Categories
Base Metals Energy Junior Mining

Granite Creek Copper Holds $2.5 Billion Worth of Copper

Bob Moriarty
Archives
Nov 4, 2021

Granite Creek Copper (GCX-V) has 100% ownership of a 176 square km copper/gold/silver property named the Carmacks project located in the Minto Copper Belt in the Yukon. The high-grade copper project is on trend with the Minto copper mine. We shall see why that is very important to the future of the company shortly.

The project had completed a 43-101 in 2018 showing an M&I resource of 23.76 MT of 0.85% Cu, 0.31 g/t Au and 3.41 g/t Ag. A 12,000-meter drill program has been completed in 2021 directed at expanding the resource and converting inferred sulphides material to M&I. An updated 43-101 is expected in early 2022 based on results from the 2021 program. In addition there will be an updated PEA in the first half of 2022 to include both oxide and sulphide material.

At today’s price of copper, that 43-101 resource is worth $104.26/tonne in the ground. Naturally copper going any higher will make this project far more desirable. As we see from the ongoing COP26 conference there seems to be a general agreement that the world needs to reduce its carbon footprint by using more “Green Energy.”

Well, Green Energy requires enormous quantities of copper, lithium and graphite, far more than today. The world is short of copper now and is going to run even shorter. Prices will have to go up. Granite Creek Copper is in the catbird’s seat ready to move to production.

As I mentioned above Minto Exploration is important to GCX for several reasons. Minto is about to build a mill and is in the process of going public imminently. Minto has only three years reserves at presently planned production. In their financing pitch deck they clearly refer to GCX with references to potential M&A activities within the Minto Copper Belt. Guess whom they are talking about?

A week ago Granite Creek released the final results from the Phase 1 of three different phases. The Phase 1 program was designed to add sulfide tonnage to the existing oxide resource. It consisted of 19 diamond core drill holes and totaled 6355 meters. Results from the Phase 2 and Phase 3 programs are still in the lab. Phase 2 did 20 RC holes and about 3000 meters in total. Phase 3 was using the diamond core rig again and did about 2700 meters.

Granite Creek is a really easy call. As of today the company has a $22 million market cap with $1 million in cash and $500,000 in callable warrants. In addition there are a bunch of $.15 warrants expiring in January 2022 so the company is well cashed up.

I’m not a big expert on copper but Granite Creek has to be one of the lowest market cap copper stories with a real asset. When Minto goes public and goes into production, I am certain they will pay attention.

Granite Creek is an advertiser. I have participated in the last private placement so naturally I am biased. Do your own due diligence.

Granite Creek Copper
GCX-V $.18 (Nov 02, 2021)

GCXXF-OTCQB 121 million shares

Granite Creek website

###

Bob Moriarty
President: 321gold
Archives

321gold Ltd

Categories
Energy Junior Mining Precious Metals

Silver Hammer Mining Announces Appointment of Former Silver Standard Chief Geologist and Vice President Exploration, Ron Burk, to the Company’s Board of Directors

VANCOUVER, British Columbia, Nov. 04, 2021 (GLOBE NEWSWIRE) — Silver Hammer Mining Corp. (CSE: HAMR, OTCQB: HAMRF) (“Silver Hammer” or the “Company”) is pleased to announce that it has appointed technical advisor, Ron Burk, to the Company’s board of directors.

Mr. Burk is an exploration geologist with over 30 years of experience in the minerals industry, primarily focused on identifying and evaluating exploration properties. He has held numerous senior roles, including Vice President Exploration at Centerra Gold Inc. and Vice President of Exploration and Chief Geologist at Silver Standard Resources Inc. (now SSR Mining), where he contributed to discoveries that resulted in the definition of a world-class silver resource at the Pitarrilla Project in Durango, Mexico and major gold resources forming the Snowfield and Brucejack deposits in northern British Columbia, Canada. Prior to joining Silver Standard in 2004, Ron had worked since 1989 as an exploration geologist for Teck Resources Ltd. and its predecessors, focused on target generation and property evaluations in the Americas.

“The addition of Ron Burk as a board member adds additional depth to our technical team as we advance the Company’s portfolio of high-potential, high-grade, past-producing western US silver assets, including the Silver Stand Mine in Idaho and the Eliza Silver Project and Silverton Mine in Nevada,” stated Silver Hammer President & CEO, Morgan Lekstrom. “Mr. Burk’s extensive experience, including nearly a decade in senior roles for a major silver-focused mining company, Silver Standard, is invaluable as we grow and advance our portfolio of US silver projects.”https://s.yimg.com/rq/darla/4-9-0/html/r-sf-flx.html

About Silver Hammer Mining Corp.

Silver Hammer Mining Corp. is a junior resource company advancing the past-producing Silver Strand Mine in the Coeur d’Alene Mining District in Idaho, USA, both the Eliza Silver Project and the Silverton Silver Mine in one of the world’s most prolific mining jurisdictions in Nevada and the Lacy Gold Project in British Columbia, Canada. The Company has commenced an initial drill program at Silver Strand that will test for silver and gold mineralization immediately below the mine’s lowest level extending only 90 metres below surface. Silver Hammer strives to become a multi-mine silver producer and will focus near-term exploration and drilling plans at the Company’s Idaho and Nevada silver-gold assets.

*Mineralization hosted on adjacent and/or nearby properties is not necessarily indicative of mineralization hosted on the Company’s property.

On Behalf of the Board of Silver Hammer Mining Corp.

Morgan Lekstrom, President & CEO

Corporate Office: Suite 206 – 595 Howe Street, Vancouver, British Columbia V6C 2T5, Canada

For further information contact: Kristina Pillon, President, High Tide Consulting Corp.
T: 604.908.1695
E: investors@silverhammermining.com

The CSE does not accept responsibility for the adequacy or accuracy of this release. The Canadian Securities Exchange has neither approved nor disapproved the contents of this press release.

Categories
Base Metals Energy Junior Mining

Hot Chili | Preliminary IPO Prospectus Lodged for TSXV Listing Application

Hot Chili Limited (ASX: HCH) (OTCQB: HHLKF) (“Hot Chili” or the “Company”) is pleased to announce the launch of a Canadian secondary market Initial Public Offering (IPO), following lodgement of a preliminary prospectus with the Securities Commissions in the Provinces of Canada, other than Quebec.

The preliminary prospectus and associated IPO are key steps in Hot Chili’s application to dual list the Company on the TSX Venture Exchange (TSXV) and fund an ambitious phase of growth and development ahead of the Company’s transition into a future copper producer.

The preliminary prospectus contains an offering of new ordinary shares (Share or Shares) of the Company to raise funds from institutional investors in Canada, the USA and other jurisdictions outside of Australia (Offering). iA Capital Markets and Cormark Securities Inc. are acting as co-lead underwriters for the Offering (Underwriters).

The offering price and size will be determined between the Company and the Underwriters in the context of the market following shareholder resolution of a proposed fifty (50) to one (1) consolidation (Consolidation) at the Company’s General Meeting scheduled for November 15, 2021.

The proposed Consolidation will reduce the number of ordinary shares currently on issue from approximately 4.4 billion to 87.5 million and provide a more effective capital structure of the Company, and a more appropriate share price for a wider range of investors, particularly institutional investors.

If the Consolidation is approved, the ordinary shares of the Company would begin trading on the ASX on a post-consolidation basis on November 17, 2021, with pricing of the IPO to be determined after that point.

Net proceeds from the IPO are proposed to be used to upgrade the Cortadera Resource, advance the Costa Fuego Preliminary Feasibility Study (PFS), test several high-priority exploration targets and for general corporate purposes.

As previously announced, the Company intends to submit an application to list its Shares on the TSXV and has reserved the symbol “HCH”.

Listing will be subject to the Company fulfilling all of the initial listing requirements and conditions of the TSXV, and there is no assurance such a listing will be obtained.  Closing of the IPO (Closing) is conditional upon the Shares from the IPO being approved for listing on the TSXV.

To access the announcement please click on the link below.:

Download full announcement here

Cortadera Copper Project

Cortadera’s maiden Mineral Resource positions Hot Chili with the largest copper Mineral Resource and one of the largest gold Mineral Resources for an ASX-listed emerging company. 

The Cortadera maiden Mineral Resource of 451Mt at 0.46% copper equivalent (CuEq) takes the total Mineral Resource estimate for Costa Fuego (Cortadera, Productora & El Fuego) to 724Mt at 0.48% CuEq for 2.9Mt copper, 2.7Moz gold, 9.9Moz Silver and 64kt molybdenum. Cortadera also contains a higher grade component of 104Mt at 0.74% CuEq, and this has strong potential to continue growing rapidly with further drilling.

View the Cortadera Project

Categories
Blog Energy Junior Mining

Eloro Hits Bigly

Bob Moriarty
Archives
Nov 3, 2021

The last time I talked to Tom Larsen of Eloro, the company had 8,000 assays outstanding. They can look at the core and know they are in mineralization but don’t have hard numbers. Progress on the assays are being made and they are down to 3,000 assays outstanding.

On November 2, 2021 Eloro put out a press release again showing outstanding numbers. They highlighted 188.5 meters of 100 g/t Ag eq/t consisting of 38.71 g/t Ag, 0.88% Zn and 0.51% Pb. That’s one of the longer holes and contains $72 rock over an incredible length.

Within that 188 meter hole there was a higher-grade interval of 65.8 meters of 75.51 g/t Ag with 0.16% Cu, 0.65% Pb and 0.96% Zn worth an interesting $122 USD per tonne.

In another hole they showed 224.92 g/t Ag eq over 7.42 meters. In that hole they showed 0.55% Sn (tin). They are using an absurdly low price for tin. Currently, 5.5 kilos of tin is worth $212 all by itself.

When the dust has settled and the assay labs get caught up and ELO has a dozen drill rigs turning on Iska Iska, they are almost certainly going to show over 2 billion tonnes of $100 rock. This is one of the best stories in the last twenty years. It is still way below the radar screen of most investors even with an absurd market cap today of about $225 million CAD.

Eloro has one of the highest caliber technical teams in South America and brilliant management. The stock was $.15 in March of 2020 only twenty months ago. When the market wakes up, it is going a lot higher.

Eloro is an advertiser. I have participated in several private placements in the past and bought shares in the open market. I am naturally biased so do your own due diligence.

Eloro Resources Ltd
ELO-V $3.65 (Nov 02, 2021) 
ELRRF-OTCQX 61.7 million shares
Eloro website

###

Bob Moriarty
President: 321gold
Archives

321gold Ltd

Categories
Base Metals Emx Royalty Energy Junior Mining Precious Metals

EMX Increases Private Placement to C$ 21.45 Million

Vancouver, British Columbia–(Newsfile Corp. – November 2, 2021) – EMX Royalty Corporation (NYSE American: EMX) (TSXV: EMX) (FSE: 6E9) (the “Company“, or “EMX“) is pleased to announce that its private placement announced October 1, 2021 of up to 5,000,000 units at C$ 3.30 each for gross proceeds of up to C$ 16,500,000 has been oversubscribed and increased up to 6,500,000 units for C$ 21,450,000. The placement is expected to close on Friday, November 5, 2021.

The units will consist of one common share of the Company and one-half of one transferable warrant. Each whole warrant will entitle the purchase for two years of one common share at C$ 4.00 in the first year and C$ 4.50 in the second year.

Eligible finders will be paid a 6.0% cash commission and issued that number of non-transferable compensation warrants equal to 6.0% of the number of units sold to investors introduced by them. Each compensation warrant will entitle the purchase for one year of one common share of the Company for C$ 3.50.https://s.yimg.com/rq/darla/4-9-0/html/r-sf-flx.html

The placement is subject to stock exchange final approval.

This news release does not constitute an offer to sell or a solicitation of an offer to buy any of the securities in the United States. The securities have not been and will not be registered under the United States Securities Act of 1933, as amended (the “1933 Act”), or any U.S. state securities laws and may not be offered or sold within the “United States” or to “U.S. Persons” (as such terms are defined in Regulation S under the 1933 Act) unless registered under the 1933 Act and applicable U.S. state securities laws, or an exemption from such registration is available.

About EMX. EMX is a precious, base and battery metals royalty company. EMX’s investors are provided with discovery, development, and commodity price optionality, while limiting exposure to risks inherent to operating companies. The Company’s common shares are listed on the NYSE American Exchange and TSX Venture Exchange under the symbol EMX, as well as on the Frankfurt exchange under the symbol “6E9”. Please see www.EMXroyalty.com for more information.

For further information contact:

David M. Cole
President and Chief Executive Officer
Phone: (303) 979-6666
Dave@EMXroyalty.com

Scott Close
Director of Investor Relations
Phone: (303) 973-8585
SClose@EMXroyalty.com

Isabel Belger
Investor Relations (Europe)
Phone: +49 178 4909039
Ibelger@EMXroyalty.com

Neither the TSX-V nor its Regulation Services Provider (as that term is defined in policies of the TSX-V) accepts responsibility for the adequacy or accuracy of this release.

Forward-Looking Statements

This news release may contain “forward looking statements” that reflect the Company’s current expectations and projections about its future results. These forward-looking statements may include statements regarding completion of the transaction, perceived merits of properties, exploration results and budgets, mineral reserves and resource estimates, work programs, capital expenditures, timelines, strategic plans, market prices for precious and base metal, or other statements that are not statements of fact. When used in this news release, words such as “estimate,” “intend,” “expect,” “anticipate,” “will”, “believe”, “potential”, “upside” and similar expressions are intended to identify forward-looking statements, which, by their very nature, are not guarantees of the Company’s future operational or financial performance, and are subject to risks and uncertainties and other factors that could cause the Company’s actual results, performance, prospects or opportunities to differ materially from those expressed in, or implied by, these forward-looking statements. These risks, uncertainties and factors may include, but are not limited to: unavailability of financing, failure to identify commercially viable mineral reserves, fluctuations in the market valuation for commodities, difficulties in obtaining required approvals for the development of a mineral project, increased regulatory compliance costs, expectations of project funding by joint venture partners and other factors. It is possible EMX may not complete the transaction, as a result of failure to fulfill conditions of closing, unavailability of financing or for other reasons EMX cannot anticipate at this time.

Readers are cautioned not to place undue reliance on these forward-looking statements, which speak only as of the date of this news release or as of the date otherwise specifically indicated herein. Due to risks and uncertainties, including the risks and uncertainties identified in this news release, and other risk factors and forward-looking statements listed in the Company’s MD&A for the quarter ended June 30, 2021 and the year ended December 31, 2020 (the “MD&A”), and the most recently filed Revised Annual Information Form (the “AIF”) for the year ended December 31, 2020, actual events may differ materially from current expectations. More information about the Company, including the MD&A, the AIF and financial statements of the Company, is available on SEDAR at www.sedar.com and on the SEC’s EDGAR website at www.sec.gov.

Not for distribution to United States newswire services or for dissemination in the United States.

Categories
Energy Junior Mining Uncategorized

Eloro Intersects 100 Ag eq/t (including 38.71 g Ag/t, 0.88%Zn and 0.51%Pb) over 188.5 m in the Santa Barbara Breccia Pipe at Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia

Eloro Resources Ltd.Tue, November 2, 2021, 7:00 AMIn this article:

Section includes a higher-grade zone of 154 g Ag eq/t (including 75.51 g Ag/t, 0.96% Zn, 0.65% Pb and 0.16% Cu) over 65.8m

Table 1

Significant Diamond Drilling Results, Iska Iska, as at November 2, 2021
Significant Diamond Drilling Results, Iska Iska, as at November 2, 2021
Significant Diamond Drilling Results, Iska Iska, as at November 2, 2021
https://s.yimg.com/rq/darla/4-9-0/html/r-sf-flx.html

Figure 1

Geology of the Iska Iska Caldera Complex showing locations of Major Breccia Pipe targets, the Santa Barbara Resource Definition Target Zone and diamond drill holes completed and in progress.  Drill holes for which assays are reported in this release are highlighted.
Geology of the Iska Iska Caldera Complex showing locations of Major Breccia Pipe targets, the Santa Barbara Resource Definition Target Zone and diamond drill holes completed and in progress. Drill holes for which assays are reported in this release are highlighted.
Geology of the Iska Iska Caldera Complex showing locations of Major Breccia Pipe targets, the Santa Barbara Resource Definition Target Zone and diamond drill holes completed and in progress. Drill holes for which assays are reported in this release are highlighted.

TORONTO, Nov. 02, 2021 (GLOBE NEWSWIRE) — Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to provide an update on its Iska Iska silver-tin polymetallic project in the Potosi Department, southern Bolivia. To date, the Company has completed 34,409 metres (m) in 64 drill holes including three (3) in progress to test major target areas at Iska Iska. This press release reports drilling results from one (1) additional hole which tested the Santa Barbara Breccia Pipe (“SBBP”) (Hole DHK-23) and two holes (DCN-05 and DCS-03) which tested the Central Breccia Pipe target (“CBP”). To date, every drill hole that has been assayed has returned multiple reportable mineralized intercepts. Currently three drill rigs are in operation at Iska Iska. Two surface drill rigs are continuing to drill at SBBP to outline an initial National Instrument 43-101 (“NI-43-101”) compliant resource. A third drill, an underground rig, situated in the west end of the Santa Barbara Adit, is testing the eastern part of SBBP and its mineralized envelope. Figure 1 is a geological plan map showing locations of drill holes and an updated geological interpretation. Table 1 provides significant drilling results with definitions of chemical symbols and Table 2 lists holes completed with assays pending, as well as holes in progress in the three major target areas. Highlights are as follows:

Highlights:

Santa Barbara Breccia Pipe

  • 100g Ag eq/t (including 38.71 g Ag/t, 0.88%Zn and 0.51%Pb) over 188.5 m from 58.67m to 247.13m in hole DHK-23, drilled from the west end of the Huayra Kasa underground workings at -70 degrees due west. This intersection includes a higher-grade portion of 154 g Ag eq/t (including 75.51 g Ag/t, 0.96% Zn, 0.65% Pb and 0.16%Cu) over 65.8m

Central Breccia Pipe

  • Hole DCS-03 drilled southwest at -60 degrees from the south radial platform of the CBP intersected twelve (12) separate zones of quartz-tourmaline veins in granodioritic intrusive breccia with best results of 224.92 g Ag eq/t (including 25.36 g Ag/t, 0.12 g Au/t and 0.55% Sn) over 7.42m and 113.67 g Ag eq/t (including 17.85 g Ag/t, 0.085 g Au/t, 0.21% Cu and 0.18% Sn) over 12.03m
  • Hole DCN-05 drilled due east at -60 degrees from the north radial platform of the CBP intersected ten (10) separate zones of quartz-tourmaline veins in granodioritic intrusive breccia with a best result of 104.72 g Ag eq/t (including 74.41 g Ag/t and 0.22% Cu) over 4.59m

Mr. Tom Larsen, CEO of Eloro, commented: “We are now starting to see a reduction in the backlog of assay samples with two laboratories operating at near capacity. These latest drill results, especially from DHK-23, are again demonstrating the accumulating amount of potential commercial bulk tonnage material, especially within the Santa Barbara complex, a subset of the overall Iska Iska volcanic edifice.”

Dr. Bill Pearson, P.Geo., Eloro’s Executive Vice President Exploration, added: “Mineral resource definition drilling is continuing in the Santa Barbara Target area, which is 1,400m along strike, 500m wide and extends to a depth of 600m. This target is open along strike to the northwest and southeast. Data from the downhole Induced Polarization survey is being processed and the resulting 3D inversion models should aid in refining our geological model, especially determining the likely geometry of the higher-grade zones that typically have greater sulphide content.”

Dr. Osvaldo Arce, P.Geo., General Manager of Eloro`s Bolivian subsidiary, Minera Tupiza S.R.L. (“Minera Tupiza”), said: “As we move to the northwest in the SBBP, silver and gold values are increasing suggesting that there is a zonation at Iska Iska, from a more tin-rich polymetallic mineralization in the southeastern part of the SBBP to more of a silver-rich polymetallic mineralization in the northwestern part. In addition, significant enriched tin-silver mineralization occurs in the northern part of the CBP.”

Table 1: Significant Diamond Drilling Results, Iska Iska, as at November 2, 2021:
https://www.globenewswire.com/NewsRoom/AttachmentNg/4f8beb2c-64d6-4e65-a54a-2c660a17b9ae

Note: True width of the mineralization is not known at the present time, but based on the current understanding of the relationship between drill orientation/inclination and the mineralization within the breccia pipes and the host rocks such as sandstones and dacites. It is estimated that true width ranges between 70% and 90% of the down hole interval length but this will be confirmed by further drilling. Percentage metal contents are shown for each element.

Chemical symbols: Ag= silver, Au = gold, Zn = zinc, Pb = lead, Cu = copper, Sn = tin, Bi = bismuth, Cd = cadmium and g Ag eq/t = grams silver equivalent per tonne. Quantities are given in percent (%) for Zn, Pb Cu, Sn, Bi and Cd and in grams per tonne (g/t) for Ag, Au and Ag eq.

Metal prices and conversion factors used for calculation of g Ag eq/t (grams Ag per grams x metal ratio) are as follows:

ElementPrice (per
kg)
Ratio to
Ag
Ag$875.001.00000
Sn$28.000.03200
Zn$2.800.00320
Pb$2.100.00240
Au$57,40065.6000
Cu$8.800.01006
Bi$12.760.01458
In$305.000.34857
Cd$5.500.00629

In calculating the intersections reported in this press release a sample cutoff of 30 g Ag eq/t was used with generally a maximum dilution of 3 continuous samples below cutoff included within a mineralized section unless more dilution is justified geologically.

The equivalent grade calculations are based on the stated metal prices and are provided for comparative purposes only, due to the polymetallic nature of the deposit. Preliminary metallurgical tests are in progress to establish levels of recovery for each element reported but currently the potential recovery for each element has not yet been established. While there is no assurance that all or any of the reported concentrations of metals will be recoverable, Bolivia has a long history of successfully mining and processing similar polymetallic deposits which is well documented in the landmark volume “Yacimientos Metaliferos de Bolivia” by Dr. Osvaldo R. Arce Burgoa, P.Geo.

Table 2: Summary of Diamond Drill Holes Completed with Assays Pending and Drill Holes in Progress at Iska Iska from press release of November 2, 2021.

Hole No.TypeCollar
Easting
Collar
Northing
ElevAzimuthAngleHole Length
m
Surface Drilling Northwest Extension Santa Barbara
DSB-12S205072.77656867.54165.0225-40806.2
DSB-13S205072.77656867.54165.0225-60696.5
DSB-14S205283.07656587.24175.0225-65968.5
DSB-15S204973.17657053.84165.0225-40731.2
DSB-16S204973.17657053.84165.0225-65862.0
DSB-17S7656765.4205131.34173.0225-40841.0
DSB-18S7656676.3205207.14175.0225-40890.4
Subtotal5,795.8
DSB-19S7656676.3205207.14175.0225-65In progress
DSB-20S7656765.4205131.34173.0225-65In progress
Underground Drilling Santa Barbara Adit
DSBU-1UG205285.27656074.84165.090-10260.5
DSBU-2UG205285.27656074.84165.0270-20563.6
DSBU-3UG205285.27656074.84165.0270-20443.5
Subtotal1,267.6
DSBU-4UG205285.27656074.84165.0180-20In progress
Central Breccia Pipe – Surface Radial Drill Program – North Setup
DCN-06S204902.07655860.04420.0180-80626.4
DCN-07S204902.07655860.04420.0270-60680.4
Subtotal1,306.8
Central Breccia Pipe – Surface Radial Drill Program – South Setup
DCS-04S204852.17655612.34429.7180-60644.4
Subtotal644.4
Porco Central – Surface Radial Drill Program
DPC-01S205457.27655110.94175.0270-60767.5
DPC-02S205457.27655110.94175.0225-60908.2
DPC-03S205457.27655110.94175.0135-60524.5
DPC-04S205457.27655110.94175.00-60371.4
DPC-05S205457.27655110.94175.090-60407.5
DPC-06S205457.27655110.94175.0243-60716.4
Subtotal3,695.5
TOTAL12,710.1

S = Surface UG=Underground; collar coordinates in metres; azimuth and dip in degrees
Total drilling completed since the start of the program on September 13, 2020, is 34,409m in 64 holes including 3 holes in progress (20 underground holes and 44 surface holes).

Figure 1: Geology of the Iska Iska Caldera Complex showing locations of Major Breccia Pipe targets, the Santa Barbara Resource Definition Target Zone and diamond drill holes completed and in progress. Drill holes for which assays are reported in this release are highlighted:
https://www.globenewswire.com/NewsRoom/AttachmentNg/cce5620d-1deb-4db4-8f54-903bee989c21

Qualified Person

Dr. Osvaldo Arce, P. Geo., General Manager of Minera Tupiza, and a Qualified Person in the context of NI 43-101, has reviewed and approved the technical content of this news release. Dr. Bill Pearson, P.Geo., Executive Vice President Exploration Eloro, and who has more than 45 years of worldwide mining exploration experience including extensive work in South America, manages the overall technical program working closely with Dr. Arce. Dr. Quinton Hennigh, P.Geo., Senior Technical Advisor to Eloro and Independent Technical Advisor, Mr. Charley Murahwi P. Geo., FAusIMM of Micon International Limited are regularly consulted on technical aspects of the project.

Drill samples are prepared in ALS Bolivia Ltda’s preparation facility in Oruro, Bolivia with pulps sent to the main ALS Global laboratory in Lima for analysis. As announced in the February 26, 2021 press release, Eloro has changed the assay protocol to utilize X-ray fluorescence (XRF) to more accurately analyze higher tin. Tin in the CBP is suspected to occur as cassiterite which is insoluble in acid digestion, and therefore not suited for wet chemical techniques. In addition, other assay protocols have been changed to provide for a more accurate measurement of the wide-ranging suite of polymetallic metals at Iska Iska. Eloro employs an industry standard QA/QC program with standards, blanks and duplicates inserted into each batch of samples analyzed with selected check samples sent to a separate accredited laboratory.

Recently, AHK Laboratories, who manage a global network of laboratories have setup operations in Bolivia with the establishment of a preparation laboratory in Oruro. AHK has a strong base of accredited laboratories in South America including Peru, Chile, Brazil and Argentina. Eloro has contracted AHK to provide additional analytical services in order to help reduce the sample backlog. A series of check samples are currently being analyzed by AHK as a QA/QC check. AHK is following the same analytical protocols used as with ALS and with the same QA/QC protocols. The used of both accredited laboratories is reducing the backlog of samples to be analysed and improving turnaround.

About Iska Iska

Iska Iska silver-tin polymetallic project is a road accessible, royalty-free property, wholly-controlled by the Title Holder, Empresa Minera Villegas S.R.L. and is located 48 km north of Tupiza city, in the Sud Chichas Province of the Department of Potosi in southern Bolivia. Eloro has an option to earn a 99% interest in Iska Iska.

Iska Iska is a major silver-tin polymetallic porphyry-epithermal complex associated with a Miocene possibly collapsed/resurgent caldera, emplaced on Ordovician age rocks with major breccia pipes, dacitic domes and hydrothermal breccias. The caldera is 1.6km by 1.8km in dimension with a vertical extent of at least 1km. Mineralization age is similar to Cerro Rico de Potosí and other major deposits such as San Vicente, Chorolque, Tasna and Tatasi located in the same geological trend.

Eloro began underground diamond drilling from the Huayra Kasa underground workings at Iska Iska on September 13, 2020. On November 18, 2020 Eloro announced the discovery of a significant breccia pipe with extensive silver polymetallic mineralization just east of the Huayra Kasa underground workings and a high-grade gold-bismuth zone in the underground workings. On November 24, 2020, Eloro announced the discovery of the SBBP approximately 150m southwest of the Huayra Kasa underground workings.

Subsequently, on January 26, 2021, Eloro announced significant results from the first drilling at the SBBP including the discovery hole DHK-15 which returned 129.60 g Ag eq/t over 257.5m (29.53g Ag/t, 0.078g Au/t, 1.45%Zn, 0.59%Pb, 0.080%Cu, 0.056%Sn, 0.0022%In and 0.0064% Bi from 0.0m to 257.5m. Subsequent drilling has confirmed significant values of Ag-Sn polymetallic mineralization in the SBBP and the adjacent CBP. A substantive mineralized envelope which is open along strike and down-dip extends around both major breccia pipes. Continuous channel sampling of the Santa Barbara Adit located to the east of SBBP returned 442 g Ag eq/t (164.96 g Ag/t, 0.46%Sn, 3.46% Pb and 0.14% Cu) over 166m including 1,092 g Ag eq/t (446 g Ag/t, 9.03% Pb and 1.16% Sn) over 56.19m. The west end of the adit intersects the end of the SBBP.

Since the discovery hole on the SBBP, Eloro has released a number of significant drill results on this target, including:

  • 122.66 grams g Ag eq/t (35.05 g Ag/t, 0.72% Zn, 0.61% Pb, 0.11% Sn and 0.06 g Au/t) over 123.61m including 205.74 g Ag eq/t (92.30 g Ag/t, 0.57% Zn, 0.85% Pb, 0.18% Sn and 0.07 g Au/t) over 32.32m (DSB-07),
  • 105.41 g Ag eq/t (8.55 g Ag/t, 1.01% Zn, 0.48% Pb, 0.06% Sn and 0.38 g Au/t) over 173.58m including 199.77 g Ag eq/t (21.90 g Ag/t, 1.18% Zn, 0.93% Pb 0.12% Sn and 0.94 g Au/t) over 39.08m (DSB-07)
  • 69.89 g Ag eq/t over 252.89m from 355.12 to 608.02m including several higher-grade sections of 196.60 g Ag eq/t including 131.13 g Ag/t over 14.52m, 134.62 g Ag eq/t including 93.25 g Ag/t over 21.08m and 145.35 g Ag eq/t including 2.38% Zn over 10.11m (DSB-08).
  • 114.96 Ag eq/t including 0.325% Sn over 56.2m including a higher-grade section of 187.98 g Ag eq/t including 0.535% Sn over 28.86m; 80.71 g Ag eq/t including 0.213% Sn over 74.39m and 118.69 g Ag eq/t over 10.77m (DSB-10).
  • 129.65 g Ag eq/t (18.38 g Ag/t, 2.14% Zn, 0.67%Pb, and 0.047% Sn) over 300.75m from 65.14m to 365.91m, including higher grade intervals of 215.54 g Ag eq/t over 72.76m, 163.35 g Ag eq/t over 31.83m and 224.48 g Ag eq/t over 19.39m. 82% of this 446.5m long hole contained reportable intervals (DHK-18).
  • 234.19 g Ag eq/t (70.58 g Ag/t, 2.31% Zn, 2.74% Pb and 0.042% Sn) over 53.2m including a higher-grade portion of 931.73 g Ag eq/t (367.29 g Ag/t, 5.64% Zn, 13.67% Pb and 0.10% Sn) over 9.26m (DHK-20).
  • 108.24 g Ag eq/t (3.14g Ag/t, 0.24 g Au/t, 2.03% Zn and 0.58% Pb) over 48.2m including a higher-grade interval grading 180.76 g Ag eq/t (4.46 g Ag/t, 0.35 g Au/t, 3.57% Zn and 1.05% Pb) over 15.02m (DHK-19). 160.22 g Ag eq/t (36.53 g Ag/t, 1.63% Zn, 1.20% Pb and 0.10% Sn) over 194.14m (DHK-21) including higher grade portions of:
    • 250.50 g Ag eq/t (51.31 g Ag/t, 3.35% Zn, 1.78% Pb and 0.10% Sn) over 18.24m.
    • 257.40 g Ag eq/t (75.83 g Ag/t, 2.29% Zn, 2.40% Pb and 0.12% Sn) over 16.33m.
    • 350.91 g Ag eq/t (112.57 g Ag/t, 1.41% Zn, 3.08% Pb and 0.33% Sn) over 30.06m.
    • 64% of this 512.9m long hole contains reportable intersections
  • 94.68 g Ag eq/t (3.87 g Ag/t, 0.067 g Au/t, 1.63% Zn, 0.43% Pb and 0.05% Sn) over 169.93m including a higher-grade zone that graded 158.64 g Ag eq/t (9.35g Ag/t, 0.016 g Au/t, 3.43% Zn, 0.71% Pb and 0.03%Sn) over 29.84m (DHK-22).

On May 4, 2021, Eloro released results from the first drill hole on the CBP. Hole DCN-01 intersected multiple mineralized intercepts including 196.09 g Ag eq/t (150.25 g Ag/t, 0.10% Sn and 0.05 g Au/t) over 56.2m and containing 342.98 g Ag eq/t (274.0 g Ag/t, 0.16% Sn and 0.16 g Au/t) over 27.53m.

Hole DCN-04 drilled at -80 degrees to the north from the northern radial platform of the CBP, intersected seventeen (17) mineralized intersections, principally Sn-Ag-bearing, over its 851.4m length. Best results include: 71.54 g Ag eq/t (32.58 g Ag/t and 0.10% Sn) over 97.10m from 134.40 to 231.5m; 101.52 g Ag eq/t (28.74 g Ag/t and 0.19% Sn) over 62.01m; 70.42 g Ag eq/t (28.74 g Ag/t and 0.16% Sn) over 22.59m; and 236.96 g Ag eq/t (92.21 g Ag/t and 0.25% Sn) over 17.45m. Hole DCS-02 was drilled southeast at -60 degrees from the south radial platform of the CBP. This hole, which was drilled to 800.5m, intersected nine (9) reportable Ag-Zn-Pb-Sn mineralized intervals. Best results include 79.53 g Ag eq/t (including 0.21% Sn) over 19.42m, 101.01 g Ag eq/t (32.76 g Ag/t, 0.76% Zn, 0.75% Pb) over 10.47 and 130.95g Ag eq/t (34.14 g Ag/t, 0.10 g Au/t, 1.35% Zn and 0.56 % Pb over 7.40m.

A detailed ground magnetic survey of the Iska Iska property, reported on June 6, 2021, confirmed the extent of the Iska Iska Caldera as determined from geological mapping and satellite interpretation, including Aster data. The SBBP and CBP, both of which have been confirmed by drill-testing, are marked by prominent low anomalies reflecting strong alteration. The magnetic data suggests that the Central and Porco Breccia Pipes likely merge at depth. In addition, there is a prominent area of low intensity magnetics northwest of the SBBP which was reported on in this press release.

Geological mapping and satellite interpretation identified a third major breccia pipe target, Porco (South), that is approximately 600m in diameter (South) located southeast of the CBP in the southern part of the Iska Iska caldera complex. The Porco (South) Breccia Pipe target has a similar magnetic signature to the Santa Barbara and Central Breccia Pipes, further confirming the likelihood of it being a major breccia pipe. Six (6) drill holes have been completed on Porco; assay results are pending. Previous channel sampling in the Porco adit located adjacent the target area 200m to the southeast returned 50m grading 519.35 g Ag eq/t including 236.13 g Ag/t, 1.89 g Au/t, 0.87% Cu, 0.22% Bi and >0.05% Sn over an average sample width of 2.49m.

Currently three diamond drill rigs are active at Iska Iska, two surface rigs and one underground drill. Planned drilling for 2021 is 51,000m with the aim of outlining an initial inferred NI 43-101 compliant mineral resource by Q1 2022. The target zone at the SBBP and the surrounding mineralized envelope is 1400m along strike, 500m wide and extends to a depth of 600m. This zone is open along strike to the northwest and southeast. A downhole induced polarization/resistivity (IP/Res) survey is in progress to further define drill targets and aid resource definition drilling. Preliminary metallurgical tests are also in progress. An updated NI 43-101 Technical Report is being prepared by independent consultant Micon International Ltd.

About Eloro Resources Ltd.

Eloro is an exploration and mine development company with a portfolio of gold and base-metal properties in Bolivia, Peru and Quebec. Eloro has an option to acquire a 99% interest in the highly prospective Iska Iska Property, which can be classified as a polymetallic epithermal-porphyry complex, a significant mineral deposit type in the Potosi Department, in southern Bolivia. Eloro commissioned a NI 43-101 Technical Report on Iska Iska, which was completed by Micon International Limited and is available on Eloro’s website and under its filings on SEDAR. Iska Iska is a road-accessible, royalty-free property. Eloro also owns an 82% interest in the La Victoria Gold/Silver Project, located in the North-Central Mineral Belt of Peru some 50 km south of Barrick’s Lagunas Norte Gold Mine and Pan American Silver’s La Arena Gold Mine. La Victoria consists of eight mining concessions and eight mining claims encompassing approximately 89 square kilometres. La Victoria has good infrastructure with access to road, water and electricity and is located at an altitude that ranges from 3,150 m to 4,400 m above sea level.

For further information please contact either Thomas G. Larsen, Chairman and CEO or Jorge Estepa, Vice-President at (416) 868-9168.

Information in this news release may contain forward-looking information. Statements containing forward looking information express, as at the date of this news release, the Company’s plans, estimates, forecasts, projections, expectations, or beliefs as to future events or results and are believed to be reasonable based on information currently available to the Company. There can be no assurance that forward-looking statements will prove to be accurate. Actual results and future events could differ materially from those anticipated in such statements. Readers should not place undue reliance on forward-looking information.

Neither the TSXV nor its Regulation Services Provider (as that term is defined in the policies of the TSXV) accepts responsibility for the adequacy or accuracy of this release.

Categories
Base Metals Energy Junior Mining Precious Metals

Vox Announces Q3 2021 Revenues and Multiple Royalty Production Records

TORONTO, Nov. 2, 2021 /CNW/ – Vox Royalty Corp. (TSXV: VOX) (“Vox” or the “Company“), a high growth precious metals focused royalty company, is pleased to announce that it has realized preliminary quarterly royalty revenue of C$1,558,800 (US$1,223,400)(1) for the three-month period ended September 30, 2021.

Quarterly revenue benefitted from record royalty-linked gold production by Karora Resources Inc. (TSX: KRR) from the Hidden Secret and Mousehollow deposits at Higginsville covered by the Dry Creek royalty and record royalty-linked iron ore production volumes by Mineral Resources Limited (ASX: MIN) at Koolyanobbing, and consistent royalty revenues from each of the Company’s Janet Ivy gold royalty and Brauna diamond royalty. Royalty revenues relative to Q2 2021 were inline in spite of a significant reduction in realised iron ore pricing at Koolyanobbing.

Quarterly, year to date, and annual revenue guidance figures are summarized in the below table:

 Three months endedSeptember 30, 2021Nine months ended
September 30, 2021
(Fiscal 2021 YTD)
2021 Annual
Guidance
Royalty revenue (C$)$1,558,800$3,856,000$4,000,000 – $5,000,000
Royalty revenue (US$)$1,223,400(1)$3,077,500$3,200,000 – $4,000,000

Kyle Floyd, Chief Executive Officer stated: “We are pleased to announce another quarter of strong royalty revenue and multiple royalty-linked production records at Higginsville and Koolyanobbing. The Vox portfolio remains on track to deliver revenue at the higher end of our expectations, even in light of revenue guidance doubling in July 2021. Further, we anticipate first royalty revenue from our Segilola asset during Q4/Q1, following the achievement of commercial production at Segilola in October. The coming quarters present even more value accretive developments for Vox shareholders to look forward to, as we continue our industry leading organic growth trajectory from 5 to 10 producing assets by late 2023.”

About Vox

Vox is a high growth precious metals royalty and streaming company with a portfolio of over 50 royalties and streams spanning eight jurisdictions. The Company was established in 2014 and has since built unique intellectual property, a technically focused transactional team and a global sourcing network which has allowed Vox to become the fastest growing company in the royalty sector. Since the beginning of 2019, Vox has announced over 20 separate transactions to acquire over 45 royalties.

Further information on Vox can be found at www.voxroyalty.com.  

Cautionary Note Regarding Forward Looking Information

This news release contains certain forward-looking statements. Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance (often, but not always, using words or phrases such as “expects” or “does not expect”, “is expected”, “anticipates” or “does not anticipate” “plans”, “estimates” or “intends” or stating that certain actions, events or results ” may”, “could”, “would”, “might” or “will” be taken, occur or be achieved) are not statements of historical fact and may be “forward-looking statements”. Forward-looking statements are subject to a variety of risks and uncertainties which could cause actual events or results to materially differ from those reflected in the forward-looking statements.

The forward-looking statements and information in this press release include, but are not limited to Vox’s anticipated outlook for the 2021 fiscal year, completion of certain anticipated milestones, transactions and developments by the operators of certain underlying projects and mines in respect of Vox’s royalty and stream portfolio, anticipated future cash flows, future financial reporting by Vox, the receipt of payments from Vox’s mining royalty and streaming portfolio, the requirements for regulatory approvals and third party consents, and the completion of mine construction, production and expansion under construction phases at the mines or properties that Vox holds an interests in.

Forward-looking statements and information are based on forecasts of future results, estimates of amounts not yet determinable and assumptions that, while believed by management to be reasonable, are inherently subject to significant business, economic and competitive uncertainties and contingencies. Forward-looking statements and information are subject to various known and unknown risks and uncertainties, many of which are beyond the ability of Vox to control or predict, that may cause Vox’s actual results, performance or achievements to be materially different from those expressed or implied thereby, and are developed based on assumptions about such risks, uncertainties and other factors set out herein, including but not limited to: the requirement for regulatory approvals and third party consents, the impact of general business and economic conditions, the absence of control over the mining operations from which Vox will receive royalties, including risks related to international operations, government relations and environmental regulation, the inherent risks involved in the exploration and development of mineral properties; the uncertainties involved in interpreting exploration data; the potential for delays in exploration or development activities; the geology, grade and continuity of mineral deposits; the impact of the COVID-19 pandemic; the possibility that future exploration, development or mining results will not be consistent with Vox’s expectations; accidents, equipment breakdowns, title matters, labor disputes or other unanticipated difficulties or interruptions in operations; fluctuating metal prices; unanticipated costs and expenses; uncertainties relating to the availability and costs of financing needed in the future; the inherent uncertainty of production and cost estimates and the potential for unexpected costs and expenses, commodity price fluctuations; currency fluctuations; regulatory restrictions, including environmental regulatory restrictions; liability, competition, loss of key employees and other related risks and uncertainties. Should one or more of these risks, uncertainties or other factors materialize, or should assumptions underlying the forward-looking information or statement prove incorrect, actual results may vary materially from those described herein as intended, planned, anticipated, believed, estimated or expected. Vox cautions that the foregoing list of material factors is not exhaustive. When relying on the Company’s forward-looking statements and information to make decisions, investors and others should carefully consider the foregoing factors and other uncertainties and potential events.

Vox has assumed that the material factors referred to in the previous paragraph will not cause such forward looking statements and information to differ materially from actual results or events. However, the list of these factors is not exhaustive and is subject to change and there can be no assurance that such assumptions will reflect the actual outcome of such items or factors. The forward-looking information contained in this press release represents the expectations of Vox as of the date of this press release and, accordingly, is subject to change after such date. Readers should not place undue importance on forward looking information and should not rely upon this information as of any other date. While Vox may elect to, it does not undertake to update this information at any particular time except as required in accordance with applicable laws.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Notes:
(1)These figures have not been audited and are subject to change. As the Company has not yet finished its quarter-end close procedures, the anticipated financial information presented in this press release is preliminary, subject to final quarter-end closing adjustments, and may change materially.

SOURCE Vox Royalty Corp.

Categories
Energy Junior Mining Precious Metals

Silver Hammer Mining Commerces Trading on the OTCQB and Provides Lacy Project Update

VANCOUVER, British Columbia, Oct. 29, 2021 (GLOBE NEWSWIRE) — Silver Hammer Mining Corp. (CSE: HAMR) (OTCQB: HAMRF) (the “Company” or “Silver Hammer”) is pleased to announce that, effective October 29, 2021, it has commenced trading on the OTCQB® under the symbol “HAMRF”. The Company has chosen to trade on this US marketplace to provide current and future US-based investors with greater access, ease of trading, home country disclosure, current financial disclosures and Real-Time Level 2 quotes on www.otcmarkets.com.

“Listing on the OTCQB venture exchange market place is an important milestone for the Company,” said Morgan Lekstrom, President and CEO of the Company. “Qualifying for OTCQB® is a natural step for the Company towards broadening exposure of our exploration activities in the U.S. It also demonstrates our commitment to increasing our investor base while providing our current and future U.S. investors convenient access to the same ease of trading, timely news and information enjoyed by investors in Canada.”

The Company appointed B. Riley to provide guidance with respect to its eligibility to meet the requirements of the OTCQB and to advise the Company on its responsibilities for complying with its U.S. disclosure obligations under the Securities Act of 1934 and Rule 12g3-2 promulgated thereunder in connection with the OTCQB listing and the OTCQB standards for international companies.

Lacy Project Update

Silver Hammer has filed an assessment report on the Lacy Project with the BC provincial government. The project comprises 590 hectares of mineral tenures in the Nanaimo and Alberni Mining Divisions of B.C. The initial evaluation of the project has produced encouraging results, including gold-silver surface mineralization in stockworks and quartz veins. Management intends to conduct a more detailed program including further geophysics over the next 6-12 months to identify possible drill targets.

About Silver Hammer Mining Corp.

Silver Hammer Mining Corp. is a junior resource company advancing the past-producing Silver Strand Mine in the Coeur d’Alene Mining District in Idaho, USA, both the Eliza Silver Project and the Silverton Silver Mine in one of the world’s most prolific mining jurisdictions in Nevada and the Lacy Gold Project in British Columbia, Canada. The Company has commenced an initial drill program at Silver Strand that will test for silver and gold mineralization immediately below the mine’s lowest level extending only 90 metres below surface. Silver Hammer strives to become a multimine silver producer and will focus near-term exploration and drilling plans at the Company’s Idaho and Nevada silver-gold assets.

*Mineralization hosted on adjacent and/or nearby properties is not necessarily indicative of mineralization hosted on the Company’s property.

On Behalf of the Board of Silver Hammer Mining Corp.

Morgan Lekstrom, President and CEO

Corporate Office: 551 Howe Street, Vancouver, British Columbia V6C 2C2, Canada

Contact: Kristina Pillon, President, High Tide Consulting Corp.

604.908.1695 / investors@silverhammermining.com

The CSE does not accept responsibility for the adequacy or accuracy of this release. The Canadian Securities Exchange has neither approved nor disapproved the contents of this press release.

Categories
Base Metals Energy Junior Mining

Granite Creek Copper Reports Final Results from Phase 1 of 2021 Drill Program, Including 23.30 Meters of 2.27 % Copper Equivalent, at the Carmacks Copper-Gold-Silver Project in Yukon, Canada

VANCOUVER, BC / ACCESSWIRE / October 28, 2021 / Granite Creek Copper Ltd. (TSX.V:GCX | OTCQB:GCXXF) (“Granite Creek” or the “Company“) is pleased to announce the third and final tranche of assay results from Phase 1 of the Company’s three-phase 2021 drill program at the 100%-owned Carmacks project.

The Phase 1 campaign focused on expansion and upgrade of resources in zones 1, 2000S, and 13 by testing the sulfide potential of these priority areas. In addition to the Phase 1 program, the Company also completed Phase 2 RC drilling at early-stage targets, and a Phase 3 diamond drill program to follow up on the success of Phase 1. All activity has been completed at site for the 2021 field season with assays for Phases 2 and 3 pending.

Granite Creek President & CEO, Tim Johnson, commented, “We are extremely pleased with the results of our 2021 exploration program which achieved many of our objectives and exceeded our expectations in several important respects. We expanded sulfide mineralization in three of the main zones at Carmacks which will be reflected in an updated NI 43-101 resource estimate followed by a new mine plan which is being developed to incorporate both oxide and sulfide material. We anticipate the sulfide resources could make a significant difference to the mine life and economics of the Carmacks deposit and we look forward to further defining that potential.”

Highlights

  • In Zone 1, diamond drill hole CRM21-019 intersected 67.35m of 1.23% Copper Equivalent (“CuEq”) mineralization including 23.30m of 2.27 CuEq.
  • In Zone 1, diamond drill hole CRM21-013 intersected 67.90m of 0.90% CuEq including 22.88m of 1.14% CuEq and 12.91m of 1.73% CuEq.
  • In Zone 13, diamond drill hole CRM21-021 intersected 96.85m of 0.84% CuEq including 35.85m of 1.04 CuEq and 21.35m of 1.21 CuEq.
  • Granite Creek believes these intercepts, plus others listed in the table below, have the potential to increase the grade and confidence of the resource model in Zone 1 and increase the grade and total size of Zones 2000S and 13.
  • Updated resource model being developed.

Table 1 – Highlights from of 2021 Phase 1 Diamond Drill Assays at the Carmacks Project

Drillhole
From(m)To(m)Length*(m)Cu(%)Mo(%)Au(g/t)Ag(g/t)CuEq** (%)
CRM21-012400.65415.7515.100.340.0060.112.130.47Zone 1ThisRelease
Including405.85411.205.350.550.0160.153.010.75
CRM21-013311.00378.9067.900.730.0050.182.690.90
Including324.75343.6322.880.920.0060.233.761.14
and including355.09368.0012.911.390.0060.375.291.73
CRM21-014355.70423.4567.750.930.0090.265.161.20
Including398.00423.4524.451.530.0090.416.211.91
CRM21-017317.42363.2045.780.420.0010.152.410.55
Including323.50335.8512.350.670.0020.283.900.92
CRM21-019277.95345.3067.350.930.0110.314.231.23
Including322.00345.3023.301.70.0160.577.512.27
CRM21-004323.50367.0043.501.120.0280.203.411.40Zone 1PreviousRelease
Including338.50367.0028.501.570.0420.294.531.96
and including352.00†367.0015.001.800.0660.334.812.31
CRM21-007222.52226.604.080.910.0060.196.321.13
CRM21-010450.00513.4063.400.270.0030.081.310.35
Including450.00482.2532.250.300.0040.081.410.39
Including488.90513.4024.500.300.0030.091.470.39
CRM21-01892.40110.4018.000.910.0080.176.791.12Zone 2000SThisRelease
and158.80170.0011.200.720.0130.144.270.91
and233.60249.0015.400.390.0240.092.090.56
and263298.9035.900.350.0080.102.620.48
including287.00298.9011.900.670.0170.193.530.90
CRM21-003146.35†214.5068.150.590.0280.143.690.83Zone 2000SPreviousRelease
Including161.40179.8018.040.810.0330.214.801.13
CRM21-005137.05179.8043.240.740.0470.163.821.06
Including142.05158.4016.351.200.0360.266.111.58
CRM21-006194.40278.2083.800.640.0120.133.230.81
Including229.20278.2049.000.870.0180.173.881.10
Including248.76266.2017.441.210.0330.225.111.53
CRM21-008195.80228.4032.600.800.0190.173.881.02
Including201.55215.5514.001.100.0230.244.861.40
CRM21-009190.50243.8553.350.590.0120.142.710.75
Including191.30201.7010.400.870.0040.253.701.09
and including209.00225.9516.950.620.0090.132.760.77
and including229.90235.255.351.210.0640.284.881.68
CRM21-011223.98329.50105.520.960.0130.184.061.18
Including223.98245.2021.222.170.0100.369.132.56
and including260.32260.820.5018.970.0080.4638.319.72
CRM21-01536.6949.3812.690.230.0030.040.960.27Zone 13 ThisRelease
CRM21-01691.30238.50147.200.380.0250.102.280.56
CRM21-021132.15229.0096.850.620.0140.203.040.84
Including132.15168.0035.850.820.0130.203.801.04
and including207.65229.0021.350.800.021`0.433.511.21

** Copper equivalent (Cu Eq) values assume Cu $3.35/lb, Au $1600/oz, Ag $24/oz, Mo $12/lb and 100% recovery. *Weighted average intercepts shown. Estimated true widths vary but, based on geological interpretation of cross-sections, are estimated to be typically 60-70% of the intersected widths.

† Part of zone has poor recovery

Figure 1 – Carmacks Copper Project Plan View

Zone 1

Eight holes were drilled in Zone 1 with the objective of increasing confidence in the inferred portion of the sulfide resource of this zone as well as evaluating the down-dip continuation of the inferred resource. Drilling was successful in achieving its objectives of delineating the depth extent of mineralization, expanding the mineralization below the current resource model, and confirming the grade and anticipated thickness in the inferred portion of the sulfide resource in this zone. Of the total reported meterage with significant mineralization, 67% returned mineralized intercepts grading greater than those reported in the inferred category of the resource estimate completed in 2017. While only preliminary, the Company feels that these intercepts have the potential to significantly increase the grade and the confidence in this area of the resource model.

While the Preliminary Economic Assessment (“PEA”) published in 2017(1,2) looked only at the oxide material in Zones 1,4, and 7, work being conducted by Sedgman and Mining Plus (see news release dated May 18, 2021) is looking at various scenarios to process the sulfide portion of Zone 1, and other sulfide zones of the deposit, to build a basis for an updated PEA that would include both oxide and sulfide ore.

Zone 2000S

Zone 2000S has the potential to add tonnage in the sulfide domain of resource category and in doing so could add significant value to an updated PEA that included sulfide resources. During Phase 1, six diamond drillholes were drilled in this zone to evaluate the continuation of bornite-chalcopyrite mineralization down dip, and two additional holes were drilled during Phase 2 with assays still pending. Drill hole CRM21-011, along with all other drillholes from the 2021 program (see release dated August 22, 2021) extended known mineralization in the zone from 30m to 100m below the current block model. CRM21-018, a technical hole drilled subparallel to the mineralization to evaluate the geological concept of a southern W-E striking fault, was successful in locating the fault and extends mineralization to depth beneath the current resource model

Zone 13

Three diamond drill holes were completed at Zone 13 in Phase 1, and an additional two holes were completed in Phase 3 with the intent of evaluating the northern continuity of sulfide mineralization, and infilling an open area of the block model. Building on success from the company’s inaugural drill program in 2020 which included 127 metres of continuous copper mineralization in drillhole CRM20-001, grading 0.85% CuEq and including 28.65m of 1.74% CuEq and 19.2m of 1.19% CuEq (see news release dated February 11,2021), all five diamond drill holes were successful in extending and infilling mineralization from Zone 13 in the Carmacks deposit including CRM21-021 which intercepted 96.85m grading 0.84% CuEq including 35.85m of 1.04% CuEq and 21.35m of 1.21% CuEq. Drill hole CRM21-020 drilled from the same pad as CRM21-021 deviated from planed direction and was not completed.

COVID-19 Protocols

Granite Creek has worked closely with the Yukon government to develop a COVID-19 safety plan that enables the Company to implement an effective work plan while maintaining the highest degree of safety of our workers and surrounding communities. The Company strictly adheres to mandates put in place by health authorities at the Federal and Territorial government level and hold the health and safety of our workers, and the citizens of the communities in which work in the highest regard.

[1] JDS Energy and Mining. Feb 9, 2017. NI 43-101 Preliminary Economic Assessment Technical Report on the Carmacks Project, Yukon, Canada. Contained metal based on 23.76 million tonnes of NI 43-101 compliant resources in the Measured and Indicated categories grading 0.85% Cu, 0.31 g/t Au, 3.14 g/t Ag.

[2] Arseneau Consulting Services, 2016 Independent Technical Report on the Carmacks Copper Project, Yukon, Canada.

About Granite Creek Copper

Granite Creek, a member of the Metallic Group of Companies, is a Canadian exploration company focused on the 176 square kilometer Carmacks project in the Minto copper district of Canada’s Yukon Territory. The project is on trend with the high-grade Minto copper-gold mine, operated by Minto Explorations Ltd, to the north and features excellent access to infrastructure with the nearby paved Yukon Highway 2, along with grid power within 12 km. More information about Granite Creek Copper can be viewed on the Company’s website at www.gcxcopper.com.

FOR FURTHER INFORMATION PLEASE CONTACT:

Timothy Johnson, President & CEO
Telephone: 1 (604) 235-1982
Toll Free: 1 (888) 361-3494
E-mail: info@gcxcopper.com
Website: www.gcxcopper.com

Qualified Person

Ms. Debbie James, P.Geo., a qualified person for the purposes of National Instrument 43-101, has reviewed and approved the technical disclosure contained in this news release.

Quality Control and Quality Assurance

Quality assurance and quality control procedures include the systematic insertion of duplicate, blank and standard samples, making up 12% of the sample stream. Drill core samples were sawn in half, labelled, placed in sealed bags and shipped directly to the Bureau Veritas preparation laboratory in Whitehorse. All geochemical analyses were performed by Bureau Veritas in Vancouver. Copper and silver analysis was performed by four-acid digestion with an ICP-ES finish. Non-sulphide copper was determined through a sulphuric acid leach with an AAS finish. Gold was analyzed by igniting a 15 g sample followed by an aqua regia digestion with an ICP-MS finish.

Forward-Looking Statements

This news release includes certain statements that may be deemed “forward-looking statements”. All statements in this release, other than statements of historical facts including, without limitation, statements regarding potential mineralization, historic production, estimation of mineral resources, the realization of mineral resource estimates, interpretation of prior exploration and potential exploration results, the timing and success of exploration activities generally, the timing and results of future resource estimates, permitting time lines, metal prices and currency exchange rates, availability of capital, government regulation of exploration operations, environmental risks, reclamation, title, and future plans and objectives of the company are forward-looking statements that involve various risks and uncertainties. Although Granite Creek Copper believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in the forward-looking statements. Forward-looking statements are based on a number of material factors and assumptions. Factors that could cause actual results to differ materially from those in forward-looking statements include failure to obtain necessary approvals, unsuccessful exploration results, changes in project parameters as plans continue to be refined, results of future resource estimates, future metal prices, availability of capital and financing on acceptable terms, general economic, market or business conditions, risks associated with regulatory changes, defects in title, availability of personnel, materials and equipment on a timely basis, accidents or equipment breakdowns, uninsured risks, delays in receiving government approvals, unanticipated environmental impacts on operations and costs to remedy same, and other exploration or other risks detailed herein and from time to time in the filings made by the companies with securities regulators. Readers are cautioned that mineral resources that are not mineral reserves do not have demonstrated economic viability. Mineral exploration and development of mines is an inherently risky business. Accordingly, the actual events may differ materially from those projected in the forward-looking statements. For more information on Granite Creek Copper and the risks and challenges of their businesses, investors should review their annual filings that are available at www.sedar.com.