Categories
Base Metals Exclusive Interviews Granite Creek Copper Junior Mining Metallic Group

Granite Creek Copper – Increases Resources by 43% on the Carmacks Deposit in the Yukon

ABOUT GRANITE CREEK COPPER Granite Creek Copper is a Canadian junior mining, exploration company focused on the advancement of its 100%-owned Stu Copper-Gold project located in the Yukon’s Minto Copper District. This 115-square-kilometer property is between, and on trend with, Pembridge Resources’ high-grade Minto Copper-Gold Mine and, to the south, the Carmacks Copper-Gold-Silver project held by Copper North of which Granite Creek holds a 30% interest. The Stu project has excellent access to infrastructure with the nearby paved Yukon Highway 2, along with grid power within 12 km. Granite Creek Copper is one of top junior mining stocks and copper stocks 2021.

Categories
Base Metals Energy Granite Creek Copper Junior Mining Metallic Group

Granite Creek Copper Announces Updated NI 43-101 Mineral Resource Estimate for High Grade Carmacks Copper-Gold-Silver Project in Yukon Canada Highlighted by 43% Increase in Measured and Indicated Contained Copper

VANCOUVER, BC / ACCESSWIRE / March 15, 2022 / Granite Creek Copper Ltd. (TSXV:GCX)(OTCQB:GCXXF) (“Granite Creek” or the “Company“) is pleased to announce an updated mineral resource estimate (the “2022 Resource Estimate”) for the Company’s 100%-owned Carmacks copper-gold-silver deposit (“Carmacks” or the “Deposit”) located in the Minto Copper District of central Yukon, Canada. The 2022 Resource Estimate represents a major increase in tonnage and contained metal at Carmacks compared to the previous resource estimate1,2, with over 8,200 m of infill and expansion drilling in 25 holes completed by Granite Creek since its acquisition in 2020. The project remains open to significant expansion within the resource area and to new discovery at the underexplored, yet highly prospective, Carmacks North target area.

Highlights

  • 43% Increase in Contained Copper – The high grade Carmacks deposit now hosts 36.2 million tonnes (Mt) in Measured and Indicated categories (M&I), grading 1.07% CuEq (0.81% Cu, 0.26g/t Au, 3.23g/t Ag and 0.011% Mo) for a total of 651 million pounds (Mlbs) of contained M&I copper and an additional 38 Mlbs Cu Inferred (see table 1). The previous resource estimate published in 2018 defined 25.0 Mt M&I, grading 0.83% Cu, equating to 457 Mlbs of contained copper. (Figure1)
  • Expansion of Gold and Silver Resources – Contained gold (M&I) increased 24% from 243,000 ounces to 302,000 ounces and contained silver (M&I) increased 41% from 2,684,000 ounces to 3,790,000 ounces.
  • Addition of Molybdenum Resources – For the first time, molybdenum has been included in the resource estimate, with 8.5 Mlbs lbs in M&I.
  • 93% of Resources in the M&I Categories – Only 7% of the 2022 resource remains in the Inferred category.
  • High Proportion of Resources Modeled in Three Conceptual Open Pits – 96% of the 2022 resources are contained within the conceptual pits. (Figure 2)
  • High Grade Copper-Gold in a Producing District – The 2022 Resource Estimate continues to advance the Carmacks project as one of the highest-grade resource-stage copper projects in North America.

Timothy Johnson, Granite Creek President & CEO, stated, “Since completing the acquisition the Carmacks deposit in November 2020, the Company has been successful in significantly growing copper, gold and silver resources through highly targeted drilling in 2020 and 2021. Our conceptual deposit model held up extremely well, with significant mineralized intercepts encountered in 22 of the 25 holes we drilled. The mineral resources contained within the conceptual pits will form the basis for an updated Preliminary Economic Assessment (“PEA”) which the Company intends to initiate immediately. This study will assess the economics of processing both oxide and sulphide material as well as by product credits including gold, silver and molybdenum.”

“From an exploration perspective, there remains the opportunity continue increasing copper resources by continued step out drilling on existing zones, adding to this resource. There is also high potential for discovery of new zones by applying the Company’s increased understanding of the geological controls of mineralization and we remain committed to adding to this mineral inventory through continued exploration. “

Live Webinar

Granite Creek Copper will be hosting a live webinar on Thursday, March 17 at 10am PT (1pm ET), during which President & CEO, Timothy Johnson will be joined by Project Geologist, Dr Jacob Longridge, for a comprehensive update on the Company’s Carmacks copper-gold silver project, including Q&A.

To register, click here.

Figure 1 – Increase in Contained Copper

Table 1 – 2022 Carmacks Copper Project Mineral Resources

Cu=copper, Au=gold, Mo=molybdenum, Ag=silver, Mt=millions of tonnes, Mlbs=millions of pounds, klbs=thousands of pounds, koz=thousands of ounces. Mineral Resources are reported using the 2014 CIM Definition Standards. Mineral Resources are reported within a conceptual constraining pit shell that includes the following input parameters: Metal prices of $3.60/lb Cu, $1,750/Au, $22/oz Ag, $14/lb Mo and pit slope angles that vary from 35° for overburden to 55°for granodiorite host, metal prices are in US$. Metallurgical recoveries reflective of prior test work that averages: 85% Cu, 85% Au, 65% Ag in the oxide domain and 90% Cu, 76% Au, 65% Ag in the sulphide domain. Mo recovery is assumed to be 70% in both oxide and sulphide domain. Tonnes are metric tonnes, with Cu and Mo grades as percentages and Au and Ag grades as gram per tonne units. Cu and Mo metal content is reported in lb and Au and Ag content is reported in troy oz. Totals and Metal content may not sum due to rounding and significant digits used in calculations. Cu Eq calculation is based on 100% recovery of all metals using the same metal prices used in the resource calculation: $3.60/lb Cu, $1,750/Au, $22/oz Ag, $14/lb Mo.

Grade Sensitivity

A copper and copper equivalent grade sensitivity analysis for both oxide and sulphide resources contained in the proposed pits is provided in Table 2 below, which demonstrates the variation in grade and tonnage in the deposit at these various cut-off grades. This sensitivity analysis is reflective of the discrete nature of the mineralized bodies. Comparing the cut-off grade of 0.30% Cu with a 0.25% Cu and a 0.35% Cu cut-off, show a <3% variation in contained copper and a ~5% variation in the tonnage.

Table 2 – Grade Sensitivity Table

Mineralization

Mineralization is constrained to discrete tabular bodies of schistose to gneissic metamorphic rock. These tabular bodies are enveloped in granodiorite that dominates the majority of the Carmacks project. The contact between these tabular metamorphic bodies and granodiorite is sharp, with little to no gradation between these units. This sharp contact creates a very distinct geochemical and geophysical pattern between the two rock types assisting in exploration vectoring.

Upon acquiring the Carmacks Deposit in 2020, Granite Creek immediately recognized the potential of the relatively untested sulphide portion that may significantly alter the scope and scale of the deposit. This conceptual understanding has been validated with the sulphide resources now roughly equal in size to the oxide resources and provides the case for an updated PEA, which will evaluate the economics of both the oxide and the sulphide portions of the resource.

Copper mineralization in the oxide domain is primarily malachite and azurite with copper sulphides accounting for up to 20% of the copper tenor in the form of chalcopyrite. A surface representing the boundary between the upper oxide and lower sulphide mineralization was interpolated based on drill hole intersections. The depth of transition between oxide to sulphide is variable in each zone. The boundary between the oxide and sulphide is defined by the solubility of copper in sulphuric acid, when >20% of total copper total tenor is soluble in sulphuric acid, the domain is classified as a copper oxide domain. Conversely, the sulphide domain is defined where <20% of the total copper is soluble in sulphuric acid, as per the previous resource. The previously defined ‘transitional zone’ is largely re-classified as part of the sulphide domain. The copper in the upper 200m of zone 1, is oxidized, whereas in zones 13 and 12, the oxidized zone can be as thin as 40m, zones 4 and 7 are primarily oxide (Figure 2). The copper sulphides in the sulphide domain consist primarily of course grained chalcopyrite, bornite and minor chalcocite and covellite.

Previous metallurgical testing has shown that the oxide copper is very amenable to leach extraction with recoveries of greater than 85% New metallurgical results from 2021 test work showed that a ~67% liberation of copper sulphide minerals is possible at 154um P80 primary grind, considering most two-product copper concentrations operate with 50-60% liberation in floatation feed, this is considered excellent and possibly coarser grinds may be sufficient in liberating copper. Flotation testing showed a 25% copper concentrate grade could be produced with recoveries of up to 95% of copper and 85% for gold, with gold reporting closely to the copper. Continuing metallurgical test work will include determining recoveries for silver and molybdenum as well as additional testing to confirm the copper and gold recoveries.

Figure 2 Oblique view of 2022 resources and proposed pits (total strike length of 2,950 m )

Estimation Methodology and Parameters

The classification of the current Mineral Resource Estimates into Measured, Indicated and Inferred are consistent with current 2014 CIM Definition Standards – For Mineral Resources and Mineral Reserves. All figures are rounded to reflect the relative accuracy of the estimate.

Completion of the 2022 Resource Estimate involved the assessment of a drill hole database, which included all data for surface drilling completed through the fall of 2021, as well as 3D mineral resource models, and available written reports. SGS used 489 surface drillholes and 56,679 meters of drill data from 1970 to 2021 to delineate three deposits (zones 147 combined, zone 2000S and zones 12 and 13 combined) in the 2022 resource estimate. Thirty-six holes (RC and diamond) totalling 9,413m completed by Granite Creek between October 2020 and October 2021 are included.

Composites of 2.0 metre used for the resource estimation procedure have been capped where appropriate. Grades for Cu (oxide, sulphide and total), Ag, Au and Mo for each deposit were interpolated into blocks 5m by 5m by 5m by the Inverse Distance Squared (ID2) calculation method. Appropriate interpolation parameters were generated for each deposit based on drill hole spacing, mineralization style and geometry.

All Resources are presented undiluted and in situ, constrained by continuous 3D wireframe models, and are considered to have reasonable prospects for eventual economic extraction. It is envisioned that parts of the Carmacks Project deposits may be mined using open pit mining methods. In- pit mineral resources are reported at a base-case cut-off grade of 0.30 % total copper(“Cu_T”) within conceptual pit shells. A pit slope of 55 degrees for rock and 35 degrees for overburden are used for the pit optimization. It is envisioned that parts of the Carmacks Project deposits may be mined using lower cost underground bulk mining methods. A selected base-case cut-off grade of 0.6 % Cu_T is used to determine the below pit resources.

Cut-off grades are based on metal prices of $3.60/lb Cu, $22.00/oz Ag, $1,750/oz Au and $14.00/lb for Mo, processing and G&A cost of $US23.00 per tonne milled, and variable mining costs including $US2.10 for open pit and $US25.00 for underground. The cut-off grades should be re-evaluated in light of future prevailing market conditions (metal prices, mining costs, processing costs etc.).

Metal recoveries used for pit optimization and calculation of base-case cut-off grades include: for oxide material 85% for copper, 65% for Ag, 85% for Au and 70% for Mo; for sulphide material, 90% for copper, 65% for Ag, 76% for Au and 70% for Mo. Fixed specific gravity values of 2.64 for oxide material and 2.71 – 2.78 (depending on deposit) were used to estimate the Mineral Resource tonnage from block model volumes. Waste in all areas was given a fixed density of 2.66.

Mineral resources are not mineral reserves and do not have demonstrated economic viability. An Inferred Mineral Resource has a lower level of confidence than that applying to a Measured and Indicated Mineral Resource and must not be converted to a Mineral Reserve. It is reasonably expected that the majority of Inferred Mineral Resources could be upgraded to Indicated Mineral Resources with continued exploration. The results from the pit optimization are used solely for the purpose of testing the “reasonable prospects for economic extraction” by an open pit and do not represent an attempt to estimate mineral reserves. There are no mineral reserves on the Carmacks Property. The results are used as a guide to assist in the preparation of a Mineral Resource statement and to select an appropriate resource reporting cut-off grade.

Quality Control and Quality Assurance

Quality assurance and quality control procedures for drilling completed by the Company and consultants to the Company include the systematic insertion of duplicate, blank and standard samples, making up 12% of the sample stream. Drill core samples were sawn in half, labelled, placed in sealed bags and shipped directly to the Bureau Veritas preparation laboratory in Whitehorse. All geochemical analyses were performed by Bureau Veritas in Vancouver. Copper, molybdenum and silver analysis was performed by four-acid digestion with an ICP-ES finish. Non-sulphide copper was determined through a sulphuric acid leach with an AAS finish. Gold was analyzed by igniting a 15 g sample followed by an aqua regia digestion with an ICP-MS finish.

Qualified Persons

The Carmacks project 2022 Resource Estimate was prepared by Allan Armitage, P.Geo., of SGS Geological Services, an independent Qualified Person, in accordance with the guidelines of the Canadian Securities Administrators’ National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”) with an effective date of February 25, 2022. Armitage conducted a site visit to the property on November 9, 2021.

Ms. Debbie James, P.Geo., a qualified person for the purposes of National Instrument 43-101, has reviewed and approved the technical disclosure not pertaining to the resource estimate contained in this news release. Ms. James is a Senior Geologist with TruePoint Exploration and a Project Manager at Carmacks.

[1]PEA: “NI 43-101 Preliminary Economic Assessment Technical Report on the Carmacks Project, Yukon, Canada” Effective Date 12 October 2016. Report Date: 25 November 2016. SEDAR Filing Date: 9 February 2017

[2]News Release: “Copper North Expands Oxide Mineral resources at Carmacks” Published on SEDAR 9 April 2018.

About Granite Creek Copper

Granite Creek, a member of the Metallic Group of Companies, is a Canadian exploration company focused on the 176 square kilometer Carmacks project in the Minto copper district of Canada’s Yukon Territory. The project is on trend with the high-grade Minto copper-gold mine, operated by Minto Metals Corp., to the north, and features excellent access to infrastructure with the nearby paved Yukon Highway 2, along with grid power within 12 km. More information about Granite Creek Copper can be viewed on the Company’s website at www.gcxcopper.com.

FOR FURTHER INFORMATION PLEASE CONTACT:
Timothy Johnson, President & CEO
Telephone: 1 (604) 235-1982
Toll-Free: 1 (888) 361-3494
E-mail: info@gcxcopper.com
Website: www.gcxcopper.com
Metallic Group: www.metallicgroup.ca
Twitter: @yukoncopper

Forward-Looking Statements

This news release includes certain statements that may be deemed “forward-looking statements”. All statements in this release, other than statements of historical facts including, without limitation, statements regarding potential mineralization, historic production, estimation of mineral resources, the realization of mineral resource estimates, interpretation of prior exploration and potential exploration results, the timing and success of exploration activities generally, the timing and results of future resource estimates, permitting time lines, metal prices and currency exchange rates, availability of capital, government regulation of exploration operations, environmental risks, reclamation, title, and future plans and objectives of the company are forward-looking statements that involve various risks and uncertainties. Although Granite Creek Copper believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in the forward-looking statements. Forward-looking statements are based on a number of material factors and assumptions. Factors that could cause actual results to differ materially from those in forward-looking statements include failure to obtain necessary approvals, unsuccessful exploration results, changes in project parameters as plans continue to be refined, results of future resource estimates, future metal prices, availability of capital and financing on acceptable terms, general economic, market or business conditions, risks associated with regulatory changes, defects in title, availability of personnel, materials and equipment on a timely basis, accidents or equipment breakdowns, uninsured risks, delays in receiving government approvals, unanticipated environmental impacts on operations and costs to remedy same, and other exploration or other risks detailed herein and from time to time in the filings made by the companies with securities regulators. Readers are cautioned that mineral resources that are not mineral reserves do not have demonstrated economic viability. Mineral exploration and development of mines is an inherently risky business. Accordingly, the actual events may differ materially from those projected in the forward-looking statements. For more information on Granite Creek Copper and the risks and challenges of their businesses, investors should review their annual filings that are available at www.sedar.com.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

SOURCE: Granite Creek Copper Ltd.



View source version on accesswire.com:
https://www.accesswire.com/693022/Granite-Creek-Copper-Announces-Updated-NI-43-101-Mineral-Resource-Estimate-for-High-Grade-Carmacks-Copper-Gold-Silver-Project-in-Yukon-Canada-Highlighted-by-43-Increase-in-Measured-and-Indicated-Contained-Copper

Categories
Base Metals Energy Granite Creek Copper Junior Mining Metallic Group

Granite Creek Copper Reports Final Results 2021 Drill Program, Including 120.65m at 0.94% Copper Equivalent, at the Carmacks Copper-Gold-Silver Project in Yukon, Canada

VANCOUVER, BC / ACCESSWIRE / March 10, 2022 / Granite Creek Copper Ltd. (TSX.V:GCX | OTCQB:GCXXF) (“Granite Creek” or the “Company“) is pleased to announce the final assay results from the Company’s Phase 2 Reverse circulation (“RC”) and Phase 3 diamond drill programs at the 100%-owned Carmacks project.

Live Webinar

Granite Creek Copper will be hosting a live webinar on Thursday, March 17 at 10am PT (1pm ET), during which President & CEO, Timothy Johnson will be joined by Project Geologist, Jacob Longridge, for a comprehensive update on the Company’s Carmacks copper-gold silver project, including Q&A. To register, click here.

The objective of the Phase 2 RC program was early-stage evaluation of additional targets adjacent to known zones as well as step-out drilling at Carmacks Norths’ Zone A area. The program was successful in identifying mineralization in 13 of 20 holes with several areas prioritized for follow-up diamond drilling in the 2022 field season. The Phase 3 diamond program was targeted at confirming the geometry in Zone 2000S, complementing hole CRM21-011 which intercepted 105 m of 1.18% Copper Equivalent (“CuEq”) (0.96% Cu, 0.01% Mo, 0.18 g/t Au, and 4.06 g/t Ag) (see news release dated August 24, 2021). Additional drilling was conducted in the central portion of Zone 13 to further upgrade resources in this zone (Figure 1).

Granite Creek President & CEO, Tim Johnson, commented, “We are extremely pleased with the results of our 2021 exploration program which achieved all of our objectives and exceeded our expectations in several important respects. We expanded sulfide mineralization in three of the main zones at Carmacks which will be reflected in an updated NI 43-101 resource estimate, followed by a new mine plan which is being developed to incorporate both oxide and sulfide material. We anticipate the sulfide resources could make a significant difference to the mine life and economics of the Carmacks deposit and we look forward to further defining that potential.”

The results of Phase 3 have highlighted the predictable geometry of zone 2000S (see Figure 2). Both drillholes intersected mineralization well below the current sulphide resource1,2, with drill hole CRM21-023 intersecting mineralization approximately 120 meters below the base of the inferred sulphide resource and extending through to approximately 230 m below the base of the current inferred sulphide resource. Two holes drilled in Zone 13 continue to highlight the potential of this zone with CRM21-025 intercepting 120.65 m grading 0.76% Cu, 0.016% Mo, 0.14 g/t Au, 2.53g/t Ag or 0.94% CuEq. These 2021 drill campaign results will be incorporated into an updated National Instrument 43-101 resource estimate being prepared by SGS Canada.

DrillholeFrom(m)To(m)Length*(m)Cu(%)Mo(%)Au(g/t)Ag(g/t)CuEq** (%)Zone
CRM21-022233.70302.0068.30.510.0090.132.300.662000S
CRM21-023324.23446.00121.770.390.0070.131.760.52
Including330.00382.7552.750.630.0090.212.740.84
CRM21-02454.8093.0038.200.790.0050.163.270.9513
Including64.0077.0013.001.470.0060.235.851.71
CRM21-024106.50158.7052.200.260.0100.061.010.34
Including134.00149.0015.000.360.0210.081.280.51
CRM21-02588.65209.30120.650.760.0160.142.530.94
Including106.00155.4049.401.080.0150.203.411.31
CRM21-025283.75287.854.101.760.0140.147.991.99

Table 1- Highlights from of 2021 Phase 3 Diamond Drilling

** Copper equivalent (Cu Eq) values assume Cu $3.35/lb, Au $1600/oz, Ag $24/oz, Mo $12/lb and 100% recovery. *Weighted average intercepts shown. Estimated true widths vary but, based on geological interpretation of cross-sections, are estimated to be typically 40-60% of the intersected widths.

Figure 1: Location of diamond and RC drilling in this release

Figure 2: Cross section through 2000S with deepest intercept (CRM21-023)

The phase 2 RC drilling was conducted in Zones 2, 5, 12 at Carmacks and Zone A at Carmacks North. The purpose of the program was to test zones peripheral to the deposit and find targets for follow up with the diamond drill. The program was most successful in Zone 5 where 4 of 4 holes intersected mineralization and, consequently, Zone 5 will be a priority for drilling in 2022. The program was also successful in Zone 12 where it was used to trace and test mineralization on the west side of the zone that is not included in the 2016 resource estimate. Six of seven holes in zone 12 intersected mineralization. At Zone 2, mineralization was intersected in 2 of 6 holes.

At Zone A, the drill was used to test geophysical targets, but the program was cut short due to drilling difficulties. One of the 3 holes intersected mineralization but the other two did not reach target depth due to difficult drilling conditions.

Table 1: Selected highlights from previously released 2020 and 2021 drillholes

Drillhole
From(m)To(m)Length*(m)Cu(%)Mo(%)Au(g/t)Ag(g/t)CuEq** (%)Zone
CRM21-004323.50367.0043.501.120.0280.203.411.401
Including338.50367.0028.501.570.0420.294.531.96
and including352.00&dagger;367.0015.001.800.0660.334.812.31
CRM21-014355.70423.4567.750.930.0090.265.161.20
Including398.00423.4524.451.530.0090.416.211.91
CRM21-019277.95345.3067.350.930.0110.314.231.23
Including322.00345.3023.301.70.0160.577.512.27
CRM21-005137.05179.8043.240.740.0470.163.821.062000S
Including142.05158.4016.351.200.0360.266.111.58
CRM21-006194.40278.2083.800.640.0120.133.230.81
Including229.20278.2049.000.870.0180.173.881.10
Including248.76266.2017.441.210.0330.225.111.53
CRM21-011223.98329.50105.520.960.0130.184.061.18
Including223.98245.2021.222.170.0100.369.132.56
and including260.32260.820.5018.970.0080.4638.319.72
CRM20-001102.85230.12127.270.610.0280.1312.140.8513
Including104.85133.5028.651.030.0140.143.091.28
CRM21-021132.15229.0096.850.620.0140.203.040.84
Including132.15168.0035.850.820.0130.203.801.04
and including207.65229.0021.350.800.0210.433.511.21

[1] JDS Energy and Mining. Feb 9, 2017. NI 43-101 Preliminary Economic Assessment Technical Report on the Carmacks Project, Yukon, Canada. Contained metal based on 23.76 million tonnes of NI 43-101 compliant resources in the Measured and Indicated categories grading 0.85% Cu, 0.31 g/t Au, 3.14 g/t Ag.

[2] Arseneau Consulting Services, 2016 Independent Technical Report on the Carmacks Copper Project, Yukon, Canada.

About Granite Creek Copper

Granite Creek, a member of the Metallic Group of Companies, is a Canadian exploration company focused on the 176 square kilometer Carmacks project in the Minto copper district of Canada’s Yukon Territory. The project is on trend with the high-grade Minto copper-gold mine, operated by Minto Explorations Ltd, to the north and features excellent access to infrastructure with the nearby paved Yukon Highway 2, along with grid power within 12 km. More information about Granite Creek Copper can be viewed on the Company’s website at www.gcxcopper.com.

FOR FURTHER INFORMATION PLEASE CONTACT:

Timothy Johnson, President & CEO

Telephone: 1 (604) 235-1982

Toll Free: 1 (888) 361-3494

E-mail: info@gcxcopper.com

Website: www.gcxcopper.com

Qualified Person

Ms. Debbie James, P.Geo., a qualified person for the purposes of National Instrument 43-101, has reviewed and approved the technical disclosure contained in this news release. Ms. James is a Senior Geologist with TruePoint Exploration and the Project Manager for the Carmacks Project.

Quality Control and Quality Assurance

Quality assurance and quality control procedures include the systematic insertion of duplicate, blank and standard samples, making up 12% of the sample stream. Drill core samples were sawn in half, labelled, placed in sealed bags and shipped directly to the Bureau Veritas preparation laboratory in Whitehorse. All geochemical analyses were performed by Bureau Veritas in Vancouver. Copper and silver analysis was performed by four-acid digestion with an ICP-ES finish. Non-sulphide copper was determined through a sulphuric acid leach with an AAS finish. Gold was analyzed by igniting a 15 g sample followed by an aqua regia digestion with an ICP-MS finish.

Forward-Looking Statements

This news release includes certain statements that may be deemed “forward-looking statements”. All statements in this release, other than statements of historical facts including, without limitation, statements regarding potential mineralization, historic production, estimation of mineral resources, the realization of mineral resource estimates, interpretation of prior exploration and potential exploration results, the timing and success of exploration activities generally, the timing and results of future resource estimates, permitting time lines, metal prices and currency exchange rates, availability of capital, government regulation of exploration operations, environmental risks, reclamation, title, and future plans and objectives of the company are forward-looking statements that involve various risks and uncertainties. Although Granite Creek Copper believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in the forward-looking statements. Forward-looking statements are based on a number of material factors and assumptions. Factors that could cause actual results to differ materially from those in forward-looking statements include failure to obtain necessary approvals, unsuccessful exploration results, changes in project parameters as plans continue to be refined, results of future resource estimates, future metal prices, availability of capital and financing on acceptable terms, general economic, market or business conditions, risks associated with regulatory changes, defects in title, availability of personnel, materials and equipment on a timely basis, accidents or equipment breakdowns, uninsured risks, delays in receiving government approvals, unanticipated environmental impacts on operations and costs to remedy same, and other exploration or other risks detailed herein and from time to time in the filings made by the companies with securities regulators. Readers are cautioned that mineral resources that are not mineral reserves do not have demonstrated economic viability. Mineral exploration and development of mines is an inherently risky business. Accordingly, the actual events may differ materially from those projected in the forward-looking statements. For more information on Granite Creek Copper and the risks and challenges of their businesses, investors should review their annual filings that are available at www.sedar.com.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

SOURCE: Granite Creek Copper Ltd.



View source version on accesswire.com:
https://www.accesswire.com/692471/Granite-Creek-Copper-Reports-Final-Results-2021-Drill-Program-Including-12065m-at-094-Copper-Equivalent-at-the-Carmacks-Copper-Gold-Silver-Project-in-Yukon-Canada

Categories
Base Metals Energy Granite Creek Copper Junior Mining Metallic Group

GoldSpot Discoveries Identifies New Targets at Granite Creek’s Carmacks Copper-Gold Project Using Proprietary Artificial Intelligence Technology

Toronto, Ontario–(Newsfile Corp. – February 15, 2022) – GoldSpot Discoveries Corp. (TSXV: SPOT) (OTCQX: SPOFF) (“GoldSpot” or the “Company“), a leading technology services company leveraging machine learning to transform the mineral discovery process, is pleased to announce it has completed work on Granite Creek Copper Ltd.’s (TSXV: GCX) (OTCQB: GCXXF) (“Granite Creek”) Carmacks deposit and Carmacks North target areas, located in the high-grade Carmacks Copper Belt of Canada’s Yukon Territory.

GoldSpot and Granite Creek collaborated to create prioritized exploration and drill targets on the 176 km2 Carmacks copper-gold property. The approaches taken during this collaboration include:

  • Re-interpretation of geophysical data using GoldSpot’s GeoFEZ software;
  • Supervised learning of various combinations of geophysical, topographic and surface geochemical data;
  • Detailed statistical analysis of multi-element geochemical data;
  • Map-based prospectivity analysis and exploration target generation;
  • Generation of a revamped 3D geological model; and
  • Initial test study of company core logging compared with historic imagery, using GoldSpot’s LithoLens.

Proof of concept was achieved when GoldSpot identified several grass-roots target areas previously identified by the Granite Creek team, but not shared with the GoldSpot team. Additional regional targets are new to the Granite Creek team and will be evaluated in the coming field season.

GoldSpot’s collaboration with Granite Creek produced several potential new targets for 2022 exploration and resource expansion, including sub-parallel raft-like domains of possible mineralization adjacent to zones 147, 2000S and 13 at the Carmacks deposit. These were initially hinted at through data mining of the drill hole database. Follow-up geochemical analysis and 3D models suggest a previously unrecognized relationship between geochemistry and mineralized zones, specifically a tell-tale halo around mineralization. These halos indicate several areas for follow-up drill testing. New regional targets have also been produced at Carmacks North using multiple geophysical techniques, including aeromagnetic and induced polarity (IP) surveys.

Vincent Dubé-Bourgeois Chief Executive Officer for GoldSpot commented, “The technologies developed by GoldSpot to provide its innovative technology to partners such as Granite Creek and provided excellent results. The targets generated by GoldSpot AI showed the exploration potential on the Carmacks project.”

Granite Creek President and CEO Tim Johnson stated, “The prospectivity of the Carmacks project has been confirmed and expanded on by the excellent work completed by GoldSpot. The number of new targets combined with the existing targets developed from historical data continues to support our assertion that there is a lot of discovery yet to be made on the property. GoldSpot’s work has advanced our understanding of the property and will become an integral part in our planning for our 2022 exploration program. We look forward to discussing our plans for the upcoming field season and we are on track to deliver a significant update to the existing NI 43-101 mineral resource estimate in Q1, as expected.”

About GoldSpot Discoveries Corp.

GoldSpot Discoveries Corp. (TSXV: SPOT) (OTCQX: SPOFF) is a technology company using artificial intelligence to revolutionize the future of global mineral exploration with a full suite of data and knowledge-driven SaaS tools and services. GoldSpot works with industry leaders across all commodity and deposit types to identify new exploration targets, develop cutting-edge technologies and to strategically invest in mineral exploration companies. Our leading team of expert scientist’s merge geoscience and data science to deliver bespoke solutions that save time, reduce costs and produce far more accurate results than ever before possible.

For further information please contact:
Vincent Dubé-Bourgeois
CEO and Director
GoldSpot Discoveries Corp.
Tel: 819-592-1195
Email: investors@goldspot.ca

About Granite Creek Copper Ltd.

Granite Creek, a member of the Metallic Group of Companies, is a Canadian exploration company focused on the 176 square kilometer Carmacks project in the Minto copper district of Canada’s Yukon Territory. The project is on trend with the high-grade Minto copper-gold mine, operated by Minto Metals Corp., to the north, and features excellent access to infrastructure with the nearby paved Yukon Highway 2, along with grid power within 12 km. More information about Granite Creek Copper can be viewed on the Company’s website at www.gcxcopper.com.

For further information please contact:

Timothy Johnson, President and CEO
Telephone: 1 (604) 235-1982
Toll-Free: 1 (888) 361-3494
Email: info@gcxcopper.com

Cautionary Statement on Forward-Looking Information
Neither the TSX Venture Exchange (“TSXV”) nor its Regulation Services Provider (as that term is defined in the policies of the TSXV) accepts responsibility for the adequacy or accuracy of this release. No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein. This news release contains forward-looking information which involves risks, uncertainties and other factors that could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. Forward-looking information in this news release includes, but is not limited to, the Company’s objectives, goals or future plans, statements regarding exploration results and exploration plans. Factors that could cause actual results to differ materially from such forward-looking information include, but are not limited to, capital and operating costs varying significantly from estimates, the preliminary nature of metallurgical test results, delays in obtaining or failures to obtain required governmental, environmental or other project approvals, uncertainties relating to the availability and costs of financing needed in the future, changes in equity markets, inflation, fluctuations in commodity prices, delays in the development of projects and the other risks involved in the mineral exploration and development industry, and those risks set out in the Company’s public documents filed on SEDAR. Although the Company believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. The Company disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by law.

Categories
Base Metals Energy Granite Creek Copper Junior Mining Metallic Group

Granite Creek Copper Identifies New Targets at Carmacks Copper-Gold Project Through Deployment of GoldSpot Discoveries’ Artificial Intelligence Technology

VANCOUVER, BC / ACCESSWIRE / February 14, 2022 / Granite Creek Copper Ltd. (TSX.V:GCX | OTCQB:GCXXF) (“Granite Creek” or the “Company“) is pleased to announce that GoldSpot Discoveries Corp. (TSX.V: SPOT) (“GoldSpot”) has completed work for Granite Creek Copper’s Carmacks project. GoldSpot was engaged to apply their proprietary machine learning technology and geoscience expertise on the Company’s Carmacks deposit and Carmacks North target area, located in the high-grade Minto copper belt of Canada ‘s Yukon Territory.

GoldSpot is a mining-focused technology company that is working with some of the leading exploration and mining names in the industry to apply cutting edge Artificial Intelligence (“AI”) algorithms to significantly increase the efficiency and success rate of mineral exploration. Recent successes by GoldSpot with leading projects in exploration, development, and production-phases have demonstrated the potential to expand resources and make new discoveries using their advanced analytical technology.

Highlights of the Granite Creek-GoldSpot collaboration include:

  • Re-interpretation of geophysical data, and the use of GoldSpot’s in-house image processing approach GeoFEZ™, to produce new priority exploration targets
  • Statistical analysis of multi-element geochemical data to develop geochemical signatures of ‘mineralized lenses (rafts)’
  • Development of Machine Learning products to help vector towards previously unidentified mineralized horizons (rafts)
  • Generation of a revamped 3D geological model on the Carmacks deposit
  • Preliminary analysis of historic drill-core photos using GoldSpot’s LithoLens

Granite Creek’s collaboration with GoldSpot produced several potential new targets (see figure 1), including sub- parallel zones adjacent to zones 147, 2000S and 13 at the Carmacks deposit identified by an analysis of the drillhole database. The spatial relationship between the geochemical signature of mineralization and associated depleted areas haloing mineralization identifies targets areas where a depletion halo occurs with no known associated mineralization. In addition to the target areas in and around the Carmacks deposit, new targets were developed in the Carmacks North area, based on a review of multiple geophysical techniques, including aeromagnetic surveys and induced polarity surveys with the interplay between the survey types generating and confirming the anomalies.

The outcome of this high-quality work provides the technical team at Granite Creek Copper with extremely valuable and necessary tools to assist in drill hole targeting for the 2022 campaign, including resource expansion, early-stage prospects, and exploratory targets on the highly prospective 176 square kilometer Carmacks copper-gold project.

Granite Creek President & CEO, Tim Johnson, stated, “The prospectively of the Carmacks project has been confirmed and expanded on by the excellent work completed by Goldspot. The number of new targets combined with the existing targets developed from historical data continues to support our assertion that there is a lot of discovery yet to be made on the property. Goldspot’s work has advanced our understanding of the property and will become an integral part in our planning for our 2022 exploration program. We look forward to discussing our plans for the upcoming field season and we are on track to deliver a significant update to the existing NI 43-101 mineral resource estimate in Q1, as expected.

Figure 1: Carmacks Project with GoldSpot defined target areas and excising targets and zones

Figure 2: Granite Creek geologist’s review core with Goldspot team at Carmacks Project

Options

Granite Creek also wises to announce that, subject to TSX Venture Exchange approval, it has granted 1,100,000 incentive stock options to directors, officers, employees, and consultants of the Company, under its long-term incentive plan. The options are exercisable for up to five years, expiring on February 14th, 2027, and each option will allow the holder to purchase one common share of the company at a price of $0.20 per share.

Shares for Debt

Further to its news release of December 23, 2021, the Company has completed the settlement of $86,162 of outstanding debt through the issuance of a total of 344,648 common shares of the Company at a deemed price of $0.25 per share. The shares issued are subject to a statutory hold period of four months and one day from the date of issuance, under applicable Canadian securities laws.

About Granite Creek Copper

Granite Creek, a member of the Metallic Group of Companies, is a Canadian exploration company focused on the 176 square kilometer Carmacks project in the Minto copper district of Canada’s Yukon Territory. The project is on trend with the high-grade Minto copper-gold mine, operated by Minto Metals Corp., to the north, and features excellent access to infrastructure with the nearby paved Yukon Highway 2, along with grid power within 12 km. More information about Granite Creek Copper can be viewed on the Company’s website at www.gcxcopper.com.

FOR FURTHER INFORMATION PLEASE CONTACT:

Timothy Johnson, President & CEO
Telephone: 1 (604) 235-1982
Toll-Free: 1 (888) 361-3494
E-mail: info@gcxcopper.com

Website: www.gcxcopper.com
Metallic Group: www.metallicgroup.ca
Twitter: @yukoncopper

Qualified Person

Ms. Debbie James, P.Geo., a qualified person for the purposes of National Instrument 43-101, has reviewed and approved the technical disclosure contained in this news release.

Forward-Looking Statements

This news release includes certain statements that may be deemed “forward-looking statements”. All statements in this release, other than statements of historical facts including, without limitation, statements regarding potential mineralization, historic production, estimation of mineral resources, the realization of mineral resource estimates, interpretation of prior exploration and potential exploration results, the timing and success of exploration activities generally, the timing and results of future resource estimates, permitting time lines, metal prices and currency exchange rates, availability of capital, government regulation of exploration operations, environmental risks, reclamation, title, and future plans and objectives of the company are forward-looking statements that involve various risks and uncertainties. Although Granite Creek Copper believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in the forward-looking statements. Forward-looking statements are based on a number of material factors and assumptions. Factors that could cause actual results to differ materially from those in forward-looking statements include failure to obtain necessary approvals, unsuccessful exploration results, changes in project parameters as plans continue to be refined, results of future resource estimates, future metal prices, availability of capital and financing on acceptable terms, general economic, market or business conditions, risks associated with regulatory changes, defects in title, availability of personnel, materials and equipment on a timely basis, accidents or equipment breakdowns, uninsured risks, delays in receiving government approvals, unanticipated environmental impacts on operations and costs to remedy same, and other exploration or other risks detailed herein and from time to time in the filings made by the companies with securities regulators. Readers are cautioned that mineral resources that are not mineral reserves do not have demonstrated economic viability. Mineral exploration and development of mines is an inherently risky business. Accordingly, the actual events may differ materially from those projected in the forward-looking statements. For more information on Granite Creek Copper and the risks and challenges of their businesses, investors should review their annual filings that are available at www.sedar.com.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

SOURCE: Granite Creek Copper Ltd.



View source version on accesswire.com:
https://www.accesswire.com/688545/Granite-Creek-Copper-Identifies-New-Targets-at-Carmacks-Copper-Gold-Project-Through-Deployment-of-GoldSpot-Discoveries-Artificial-Intelligence-Technology

Categories
Base Metals Granite Creek Copper Junior Mining Metallic Group Metallic Minerals Precious Metals Stillwater Critical Minerals

Granite Creek Copper to Join Metallic Group of Companies for Live Webinar

VANCOUVER, BC / ACCESSWIRE / January 11, 2022 / Granite Creek Copper Ltd. (TSXV:GCX)(OTCQB:GCXXF) (“Granite Creek” or the “Company“) is pleased to announce that the Company will join fellow members of the Metallic Group of Companies for a live webinar on January 13, 2022 at 10:00 am PT (1:00 pm ET). The CEOs of Granite Creek Copper, Group Ten Metals and Metallic Minerals will provide a concise review of key milestones achieved in 2021, followed by an update on major catalysts expected in 2022. The event will conclude with a roundtable Q&A session during which participants will be invited to provide questions to Tim Johnson (Granite Creek), Michael Rowley (Group Ten) and Greg Johnson (Metallic Minerals).

To register for the webinar, click here or on the graphic below.

About Granite Creek Copper

Granite Creek, a member of the Metallic Group of Companies, is a Canadian exploration company focused on the 176 square kilometer Carmacks project in the Minto copper district of Canada’s Yukon Territory. The project is on trend with the high-grade Minto copper-gold mine, operated by Minto Metals Corp., to the north, and features excellent access to infrastructure with the nearby paved Yukon Highway 2, along with grid power within 12 km. More information about Granite Creek Copper can be viewed on the Company’s website at www.gcxcopper.com.

FOR FURTHER INFORMATION PLEASE CONTACT:

Timothy Johnson, President & CEO
Telephone: 1 (604) 235-1982 | 1 (888) 361-3494
E-mail: info@gcxcopper.com
Website: www.gcxcopper.com

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

SOURCE: Granite Creek Copper Ltd.

Categories
Base Metals Energy Granite Creek Copper Junior Mining Metallic Group

Granite Creek Issues Shares For Debt

VANCOUVER, BC / ACCESSWIRE / December 23, 2021 / Granite Creek Copper Ltd. (TSXV:GCX)(OTCQB:GCXXF) (“Granite Creek” or the “Company“) is pleased to announce that the board of directors of Granite Creek has approved the settlement of up to CAD$86,162 of debt (the “Debt Settlement“) through the issuance of 344,648 common shares of the Company (the “Shares“) at a deemed price of 0.25 per share, subject to the approval of the TSX Venture Exchange.

All Shares issued will be subject to a statutory hold period of four months plus one day from the date of issuance.

About Granite Creek Copper

Granite Creek, a member of the Metallic Group of Companies, is a Canadian exploration company focused on the 176 square kilometer Carmacks project in the Minto copper district of Canada’s Yukon Territory. The project is on trend with the high-grade Minto copper-gold mine, operated by Minto Metals Corp., to the north, and features excellent access to infrastructure with the nearby paved Yukon Highway 2, along with grid power within 12 km. More information about Granite Creek Copper can be viewed on the Company’s website at www.gcxcopper.com.

FOR FURTHER INFORMATION PLEASE CONTACT:

Timothy Johnson, President & CEO
Telephone: 1 (604) 235-1982
Toll-Free: 1 (888) 361-3494
E-mail: info@gcxcopper.com
Website: www.gcxcopper.com
Metallic Group: www.metallicgroup.ca
Twitter: @yukoncopper

Qualified Person

Ms. Debbie James, P.Geo., a qualified person for the purposes of National Instrument 43-101, has reviewed and approved the technical disclosure contained in this news release.

Forward-Looking Statements

This news release includes certain statements that may be deemed “forward-looking statements”. All statements in this release, other than statements of historical facts including, without limitation, statements regarding potential mineralization, historic production, estimation of mineral resources, the realization of mineral resource estimates, interpretation of prior exploration and potential exploration results, the timing and success of exploration activities generally, the timing and results of future resource estimates, permitting time lines, metal prices and currency exchange rates, availability of capital, government regulation of exploration operations, environmental risks, reclamation, title, and future plans and objectives of the company are forward-looking statements that involve various risks and uncertainties. Although Granite Creek Copper believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in the forward-looking statements. Forward-looking statements are based on a number of material factors and assumptions. Factors that could cause actual results to differ materially from those in forward-looking statements include failure to obtain necessary approvals, unsuccessful exploration results, changes in project parameters as plans continue to be refined, results of future resource estimates, future metal prices, availability of capital and financing on acceptable terms, general economic, market or business conditions, risks associated with regulatory changes, defects in title, availability of personnel, materials and equipment on a timely basis, accidents or equipment breakdowns, uninsured risks, delays in receiving government approvals, unanticipated environmental impacts on operations and costs to remedy same, and other exploration or other risks detailed herein and from time to time in the filings made by the companies with securities regulators. Readers are cautioned that mineral resources that are not mineral reserves do not have demonstrated economic viability. Mineral exploration and development of mines is an inherently risky business. Accordingly, the actual events may differ materially from those projected in the forward-looking statements. For more information on Granite Creek Copper and the risks and challenges of their businesses, investors should review their annual filings that are available at www.sedar.com.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

SOURCE: Granite Creek Copper Ltd.



View source version on accesswire.com:
https://www.accesswire.com/679447/Granite-Creek-Issues-Shares-For-Debt

Categories
Base Metals Energy Granite Creek Copper Junior Mining Metallic Group

Granite Creek Copper Closes C$1.5 Million Flow-Through Private Placement

VANCOUVER, BC / ACCESSWIRE / December 17, 2021 / Vancouver, B.C., Granite Creek Copper Ltd. (TSX.V:GCX | OTCQB:GCXXF) (“Granite Creek” or the “Company“) announces the closing of a non-brokered private placement of 8,333,337 flow-through common shares (the “FT Shares”) of the Company at a price of $0.18 per common share for gross proceeds of $1,500,001 (the “Financing”).

Proceeds from the Financing are intended for eligible Canadian Exploration Expenses, within the meaning of the Income Tax Act (Canada), at the Company’s Carmacks project in the Yukon Territory. Shares are subject to a statutory hold period of four months and one day from the date of issuance, under applicable Canadian securities laws.

Two directors and an officer of the Company participated in the private placement for an aggregate of 194,456 FT Shares. The participation by insiders in the private placement is considered to be a related-party transaction as defined under Multilateral Instrument 61-101. The transaction is exempt from the formal valuation and minority shareholder approval requirements of MI 61-101, as neither the fair market value of the securities being issued, nor the consideration being paid exceeds 25% of the Company’s market capitalization

Canaccord Genuity Corp. and Research Capital Corp (the “Finders”) acted as finders in connection with the Offering, Granite Creek paid the Finders aggregate cash fees totalling $91,000 and issued 505,554 non-transferable common share purchase warrants of the Company (the “Finder Warrants”). Each Finder Warrant will entitle the holder to purchase one common share in the capital of the Company at a price of $0.27 per share for a period of two years from the date of closing.

The FT Shares have not been, and will not be, registered under the U.S. Securities Act or any U.S. state securities laws, and may not be offered or sold in the United States or to, or for the account or benefit of, U.S. persons, absent registration or any applicable exemption from the registration requirements of the U.S. Securities Act and applicable U.S. state securities laws.

About Granite Creek Copper

Granite Creek, a member of the Metallic Group of Companies, is a Canadian exploration company focused on the 176 square kilometer Carmacks project in the Minto copper district of Canada’s Yukon Territory. The project is on trend with the high-grade Minto copper-gold mine, operated by Minto Metals Corp., and features excellent access to infrastructure with the nearby paved Yukon Highway 2, along with grid power within 12 km. More information about Granite Creek Copper can be viewed on the Company’s website at www.gcxcopper.com.

FOR FURTHER INFORMATION PLEASE CONTACT:

Timothy Johnson, President & CEO
Telephone: 1 (604) 235-1982
Toll-Free: 1 (888) 361-3494
E-mail: info@gcxcopper.com
Website: www.gcxcopper.com
Metallic Group: www.metallicgroup.ca
Twitter: @yukoncopper

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts
responsibility for the adequacy or accuracy of this release.

SOURCE: Granite Creek Copper Ltd.



View source version on accesswire.com:
https://www.accesswire.com/678230/Granite-Creek-Copper-Closes-C15-Million-Flow-Through-Private-Placement

Categories
Base Metals Energy Granite Creek Copper Junior Mining Metallic Group

Granite Creek Copper Announces Results of Mine Planning & Mineral Processing Work Conducted on the Carmacks Copper-Gold Project by Sedgman and Mining Plus

VANCOUVER, BC / ACCESSWIRE / December 1, 2021 / Granite Creek Copper Ltd. (TSXV:GCX)(OTCQB:GCXXF) (“Granite Creek” or the “Company“) is pleased to announce the results of work completed by Sedgman Canada and Mining Plus on the Company’s Carmacks copper-gold-silver deposit in the Minto Copper Belt located in central Yukon, Canada. The Company has received a final report on studies that include review of alternate leach technologies, mine planning, ore sorting and other key elements which are expected to be highly influential on the updated preliminary economic assessment (“PEA”) planned for H1 2022.

Highlights include:

  • Excellent results from initial metallurgical testing on sulfide material;
  • Confirmation of in tank leaching as the preferred method of extraction of both copper and precious metals from oxide ores;
  • Identification of conventional flotation as the preferred method of producing a copper concentrate from sulfide ores;
  • Development of a draft underground mine plan, with sub-level block cave as the preferred underground mining method at Carmacks;

Granite Creek President & CEO, Tim Johnson, stated, “We are extraordinarily pleased with the results provided by Sedgman and Mining Plus and the degree of efficiency, expertise and professionalism they have demonstrated since Granite Creek initially engaged them in May of this year. The studies have provided a great deal of new insight and clarity on the best path forward as we continue to advance Carmacks toward updated economics and, ultimately, production. We are very confident that these elements of mine planning and optimization, combined with the updated 43-101 mineral resource estimate we anticipate in Q1, will form the basis of a robust new PEA. The Yukon is an exceptional mining jurisdiction, the Minto belt has excellent infrastructure and robust mineralization currently being mined by Minto Metals Corp. just to the north of us who are now publicly traded on the Venture Exchange. We look forward to additional announcements soon as the pieces continue to fall into place at Carmacks.”

Virtual Investor Conference – OTC Markets Group

Granite Creek will be presenting at the upcoming Mining & Metals Virtual Investor Conference hosted by OTC Markets Group on Wednesday, December 8th at 11:30 AM PT / 2:30 PM ET. Topics of discussion will include the Company’s 2021 drilling campaign, the mine planning and mineral processing results described herein, and implications for the expected updates to both the existing 43-101 mineral resource estimate and PEA. To register, click here.

Sedgman / Mining Plus Report Discussion

An initial review of geotechnical studies as referenced in the 2017 PEA1,2, has indicated that a sub-level block cave is likely the most cost-effective method of underground mining of Zone 1 at the Carmacks Deposit. Based on this, Granite Creek will now move to initiate costing studies to support an updated PEA that includes potential underground resources not only in Zone 1 but other adjacent zones. In addition, the Company will launch pit design and optimization efforts on mineralized zones that lie outside of the pit contemplated in the 2017 PEA. Specifically, Zones 2000S and 13 will see pit optimization scenarios that will determine how much material could potentially be mined via open pit and what portion of the resources will be extracted by underground mining methods.

Metallurgical testing of sulfide mineralization to determine recovery of copper minerals using conventional flotation technology to create a copper concentrate was highly successful, achieving copper recoveries of up to 95%. Further testing is planned to confirm these recovery rates and to add gold and silver to a concentrate scenario. This work will be used identify the correct sizing of a copper-gold-silver concentrator circuit and the associated economics.

Previous economic assessments did not consider the potential value from processing of the high-grade sulphide material at Carmacks, despite a defined sulfide resource. In conducting a comprehensive review of the Carmacks deposit and the Carmacks North target area, the presence of significant sulfide mineralization became immediately apparent and Granite Creek felt it prudent to examine its potential inclusion as a means to expand the overall resource, extend mine life and improve economics. The majority of the Company’s 2021 drilling campaign focused on delineating and expanding sulfide resources with both near surface and deeper targets explored. Both oxide and sulphide mineralized zones remain open to expansion, with a significant expansion of the sulphide resource anticipated in the upcoming resource estimate update in Q1 2022. The updated PEA will incorporate this expanded resource and will include review of the mining sequence including an assessment of whether any sulfide resources may be mined via open pit and the optimal sequence for sulfide flotation and oxide leaching.

Table 1. Current Mineral Resource Estimate on the Carmacks Copper Project1,2

CategoryTonnes (000)Cu (%)Au (g/t)Ag (g/t)
Oxide & Transition MineralizationMeasured6,4840.860.414.24
Indicated9,2060.970.363.80
M&I15,6900.940.383.97
Inferred9130.450.121.90
Sulphide MineralizationMeasured1,3810.640.192.17
Indicated6,6870.690.172.34
M&I8,0680.680.182.33
Inferred8,4070.630.151.99

[1] JDS Energy and Mining. Feb 9, 2017. NI 43-101 Preliminary Economic Assessment Technical Report on the Carmacks Project, Yukon, Canada. Contained metal based on 23.76 million tonnes of NI 43-101 compliant resources in the Measured and Indicated categories grading 0.85% Cu, 0.31 g/t Au, 3.14 g/t Ag.

[2] Arseneau Consulting Services, 2016 Independent Technical Report on the Carmacks Copper Project, Yukon, Canada.

About Granite Creek Copper

Granite Creek, a member of the Metallic Group of Companies, is a Canadian exploration company focused on the 176 square kilometer Carmacks project in the Minto copper district of Canada’s Yukon Territory. The project is on trend with the high-grade Minto copper-gold mine, operated by Minto Metals Corp., to the north, and features excellent access to infrastructure with the nearby paved Yukon Highway 2, along with grid power within 12 km. More information about Granite Creek Copper can be viewed on the Company’s website at www.gcxcopper.com.

FOR FURTHER INFORMATION PLEASE CONTACT:

Timothy Johnson, President & CEO
Telephone: 1 (604) 235-1982
Toll-Free: 1 (888) 361-3494
E-mail: info@gcxcopper.com
Website: www.gcxcopper.com
Metallic Group: www.metallicgroup.ca
Twitter: @yukoncopper

Qualified Person

Ms. Debbie James, P.Geo., a qualified person for the purposes of National Instrument 43-101, has reviewed and approved the technical disclosure contained in this news release.

Forward-Looking Statements

This news release includes certain statements that may be deemed “forward-looking statements”. All statements in this release, other than statements of historical facts including, without limitation, statements regarding potential mineralization, historic production, estimation of mineral resources, the realization of mineral resource estimates, interpretation of prior exploration and potential exploration results, the timing and success of exploration activities generally, the timing and results of future resource estimates, permitting time lines, metal prices and currency exchange rates, availability of capital, government regulation of exploration operations, environmental risks, reclamation, title, and future plans and objectives of the company are forward-looking statements that involve various risks and uncertainties. Although Granite Creek Copper believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in the forward-looking statements. Forward-looking statements are based on a number of material factors and assumptions. Factors that could cause actual results to differ materially from those in forward-looking statements include failure to obtain necessary approvals, unsuccessful exploration results, changes in project parameters as plans continue to be refined, results of future resource estimates, future metal prices, availability of capital and financing on acceptable terms, general economic, market or business conditions, risks associated with regulatory changes, defects in title, availability of personnel, materials and equipment on a timely basis, accidents or equipment breakdowns, uninsured risks, delays in receiving government approvals, unanticipated environmental impacts on operations and costs to remedy same, and other exploration or other risks detailed herein and from time to time in the filings made by the companies with securities regulators. Readers are cautioned that mineral resources that are not mineral reserves do not have demonstrated economic viability. Mineral exploration and development of mines is an inherently risky business. Accordingly, the actual events may differ materially from those projected in the forward-looking statements. For more information on Granite Creek Copper and the risks and challenges of their businesses, investors should review their annual filings that are available at www.sedar.com.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

SOURCE: Granite Creek Copper Ltd.



View source version on accesswire.com:
https://www.accesswire.com/675433/Granite-Creek-Copper-Announces-Results-of-Mine-Planning-Mineral-Processing-Work-Conducted-on-the-Carmacks-Copper-Gold-Project-by-Sedgman-and-Mining-Plus

Categories
Base Metals Energy Granite Creek Copper Junior Mining Metallic Group

Granite Creek Copper Retains SGS for 43-101 Mineral Resource Update on Carmacks Deposit in Yukon, Canada

VANCOUVER, BC / ACCESSWIRE / November 10, 2021 / Granite Creek Copper Ltd. (TSXV:GCX)(OTCQB:GCXXF) (“Granite Creek” or the “Company“) is pleased to announce the retention of SGS Geological Services (‘SGS”) to provide an updated National Instrument 43-101 mineral resource estimate on the Company’s Carmacks copper-gold-silver deposit in the Minto Copper Belt located in central Yukon, Canada.

Granite Creek will be incorporating drilling completed in 2017, 2020 and 2021 into an updated resource estimate which will build on the existing NI 43-101 compliant resources last published in 20171,2. Resource expansion drilling completed in 2021 consisted of 22 diamond drill holes primarily targeted at sulfide mineralization in Zones 1, 2000S and 13 and is expected to add to the existing sulfide resource (see news release dated October 28, 2021).

Table 1. Current Mineral Resource Estimate on the Carmacks Copper Project

CategoryTonnes (000)Cu (%)Au (g/t)Ag (g/t)
Oxide & Transition MineralizationMeasured6,4840.860.414.24
Indicated9,2060.970.363.80
M&I15,6900.940.383.97
Inferred9130.450.121.90
Sulphide MineralizationMeasured1,3810.640.192.17
Indicated6,6870.690.172.34
M&I8,0680.680.182.33
Inferred8,4070.630.151.99

About SGS Geological Services

SGS Geological services has a very strong team, with valuable experience, known, renown and respected in the international mining industry. The team has considerable experience in estimation and modeling of deposits of all types and practical and theoretical experience having realized hundreds of assessments for clients. A multidisciplinary group of qualified persons with a strong understanding of the disclosure requirements for Mineral Resources set out in the NI 43-101 Standards of Disclosure for Mineral Projects (2016), CIM Definition Standards – For Mineral Resources and Mineral Reserves (2014) and a strong understanding of the CIM Estimation of Mineral Resources & Mineral Reserves Best Practice Guidelines 2019.

Resource Road Update

On November 8th the Yukon government announced the following road construction update that directly effects Granite Creek’s Carmacks Project.

“Whitehorse based company Pelly Construction has been awarded the contract for the Carmacks Bypass Project, a $29.6 million investment to construct a new road and bridge near Carmacks. This project is a key component under the Yukon Resource Gateway Program and a collaborative effort between the Government of Yukon and Little Salmon/Carmacks First Nation.

The project, which is anticipated to be complete in 2024, will allow industrial vehicles to bypass the community of Carmacks, creating an enhanced and safer flow of traffic for residents. It will also improve access to mining activities while enabling the Little Salmon/Carmacks First Nation to benefit from contracting, education and training benefits associated with the project.

The Yukon Resource Gateway Program improves infrastructure to Yukon’s most mineral-rich areas. The Carmacks Bypass project is jointly funded by Canada and the Yukon and is the first project to be awarded under the program.”

Granite Creek President & CEO, Tim Johnson, commented, “We are very pleased to have engaged with a top calibre firm like SGS on this key milestone in the Company’s relatively short history. With the amount of highly targeted new drilling we have completed, we anticipate a robust update to the existing resource estimate and that this, along with the mine planning and trade-off studies being developed by Sedgman and Mining Plus, will have a significant impact on the project economics. In our continuing development of Carmacks, the recent announcement by the Yukon government of the start of construction on the Carmacks Bypass is extremely good news. The incremental improvement in access represented by this road upgrade is welcomed and this, combined with an updated resource estimate, will pave the way for and even more extensive exploration program in 2022.”

[1] JDS Energy and Mining. Feb 9, 2017. NI 43-101 Preliminary Economic Assessment Technical Report on the Carmacks Project, Yukon, Canada. Contained metal based on 23.76 million tonnes of NI 43-101 compliant resources in the Measured and Indicated categories grading 0.85% Cu, 0.31 g/t Au, 3.14 g/t Ag.

[2] Arseneau Consulting Services, 2016 Independent Technical Report on the Carmacks Copper Project, Yukon, Canada.

About Granite Creek Copper

Granite Creek, a member of the Metallic Group of Companies, is a Canadian exploration company focused on the 176 square kilometer Carmacks project in the Minto copper district of Canada’s Yukon Territory. The project is on trend with the high-grade Minto copper-gold mine, operated by Minto Explorations Ltd, to the north, and features excellent access to infrastructure with the nearby paved Yukon Highway 2, along with grid power within 12 km. More information about Granite Creek Copper can be viewed on the Company’s website at www.gcxcopper.com.

FOR FURTHER INFORMATION PLEASE CONTACT:

Timothy Johnson, President & CEO
Telephone: 1 (604) 235-1982
Toll-Free: 1 (888) 361-3494
E-mail: info@gcxcopper.com
Website: www.gcxcopper.com
Metallic Group: www.metallicgroup.ca

Qualified Person

Ms. Debbie James, P.Geo., a qualified person for the purposes of National Instrument 43-101, has reviewed and approved the technical disclosure contained in this news release.

Forward-Looking Statements

This news release includes certain statements that may be deemed “forward-looking statements”. All statements in this release, other than statements of historical facts including, without limitation, statements regarding potential mineralization, historic production, estimation of mineral resources, the realization of mineral resource estimates, interpretation of prior exploration and potential exploration results, the timing and success of exploration activities generally, the timing and results of future resource estimates, permitting time lines, metal prices and currency exchange rates, availability of capital, government regulation of exploration operations, environmental risks, reclamation, title, and future plans and objectives of the company are forward-looking statements that involve various risks and uncertainties. Although Granite Creek Copper believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in the forward-looking statements. Forward-looking statements are based on a number of material factors and assumptions. Factors that could cause actual results to differ materially from those in forward-looking statements include failure to obtain necessary approvals, unsuccessful exploration results, changes in project parameters as plans continue to be refined, results of future resource estimates, future metal prices, availability of capital and financing on acceptable terms, general economic, market or business conditions, risks associated with regulatory changes, defects in title, availability of personnel, materials and equipment on a timely basis, accidents or equipment breakdowns, uninsured risks, delays in receiving government approvals, unanticipated environmental impacts on operations and costs to remedy same, and other exploration or other risks detailed herein and from time to time in the filings made by the companies with securities regulators. Readers are cautioned that mineral resources that are not mineral reserves do not have demonstrated economic viability. Mineral exploration and development of mines is an inherently risky business. Accordingly, the actual events may differ materially from those projected in the forward-looking statements. For more information on Granite Creek Copper and the risks and challenges of their businesses, investors should review their annual filings that are available at www.sedar.com.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

SOURCE: Granite Creek Copper Ltd.



View source version on accesswire.com:
https://www.accesswire.com/672206/Granite-Creek-Copper-Retains-SGS-for-43-101-Mineral-Resource-Update-on-Carmacks-Deposit-in-Yukon-Canada

https://s.yimg.com/rq/darla/4-9-0/html/r-sf-flx.htmlhttps://openweb.jac.yahoosandbox.com/0.8.1/safeframe.html