry style gold mineralization at the Eldorado Property. Based on Mr. Gibson’s site inspection, as well as the authors’ review of historic and recent work completed at the Property, it is the opinion of the authors of this Report that the Eldorado Property is a property of merit that warrants future exploration.

As a result, the authors recommend a staged exploration program for the Property, with Phase 2 exploration being dependent on the results of Phase 1.

The Company will report on its next steps for advancing the Eldorado Property within the coming weeks. The Company has now submitted all the final permitting documents requested and required by DOGAMI, to finalize the review process. The Company is unaware of any further issues likely to arise and has been told that no further information will be required to complete the permit. Site visits to the property have identified additional areas of obvious surface mineralization. Based on these studies, the Company wants to expand the currently planned drilling to include some of these areas inside and outside the historically drilled area. The Company plans to conduct its initial drilling program in the Spring to allow use of the new information to help guide exploration of these undrilled areas and to take advantage of more favorable weather. More will be reported on these newly recognized mineralized areas in the very near future.

NI 43-101 Technical Report

An NI 43-101 Technical Report (the “Report”) entitled “Technical Report on the Eldorado Property, Malheur County, Oregon ” has been completed and filed on behalf of the Company. The report was completed by Michael Dufresne, M.Sc., P.Geol., P.Geo. of Apex Geosciences Ltd. and Jodie Gibson, M.Sc., P.Geo. with an effective date of October 20, 2022. The report was prepared to provide an independent evaluation of the exploration potential of the Eldorado Property. The Report has been posted on the Company’s website and is available on SEDAR.

Qualified Person

Steven Craig, CPG, an independent consultant and qualified person as defined under National Instrument 43-101, has reviewed and approved the technical contents of this news release.

About Provenance Gold Corp.

Provenance Gold Corp. is a precious metals exploration company with a focus on gold and silver mineralization within North America. The Company currently holds interests in three properties, two in Nevada, and one in eastern Oregon, USA. For further information please visit the Company’s website at https://provenancegold.com or contact Rob Clark at rclark@provenancegold.com.

On behalf of the Board,
Provenance Gold Corp.
Rauno Perttu, Chief Executive Officer

Neither the Canadian Securities Exchange, nor its regulation services provider, accepts responsibility for the adequacy or accuracy of this press release. This news release may contain certain “Forward-Looking Statements” within the meaning of the United States Private Securities Litigation Reform Act of 1995 and applicable Canadian securities laws. When or if used in this news release, the words “anticipate”, “believe”, “estimate”, “expect”, “target, “plan”, “forecast”, “may”, “schedule” and similar words or expressions identify forward-looking statements or information. Such statements represent the Company’s current views with respect to future events and are necessarily based upon a number of assumptions and estimates that, while considered reasonable by the Company, are inherently subject to significant business, economic, competitive, political and social risks, contingencies and uncertainties. Many factors, both known and unknown, could cause results, performance or achievements to be materially different from the results, performance or achievements that are or may be expressed or implied by such forward-looking statements. The Company does not intend, and does not assume any obligation, to update these forward-looking statements or information to reflect changes in assumptions or changes in circumstances or any other events affecting such statements and information other than as required by applicable laws, rules and regulations.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/143445

Categories
Energy Junior Mining Precious Metals

Dolly Varden Silver Intersects 1.50m of 1,367 g/t Ag within 12.51 meters Grading 442 g/t Ag at Kitsol Vein

Vancouver, British Columbia–(Newsfile Corp. – November 7, 2022) – Dolly Varden Silver Corporation (TSXV: DV) (OTCQX: DOLLF) (the “Company” or “Dolly Varden“) is pleased to announce results from drilling at the Torbrit Resource area, including infill and step-out drilling within the Kitsol Vein zone.

The high-grade, potentially bulk-mineable Kitsol Vein continued to deliver outstanding, contiguous silver and base metal mineralization, where DV22-291 intersected 12.51m (8.88m true width) averaging 442 g/t Ag, 0.68% Pb and 0.42% Zn, including of 1,367 g/t Ag over 1.50m (1.07m true width), as an up-dip infill hole from previous high-grade intercepts.

Highlights include:

  • DV22-289: 979 g/t Ag over 0.49 meters true width, step out at Torbrit Main
  • DV22-291: 442 g/t Ag over 8.88 meters true width, infill at Kitsol
  • DV22-298: 372 g/t Ag over 10.78 meters true width, up-dip extension at Kitsol
  • DV22-308: 297 g/t Ag over 6.59 meters true width, step out at Torbrit Main
  • DV22-312: 585 g/t Ag over 3.30 meters true width, step out at Torbrit Main

“In addition to discovery-focused exploration drilling, Dolly Varden Silver has been prioritizing resource expansion and upgrading at the Torbrit/Kitsol, Wolf, Homestake Main and Homestake Silver deposits. We continue to encounter wide, potentially bulk-mineable vein-hosted silver mineralization at Kitsol, and expect to announce significant drill results from the other resource areas in the next few weeks,” said Shawn, Khunkhun, President and CEO.

The 2022 exploration drill program on the Kitsault Valley trend has completed 37,061m in 108 drill holes. Drilling wrapped up in mid-October, with the majority of assays still pending. Additionally, ground geophysics, surface mapping and prospecting work were completed, evaluating historic prospects and identifying new silver and gold occurrences.

Torbrit Main and North Deposits consist of distinctive stratabound silver mineralization associated with a high potassium and coincident sodium depletion alteration signature. Layers consist of red jasper with bladed crystal growths after barite later replaced by silica. Relatively quick capping of the system by volcanic activity caused an overprinting of epithermal brecciation and veining which further augmented the silver grades within the deposit area.



Figure 1. Drill hole DV22-308 from Torbrit Main showing typical red jasperoid stratabound mineralization with epithermal overprint carrying higher silver grades

To view an enhanced version of Figure 1, please visit:
https://images.newsfilecorp.com/files/1728/143231_102a401624b57ac9_002full.jpg.

The main focus of Torbrit step out drilling at the Torbrit Main Deposit targeted the southern limits of the current Mineral Resource. Drill holes were oriented to step-out from, as well as infill areas of modelled inferred resources (see Figure 3). The Torbrit horizon was intersected in all expansion holes; future infill drilling programs will target high grade shoots within the lower grade horizon, which were commonly encountered in historic mining at the Torbrit, Wolf and Dolly Varden deposits.



Figure 2. Location along the Kitsault Valley trend

To view an enhanced version of Figure 2, please visit:
https://images.newsfilecorp.com/files/1728/143231_102a401624b57ac9_003full.jpg.

The Kitsol Vein is considered part of the epithermal, structurally controlled system that over printed the stratabound layers. Mineralization consists of pyrargerite (ruby silver), argentite and native silver in a silica breccia vein system. The northeast/southwest orientation of the vein and nature of the high grade silver plunge is similar to what is developing at the Wolf deposit 1.4km to the north (see figure 2).

Drilling during the 2022 season at Kitsol has encountered wide, high grade silver mineralization, commonly with overprinting high-grade vein shoots within wide vein sets. Previously reported step-out drill hole DV22-283 that intersected 50.18m (~30.0m true width) averaging 414 g/t Ag (see news release August 10, 2022) suggest multiple high-grade, steeply plunging yet wide silver shoots that extend to surface, as demonstrated by up-dip hole DV22-298 which intersected 21.55m (10.78m true width) grading 372 g/t Ag (see Figure 5). Additional results from step-out drill holes testing deeper, down plunge mineralization from DV22-283 at the Kitsol Vein are pending.



Figure 3. Plan map, Torbrit Resource Area with 2019 resource block model. Yellow/orange blocks indicates targeted expansion areas of Inferred and exploration potential respectively.

To view an enhanced version of Figure 3, please visit:
https://images.newsfilecorp.com/files/1728/143231_102a401624b57ac9_004full.jpg.



Figure 4. Geological Cross Section (A-B) of southern Torbrit deposit with 2019 modelled mineralized envelope in red and 2022 drilling with mineralized intercepts as pink lithology

To view an enhanced version of Figure 4, please visit:
https://images.newsfilecorp.com/files/1728/143231_102a401624b57ac9_005full.jpg.



Figure 5. Kitsol vein long section highlighting six 2022 infill and expansion drill holes that define a steep plunge to high-grade silver mineralization. Section view looking Northwest.

To view an enhanced version of Figure 5, please visit:
https://images.newsfilecorp.com/files/1728/143231_102a401624b57ac9_006full.jpg.

Table 1. Drill hole assays for Torbrit Deposit Area (including Kitsol Vein zone as noted).

Hole IDFromToCore
Length
(m)
True
Width
(m)*
Ag
(g/t)
Pb
(%)
Zn
(%)
Au
(ppm)
AgEq**
(g/t)
DV22-282
(Kitsol)
175.38179.053.672.832100.480.110.04232
DV22-284111.33112.971.641.31500.586.10NSV299
and114.43115.511.080.861290.161.45NSV189
and125.32128.853.532.82270.113.440.06165
DV22-286
(Kitsol)
173.54174.500.960.581410.810.550.15200
and177.00183.956.954.171880.240.160.09209
including178.80179.530.730.444480.150.180.16473
including181.92182.420.500.305640.290.110.39609
DV22-287176.00177.001.000.90NSVNSV1.69NSV64
DV22-28911.4912.000.510.499790.370.16NSV996
DV22-291
(Kitsol)
120.19132.7012.518.884420.260.31NSV462
including120.19120.720.530.381441.211.330.05236
including125.50127.001.501.0713670.220.17NSV1380
DV22-29019.2119.940.730.704060.170.13NSV416
DV22-292NSV
DV22-29388.3491.803.463.431360.050.02NSV138
including90.7791.801.031.021660.080.03NSV170
DV22-295
(Kitsol)
145.90152.006.103.481450.850.36NSV185
including147.40151.003.602.051660.230.33NSV186
and240.50241.000.500.292300.020.010.01232
DV22-298
(Kitsol)
25.4547.0021.5510.783720.680.42NSV409
including27.7934.566.773.397851.590.64NSV858
including27.2528.851.600.805175.482.40NSV777
including29.5030.501.000.5010540.500.21NSV1077

*Calculated true widths vary depending intersection angles and range from 50% to 100% of intersection lengths
**AgEq is calculated using $US1650/oz Au, $US20/oz Ag, $US0.90/lb Pb and $US1.10/lb Zn

Table 1 con’t. Drill hole assays for Torbrit Deposit Area (including Kitsol Vein zone as noted).

Hole IDFromToCore
Length
 (m)
True
Width
(m)*
Ag
(g/t)
Pb
(%)
Zn
(%)
Au
(ppm)
AgEq**
(g/t)
DV22-29681.0082.251.250.891191.150.27NSV165
and85.0588.503.452.451301.310.41NSV186
and90.0091.001.000.71981.280.35NSV151
and108.40115.607.205.11601.440.67NSV130
and124.25125.401.150.822740.050.43NSV292
DV22-297NSV
DV22-29919.4523.003.553.121660.030.06NSV169
and30.5031.000.500.445173.160.09NSV618
and52.3552.830.480.422672.290.07NSV341
and74.7375.480.750.662420.260.10NSV254
and107.12112.004.884.291680.150.50NSV192
and122.87123.530.660.581990.250.19NSV214
DV22-301127.50129.001.500.663700.550.15NSV393
and163.30164.160.860.381530.260.200.01168
including173.16173.950.790.352350.220.16NSV248
DV22-303150.91154.853.943.433250.420.060.30340
DV22-305157.00159.262.262.211680.210.05NSV176
and170.05170.550.500.492830.050.02NSV285
DV22-306114.00117.413.413.411320.400.640.01170
and119.00123.504.504.501660.120.560.02193
and148.00151.443.443.441910.060.030.01194
and155.00159.004.004.001450.180.090.01155
DV22-308146.18154.528.346.592971.250.47NSV354
including149.75152.282.532.007731.290.68NSV839
DV22-309126.62128.581.961.841930.480.030.01210
DV22-310NSV
DV22-31260.0063.303.303.305850.020.06NSV588
including60.0061.131.131.1310500.020.06NSV1053
and105.25108.623.373.371590.130.04NSV165
DV22-31380.0081.101.101.101580.010.30NSV169
and105.00106.671.671.671600.300.09NSV173

*Calculated true widths vary depending intersection angles and range from 50% to 100% of intersection lengths
**AgEq is calculated using $US1650/oz Au, $US20/oz Ag, $US0.90/lb Pb and $US1.10/lb Zn

Table 2. Drill hole locations.

Hole IDZoneEasting
UTM83 (m)
Northing
UTM83 (m)
Elev. (m)AzimuthDipLength
 (m)
DV22282Kitsol4675436172134404118-45214.00
DV22286Kitsol467543617213440490-58438.00
DV22284Torbrit467833617163934928-59472.35
DV22287Torbrit467833617163934928-88215.00
DV22289Torbrit468026617133435250-6890.00
DV22290Torbrit468026617133435250-69165.00
DV22291Kitsol4675716172168394100-50300.00
DV22295Kitsol4675716172168394100-60339.00
DV22292Torbrit468040617128735855-45129.00
DV22293Torbrit468405617130964970-50137.00
DV22296Torbrit468405617130964945-65150.00
DV22297Torbrit468405617130964945-80201.00
DV22299Torbrit468405617130964915-50183.00
DV22298Kitsol4676276172140371115-65121.00
DV22301Torbrit468330617140564345-82237.00
DV22303Torbrit4683266171329605120-83216.00
DV22305Torbrit4683266171329605200-80216.00
DV22306Torbrit468221617139054945-55216.00
DV22308Torbrit468221617139054950-80219.00
DV22309Torbrit468228617126352235-60177.00
DV22310Torbrit468228617126352235-78201.00
DV22312Torbrit468320617121656845-58150.00
DV22313Torbrit468320617121656845-75150.00

Quality Assurance and Quality Control

The Company adheres to CIM Best Practices Guidelines for exploration related activities conducted on its property. Quality Assurance and Quality Control (QA/QC) procedures are overseen by the Qualified Person.

Dolly Varden QA/QC protocols are maintained through the insertion of certified reference material (standards), blanks and field duplicates within the sample stream. Drill core is cut in-half with a diamond saw, with one-half placed in sealed bags and shipped to the laboratory and the other half retained on site. Third party laboratory checks on 5% of the samples are carried out as well. Chain of custody is maintained from the drill to the submittal into the laboratory preparation facility.

Analytical testing was performed by ALS Canada Ltd. in North Vancouver, British Columbia. The entire sample is crushed and a 500 gram split is pulverized to minus 200mesh. Multi-element analyses were determined by Inductively-Coupled Plasma Mass Spectrometry (ICP-MS) for 48 elements following a 4-acid digestion process. High grade silver testing was determined by Fire Assay with either an atomic absorption, or a gravimetric finish, depending on grade range. Au is determined by Fire Assay on a 30g split.

Qualified Person

Rob van Egmond, P.Geo. Vice-President Exploration for Dolly Varden Silver, the “Qualified Person” as defined by NI43-101 has reviewed, validated and approved the scientific and technical information contained in this news release and supervises the ongoing exploration program at the Dolly Varden Project.

About Dolly Varden Silver Corporation

Dolly Varden Silver Corporation is a mineral exploration company focused on advancing its 100% held Kitsault Valley Project (which combines the Dolly Varden Project and the Homestake Ridge Project) located in the Golden Triangle of British Columbia, Canada, 25kms by road to tide water. The 163 sq. km. project hosts the high-grade silver and gold resources of Dolly Varden and Homestake Ridge along with the past producing Dolly Varden and Torbrit silver mines. It is considered to be prospective for hosting further precious metal deposits, being on the same structural and stratigraphic belts that host numerous other, on-trend, high-grade deposits, such as Eskay Creek and Brucejack. The Kitsault Valley Project also contains the Big Bulk property which is prospective for porphyry and skarn style copper and gold mineralization, similar to other such deposits in the region (Red Mountain, KSM, Red Chris).

Forward-Looking Statements

This release may contain forward-looking statements or forward-looking information under applicable Canadian securities legislation that may not be based on historical fact, including, without limitation, statements containing the words “believe”, “may”, “plan”, “will”, “estimate”, “continue”, “anticipate”, “intend”, “expect”, “potential”, and similar expressions. Forward-looking statements involve known and unknown risks, uncertainties, and other factors which may cause the actual results, performance, or achievements of Dolly Varden to be materially different from any future results, performance, or achievements expressed or implied by the forward-looking statements. Forward-looking statements or information in this release relates to, among other things, the 2022 drill program at the Kitsault Valley Project, the results of previous field work and programs and the continued operations of the current exploration program, interpretation of the nature of the mineralization at the project and that that the mineralization on the project is similar to Eskay and Brucejack, results of the mineral resource estimate on the project, the potential to grow the project, the potential to expand the mineralization and our beliefs about the unexplored portion of the property.

These forward-looking statements are based on management’s current expectations and beliefs and assume, among other things, the ability of the Company to successfully pursue its current development plans, that future sources of funding will be available to the company, that relevant commodity prices will remain at levels that are economically viable for the Company and that the Company will receive relevant permits in a timely manner in order to enable its operations, but given the uncertainties, assumptions and risks, readers are cautioned not to place undue reliance on such forward-looking statements or information. The Company disclaims any obligation to update, or to publicly announce, any such statements, events or developments except as required by law.

For additional information on risks and uncertainties, see the Company’s most recently filed annual management discussion & analysis (“MD&A“) and management information circular dated January 21, 2022 (the “Circular“), both of which are available on SEDAR at www.sedar.com. The risk factors identified in the MD&A and the Circular are not intended to represent a complete list of factors that could affect the Company.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX-V) accepts responsibility for the adequacy or accuracy of this news release.

For further information: Shawn Khunkhun, CEO & Director, 1-604-609-5137, www.dollyvardensilver.com;

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/143231

Categories
Base Metals Energy Junior Mining Metallic Group Metallic Minerals Precious Metals

Stillwater Critical Minerals Applies for Warrant Extension

VANCOUVER, BC / ACCESSWIRE / November 4, 2022 / Stillwater Critical Minerals (formerly Group Ten Metals) (TSXV:PGE)(OTCQB:PGEZF)(FSE:5D32) (the “Company” or “SWCM”) announces that the Company has applied for TSX Venture Exchange approval to extend the expiry date on certain warrants that were due to expire November 21, 2022 (the “Warrants”). Per the application, 5,233,824 Warrants that were originally issued as part of a financing completed in November 2019 (see news release dated November 21, 2019) will be extended to a new expiration date of May 21, 2023. Each Warrant entitles the holder to acquire one common share at an exercise price of CDN$ 0.25.

About Stillwater Critical Minerals Corp.

Stillwater Critical Minerals (TSX.V: PGE | OTCQB: PGEZF) is a mineral exploration company focused on its flagship Stillwater West PGE-Ni-Cu-Co + Au project in the iconic and famously productive Stillwater mining district in Montana, USA. With the recent addition of two renowned Bushveld and Platreef geologists to the team, the Company is well positioned to advance the next phase of large-scale critical mineral supply from this world-class American district, building on past production of nickel, copper, and chromium, and the ongoing production of platinum group and other metals by neighboring Sibanye-Stillwater. The Platreef-style nickel and copper sulphide deposits at Stillwater West contain a compelling suite of critical minerals and are open for expansion along trend and at depth, with an updated NI 43-101 mineral resource update now in progress based on a 14-hole expansion drilling campaign.

Stillwater Critical Minerals also holds the high-grade Drayton-Black Lake Gold project adjacent to Treasury Metals’ development-stage Goliath Gold Complex in northwest Ontario. Drayton-Black Lake is currently under an earn-in agreement with an option to joint venture whereby Heritage Mining may earn up to a 90% interest in the project by completing payments and work on the project. The Company also holds the Kluane PGE-Ni-Cu-Co project on trend with Nickel Creek Platinum‘s Wellgreen deposit in Canada‘s Yukon Territory.

FOR FURTHER INFORMATION, PLEASE CONTACT:

Michael Rowley, President, CEO & Director
Email: info@criticalminerals.com
Phone: (604) 357 4790
Web: http://criticalminerals.com
Toll Free: (888) 432 0075

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

SOURCE: Stillwater Critical Minerals Corp.



View source version on accesswire.com:
https://www.accesswire.com/724042/Stillwater-Critical-Minerals-Applies-for-Warrant-Extension

Categories
Base Metals Energy Exclusive Interviews Junior Mining Precious Metals Rover Metals

Rover Metals – Lithium, Nevada, Finance Opportunity

Rover Metals, Proven and Probable

A CRITICAL MINERALS EXPLORATION COMPANY
Rover Metals (“Rover”) is a publicly traded Canadian junior mining company specialized in North American critical minerals and precious metal development-stage mining projects. Rover’s twelve month forward-looking plan is to advance exploration at our Nevada Claystone Lithium project and at our Northern Canada Zinc-Copper project, located near the city of Yellowknife, NT, Canada. The Indian Mountain Lake Project is the Company’s first district scale land package, representing approximately 30,000 acres of greenstone belt.

Rover Metals also has 100% ownership of several gold mining assets located near to the city of Yellowknife, NT. Rover obtained a public listing for its securities on the TSX Venture Exchange as a Tier II Mining Issuer on June 26, 2018.

Rover Metals trades under the symbol “ROVR” on the TSXV. Rover also obtained a public co-listing of its securities on the OTCQB on January 17, 2019 (OTCQB: ROVMD), and on the Frankfurt Stock Exchange on February 1, 2021 (FRA: 4XO).

The Company is run by an experienced management team and board that are career mining executives. Our management team and board have a proven history financing the development of mining projects, taking them into production, and re-selling them.

The Best Video on Why and When to Buy and Sell Physical Precious Metals:

Website| www.provenandprobable.com Call me directly at 855.505.1900 or email: Maurice@MilesFranklin.com Precious Metals FAQ – https://www.milesfranklin.com/faq-maurice/

Proven and Probable Where we deliver Mining Insights & Bullion Sales. I’m a licensed broker for Miles Franklin Precious Metals Investments (https://www.milesfranklin.com/contact/) Where we provide unlimited options to expand your precious metals portfolio, from physical delivery, offshore depositories, and precious metals IRA’s. Call me directly at (855) 505-1900 or you may email maurice@milesfranklin.com.

Proven and Probable provides insights on mining companies, junior miners, gold mining stocks, uranium, silver, platinum, zinc & copper mining stocks, silver and gold bullion in Canada, the US, Australia, and beyond.

Categories
Base Metals Energy Junior Mining Precious Metals

RooGold Closes Property Acquisition

TORONTO, ON / ACCESSWIRE / November 3, 2022 / (CSE:ROO)(OTC PINK:JNCCF)(Frankfurt:5VHA) – RooGold Inc. (“RooGold” or the “Issuer“).

Further to its September 30, 2021 news release, RooGold is pleased to announce, with Australian regulatory clearance obtained, the final closing of the definitive Share Exchange Agreement with Aussie Precious Metals Corp. (“APMC“) in which RooGold has effectively acquired a 100% interest in APMC’s Trilby and Lorne properties (“Properties“) in New South Wales (NSW) Australia. The Issuer issued four million (4,000,000) common shares (the “Purchase Shares“) to the shareholders (“Shareholders“) of APMC in exchange for all of the issued and outstanding shares of APMC with the Properties held in APMC’s wholly owned Australian subsidiary. The Purchase Shares have now been released from escrow subject to voluntary undertakings as to when such Purchase Shares may be traded.

About RooGold Inc.
ROOGOLD is a Canadian based junior venture mineral exploration issuer which is uniquely positioned to be a dominant player in New South Wales, Australia, through a growth strategy focused on the consolidation and exploration of high potential, mineralized precious metals properties in this prolific region of Australia. Through its announced acquisitions of Southern Precious Metals Ltd., RooGold Ltd. and Aussie Precious Metals Corp. properties, RooGold commands a portfolio of 13 high-grade potential gold (9) and silver (4) concessions covering 1,380 km2 which have 137 historic mines and prospects.

For further information please contact:
Ryan Bilodeau
(416) 910-1440
info@roogoldinc.com

Forward-Looking Statements

This press release may contain forward-looking statements within the meaning of applicable securities law. Forward-looking statements are frequently characterized by words such as “plan”, “expect”, “project”, “intend”, “believe”, “anticipate”, “estimate” and other similar words, or statements that certain events or conditions “may” or “will” occur.

Although the Issuer believes that the expectations reflected in applicable forward-looking statements are reasonable, therecan be no assurance that such expectations will prove to be correct. Such forward-looking statements are subjectto risks and uncertainties that may cause actual results, performance or developments to differ materially from those contained in such statements.

NEITHER THE CANADIAN SECURITIES EXCHANGE NOR ITS REGULATION SERVICES PROVIDER ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.

SOURCE: RooGold Inc.



View source version on accesswire.com:
https://www.accesswire.com/723910/RooGold-Closes-Property-Acquisition

Categories
Base Metals Energy Junior Mining Nevada Copper

Nevada Copper Provides Pumpkin Hollow Update and Restart of Operations and Board Appointment

Nevada Copper Corp.
Nevada Copper Corp.

Second Dike Crossing

Completion of the second dike crossing, allowing access to the higher-grade EN Zone
Completion of the second dike crossing, allowing access to the higher-grade EN Zone

YERINGTON, Nev., Nov. 03, 2022 (GLOBE NEWSWIRE) — Nevada Copper (TSX: NCU) (OTC: NEVDF) (FSE: ZYTA) (“Nevada Copper” or the “Company”) is pleased to provide an update on restart and operational activities for its underground mine (the “Underground Mine”) following the closing of the restart financing package that provides up to US$123 million of liquidity to the Company, as announced in the Company’s October 28, 2022 press release.

Additionally, the Company announces the addition to its Board of Directors of Guillaume de Dardel, Head of Energy Transition Metals and part of the Energy Transition desk at Mercuria Energy Trading SA (“Mercuria”), one of Nevada Copper’s largest shareholders.

Operational Updates

Optimized Mine Plan – John Wood Group plc, has completed an optimized life-of-mine plan that focuses on accessing the larger, higher-grade stopes of the East North Zone (“EN Zone”) to bring value forward in the mine life. This optimized plan is being incorporated into our development and mine planning in preparation for restart of mining operations.

Final Dike Crossings – As indicated in the Company’s October 5, 2022 press release, the Company continues to build on the significant progress made to date with the completion of the second dike crossing.   This critical achievement provides access to the higher-grade stopes of the EN Zone that is estimated to represent the highest value area of the underground reserve. This zone also represents the most competent geotechnical rock mass within the reserve which is expected to allow larger stopes to be extracted, significantly improving production efficiencies. The Company is encouraged by the rock quality being encountered beyond the dike as progress is made on development headings into the EN Zone, and appears to be as predicted by the geotechnical models. To date, nine of the first stopes to be mined have been drilled to provide critical data for final stope design in preparation for the commencement of mining in the second half of 2023.

Completion of the second dike crossing, allowing access to the higher-grade EN Zone
Completion of the second dike crossing, allowing access to the higher-grade EN Zone

The underground crews have transitioned to work on the final dike crossing which is expected to be completed in early 2023. A well-known industry grouting and geotechnical consultant has been engaged in developing the final dike crossing design and plan. The completion of the dike crossing will provide necessary access for a development contractor to begin rapid development into the EN Zone in early 2023.

Development Contractor – The Company has received indications of interest in providing proposals for development mining from six large, well-known, and established mining contractors. Discussions are in the advanced stages with these contractors and the Company expects to award a contract by the end of 2022.

Capital Projects Proceeding – The Company has signed a letter of intent (“LOI”) with an engineering firm to bring critical capital projects to completion, including the coarse ore bin, permanent dewatering system, vent shaft rehabilitation and surface fans. The scope of the LOI includes delivery of construction execution plans within the next 30 days. These execution plans would identify any procurement or fabrication of materials and equipment to complete the construction activities, labor requirements, and necessary activities ancillary to these capital projects.

The Company has also secured the remaining long-lead item for the coarse ore bin project, the underground jaw crusher, which is expected to be delivered in November 2022.

Strengthening the Site Technical Leadership – The operations leadership has been strengthened with the recent additions of highly experienced individuals in critical technical and operational roles. Included in these recent additions are an Underground Mine Manager, a Capital Projects Manager, a Senior Paste Backfill Engineer, a Contracts Manager, and a Senior Geotechnical Engineer. The Company has also started to fill out the underground operations crews with several skilled mining and operations crews that will focus on capital development projects ahead of stope mining that is planned to begin in the second half of 2023.

Board Addition

Guillaume de Dardel, Head of Energy Transition Metals and part of the Energy Transition desk at Mercuria, will join the Board of Directors of the Company effective November 4, 2022. Mercuria is a significant shareholder in Nevada Copper. Mr. de Dardel studied in Sao Paulo and Switzerland and holds a BA HSG (magna cum laude) from the University of St. Gallen.

Mercuria is one of the world’s largest independent global energy and commodities groups and makes strategic investments to provide access to key infrastructure and physical commodity markets. They have expanded rapidly into renewables and the energy transition which has become a core pillar of Mercuria’s strategy.

Qualified Person

The technical information and data in this news release has been reviewed by Steven Newman, Registered Member – SME, Vice President, Technical Services for Nevada Copper, who is a non-independent Qualified Person within the meaning of NI 43-101.

About Nevada Copper

Nevada Copper (TSX: NCU) is a copper producer and owner of the Pumpkin Hollow copper project. Located in Nevada, USA, Pumpkin Hollow has substantial reserves and resources including copper, gold and silver. Its two fully permitted projects include the high-grade Underground Mine and processing facility, which is now in the production stage, and a large-scale open pit project, which is advancing towards feasibility status.

Randy Buffington
President & CEO

For additional information, please see the Company’s website at www.nevadacopper.com, or contact:

Tracey Thom Vice President, IR and Community Relations
tthom@nevadacopper.com
+1 775 391 9029

Cautionary Language on Forward Looking Statements
This news release contains “forward-looking information” and “forward-looking statements” within the meaning of applicable Canadian securities laws. All statements in this news release, other than statements of historical facts, are forward-looking statements. Such forward-looking information and forward-looking statements specifically include, but are not limited to, statements that relate to the development plans for the Underground Mine and the expected results thereof.

Forward-looking statements and information include statements regarding the expectations and beliefs of management. Often, but not always, forward-looking statements and forward-looking information can be identified by the use of words such as “plans”, “expects”, “potential”, “is expected”, “anticipated”, “is targeted”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates”, or “believes” or the negatives thereof or variations of such words and phrases or statements that certain actions, events or results “may”, “could”, “would”, “might” or “will” be taken, occur or be achieved. Forward-looking statements or information should not be read as guarantees of future performance and results. They are subject to known and unknown risks, uncertainties and other factors which may cause the actual results and events to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements or information.

Such risks and uncertainties include, without limitation, those relating to: requirements for additional capital and no assurance can be given regarding the availability thereof; the outcome of discussions with creditors and vendors; the ability of the Company to complete the ramp-up of the Underground Mine within the expected cost estimates and timeframe; the impact of COVID-19 on the business and operations of the Company; the state of financial markets; history of losses; dilution; adverse events relating to milling operations, construction, development and ramp-up, including the ability of the Company to address underground development and process plant issues; ground conditions; cost overruns relating to development, construction and ramp-up of the Underground Mine; loss of material properties; interest rate increases; global economy; limited history of production; future metals price fluctuations; speculative nature of exploration activities; periodic interruptions to exploration, development and mining activities; environmental hazards and liability; industrial accidents; failure of processing and mining equipment to perform as expected; labour disputes; supply problems; uncertainty of production and cost estimates; the interpretation of drill results and the estimation of mineral resources and reserves; changes in project parameters as plans continue to be refined; possible variations in ore reserves, grade of mineralization or recovery rates from management’s expectations and the difference may be material; legal and regulatory proceedings and community actions; accidents; title matters; regulatory approvals and restrictions; increased costs and physical risks relating to climate change, including extreme weather events, and new or revised regulations relating to climate change; permitting and licensing; dependence on management information systems and cyber security risks; volatility of the market price of the Company’s securities; insurance; competition; hedging activities; currency fluctuations; loss of key employees; other risks of the mining industry as well as those risks discussed in the Company’s Management’s Discussion and Analysis in respect of the year ended December 31, 2021 and the quarter ended March 31, 2022 and in the section entitled “Risk Factors” in the Company’s Annual Information Form dated March 31, 2022. The forward-looking statements and information contained in this news release are based upon assumptions management believes to be reasonable, including, without limitation: no adverse developments in respect of the property or operations at the project; no material changes to applicable laws; the ramp-up of operations at the Underground Mine in accordance with management’s plans and expectations; no worsening of the current COVID-19 related work restrictions; reduced impacts of COVID-19 going forward; the Company will be able to obtain sufficient additional funding to complete the ramp-up, no material adverse change to the price of copper from current levels; and the absence of any other factors that could cause actions, events or results to differ from those anticipated, estimated or intended.

The forward-looking information and statements are stated as of the date hereof. The Company disclaims any intent or obligation to update forward-looking statements or information except as required by law. Although the Company has attempted to identify important factors that could cause actual actions, events, or results to differ materially from those described in forward-looking information and statements, there may be other factors that could cause actions, events or results not to be as anticipated, estimated or intended. Specific reference is made to “Risk Factors” in the Company’s Management’s Discussion and Analysis in respect of the year ended December 31, 2021 and the quarter ended March 31, 2022 and “Risk Factors” in the Company’s Annual Information Form dated March 31, 2022, for a discussion of factors that may affect forward-looking statements and information. Should one or more of these risks or uncertainties materialize, should other risks or uncertainties materialize or should underlying assumptions prove incorrect, actual results and events may vary materially from those described in forward-looking statements and information. For more information on the Company and the risks and challenges of its business, investors should review the Company’s filings that are available at www.sedar.com.

The Company provides no assurance that forward-looking statements and information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements or information. Accordingly, readers should not place undue reliance on forward-looking statements or information.

A photo accompanying this announcement is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/3d89cb97-1129-4757-aab3-d6866ec82a97

Categories
Gold Shore Resources Junior Mining Precious Metals

Goldshore Intersects 1.34 g/t Au over 90.95m in 100 Meter Step-Out to the North

Vancouver, British Columbia–(Newsfile Corp. – November 2, 2022) – Goldshore Resources Inc. (TSXV: GSHR) (OTCQB: GSHRF) (FSE: 8X00) (“Goldshore” or the “Company“), is pleased to announce assay results from its ongoing 100,000-meter drill program at the Moss Lake Project in Northwest Ontario, Canada (the “Moss Lake Gold Project“).

Highlights:

  • Results for eight holes, drilled to both expand and infill historic but poorly surveyed drill sections in the Main Zone, have confirmed higher-grade gold mineralization within a large volume of well mineralized diorite with best intercepts of:
  • Results for four holes, drilled to evaluate the under-drilled Southwest Zone, have confirmed narrow higher-grade gold mineralized structures with best intercepts of:

President and CEO Brett Richards stated: “Throughout our entire drilling campaign from 2021 to now, we have consistently and repeatedly delivered promising drill results, indicating not only the size and scale potential of the Moss Lake Project, but also the quality of the higher-grade areas of the deposit. As we illustrated at the end of H1 2022, our focus turned from identifying and drilling the size of the global resource; to identifying the high(er) grade sections contained within the historical resource (and stepped out from the historical resource), and focusing on building a much smaller open pit project PEA around this. The results from this change in focus are evident in press releases in H1 2022 and Q3 2022, and continue with the results highlighted today. To that end, we are expediting our independent mineral resource estimate (“MRE“) on the high(er) grade sections within the historical resource, and look to have the results of this MRE presented to the market by the end of 2022, versus the end of Q1 2023, as previously guided. This will also lead to the Company accelerating a preliminary economic assessment (“PEA“) on a smaller, high(er) grade resource, but much more manageable project in terms of CapEx and project timeline, versus a large-scale project PEA on an updated larger resource similar to the historic resource. The target delivery to the market of the economic results of the PEA is slated for the end of Q1 2023, under current market conditions and circumstances, versus the end of Q2 2023, as previously guided.”

Technical Overview

Figure 1 shows the better intercepts in plain view and Figure 2 is a typical section through hole MMD-22-057.

Figure 1: Drill plan showing best of several +1 g/t Au intercepts relative to implicit modelled grade shells

To view an enhanced version of Figure 1, please visit:
https://images.newsfilecorp.com/files/8051/142661_77d166be4416c9d5_002full.jpg

Figure 2: Drill section through MMD-22-057 relative to implicit modelled grade shells showing 100-meter step out to the north

To view an enhanced version of Figure 2, please visit:
https://images.newsfilecorp.com/files/8051/142661_77d166be4416c9d5_003full.jpg

Over the last month, results have been received for eighteen holes, including:

  • Eight holes that have infilled areas of the Main Zone that are between sections drilled by historic holes with collar survey problems. They will replace the low-confidence historic holes in the upcoming resource model update.
  • Four holes drilled to evaluate the under-drilled Southwest Zone.
  • Five holes testing the margins of the main +1 g/t Au zones that provide valuable geological information in these marginal areas.

As with the historic holes, the Main and Southwest Zone holes intersected several broad zones of low-grade mineralization within the altered diorite intrusion host. Examples include 0.98 g/t Au over 50.9m from 51m and 0.32 g/t Au over 122m from 473m depth in MMD-22-036; 0.48 g/t Au over 88m from 388m and 0.53 g/t Au over 33m from 279m depth in MMD-22-042; 0.46 g/t Au over 133m from 443m depth and 0.35 g/t Au over 29.25m from 316.85m depth in MMD-22-048; 0.70 g/t Au over 126m from 335m depth and 0.89 g/t Au over 60.6m from 120.4m depth in MMD-22-053; 0.80 g/t Au over 25.35m from 563.65m depth in MMD-22-055; 0.64 g/t Au over 44m from 168m depth and 0.63 g/t Au over 33.65m from 237.35m depth in MMD-22-064; 0.47 g/t Au over 38.1m from 615.45m depth in MMD-22-066; and 0.46 g/t Au over 27.65m from 366.25m depth in MMD-22-078.

All these low-grade zones occur as envelopes to higher-grade structures that form a three-dimensional, anastomosing shear network that has developed in response to strain on the altered diorite intrusion. Results include the broad zones of +1 g/t Au mineralization shown in the highlights (e.g., 1.34 g/t Au over 90.95m from 254.05m depth in MMD-22-057) and several narrow high-grade intervals, including better intercepts of 39.3 g/t Au over 0.7m from 90.45m depth in MMD-22-036; 47.4 g/t Au over 0.5m from 420.25m depth in MMD-22-052; 11.4 g/t Au over 2.35m from 549m depth in MMD-22-056; 26.7 g/t Au over 1m from 287m depth in MMD-22-057; and 231 g/t Au over 0.35m from 182.75m depth in MMD-22-064.

Four holes were drilled into the Link zone and potential overlap between the QES zone and Moss Main zone to properly define the boundaries of each zone and to better understand the behavior of the southern edge of the altered diorite package. These dominantly drilled through the lesser altered and deformed porphyritic diorite phase containing several narrow lenses of low-grade mineralization as indicated by the historic drill results.

Geological modelling of the altered diorite host rock and anastomosing shear network at Moss Lake has progressed faster than anticipated and is now complete. As a result, the Company has embarked on an independent resource modelling exercise and has engaged international consulting group, CSA Global (an ERM group company) to complete this work. This will lead to a new Mineral Resource estimate that will be reported following National Instrument 43-101 standards for disclosure. This new estimate will be published before the end of 2022.

Pete Flindell, VP Exploration for Goldshore, said, “These drill results continue the vein of local high grade gold mineralization that bulks out to produce 50- to 200-meter-wide zones of +1 g/t Au gold mineralization within a “sea” of low-grade mineralization. This style of mineralization is capable of producing large, low-grade gold resources with a significant volume of higher-grade mineralization. We anticipate that this should, with the selection of the appropriate gold price for the constraining Whittle shell, allow the reporting of a smaller, higher-grade resource at the Moss Lake Project.”

Table 1 shows the significant intercepts and Table 2 shows the drill hole locations.

Table 1: Significant downhole gold intercepts

ZONEHOLE IDFROMTOLENGTH (m)TRUE WIDTH (m)CUT GRADE
(g/t Au)
UNCUT GRADE
(g/t Au)
MAINMMD-22-03622.0035.8013.804.40.620.62
51.00101.9050.9016.60.981.11
including62.5067.354.851.61.391.39
and84.5094.009.503.13.704.38
238.50256.3017.806.10.470.47
276.40286.209.803.40.460.46
including279.00281.852.851.01.011.01
419.10446.5027.4010.00.360.36
including420.00422.002.000.71.841.84
473.00595.00122.0047.40.320.32
613.45619.956.502.60.360.36
631.00634.753.751.50.470.47
671.45686.0014.555.80.350.35
MAINMMD-22-048190.00192.402.401.50.780.78
220.00227.007.004.30.540.54
277.60285.007.404.50.340.34
316.85346.1029.2518.00.350.35
373.55400.0026.4516.31.051.05
including388.00399.1511.156.91.601.60
443.00576.00133.0084.20.460.46
including446.00458.2012.207.61.081.08
and467.90472.004.102.61.371.37
and521.00538.3517.3511.11.031.03
602.00614.0012.007.80.310.31
620.00635.4015.4010.00.560.56
MAINMMD-22-052104.35111.006.653.40.460.46
138.00140.002.001.10.310.31
274.25277.303.051.70.440.44
311.15313.352.201.30.350.35
MAINMMD-22-05318.0027.009.004.90.390.39
33.0038.005.002.70.420.42
49.3566.3016.959.10.370.37
77.0081.454.452.41.581.58
including77.7581.453.702.01.811.81
92.20100.208.004.21.631.63
including92.2098.005.803.12.102.10
120.40181.0060.6032.10.890.89
including121.00139.0018.009.51.801.80
and158.00167.009.004.81.721.72
201.00205.004.002.10.530.53
222.00225.003.001.65.245.24
248.00263.0015.007.80.380.38
285.00304.0019.009.90.350.35
310.60313.002.401.30.350.35
335.00461.00126.0065.60.700.70
including341.00344.003.001.61.141.14
and355.60399.2543.6522.71.301.30
and444.00450.006.003.11.631.63
487.75490.002.251.20.570.57
MAINMMD-22-054383.00389.606.602.10.420.42
429.40434.304.901.60.510.51
531.05539.007.952.60.310.31
MAINMMD-22-055168.00182.8514.858.40.300.30
212.00215.003.001.70.730.73
360.60374.9014.307.81.071.07
including364.00374.9010.905.91.281.28
525.40528.252.851.61.551.55
563.65589.0025.3514.20.800.80
including581.05583.802.751.63.083.08
600.00612.1012.106.90.360.36
MAINMMD-22-056181.00185.604.602.10.520.52
221.00225.004.001.80.380.38
267.00270.353.351.50.340.34
287.85296.008.153.70.630.63
336.35342.255.902.60.620.62
353.70358.454.752.10.350.35
379.40387.658.253.61.201.20
441.00461.5020.508.90.490.49
502.00561.9059.9025.51.021.02
including509.00511.002.000.93.163.16
and542.00551.359.354.04.784.78
593.30598.004.702.00.380.38
MAINMMD-22-05718.1026.258.152.82.662.66
40.9043.102.200.80.460.46
254.05345.0090.9534.21.341.34
including260.40272.4012.004.52.422.42
and283.55299.9516.406.24.024.02
and312.00328.7516.756.31.041.04
366.00371.255.252.01.111.11
382.00385.003.001.20.700.70
457.50461.003.501.40.360.36
552.40559.006.602.70.360.36
570.00583.0013.005.50.340.34
594.00599.005.002.10.340.34
SWMMD-22-04236.9541.004.052.70.870.87
106.65110.754.103.00.490.49
209.00212.053.052.50.500.50
239.00241.002.001.70.430.43
256.55266.009.458.10.970.97
including261.95266.004.053.51.771.77
279.00312.0033.0029.00.530.53
330.00341.0011.0010.00.940.94
366.00377.0011.0010.20.740.74
including370.00377.007.006.51.081.08
388.00476.0088.0084.10.480.48
including388.00396.258.257.72.262.26
SWMMD-22-050162.00168.356.355.00.680.68
194.40207.1012.7010.40.480.48
300.15312.9012.7511.40.820.82
including303.00311.008.007.11.101.10
SWMMD-22-06428.0031.853.852.51.421.42
42.4555.1012.658.20.920.92
168.00212.0044.0029.90.642.24
including182.00185.503.502.43.6423.70
237.35271.0033.6523.20.630.63
including250.25252.402.151.51.591.59
SWMMD-22-066451.00453.252.251.70.580.58
559.35572.0012.659.70.310.31
586.00589.003.002.30.390.39
599.00609.5510.558.20.360.36
615.45653.5538.1030.10.470.47
including625.00627.002.001.61.081.08
LINKMMD-22-074603.85607.904.053.10.660.66
LINKMMD-22-07862.5567.905.353.60.400.40
366.25393.9027.6520.10.460.46
422.55425.502.952.20.310.31
447.80455.407.605.70.640.64
including452.20455.403.202.41.081.08
492.25498.406.154.60.310.31
LINKMMD-22-08183.0091.008.005.60.450.45
253.20257.654.453.30.640.64
286.55295.008.456.30.510.51
335.00353.9518.9514.40.300.30
LINKMMD-22-082122.00131.009.006.50.740.74
including122.00124.002.001.51.221.22
147.00149.002.001.50.510.51
167.00178.0011.008.20.900.90
including172.00175.003.002.21.341.34
Intersections calculated above a 0.3 g/t Au cut off with a top cut of 30 g/t Au and a maximum internal waste interval of 10 metres. Bordered intervals are intersections calculated above a 1.0 g/t Au cut off. Intervals in bold are those with a grade thickness factor exceeding 20 gram x metres / tonne gold. True widths are approximate and assume a subvertical body.

Table 2: Location of drill holes in this press release

ZONEHOLEEASTNORTHRLAZIMUTHDIPEOH
MAINMMD-22-036668,8685,379,279441154°-71°690.00
SWMMD-22-042668,5205,378,529436158°-50°516.00
MAINMMD-22-048668,7055,379,209435155°-52°690.00
SWMMD-22-050668,5175,378,529437110°-50°464.00
MAINMMD-22-052668,9945,379,542438155°-60°597.30
MAINMMD-22-053669,0145,379,307427154°-61°605.85
MAINMMD-22-054668,7055,379,209435150°-70°576.00
MAINMMD-22-055668,7215,379,279443154°-59°618.00
MAINMMD-22-056668,8015,379,340438151°-61°600.00
MAINMMD-22-057668,8875,379,368437154°-70°603.00
SWMMD-22-064668,4815,378,460439109°-51°407.15
SWMMD-22-066669,0775,378,242432290°-50°654.30
LINKMMD-22-074669,2415,378,339430335°-51°660.85
LINKMMD-22-077669,6595,379,054432335°-60°12.00
LINKMMD-22-078669,6595,379,055432337°-50°603.00
LINKMMD-22-079669,5735,379,011437336°-50°333.00
LINKMMD-22-081669,4695,378,982428334°-48°375.00
LINKMMD-22-082669,2485,378,768437335°-46°347.85

Analytical and QA/QC Procedures

All samples were sent to ALS Geochemistry in Thunder Bay for preparation and analysis was performed in the ALS Vancouver analytical facility. ALS is accredited by the Standards Council of Canada (SCC) for the Accreditation of Mineral Analysis Testing Laboratories and CAN-P-4E ISO/IEC 17025. Samples were analyzed for gold via fire assay with an AA finish (“Au-AA23”) and 48 pathfinder elements via ICP-MS after four-acid digestion (“ME-MS61”). Samples that assayed over 10 ppm Au were re-run via fire assay with a gravimetric finish (“Au-GRA21”).

In addition to ALS quality assurance / quality control (“QA/QC”) protocols, Goldshore has implemented a quality control program for all samples collected through the drilling program. The quality control program was designed by a qualified and independent third party, with a focus on the quality of analytical results for gold. Analytical results are received, imported to our secure on-line database and evaluated to meet our established guidelines to ensure that all sample batches pass industry best practice for analytical quality control. Certified reference materials are considered acceptable if values returned are within three standard deviations of the certified value reported by the manufacture of the material. In addition to the certified reference material, certified blank material is included in the sample stream to monitor contamination during sample preparation. Blank material results are assessed based on the returned gold result being less than ten times the quoted lower detection limit of the analytical method. The results of the on-going analytical quality control program are evaluated and reported to Goldshore by Orix Geoscience Inc.

About Goldshore

Goldshore is an emerging junior gold development company, and owns the Moss Lake Gold Project located in Ontario. Wesdome is currently a large shareholder of Goldshore with an approximate 27% equity position in the Company. Well-financed and supported by an industry-leading management group, board of directors and advisory board, Goldshore is positioned to advance the Moss Lake Gold Project through the next stages of exploration and development.

About the Moss Lake Gold Project

The Moss Lake Gold Project is located approximately 100 km west of the city of Thunder Bay, Ontario. It is accessed via Highway 11 which passes within 1 km of the property boundary to the north. The Moss Lake Gold Project covers 14,292 hectares and consists of 282 unpatented and patented mining claims.

The Moss Lake Gold Project hosts a number of gold and base metal rich deposits including the Moss Lake Deposit, the East Coldstream Deposit (Table 3), the historically producing North Coldstream Mine (Table 4), and the Hamlin Zone, all of which occur over a mineralized trend exceeding 20 km in length. A historical preliminary economic assessment (the “Moss Lake Historical Estimate“) was completed on the Moss Lake Gold Project in 2013 and published by Moss Lake Gold Mines Ltd. (“Moss Lake Gold Mines“)1,3. A historical mineral resource estimate (the “East Coldstream Historical Estimate“) was completed on the East Coldstream Deposit in 2011 by Foundation Resources Inc.2,3 In addition to these zones, the Moss Lake Gold Project also hosts a number of under-explored mineral occurrences which are reported to exist both at surface and in historically drilled holes. The Moss Lake Deposit is a shear-hosted disseminated-style gold deposit which outcrops at surface. It has been drilled over a 2.5 km length and to depths of 300 m with 376 holes completed between 1983 and 2017. The last drilling program conducted in 2016 and 2017 by Wesdome Gold Mines Ltd. (“Wesdome“), which consisted of widely spaced holes along the strike extension of the deposit was successful in expanding the mineralized footprint and hydrothermal system 1.6 km to the northeast. Additionally, the deposit remains largely open to depth. In 2017, Wesdome completed an induced polarization survey which traced the potential extensions of pyrite mineralization associated with the Moss Lake Deposit over a total strike length of 8 km and spanning the entire extent of the survey grids.

The East Coldstream Deposit is a shear-hosted disseminated-style gold deposit which locally outcrops at surface. It has been drilled over a 1.3 km length and to depths of 200 m with 138 holes completed between 1988 and 2017. The deposit remains largely open at depth and may have the potential for expansion along strike. Historic drill hole highlights from the East Coldstream Deposit include 4.86 g/t Au over 27.3 m in C-10-15.

The historically producing North Coldstream Mine is reported to have produced significant amounts of copper, gold and silver4 from mineralization with potential iron-oxide-copper-gold deposit style affinity. The exploration potential immediately surrounding the historic mining area is not currently well understood and historic data compilation is required.

The Hamlin Zone is a significant occurrence of copper and gold mineralization, and also of potential iron-oxide-copper-gold deposit style affinity. Between 2008 and 2011, Glencore tested Hamlin with 24 drill holes which successfully outlined a broad and intermittently mineralized zone over a strike length of 900 m. Historic drill hole highlights from the Hamlin Zone include 0.9 g/t Au and 0.35% Cu over 150.7 m in HAM-11-75.

The Moss Lake, East Coldstream and North Coldstream deposits sit on a mineral trend marked by a regionally significant deformation zone locally referred to as the Wawiag Fault Zone in the area of the Moss Lake Deposit. This deformation zone occurs over a length of approximately 20 km on the Moss Lake Gold Project and there is an area spanning approximately 7 km between the Moss Lake and East Coldstream deposits that is significantly underexplored.

Table 3: Historical Mineral Resources1,2,3

INDICATEDINFERRED
DepositTonnesAu g/tAu ozTonnesAu g/tAu oz
Moss Lake Historical Estimate
Open Pit Potential39,795,0001.11,377,30048,904,0001.01,616,300
Underground Potential1,461,1002.9135,400
Moss Lake Total39,795,0001.11,377,30050,364,0001.11,751,600
East Coldstream Historical Estimate
East Coldstream Total3,516,7000.8596,40030,533,0000.78763,276
Combined Total43,311,7001.081,473,70080,897,0000.982,514,876

Notes:

(1) Source: Poirier, S., Patrick, G.A., Richard, P.L., and Palich, J. “Technical Report and Preliminary Economic Assessment for the Moss Lake Project”, prepared for Moss Lake Gold Mines Ltd. The qualified persons for the Moss Lake Historical Estimate are Pierre-Luc Richard, MSc, PGeo (InnovExplo Inc), and Carl Pelletier, BSc, PGeo (InnovExplo Inc), and the effective date of the Moss Lake Historical Estimate is February 8, 2013. In-Pit results are presented undiluted and in situ, within Whittle-optimized pit shells. Underground results are presented undiluted and in situ, outside Whittle-optimized pit shells. The Moss Lake Historical Estimate includes 18 gold-bearing zones and 1 envelope containing isolated gold intercepts. Whittle parameters: mining cost = C$2.28; pit slope angle = 50.0 degrees; production cost = C$9.55; mining Dilution = 5%; mining recovery = 95%; processing recovery = 80% to 85%; gold price = C$1,500. In-Pit and Underground resources were compiled at cut-off grades from 0.3 to 5.0 g/t Au (for sensitivity characterization). A cut-off grade of 0.5 g/t Au was selected as the official in-pit cut-off grade and a cut-off grade of 2.0 g/t Au was selected as the official underground cut-off grade. The Moss Lake Historical Estimate is based on 352 diamond drill holes (90,978 m) drilled from 1983 and 2008. A fixed density of 2.78 g/cm3 was used. A minimum true thickness of 5.0 m was applied, using the grade of the adjacent material when assayed or a value of zero when not assayed. Capping was established at 35 g/t Au, supported by statistical analysis and the high grade distribution within the deposit. Compositing was done on drill hole sections falling within the mineralized zone solids (composite = 1 m). Resources were evaluated from drill hole samples using the ID2 interpolation method in a multi-folder percent block model using Gems version 6.4. Based on geostatistics, the ellipse range for interpolation was 75m x 67.5m x 40m. The Indicated category is defined by combining the blocks within the two main zones and various statistical criteria, such as average distance to composites, distance to closest composite, quantity of drill holes within the search area. Ounce (troy) = metric tons x grade / 31.10348. Calculations used metric units (metres, tonnes and g/t). The number of metric tonnes was rounded to the nearest thousand. Any discrepancies in the totals are due to rounding effects; rounding followed the recommendations in NI 43-101.

(2) Source: McCracken, T. “Technical Report and Resource Estimate on the Osmani Gold Deposit, Coldstream Property, Northwestern Ontario”, prepared for Foundation Resources Inc. and Alto Ventures Ltd. The East Coldstream Historical Estimate is based on a 0.4 g/t Au cut-off grade. The qualified persons for the East Coldstream Historical Estimate are Todd McCracken, P.Geo. (Tetratech Wardrop), and Jeff Wilson, Ph.D., P.Geo. (Tetratech Wardrop), and the effective date of the East Coldstream Historical Estimate is December 12, 2011. Resources are presented unconstrained, undiluted and in situ. The East Coldstream Historical Estimate includes 2 gold-bearing zones. A cut-off grade of 0.4 g/t Au was selected as the official resource cut-off grade. The East Coldstream Historical Estimate is based on 116 diamond drill holes drilled from 1986 to 2011. A fixed density of 2.78 g/cm3 was used. Capping was established at 5.89 g/t Au and 5.70 g/t Au for domains EC-1 and EC-2, respectively. This is supported by statistical analysis and the high grade distribution within the deposit. Compositing was done on drill hole sections falling within the mineralized zone solids (composite = 1 m). Resources were evaluated from drill hole samples using the ID2 interpolation method in a multi-folder percent block model using Datamine Studio 3 version 3.20.5321.0. Resource categorization is based on spatial continuity based from the variography of the assays within the drillholes. Ounce (troy) = metric tons x grade / 31.10348. Calculations used metric units (metres, tonnes and g/t). The number of metric tonnes was rounded to the nearest thousand. Any discrepancies in the totals are due to rounding effects; rounding followed the recommendations in NI 43-101.

(3) The reader is cautioned that the Moss Lake Historical Estimate East and the East Coldstream Historical Estimate (the “Historical Estimates“) are considered historical in nature and as such is based on prior data and reports prepared by previous property owners. The reader is cautioned not to treat them, or any part of them, as current mineral resources or reserves. The Company has determined these historical resources are reliable, and relevant to be included here in that they demonstrate simply the mineral potential of the Moss Lake Gold Project. A qualified person has not done sufficient work to classify the Historical Estimates as current resources and Goldshore is not treating the Historical Estimates as current resources. Significant data compilation, re-drilling, re-sampling and data verification may be required by a qualified person before the Historical Estimates can be classified as a current resource. There can be no assurance that any of the historical mineral resources, in whole or in part, will ever become economically viable. In addition, mineral resources are not mineral reserves and do not have demonstrated economic viability. Even if classified as a current resource, there is no certainty as to whether further exploration will result in any inferred mineral resources being upgraded to an indicated or measured mineral resource category. The Historical Estimates relating to inferred mineral resources were calculated using prior mining industry standard definitions and practices for estimating mineral resource and mineral reserves. Such prior definitions and practices were utilized prior to the implementation of the current standards of the Canadian Institute of Mining for mineral resource estimation, and have a lower level of confidence.

Table 4: Reported Historical Production from the North Coldstream Deposit4

DepositTonnesCu %Au g/tAgCu lbsAu ozAg oz
Historical Production2,700,00001.890.565.59102,000,00044,000440,000

Note:

(4) Source: Schlanka, R., 1969. Copper, Nickel, Lead and Zinc Deposits of Ontario, Mineral Resources Circular No. 12, Ontario Geological Survey, pp. 314-316.

Peter Flindell, P.Geo., MAusIMM, MAIG, Vice President – Exploration of the Company, a qualified person under NI 43-101 has approved the scientific and technical information contained in this news release.

Neither the TSXV nor its Regulation Services Provider (as that term is defined in the policies of the TSXV) accepts responsibility for the adequacy or accuracy of this release.

For More Information – Please Contact:

Brett A. Richards
President, Chief Executive Officer and Director
Goldshore Resources Inc.

P. +1 604 288 4416  M. +1 905 449 1500
E. brichards@goldshoreresources.com
W. www.goldshoreresources.com

Facebook: GoldShoreRes | Twitter: GoldShoreRes | LinkedIn: goldshoreres

Cautionary Note Regarding Forward-Looking Statements

This news release contains statements that constitute “forward-looking statements.” Such forward looking statements involve known and unknown risks, uncertainties and other factors that may cause the Company’s actual results, performance or achievements, or developments to differ materially from the anticipated results, performance or achievements expressed or implied by such forward-looking statements. Forward looking statements are statements that are not historical facts and are generally, but not always, identified by the words “expects,” “plans,” “anticipates,” “believes,” “intends,” “estimates,” “projects,” “potential” and similar expressions, or that events or conditions “will,” “would,” “may,” “could” or “should” occur.

Forward-looking statements in this news release include, among others, statements relating to expectations regarding the exploration and development of the Moss Lake Gold Project, release of the MRE, release of a PEA, and other statements that are not historical facts. By their nature, forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause our actual results, performance or achievements, or other future events, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. Such factors and risks include, among others: the Company may require additional financing from time to time in order to continue its operations which may not be available when needed or on acceptable terms and conditions acceptable; compliance with extensive government regulation; domestic and foreign laws and regulations could adversely affect the Company’s business and results of operations; the stock markets have experienced volatility that often has been unrelated to the performance of companies and these fluctuations may adversely affect the price of the Company’s securities, regardless of its operating performance; and the impact of COVID-19.

The forward-looking information contained in this news release represents the expectations of the Company as of the date of this news release and, accordingly, is subject to change after such date. Readers should not place undue importance on forward-looking information and should not rely upon this information as of any other date. The Company undertakes no obligation to update these forward-looking statements in the event that management’s beliefs, estimates or opinions, or other factors, should change.

This news release does not constitute an offer to sell, or a solicitation of an offer to buy, any securities in the United States. The securities have not been and will not be registered under the United States Securities Act of 1933, as amended (the “U.S. Securities Act”) or any state securities laws and may not be offered or sold within the United States or to U.S. Persons unless registered under the U.S. Securities Act and applicable state securities laws or an exemption from such registration is available.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/142661

Categories
Energy Junior Mining Precious Metals Uncategorized

Bravo Intersects Exceptional Thickness of High-Grade PGMs at Luanga

Highlights include 58.8m @ 2.11g/t PGM+Au, and 19.8m @ 2.68g/t PGM+Au

VANCOUVER, BC, Nov. 2, 2022 /CNW/ – Bravo Mining Corp. (TSXV: BRVO) (OTCQX: BRVMF), (“Bravo” or the “Company“) today announced that it has received assay results from an additional nine infill diamond drill holes (“DDH”) from its Luanga palladium + platinum + rhodium + gold + nickel (3PGM+Au+Ni) project (“Luanga” or “Luanga PGM+Au+Ni“), located in the Carajás Mineral Province, state of Pará, Brazil.

“Drill hole DDH22LU029, which intersected 58.8m @ 2.11g/t 3PGM+Au from 9.7m, is one of the broadest zones of 3PGM+Au mineralization intersected at Luanga to date. This drill hole also demonstrates that multiple stacked 3PGM+Au+Ni zones exist stratigraphically above (see section attached) and below the previously defined mineralized horizons. This increases our confidence in both the overall 3PGM+Au+Ni potential of Luanga, and the potential for higher-grade nickel sulphide mineralization given the 39.4m @ 0.16% Ni intersected from 29.1m,” said Luis Azevedo, Chairman and CEO of Bravo. “Furthermore, DDH22LU029 intersected a zone of nickel-rich disseminated sulphides below the main mineralized horizons (see section attached), yet still within the same orthopyroxenite host stratigraphy, again opening the possibility for new as yet unseen styles of nickel sulphide mineralization at depth.”

Highlights

  • The infill drilling campaign continues to advance rapidly, while results compare well with, or exceed, the intercepts in historic drill holes on nearby drill sections, in both tenor and mineralized thicknesses.
  • Highlights of Bravo’s recent intercepts are tabulated below, with details attached:
HOLE-IDFrom(m)To(m)Thickness
(m)
Pd(g/t)Pt(g/t)Rh(g/t)Au
(g/t)
PGM + Au
(g/t)
Ni (%
Sulphide)
TYPE
DDH22LU0299.768.558.81.330.640.090.062.11NAOx/FR
Including29.168.539.41.120.480.070.071.740.16FR
And108.4117.18.72.121.700.24*0.034.09*0.05FR
And158.5165.06.50.330.140.010.010.500.43FR
DDH22LU01655.575.319.80.481.940.260.012.680.06FR/LS
DDH22LU02281.2101.019.81.270.770.120.052.210.23FR
Notes:  All ‘From’, ‘To’ depths, and ‘Thicknesses’ are downhole.
             Given the orientation of the hole and the mineralization, the intercept is estimated to be 80% to 90% of true thickness.
             Type: Ox = Oxide. LS = Low Sulphur. FR = Fresh Rock. Recovery methods and results will differ based on the type of mineralization.
             NA: Not Applicable as intercept is oxide or a mix of oxide and fresh rock mineralization.
             * = Includes Rh >1.00g/t result. Overlimit analyses pending.
  • In addition, two diamond drill holes were completed on two drill sections, 50m north and south of DDH22LU047, the hole that intercepted massive sulphides (see August 16th, 2022 news release). All four step out drill holes have intersected varying amounts of semi-massive sulphides. Assay results are pending.
  • Downhole Electromagnetic surveys (“EM”) on these 4 drill holes, and surface fixed loop EM over the Luanga deposit, have commenced.
  • 102 drill holes have been completed, for a total of 17,337 metres (or 68% of Phase 1 Drilling Program), including 6 twin holes and 6 metallurgical holes.
  • 17,689 samples submitted for assay to date including 3,216 re-assay samples from historic drill core.
  • 6 drill rigs operating onsite.

Luanga Drill Program

The Phase 1 diamond drill program continues as planned at Luanga. Six drill rigs are on site, with drilling progressing in various locations along the entire 8.1km strike length of the known Luanga mineralized envelope. To date, 102 drill holes have been completed, for a total of 17,337 metres (or 68%) of the planned 25,500 metre Phase 1 drill program.

Location of Bravo Drilling Reported in this Document (CNW Group/Bravo Mining Corp.)
Location of Bravo Drilling Reported in this Document (CNW Group/Bravo Mining Corp.)
Section – Showing DDH22LU029 Stacked 3PGM+Au+Ni Zones, and New Nickel Zone at Depth (CNW Group/Bravo Mining Corp.)
Section – Showing DDH22LU029 Stacked 3PGM+Au+Ni Zones, and New Nickel Zone at Depth (CNW Group/Bravo Mining Corp.)

Complete Table of Intercepts

HOLE-IDFrom(m)To(m)Thickness
(m)
Pd(g/t)Pt(g/t)Rh(g/t)Au
(g/t)
3PGM +
Au (g/t)
Ni (%
Sulphide)
TYPE
DDH22LU01655.575.319.80.481.940.260.012.680.06FR/LS
DDH22LU0218.013,05.00.290.24<0.010.010.54NAOx
DDH22LU02281.2101.019.81.270.770.120.052.210.23FR
DDH22LU0230.07.07.00.380.30<0.010.030.62NAOx
DDH22LU02466.676.09.40.770.290.120.051.240.22FR
DDH22LU02528.537.59.00.850.550.150.021.570.17FR
DDH22LU02788.191.13.00.420.270.030.010.730.01FR
And95.6103.68.00.260.090.050.010.400.01FR/LS
DDH22LU0280.024.024.00.250.26<0.010.010.52NAFR
DDH22LU0299.768.558.81.330.640.090.062.11NAOx/FR
Including29.168.539.41.120.480.070.071.740.16FR
And108.4117.18.72.121.700.24*0.034.09*0.05FR
And158.5165.06.50.330.140.010.010.500.43FR
Notes:  All ‘From’, ‘To’ depths, and ‘Thicknesses’ are downhole.
             Given the orientation of the hole and the mineralization, the intercept is estimated to be 80% to 90% of true thickness.
             Type: Ox = Oxide. LS = Low Sulphur. FR + Fresh Rock. Recovery methods and results will differ based on the type of mineralization.
             NA: Not Applicable as intercept is oxide or a mix of oxide and fresh rock mineralization.
             * = Includes Rh >1.00g/t result. Overlimit analyses pending.

About Bravo Mining Corp.

Bravo is a Canada and Brazil-based mineral exploration and development company focused on advancing its Luanga 3PGM + Au + Ni Project in the world-class Carajás Mineral Province of Brazil.

The Luanga Project benefits from being in a location close to operating mines, with excellent access and proximity to existing infrastructure, including road, rail and clean and renewable hydro grid power. The project area was previously de-forested for agricultural grazing land. Bravo’s current Environmental, Social and Governance activities includes replanting trees in the project area, hiring and contracting locally, and ensuring protection of the environment during its exploration activities.

Technical Disclosure
Technical information in this news release has been reviewed and approved by Simon Mottram, F.AusIMM (Fellow Australia Institute of Mining and Metallurgy), President of Bravo Mining Corp. who serves as the Company’s “qualified person”, as defined in National Instrument 43-101 Standards of Disclosure for Mineral Projects (“NI 43-101“). Mr. Mottram has verified the technical data and opinions contained in this news release.

Forward Looking Statements

This news release contains forward-looking information which is not comprised of historical facts. Forward-looking information is characterized by words such as “Exceptional”, “High-Grade”, “Highlights”, “broadest”, “multiple”, “confidence”, “potential”, “rich”, “possibility”, “as yet unseen”, “continues”, “compare well”, “exceed”, “highlights”, and other similar words, phrases or statements that certain events or conditions “should”, or “will” occur. In particular, this news release contains forward-looking information pertaining to the Company’s ongoing re-assay and drill programs and the results thereof; the expected completion of geophysical surveys and the results of such surveys; the potential for the definition o new styles of mineralization and extensions to depth and the Company’s plans in respect thereof. Forward-looking information involves risks, uncertainties and other factors that could cause actual events, results, and opportunities to differ materially from those expressed or implied by such forward-looking information. Factors that could cause actual results to differ materially from such forward-looking information include, but are not limited to, changes in the state of equity and debt markets, fluctuations in commodity prices, delays in obtaining required regulatory or governmental approvals, environmental risks, limitations on insurance coverage; and other risks and uncertainties involved in the mineral exploration and development industry. Forward-looking information in this news release is based on the opinions and assumptions of management considered reasonable as of the date hereof, including, but not limited to, the assumption that the assay results confirm the interpreted mineralization contains significant values of nickel, copper and also contain PGMs and Au; final drill and assay results will be in line with management’s expectations; that activities will not be adversely disrupted or impeded by regulatory, political, community, economic, environmental and/or healthy and safety risks; that the Luanga Project will not be materially affected by potential supply chain disruptions; and general business and economic conditions will not change in a materially adverse manner. Although the Company believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information. The Company disclaims any intention or obligation to update or revise any forward-looking information, other than as required by applicable securities laws.

Schedule 1: Drill Hole Collar Details

HOLE-IDCompanyEast (m)North (m)RL (m)DatumDepth (m)AzimuthDip
DDH22LU016Bravo659067.999341140.05231.20SIRGAS2000 UTM22S199.0590.00-60.00
DDH22LU021Bravo660000.709341825.04256.77SIRGAS2000 UTM22S250.0090.00-60.00
DDH22LU022Bravo659195.859341118.15227.84SIRGAS2000 UTM22S150.30330.00-60.00
DDH22LU023Bravo660000.029341721.99241.36SIRGAS2000 UTM22S250.0590.00-60.00
DDH22LU024Bravo657100.069339629.97259.19SIRGAS2000 UTM22S170.00360.00-60.00
DDH22LU025Bravo659158.019341182.98225.69SIRGAS2000 UTM22S150.35330.00-60.00
DDH22LU027Bravo659245.189341231.67229.00SIRGAS2000 UTM22S150.35330.00-60.00
DDH22LU028Bravo657000.019339729.10296.06SIRGAS2000 UTM22S170.40360.00-60.00
DDH22LU029Bravo659836.039341725.05243.28SIRGAS2000 UTM22S183.7590.00-60.00


Schedule 2: Assay Methodologies and QAQC

Samples follow a chain of custody between collection, processing and delivery to the ALS laboratory in Parauapebas, state of Pará, Brazil. The drill core is delivered to the core shack at Bravo’s Luanga site facilities and processed by geologists who insert certified reference materials, blanks and duplicates into the sampling sequence. Drill core is half cut and placed in secured polyurethane bags, then in security-sealed sacks before being delivered directly from the Luanga site facilities to the Parauapebas ALS laboratory by Bravo staff. Additional information about the methodology can be found on the ALS global website (ALS) in the analytical guides.

Quality Assurance and Quality Control (“QAQC“) is maintained internally at the lab through rigorous use of internal certified reference materials, blanks, and duplicates. An additional QAQC program is administered by Bravo using certified reference materials, duplicate samples and blank samples that are blindly inserted into the sample batch. If a QAQC sample returns an unacceptable value an investigation into the results is triggered and when deemed necessary, the samples that were tested in the batch with the failed QAQC sample are re-tested.

Bravo ALS
PreparationMethodMethodMethodMethod
For All ElementsPt, Pd, AuRhNi-SulphideTrace Elements
PREP-31BPGM-ICP27Rh-MS25Ni-ICP05ME-ICP61
www.bravomining.com (CNW Group/Bravo Mining Corp.)
www.bravomining.com (CNW Group/Bravo Mining Corp.)

SOURCE Bravo Mining Corp.

Cision
Cision

View original content to download multimedia: http://www.newswire.ca/en/releases/archive/November2022/02/c5677.html