Categories
Junior Mining Precious Metals

Lakewood Exploration Samples up to 2,744.91 g/t Silver & 4.80 g/t Gold at the Past-Producing Silver Strand Mine in Idaho, USA

Lakewood Exploration Inc.Thu, July 15, 2021, 9:18 AMIn this article:

My WatchlistMy WatchlistView my watchlists

Table 1.

Underground Samples
Underground Samples
Underground Samples

VANCOUVER, British Columbia, July 15, 2021 (GLOBE NEWSWIRE) — Lakewood Exploration (CSE: LWD / OTC: LWDEF) (“Lakewood” or the “Company”) is pleased to announce results from a sampling program at the Company’s newly acquired past-producing Silver Strand Mine located in the storied Coeur d’Alene Mining District of Idaho.

A total of 14 rock chip samples were collected from altered and mineralized surface and underground exposures. Two grab samples were collected to verify high grade silver and gold values from a previous sampling program from which a sample reported 1,669 grams per tonne (g/t) silver (Ag) and 9.77 g/t Gold (Au) (See June 28, 2021 News Release). Assays from the two verification samples PN614015 and PN614014 returned 2,744.91 g/t Ag & 4.80 g/t Au and 238.29 g/t Silver & 3.60 g/t Gold, respectively.

Lakewood President, Morgan Lekstrom stated: “These high-grade underground sampling results suggest to us that the potential for substantial high-grade mineralization is present at Silver Strand. Obtaining gold and silver values from reconnaissance surface sampling 1 km to the southeast of Silver Strand is also highly encouraging and demonstrates the potential to outline a significantly more extensive vein system within our expanded property package.”

A photo accompanying this announcement is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/ec6c7f73-7ce0-46b5-abfd-126383f53bac

Twelve surface rock chip samples were collected along road cuts and logging trails immediately to the southeast of the Silver Strand property prompting additional claim staking. The surface samples consist of quartz-FeOx veins and veinlet zones, consistent with known mineralization at Silver Strand, and indicate that these mineralized zones continue for approximately 1 km to the southeast. Sample results range from 1.71 g/t Ag to 8.23 g/t Ag with anomalous gold up to 0.21 g/t Au. These new surface results along trend provide the Company with new key data that will support efforts to vector towards higher-grade Au-Ag mineralization along strike, in addition to the potential depth extensions below the shallow historical mining at Silver Strand.

The samples were analyzed by Chris Christopherson of CCI laboratory, in Smelterville, Idaho. Samples were analyzed by fire assay methods with a gravimetric finish for gold and silver.

Qualified Person

Technical aspects of this press release have been reviewed and approved under the supervision of Philip Mulholland, P.Geo. Mr. Mulholland is a Qualified Person (QP) under National Instrument 43-101 Standards of Disclosure for Mineral Projects.

About Lakewood Exploration

Lakewood Exploration is a junior resource company that controls the Lacy Gold Project in British Columbia, Canada, and the past-producing Silver Strand Mine in the Coeur d’Alene Mining District in Idaho, USA. The Company is rapidly advancing towards an initial drill program at Silver Strand with the aim of defining a large silver resource within a belt that has produced more than 1.2 billion ounces of silver to-date. Geologic studies indicate that the Silver Strand Mine is hosted by the Revett formation, suggesting the potential for significant down dip extensions as demonstrated by other major mines in the district. Previous operators were solely interested in developing the known shallow mineralization, with the mine’s lowest level extending only 90 metres below surface. Lakewood strives to become a multi-mine silver producer.

*Mineralization hosted on adjacent and/or nearby properties is not necessarily indicative of mineralization hosted on the Company’s property.

On Behalf of the Board of Lakewood Exploration Inc.

Morgan Lekstrom

President

Corporate Office: 551 Howe Street, Vancouver, British Columbia V6C 2C2, Canada

Contact Kristina Pillon, President, High Tide Consulting Corp., 604.908.1695 / investors@silverhammermining.com

The CSE has neither approved nor disapproved the contents of this news release. Neither the CSE nor its Regulation Services Provider (as that term is defined in the policies of the CSE) accepts responsibility for the adequacy or accuracy of this release.

Categories
Base Metals Energy Junior Mining Precious Metals Project Generators

Riverside to Receive US$5,400,000 in Additional Funding from BHP to Advance and Drill Copper Projects in Sonora, Mexico

Vancouver, British Columbia–(Newsfile Corp. – July 15, 2021) – Riverside Resources Inc. (TSXV: RRI) (OTCQB: RVSDF) (FSE: 5YY) (“Riverside” or the “Company”) is pleased to announce that an additional US$5,400,000 in exploration funding is being granted to advance four (4) previously generated copper projects as part of the expanding copper exploration program with BHP in Sonora, Mexico (see Figure 1 below). This new funding of at least US$5,400,000 is in addition to the US$1,300,000 allocated for the next generative phase of exploration work, which began two months ago on May 15th, 2021. Program funding highlights for the new project-focused funding are summarized below:

  • Drilling funding has been allocated for the Chuin Project, including an initial 4,500 metres (“m”) of drilling to test three geophysical centres within the Chinalito Target area.
  • Drilling funding budgeted for the Palofierro Project, including 4,500 m stratigraphic core drilling to cut bedrock beneath post-mineral cover and test for Laramide aged porphyry potential.
  • Geophysics funding designated for a close spaced MT (Magneto-telluric) Survey at Sinoquipe, designed to uncover conductive bodies (i.e., potential porphyry copper deposits) underneath post-mineral conglomerate cover.
  • Geophysics funding budgeted for a broadly spaced MT Survey and geophysical targeting at Peñitas which will lead toward drill targeting.

The permitting process for drilling at Chuin and Palofierro is already underway. The MT Survey’s at Sinoquipe and Peñitas are expected to commence after contractors are secured and the results from the deep geophysics work has the potential to lead to further drilling programs based on results.

Riverside’s President & CEO, John-Mark Staude : “We are pleased to work closely with BHP’s geoscientists and their exploration group as the porphyry copper targets we have identified continue to progress towards drilling. These projects and corresponding exploration campaigns expose our shareholders to incredible upside and catalysts that have the potential to create significant value for the Company. Riverside and BHP recently completed a weeklong technical field trip, which culminated with the approval by BHP of this additional US$5.4Million in exploration funding. In total, the additional budget allocation brings Riverside’s 2021 funding for copper exploration to over US$6.7M. We see excellent potential for continued growth in the well-endowed and under-explored southern extension of the Arizona-Sonora world class porphyry copper belt.

These four projects include the previously highlighted: Chuin, Palofierro, Sinoquipe, and Peñitas properties (see press release dated June 21, 2021). The projects have now been approved for full funding to move toward drilling on the Chuin and Palofierro projects and deep geophysics on the Sinoquipe and Peñitas projects which would lead toward additional drill decisions in the near future and will be ongoing for a third consecutive year (see press release dated May 27, 2021). Sinoquipe and Peñitas will be progressed with geophysical studies similar to those done at Chuin and Palofierro where BHP and Riverside are preparing targets for upcoming drill programs.



Figure 1: BHP Riverside Exploration area for copper and portfolio of projects owned by Riverside and BHP/Riverside Program

To view an enhanced version of Figure 1, please visit:
https://orders.newsfilecorp.com/files/6101/90274_50996a00340618d1_002full.jpg

Program Details:

  • Chuin Project: Funding of 4,500 m of core drilling to test the main Magneto-telluric (MT) anomalies discovered through last year’s funding. This first phase of drilling is focused on 3 geophysical centers identified at the Chinalito Target, which if successful could trigger an expanded drilling program as a Defined Project (“DP”) as outlined in the reference terms of the Exploration Funding Agreement (“EFA”). Environmental permitting for drilling is being progressed. Chinalito remains the priority copper target for Riverside.
  • Palofierro Project: Funding of 4,500 m of stratigraphic core drilling to probe bedrock beneath the post-mineral units and evaluate the basement geology for Laramide style porphyry Cu potential to the east of the Opodepe Mo-Cu porphyry district and west of exposed high sulfidation and upper-level porphyry copper geology where the Riverside-BHP target area is covered by post-Laramide gravel. This target area is defined by combining gravity survey results with geological mapping of the margins of the Rayon, Sonora Tertiary pediment, with the Company having found positive indicators for potential porphyry system at the margins of the basin and exploration data vectoring toward underneath the post-mineral cover. Environmental permitting for drilling is in progress.
  • Sinoquipe Project: Funding of an extensive and close-spaced MT survey which includes over 250 stations and is expected to start in late July 2021 pending weather and contractor availability. The interpreted target at Sinoquipe is a porphyry copper system projected under varying thickness of post-mineral conglomerate and possibly some Tertiary volcanics, where both margins of the basin show compiled geological evidence that indicates large potential for porphyry copper underneath the gravels. The purpose of this survey is to find conductive bodies that will potentially turn into drill targets in the coming months. This work builds on the 2021 field programs of sampling, mapping and targeting that remain on-going.
  • Peñitas: Funding of an open-spaced MT survey that comprises 150 stations to cover multiple target areas already identified with geological mapping and geochemical sampling. Similar to Sinoquipe, Peñitas has multiple targets that are projected under post-mineral cover and the aim of the survey is to detect large conductive bodies that would eventually generate geophysical drill targets.

Qualified Person & QA/QC:

The scientific and technical data contained in this news release pertaining to the BHP Exploration Financing Agreement was reviewed and approved by Freeman Smith, P.Geo, a non-independent qualified person to Riverside Resources, who is responsible for ensuring that the geologic information provided in this news release is accurate and who acts as a “qualified person” under National Instrument 43-101 Standards of Disclosure for Mineral Projects.

About Riverside Resources Inc.:

Riverside is a well-funded exploration company driven by value generation and discovery. The Company has over $4M in cash, no debt and less than 72M shares outstanding with a strong portfolio of gold-silver and copper assets and royalties in North America. Riverside has extensive experience and knowledge operating in Mexico and Canada and leverages its large database to generate a portfolio of prospective mineral properties. In addition to Riverside’s own exploration spending, the Company also strives to diversify risk by securing joint-venture and spin-out partnerships to advance multiple assets simultaneously and create more chances for discovery. Riverside has properties available for option, with information available on the Company’s website at www.rivres.com.

ON BEHALF OF RIVERSIDE RESOURCES INC.

“John-Mark Staude”

Dr. John-Mark Staude, President & CEO

For additional information contact:

John-Mark Staude
President, CEO
Riverside Resources Inc.
info@rivres.com
Phone: (778) 327-6671
Fax: (778) 327-6675
Web: www.rivres.com

Raffi Elmajian
Corporate Communications
Riverside Resources Inc.
relmajian@rivres.com
Phone: (778) 327-6671
TF: (877) RIV-RES1
Web: www.rivres.com

Certain statements in this press release may be considered forward-looking information. These statements can be identified by the use of forward-looking terminology (e.g., “expect”,” estimates”, “intends”, “anticipates”, “believes”, “plans”). Such information involves known and unknown risks — including the availability of funds, the results of financing and exploration activities, the interpretation of exploration results and other geological data, or unanticipated costs and expenses and other risks identified by Riverside in its public securities filings that may cause actual events to differ materially from current expectations. Readers are cautioned not to place undue reliance on these forward-looking statements, which speak only as of the date of this press release.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Categories
Base Metals Energy Granite Creek Copper Junior Mining

Granite Creek Copper Completes IP Survey and Launches Phase 2 of Expanded Drill Program at Carmacks Copper-Gold Project in Yukon, Canada

July 14, 2021

Vancouver, B.C., Granite Creek Copper Ltd. (TSX.V: GCX | OTCQB: GCXXF) (“Granite Creek” or the “Company”) is pleased to announce that Simcoe Geophysics has completed a 20.8 line kilometer (“km”) induced polarization (IP) survey on the Company’s Carmacks North target area. Preliminary results from the survey have identified several near surface chargeability anomalies that have been prioritized as trenching and reverse circulation (“RC”) drill targets for Phase 2 of the 2021 season. 

Granite Creek further announces the completion of Phase 1 of its 2021 drilling program, which consisted of 19 holes totalling 6355 meters of diamond drilling on Zones 1, 2000S and 13 of the Carmacks deposit. The first tranche of assays from Phase 1 are expected very soon and will be released in batches as received and reviewed by the Company. With this initial stage of drilling completed, Vision Quest Exploration, based in Whitehorse, Yukon, has mobilized a reverse circulation (“RC”) drill rig to the property and commenced Phase 2 drilling which is expected to consist of approximately 3000 meters. 

Given the early start to the 2021 field season and encouraging early indications of success, Granite Creek has made the decision to expand the previously defined 10,000-meter program by adding a third phase which is expected to add an additional 2700 meters of diamond drilling to the overall program. Launch date for Phase 3 is tentatively targeted for early September, with potential to bring that forward to late August. The Company will provide further guidance in this regard in the ensuing weeks.

Granite Creek President & CEO, Tim Johnson, commented, “We are extraordinarily pleased with the progress we have made to date in advancing the Carmacks project. It is a testament to the strength and dedication of our team that we have been able to maintain a very aggressive pace as we move towards an updated 43-101 resource estimate and subsequent economic assessment. This drill campaign has been a showcase of professionalism from our site teams and contractors, and we are very much looking forward to carrying that momentum ahead through Phase 2 and the newly announced Phase 3. In total, we are now expecting to complete over 13,000 meters of drilling, data from which will be incorporated into the new resource update being targeted for Q4.”

Carmacks North Target Area

The Carmacks North Target area is comprised of Zones A-D, as well as additional targets currently being developed. Prior to the Granite Creek’s inaugural drill program completed last fall (see news release dated Feb 11, 2021), little work had been completed on the area since 1980. Historical high-grade copper intercepts of up to 2.52% Cu, 1.64 g/t Au, 12.84 g/t Ag over 19.81 meters were successfully followed up with intercepts of 4.31% Cu, 3.41 g/t Au, 23.78 Ag over 4.36 meters and 0.97% Cu, 0.32 g/t Au, 2.84 g/t Ag over 25 meters. Recognizing the discovery potential in the target area the Company is pleased to deploy modern, advanced exploration tools such as the Alpha Induced Polarization survey employed by Simcoe Geophysics. Capable of measuring the chargeability and resistivity of the rock up to 1000m below the surface these types of surveys greatly improves the chance of success with drilling. The use of a rapidly deployable drill rig such as the RC rig being supplied by Vision Quest along with excavator trenching allows for testing of multiple high priority targets during a single field season. 

OTCQB Metals and Mining Virtual Conference 

Granite Creek Copper will be presenting at the upcoming Green Energy and Precious Metals Investor Conference hosted by OTC Markets on July 29 at 1:30pm ET. President & CEO, Tim Johnson, will provide a comprehensive overview of the Company, including an update on 2021 exploration activities to date and upcoming newsflow. To register, click here

COVID-19 Protocols

Granite Creek has worked closely with the Yukon government to develop a COVID-19 safety plan that enables the Company to implement an effective work plan while maintaining the highest degree of safety of our workers and surrounding communities. The Company strictly adheres to mandates put in place by health authorities at the Federal and Territorial government level and holds the health and safety of our workers, and the citizens of the communities in which we work, in the highest regard. 

Figure 1: Oblique view of the UBC 2D DCIP inversion sections of the chargeability from 20.8 km of IP collected by Simcoe Geophysics over Carmacks North

Figure 2: 2D IP chargeability model of Line 3

About Granite Creek Copper

Granite Creek, a member of the Metallic Group of Companies, is a Canadian exploration company focused on the 176 square kilometer Carmacks project in the Minto copper district of Canada’s Yukon Territory. The project is on trend with the high-grade Minto copper-gold mine, operated by Minto Explorations Ltd, to the north and features excellent access to infrastructure with the nearby paved Yukon Highway 2, along with grid power within 12 km. More information about Granite Creek Copper can be viewed on the Company’s website at www.gcxcopper.com.

FOR FURTHER INFORMATION PLEASE CONTACT:

Timothy Johnson, President & CEO
Telephone:         1 (604) 235-1982
Toll Free:             1 (888) 361-3494
E-mail:       info@gcxcopper.com
Website:    www.gcxcopper.com
Metallic Group:  www.metallicgroup.ca   

Qualified Person

Ms. Debbie James, P.Geo., a qualified person for the purposes of National Instrument 43-101, has reviewed and approved the technical disclosure contained in this news release.

Forward-Looking Statements
This news release includes certain statements that may be deemed “forward-looking statements”. All statements in this release, other than statements of historical facts including, without limitation, statements regarding potential mineralization, historic production, estimation of mineral resources, the realization of mineral resource estimates, interpretation of prior exploration and potential exploration results, the timing and success of exploration activities generally, the timing and results of future resource estimates, permitting time lines, metal prices and currency exchange rates, availability of capital, government regulation of exploration operations, environmental risks, reclamation, title, and future plans and objectives of the company are forward-looking statements that involve various risks and uncertainties. Although Granite Creek Copper believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in the forward-looking statements. Forward-looking statements are based on a number of material factors and assumptions. Factors that could cause actual results to differ materially from those in forward-looking statements include failure to obtain necessary approvals, unsuccessful exploration results, changes in project parameters as plans continue to be refined, results of future resource esti-mates, future metal prices, availability of capital and financing on acceptable terms, general economic, market or business conditions, risks associated with regulatory changes, defects in title, availability of personnel, materials and equipment on a timely basis, accidents or equipment breakdowns, uninsured risks, delays in receiving government approvals, unanticipated environmental impacts on operations and costs to remedy same, and other exploration or other risks detailed herein and from time to time in the filings made by the companies with securities regulators. Readers are cautioned that mineral resources that are not mineral reserves do not have demonstrated economic viability. Mineral exploration and development of mines is an inherently risky business. Accordingly, the actual events may differ materially from those projected in the forward-looking statements. For more infor-mation on Granite Creek Copper and the risks and challenges of their businesses, investors should review their annual filings that are available at www.sedar.com.


Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Categories
Junior Mining Precious Metals

MAGNA GOLD REPORTS Q2 2021 PRODUCTION RESULTS

EXITS Q2 WITH RECORD TO DATE MONTHLY PRODUCTION OF 5,398 OZ GOLD

Toronto, Ontario – July 14, 2021 – Magna Gold Corp. (TSXV: MGR, OTCQB: MGLQF) (“Magna” or the “Company“), is pleased to report June 2021 production of 5,398 oz gold (“Au”) a record to date. Additionally, the strip ratio for the month of June was 2.9, another record for the company. Q2 2021 gold production was 11,713 ounces at its San Francisco Mine in Sonora, Mexico. Gold sold during the quarter was 11,777 ounces at an average realized gold price of $1,752 per ounce (1). With 21,498 ounces of gold produced through the second quarter and achievement of full-scale commercial production on June 1, 2021, the Company reiterates full year gold production guidance of 55,000 to 65,000 ounces.

TABLE 1: Q2 2021 OPERATIONAL HIGHLIGHTS

 Three months ended               Change   Change %   
 jun-21mar-21 jun-21mar-21
MINING     
Ore mined (dry kt)1,231619 61299%
Ore mined grade (g/t Au)0.430.34 0.0927%
Waste mined (kt)4,8805,195 -315-6%
Total mined (kt)6,1115,814 2975%
Strip ratio3.968.4 -4.43-53%
Avg. total mined (t/d)67,15364,597 2,5554%
      
      CRUSHING AND PROCESSING   
Ore processed (kt) – From open pit1,221611 610100%
Ore processed grade (g/t Au) – From open pit0.440.32 0.1135%
Ore processed (kt) – All sources1,347744 60381%
Ore processed grade (g/t Au) – All sources0.490.51 -0.02-4%
Gold placed on pads (ozs) – All sources21,09412,177 8,91773%
      
PRODUCTION    
Gold ounces produced (ozs)11,7139,785 1,92820%
Silver ounces produced (ozs)7,7428,093 -351-4%
Gold ounces sold (ozs)11,7778,430 3,34740%
Silver ounces sold (ozs)8,4226,961 1,46121%
      
Realized gold price (USD)1,7521,796 -44-2%

FIGURE 1: YTD OPERATIONAL IMPROVEMENTS

Magna Gold plans to release its full second quarter 2021 financial and operational results on or around August 30, 2021. Gold grades mined, gold grades processed, and gold recoveries will be reported with the quarterly results.

Arturo Bonillas, President & CEO of Magna Gold, stated:

“The end of Q2 marked a major milestone for the Magna Gold team. We achieved commercial production on schedule and had our highest production total in the month of June. We are seeing production ramp up every day and look to end the year producing ~7,500 oz Au per month. Figure 1 demonstrates just how far we have come as our strip ratio has been brought down to near life of mine averages and our production continues to steeply trend upwards.”

“Magna Gold is in a phase of rapid expansion and advancement of our assets. Having said that our commitment to health and safety remains a priority, this evidenced by our unblemished ~3.5M man hours without a lost time incident. We look to continue our dedication to best practices as we are well on our way to become a mid tier producer.”

  1. Realized gold price for Q2 2021 includes gains and losses on derivatives.

About Magna Gold Corp

Magna is a Mexico focused gold/silver production company focused on acquiring, exploring, developing and operating quality precious metals properties in Mexico. It is committed to advancing its 100% owned flagship San Francisco Mine and other highly prospective mineral properties located in Sonora and in Chihuahua. The primary strength of the Company is the team of highly experienced mining professionals with a proven track record of developing properties in Mexico from discovery to production. Magna employs community members and services in its operations.

Based on the NI-43-101 technical report dated August 8, 2020, San Francisco operations are estimated to have measured and indicated resources of 99,700,000 tonnes @ 0.446g/t Au containing 1,430,000 ounces of gold, and inferred resources of 11,374,000 tonnes @ 0.446 g/t containing 171,000 ounces of gold. The total proven and probable reserves is 47,629,000 tonnes @ 0.495 g/t Au containing 758,000 ounces of gold. Mineral resources are inclusive of mineral reserves. Mineral resources that are not mineral reserves do not have demonstrated economic viability.

ON BEHALF OF THE BOARD OF DIRECTORS

Arturo Bonillas

President and CEO

For further information, please visit the Company’s SEDAR profile at www.sedar.com or the Company’s corporate website at www.magnagoldcorp.com or contact us at telephone +52 (662) 310 0326, email info@magnagoldcorp.com.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Qualified Person

James Baughman (P. Geo.), Consulting Geologist and a Qualified Person as defined by NI 43-101, has approved the scientific and technical information in this news release.

Cautionary Statements

This News Release includes certain “forward-looking statements” which are not comprised of historical facts. Forward-looking statements include estimates and statements that describe the Company’s future plans, objectives or goals, including words to the effect that the Company or management expects a stated condition or result to occur. Forward-looking statements may be identified by such terms as “believes”, “anticipates”, “expects”, “estimates”, “may”, “could”, “would”, “will”, or “plans”. Since forward-looking statements are based on assumptions and address future events and conditions, by their very nature they involve inherent risks and uncertainties. Although these statements are based on information currently available to the Company, the Company provides no assurance that actual results will meet management’s expectations. Risks, uncertainties and other factors involved with forward-looking information could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. Forward-looking information in this news release includes, but is not limited to, the Company’s objectives, goals or future plans, exploration results, potential mineralization (including estimates of measured and indicated resources, inferred resources and probable reserves), exploration and mine development plans, production (including gold production expectations and guidance and expectations of becoming a mid-tier producer), processing and mining expectations (including statements regarding expansion and advancement of assets) and strip ratio trends and expectations . Factors that could cause actual results to differ materially from such forward-looking information include, but are not limited to failure to identify mineral resources, failure to convert estimated mineral resources to reserves, the inability to complete a feasibility study which recommends a production decision, the preliminary nature of metallurgical test results, delays in obtaining or failures to obtain required governmental, environmental or other project approvals, political risks, uncertainties relating to the availability and costs of financing needed in the future, changes in equity markets, inflation, changes in exchange rates, fluctuations in commodity prices, delays in the development of projects, capital, operating and reclamation costs varying significantly from estimates and the other risks involved in the mineral exploration and development industry,  risks related to the effects of COVID-19 on the Company; and those risks set out in the Company’s public documents filed on SEDAR. Although the Company believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. The Company disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by law.

Categories
Junior Mining Precious Metals

Kesselrun Announces Appointment of VP Corporate Development

Thunder Bay, Ontario–(Newsfile Corp. – July 14, 2021) – Kesselrun Resources Ltd. (TSXV: KES) (OTC Pink: KSSRF) (“Kesselrun” or the “Company”) is pleased to announce the appointment of Mr. Rodney Stevens as Vice President, Corporate Development for the Company, subject to any required regulatory approvals.

Mr. Stevens is a Chartered Financial Analyst (“CFA”) charterholder with over a decade of experience in the capital markets, first as an investment analyst with Salman Partners Inc. and subsequently as a merchant and investment banker. While at Salman Partners, he became a top-rated analyst by StarMine on July 17, 2007 for the metals and mining industry. Mr. Stevens was also a Portfolio Manager registered with Wolverton Securities Ltd. and over the course of his career, he has been instrumental in assisting in financings and mergers and acquisitions activities worth over $1 billion in transaction value.

Michael Thompson, P.Geo., President and CEO of the Company, commented, “We are excited to welcome Rodney to the Kesselrun team. His experience and enthusiasm will serve shareholders well as we advance the Huronian project.”https://s.yimg.com/rq/darla/4-8-0/html/r-sf-flx.html

Options

The Company has granted 800,000 incentive stock options to its directors, officers, employees, consultants and management company employees. The stock options shall be exercisable at a price of $0.40 per share for a period of five (5) years from the date of issue.

About the Huronian Gold Project

The 100% owned Huronian Gold Project hosts the past producing Huronian Mine, Northwestern Ontario’s first gold mine with an historic resource estimate of 44,592 oz Au at an average grade of 15.3 g/t Au in the indicated category and 501,377 oz Au at an average grade of 14.4 g/t Au in the inferred category. The resource estimate presented for the Huronian Project is historic in nature. Kesselrun Resources’ qualified person has not completed sufficient work to confirm the results of the historical resource. Kesselrun Resources is not treating this as a current mineral resource but is considering it relevant as a guide to future exploration and is included for reference purposes only. The historic resource was estimated by Minescape Exploration Inc. in 1998. Further drilling will be required by Kesselrun Resources to verify the historic estimate as current mineral resources.

As well, the Huronian Gold Project hosts the same lithological package of rocks, as interpreted from both Government of Ontario and Kesselrun Resources mapping, compilation and modelling, on strike from Goldshore Resources’ adjacent Moss Lake Gold Deposit with a resource estimate of 1,377,300 oz Au at an average grade of 1.1 g/t Au in the indicated category and 1,751,600 oz Au at an average grade of 1.1 g/t Au in the inferred category as outlined in their 2013 PEA1. Mineralization hosted on adjacent and/or nearby properties is not necessarily indicative of mineralization hosted on Kesselrun Resources’ property.

(1) Moss Lake Gold Mines news releases February 20, 2013 and September 9, 2013.

On January 26, 2021 Wesdome announced that the Moss Lake Project would be purchased by Goldshore Resources Inc. (see Wesdome and Goldshore news releases dated January 26, 2021).

Qualified Person

Michael Thompson, P.Geo., President and CEO of Kesselrun, is the Qualified Person responsible for the project as defined by National Instrument 43-101 and has approved the technical information in this news release.

QA/QC

Kesselrun has implemented a quality control program to comply with industry best practices for sampling, chain of custody and analyses. Certified gold reference standards, blanks and duplicates are inserted at the core processing site as part of the QA/QC program in addition to the control samples inserted by the lab. Samples are prepared and analyzed by Activation Laboratories in Thunder Bay. Samples are analyzed for gold using Fire Assay-AA techniques. Samples returning over 10 g/t gold are analyzed using Fire Assay-Gravimetric methods. Selected samples are also analyzed with a standard 1 kg metallic screen fire assay. All results reported herein have passed QA/QC protocols.

Health and Safety

The health and safety of our personnel and contractors is always top priority to Kesselrun. The current situation presents new challenges above and beyond what we normally face while working in the field. Kesselrun has implemented further measures to ensure the health and safety of all working on the Company’s projects.

About Kesselrun Resources Ltd.

Kesselrun Resources is a Thunder Bay, Ontario-based mineral exploration company focused on growth through property acquisitions and discoveries. Kesselrun’s management team possesses strong geological and exploration expertise in Northwest Ontario. For more information about Kesselrun Resources, please visit www.kesselrunresources.com.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.

For additional information please contact:

Kesselrun Resources Ltd.

Michael Thompson, P.Geo., President & CEO
807.285.3323
michaelt@kesselrunresources.com

Corporate Communications
1.866.416.7941
information@kesselrunresources.com

Forward-Looking Statements – Certain information set forth in this news release may contain forward-looking statements that involve substantial known and unknown risks and uncertainties. These forward-looking statements are subject to numerous risks and uncertainties, certain of which are beyond the control of Kesselrun, including, but not limited to the impact of general economic conditions, industry conditions, volatility of commodity prices, dependence upon regulatory approvals, the execution of definitive documentation, the availability of financing and exploration risk. Readers are cautioned that the assumptions used in the preparation of such information, although considered reasonable at the time of preparation, may prove to be imprecise and, as such, undue reliance should not be placed on forward-looking statements.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/90135

Categories
Junior Mining Rover Metals

Rover Provides Update on Phase 2 Exploration at Cabin Gold Project, NT, Canada

VANCOUVER, British Columbia, July 13, 2021 (GLOBE NEWSWIRE) — Rover Metals Corp. (TSXV: ROVR) (OTCQB: ROVMF) (FRA:4X0) (“Rover” or the “Company”) further to its release of June 8, 2021, announcing the start of its Phase 2 Exploration Program at its 100% owned Cabin Gold Project, Rover has now received its first batch of rush assays for diamond drill hole CL-21-10 and is reporting an average grade of 5.71 g/t Au over 3.4 meters (true width). The Company is still waiting on assays for over 10 meters of hole CL-21-10. The reported grades are 90% higher than historic hole DDH-88-61 that was drilled at a similar location in the Beaver Zone in the 1980s.

Sample #FromToInterval (m)Au g/t
V74921945.645.90.322.4
V74921745.946.40.55.4
V74922146.446.70.38.33
V74922246.747.20.51.43
V74922347.247.70.50.42
V74922447.748.20.51.45
V74922548.2490.87.3

The Beaver Zone
The current drill holes at the historic Beaver Zone are 400 meter step-out holes to the Arrow Zone (formerly the Cabin Lake Zone) that reported 32 meters of 13.6 g/t Au in Q4-2020, with >30% sulfides, resulting in the Arrow Zone ore shoot discovery. The preliminary results coming from the Beaver Zone show that high-grade gold continues to be associated with high sulfide values. The Company is also pleased to announce that the core logging of new drill hole CL-21-13 (assays still at lab) has reported >30% sulfides, shearing, and quartz flooding.

Judson Culter, CEO of Rover Metals states, “the Phase 2 Exploration Drill Program was planned to target historic zones on the Cabin Gold property that carried sulfide rich historic results. We’re very pleased that the preliminary results of our program at the historic Beaver Zone are proving that high-sulfides continue to be associated with high-grade gold. The fact that we continue to increase the average gold grades across the property shows the exploration potential of the Cabin Gold Project. Additionally, we’re reporting true width intercepts of 3.4 meters at hole CL-21-10 due to the angle of the sulfide intercepts. It’s still early in the program, and we remain very optimistic on defining an additional zone comparable to the Arrow Zone. The historic Andrew South Zone is also being targeted in this summer’s drill program.

Rover is holding an informative webinar to discuss its exploration program on July 22, 2021 at 11:00am PST (Vancouver time) hosted by RBMG. Please contact Paul Lampoutis plampoutis@rbmilestone.com if you wish to register for this event.”

Technical Information
Drill core is cut with half sent to ALS Global Laboratories (ALS) for crushing to <2 mm with 250 g split pulverized to -75 µm (200#). ALS is an ISO 17025 accredited laboratory. A 30g change is fire assayed and analysed using AAS finish for Gold. Select samples with visible gold or high-grade mineralization are assayed by metallic screen prep and fire assay on a 1 kg sample.

True thickness of the intervals reported herein have not been calculated, therefore, all intervals are reported as drill core intervals and should be considered apparent thicknesses. All historic and 2021 program gold averages are reported at weighed averages.

Technical information in this news release has been approved by Raul Sanabria, M.Sc., P.Geo., Technical Advisor and shareholder of Rover Metals Corp. and a Qualified Person for the purposes of National Instrument 43-101.

About Rover Metals
Rover is a precious metals exploration company specialized in North American precious metal resources, that is currently advancing the gold potential of its existing projects in the Northwest Territories of Canada (60th parallel). The Company has recently re-branded, and has a new corporate logo, and has updated the look and feel of its website, and corporate documents.

You can follow Rover on its social media channels:

Twitter: https://twitter.com/rovermetals

LinkedIn: https://www.linkedin.com/company/rover-metals/

Facebook: https://www.facebook.com/RoverMetals/

for daily company updates and industry news, and

YouTube: https://www.youtube.com/channel/UCJsHsfag1GFyp4aLW5Ye-YQ?view_as=subscriber

for corporate videos.

Website: https://www.rovermetals.com/

ON BEHALF OF THE BOARD OF DIRECTORS
“Judson Culter”
Chief Executive Officer and Director

For further information, please contact:
Fern Turner
Email: fern@rovermetals.com
Phone: +1 (778) 754-2617

Statement Regarding Forward-Looking Information
This news release contains statements that constitute “forward-looking statements”. Such forward-looking statements involve known and unknown risks, uncertainties and other factors that may cause Rover’s actual results, performance or achievements, or developments in the industry to differ materially from the anticipated results, performance or achievements expressed or implied by such forward-looking statements. Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by the words “expects,” “plans,” “anticipates,” “believes,” “intends,” “estimates,” “projects,” “potential” and similar expressions, or that events or conditions “will,” “would,” “may,” “could” or “should” occur. There can be no assurance that such statements be prove to be accurate. Actual results and future events could differ materially from those anticipated in such statements, and readers are cautioned not to place undue reliance on these forward-looking statements. Any factor could cause actual results to differ materially from Rover’s expectations. Rover undertakes no obligation to update these forward-looking statements in the event that management’s beliefs, estimates or opinions, or other factors, should change.

THE FORWARD-LOOKING INFORMATION CONTAINED IN THIS NEWS RELEASE REPRESENTS THE EXPECTATIONS OF THE COMPANY AS OF THE DATE OF THIS NEWS RELEASE AND, ACCORDINGLY, IS SUBJECT TO CHANGE AFTER SUCH DATE. READERS SHOULD NOT PLACE UNDUE IMPORTANCE ON FORWARD-LOOKING INFORMATION AND SHOULD NOT RELY UPON THIS INFORMATION AS OF ANY OTHER DATE. WHILE THE COMPANY MAY ELECT TO, IT DOES NOT UNDERTAKE TO UPDATE THIS INFORMATION AT ANY PARTICULAR TIME EXCEPT AS REQUIRED IN ACCORDANCE WITH APPLICABLE LAWS.

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OF THIS RELEASE.

Categories
Base Metals Energy Junior Mining Nevada Copper

Nevada Copper Announces Further Progress with Underground Operations and Strategic Project Development

July 12, 2021View PDF

Yerington, NV – July 12, 2021 – Nevada Copper Corp. (TSX: NCU) (OTC: NEVDF) (“Nevada Copper” or the “Company”) is pleased to provide an update regarding the ramp-up of the Underground Mine and development activities for the Open Pit project at its 100%-owned, fully-permitted Pumpkin Hollow Project in Nevada.

Production Ramp-Up Update

  • Safe and effective penetration of dike structure: The Company is in the process of safely completing the dike crossing. As reported on May 17, 2021, ground and hydrological conditions associated with the dike reduced development rates for a temporary period while traversing the dike to allow for grouting and ground control. With the completion of the dike crossing within the next two weeks, the Company expects to see lateral development rates increase back to planned rates this month.
  • Underground ventilation commissioned on-schedule: All underground ventilation fans were installed and commissioned during May, as planned. The final surface fans continue to be planned for delivery in Q3 2021 and commissioning in Q4 2021. Consequently, achievement of steady-state production continues to be expected in Q4 2021.
  • Successful completion of process plant C5 Testing: During June, Sedgman successfully completed C5 testing of the processing plant for grind size and moisture.

Mike Ciricillo, Nevada Copper’s Chief Executive Officer, stated:

“I am pleased with the continued progress with the ramp-up from Pumpkin Hollow. The safe penetration of the dike and commissioning of the underground ventilation system are significant de-risking steps and facilitate increasing development and production rates, as we progress to steady-state. The longer-term mine planning work being advanced indicates future potential upside for both Underground and Open Pit projects.”

Project Development

  • Underground Mine Planning supports potential for higher long-term production rates: As part of its project development objectives reported on March 1, 2021, the Company has progressed its life-of-mine planning aimed at operating its underground mine at an ultimate production rate in excess of the originally contemplated 5,000 tons per day rate. Mine planning work during Q2 2021 further supports the potential for the mine, once ramped-up to steady-state, to operate at higher long-term rates of 6,500 tons per day milled, increasing long-term annual copper production. This additional production capacity would also support accelerated mining of the significant additional underground copper resources that exist over and above the current underground reserve. Further engineering work will be undertaken during H2 2021 to support the potential for a higher long-term production rate from the underground operation.
  • Open Pit Solar Power Study indicates potential to further reduce Open Pit power costs: The Company has also progressed the planned feasibility studies for a potential solar project, with renewables consulting group Sprout Associates, with the following initial conclusions. Further updates will be provided upon completion of the next phase of study work:
    • Pumpkin Hollow benefits from ample sun and land to support a large solar project with the capacity to meet a significant portion of the Open Pit project’s power requirements;
    • The solar potential at the site is up to 200MW;
    • Already low grid power costs in Nevada could be materially further reduced through an on-site solar plant; and
    • A third-party solar project provides an option to remove upfront power infrastructure costs from the Open Pit project.

Balance Sheet Update

  • Further to the Company’s announcement on May 17, 2021, Pala Investments Limited has agreed to provide additional financing of US$25 million through a promissory note (in addition to the fully drawn existing US$30 million credit facility), providing additional liquidity for the ramp-up and addressing the reduced development rates associated with the dike grouting program. The Company has drawn US$15 million under the promissory note, with subsequent draws available at the Company’s option, subject to agreed use of proceeds. The promissory note has a maturity date of June 30, 2022 and bears interest at 8% per annum on amounts drawn. The promissory note was reviewed and approved by the independent members of the Company’s board of directors. In addition, US$9 million remains available to draw under the Company’s working capital facility with its offtake partner, Concord Resources Limited.
  • The Company has received proceeds of CAD$1.4 million for exercise of warrants so far in 2021. The Company has the potential to receive a further CAD$65 million of warrant proceeds should all the outstanding warrants expiring in January 2022 with an exercise price of CAD$0.20 (the “January 2022 Warrants”) be exercised prior to maturity. In addition to the January 2022 Warrants, a further CAD$34 million of warrant exercise proceeds may be received should the outstanding warrants expiring in July 2022 with an exercise price of CAD$0.22 be exercised in full prior to maturity.
  • The Company’s senior lender, KfW IPEX-Bank (“KfW”), has provided the Company with a 60-day extension to the project completion longstop date from June 30, 2021 to August 31, 2021, while the parties agree on a revised completion test and longstop date for the project. The Company will provide a further update once a revised project completion test and longstop date has been agreed with KfW. While the Company expects to agree on an appropriate revised date with KfW, there can be no assurance this will be achieved.
  • The Company continues to undertake near-term mine planning to incorporate the recent impact of the dike on development rates and other factors that have slowed the production ramp-up. It is possible that such mine plan updates may indicate higher operating costs and additional development capital and working capital requirements for the ramp-up than previously contemplated.

Qualified Persons

The information and data in this news release was reviewed by Greg French, C.P.G., and Norm Bisson, P.Eng., for Nevada Copper, who are non-independent Qualified Persons within the meaning of NI 43-101.

About Nevada Copper

Nevada Copper (TSX: NCU) is a copper producer and owner of the Pumpkin Hollow copper project. Located in Nevada, USA, Pumpkin Hollow has substantial reserves and resources including copper, gold and silver. Its two fully permitted projects include the high-grade Underground Mine and processing facility, which is now in the production stage, and a large-scale Open Pit project, which is advancing towards feasibility status.

NEVADA COPPER CORP.

www.nevadacopper.com

Mike Ciricillo, President and CEO

For further information contact:
Rich Matthews, Investor Relations
Integrous Communications
rmatthews@integcom.us
+1 604 757 7179

Cautionary Language

This news release includes certain statements and information that constitute forward-looking information within the meaning of applicable Canadian securities laws. All statements in this news release, other than statements of historical facts are forward-looking statements. Such forward-looking statements and forward-looking information specifically include, but are not limited to, statements that relate to mine development plans, production and ramp-up plans and the expected timing and results thereof, equipment installation, and further discussions with KfW.

Often, but not always, forward-looking statements and forward-looking information can be identified by the use of words such as “plans”, “expects”, “potential”, “is expected”, “anticipated”, “is targeted”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates”, or “believes” or the negatives thereof or variations of such words and phrases or statements that certain actions, events or results “may”, “could”, “would”, “might” or “will” be taken, occur or be achieved. Forward-looking statements or information are subject to known or unknown risks, uncertainties and other factors which may cause the actual results and events to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements or information.

Forward-looking statements or information are subject to a variety of risks and uncertainties which could cause actual events or results to differ from those reflected in the forward-looking statements or information, including, without limitation, risks and uncertainties relating to: the ability of the Company to complete the ramp-up of the Underground Mine within the expected cost estimates and timeframe; requirements for additional capital and no assurance can be given regarding the availability thereof; the impact of COVID-19 on the business and operations of the Company; the state of financial markets; history of losses; dilution; adverse events relating to milling operations, construction, development and ramp-up, including the ability of the Company to address underground development and process plant issues; ground conditions; cost overruns relating to development, construction and ramp-up of the Underground Mine; loss of material properties; interest rates increase; global economy; limited history of production; future metals price fluctuations; speculative nature of exploration activities; periodic interruptions to exploration, development and mining activities; environmental hazards and liability; industrial accidents; failure of processing and mining equipment to perform as expected; labor disputes; supply problems; uncertainty of production and cost estimates; the interpretation of drill results and the estimation of mineral resources and reserves; changes in project parameters as plans continue to be refined; possible variations in ore reserves, grade of mineralization or recovery rates from management’s expectations and the difference may be material; legal and regulatory proceedings and community actions; accidents; title matters; regulatory approvals and restrictions; increased costs and physical risks relating to climate change, including extreme weather events, and new or revised regulations relating to climate change; permitting and licensing; volatility of the market price of the Company’s securities; insurance; competition; hedging activities; currency fluctuations; loss of key employees; other risks of the mining industry as well as those risks discussed in the Company’s Management’s Discussion and Analysis in respect of the year ended December 31, 2020 and in the section entitled “Risk Factors” in the Company’s Annual Information Form dated March 18, 2021. Should one or more of these risks and uncertainties materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those described in forward-looking statements or information. The forward-looking information and statements are stated as of the date hereof. The Company disclaims any intent or obligation to update forward-looking statements or information except as required by law.

The Company provides no assurance that forward-looking statements and information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements and information.

Categories
Base Metals Junior Mining

Hot Chili Commences TSXV
Dual Listing Process

Hot Chili Limited (ASX: HCH) (OTCQB: HHLKF) (“Hot Chili” or “Company”) is pleased to announce its intention to list in Canada on the TSX Venture Exchange (TSXV) by end of 2021.

Hot Chili’s move to dual list in Canada is a key step toward the future funding and development of the Company’s large-scale Costa Fuego copper-gold project in Chile.

The Company has paid application fees, appointed legal advisors and commenced the formal application process for dual listing.

The Canadian market has a proven track record in supporting large-scale exploration and development companies in the copper and gold space with the transformative dual listings from Equinox Minerals (C$7.3Bn takeover by Barrick Gold Corp) and Andean Resources Limited (C$3.6Bn takeover by Goldcorp Inc) the stand-outs.

Costa Fuego’s current resource stands at 724Mt grading 0.48% CuEq for 3.5Mt CuEq metal (2.9Mt copper, 2.7Moz gold, 9.9Moz silver and 64kt molybdenum). Continued drilling success at the Company’s flagship Cortadera porphyry discovery looks set to deliver another significant resource upgrade this year.

A TSXV dual listing would position Hot Chili favourably amongst its Canadian peers which trade at significantly higher valuation multiples and who control the other leading copper developments in South America such as Marimaca Copper Corp. (Chile, TSXV:MARI), Filo Mining Corp. (Argentina, TSXV:FIL), Solaris Resources Inc (Ecuador, TSX: SLS), Josemaria Resources Inc. (Chile, TSX: JOSE) and SolGold Plc (Ecuador, TSX: SOLG).

The Directors look forward to announcing key advisory appointments in relation to its TSXV dual listing process.
A listing on the TSXV is subject to all necessary approvals of the TSXV, and there can be no guarantee that Hot Chili will be accepted for listing pending completion of the application process.

Further news flow is expected shortly, with three drill rigs in operation, pre-feasibility studies underway and multiple exploration programmes advancing across the Company’s Cortadera and Santiago Z coastal copper projects.

This announcement is authorised by the Board of Directors for release to ASX.

For more information please contact:

Christian Easterday
Managing Director
Tel: +618 9315 9009

Email: christian@hotchili.net.au

or visit Hot Chili’s website at www.hotchili.net.au

Figure 1 Location of Cortadera and Productora in relation to the coastal range infrastructure of Hot Chili’s combined Costa Fuego copper project, located 600km north of Santiago

Refer to ASX Announcement “Costa Fuego Becomes a Leading Global Copper Project” (12th October 2020) for JORC Table 1 information related to the Cortadera JORC compliant Mineral Resource estimate by Wood and the Productora re-stated JORC compliant Mineral Resource estimate by AMC Consultants

* Copper Equivalent (CuEq) reported for the resource were calculated using the following formula: CuEq% = ((Cu% × Cu price 1% per tonne × Cu_recovery)+(Mo ppm × Mo price per g/t × Mo_recovery)+(Au ppm × Au price per g/t × Au_recovery)+ (Ag ppm × Ag price per g/t × Ag_recovery)) / (Cu price 1% per tonne).  The Metal Prices applied in the calculation were: Cu=3.00 USD/lb, Au=1,550 USD/oz, Mo=12 USD/lb, and Ag=18 USD/oz.  For Cortadera (Inferred + Indicated), the average Metallurgical Recoveries were: Cu=83%, Au=56%, Mo=82%, and Ag=37%.  For Productora (Inferred + Indicated), the average Metallurgical Recoveries were: Cu=83%, Au=43% and Mo=42%.  For Costa Fuego (Inferred + Indicated), the average Metallurgical Recoveries were: Cu=83%, Au=51%, Mo=67% and Ag=23%. ** Reported on a 100% Basis – combining Cortadera and Productora Mineral Resources using a +0.25% CuEq reporting cut-off grade

Qualifying Statements

Independent JORC Code Costa Fuego Combined Mineral Resource (Reported 12th October 2020)

Reported at or above 0.25% CuEq*. Figures in the above table are rounded, reported to appropriate significant figures, and reported in accordance with the JORC Code – Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Metal rounded to nearest thousand, or if less, to the nearest hundred. * * Copper Equivalent (CuEq) reported for the resource were calculated using the following formula:: CuEq% = ((Cu% × Cu price 1% per tonne × Cu_recovery)+(Mo ppm × Mo price per g/t × Mo_recovery)+(Au ppm × Au price per g/t × Au_recovery)+ (Ag ppm × Ag price per g/t × Ag_recovery)) / (Cu price 1 % per tonne). The Metal Prices applied in the calculation were: Cu=3.00 USD/lb, Au=1,550 USD/oz, Mo=12 USD/lb, and Ag=18 USD/oz. For Cortadera (Inferred + Indicated), the average Metallurgical Recoveries were: Cu=83%, Au=56%, Mo=82%, and Ag=37%. For Productora (Inferred + Indicated), the average Metallurgical Recoveries were: Cu=83%, Au=43% and Mo=42%. For Costa Fuego (Inferred + Indicated), the average Metallurgical Recoveries were: Cu=83%, Au=51%, Mo=67% and Ag=23%.

** Note: Silver (Ag) is only present within the Cortadera Mineral Resource estimate

Competent Person’s Statement- Exploration Results
Exploration information in this Announcement is based upon work compiled by Mr Christian Easterday, the Managing Director and a full-time employee of Hot Chili Limited whom is a Member of the Australasian Institute of Geoscientists (AIG). Mr Easterday has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a ‘Competent Person’ as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’ (JORC Code). Mr Easterday consents to the inclusion in the report of the matters based on their information in the form and context in which it appears.


Competent Person’s Statement- Productora Mineral Resources
The information in this Announcement that relates to the Productora Project Mineral Resources, is based on information compiled by Mr N Ingvar Kirchner. Mr Kirchner is employed by AMC Consultants (AMC). AMC has been engaged on a fee for service basis to provide independent technical advice and final audit for the Productora Project Mineral Resource estimates. Mr Kirchner is a Fellow of the Australasian Institute of Mining and Metallurgy (AusIMM) and is a Member of the Australian Institute of Geoscientists (AIG). Mr Kirchner has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’ (the JORC Code 2012). Mr Kirchner consents to the inclusion in this report of the matters based on the source information in the form and context in which it appears.


Competent Person’s Statement- Cortadera and Costa Fuego Mineral Resources
The information in this report that relates to Mineral Resources for the Cortadera and combined Costa Fuego Project is based on information compiled by Elizabeth Haren, a Competent Person who is a Member and Chartered Professional of the Australasian Institute of Mining and Metallurgy and a Member of the Australian Institute of Geoscientists. Elizabeth Haren is employed as an associate Principal Geologist of Wood, who was engaged by Hot Chili Limited. Elizabeth Haren has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Elizabeth Haren consents to the inclusion in the report of the matters based on her information in the form and context in which it appears.

Reporting of Copper Equivalent
Copper Equivalent (CuEq) reported for the resource were calculated using the following formula: CuEq% = ((Cu% × Cu price 1% per tonne × Cu_recovery)+(Mo ppm × Mo price per g/t × Mo_recovery)+(Au ppm × Au price per g/t × Au_recovery)+ (Ag ppm × Ag price per g/t × Ag_recovery)) / (Cu price 1 % per tonne). The Metal Prices applied in the calculation were: Cu=3.00 USD/lb, Au=1,550 USD/oz, Mo=12 USD/lb, and Ag=18 USD/oz. For Cortadera (Inferred + Indicated), the average Metallurgical Recoveries were: Cu=83%, Au=56%, Mo=82%, and Ag=37%. For Productora (Inferred + Indicated), the average Metallurgical Recoveries were: Cu=83%, Au=43% and Mo=42%. For Costa Fuego (Inferred + Indicated), the average Metallurgical Recoveries were: Cu=83%, Au=51%, Mo=67% and Ag=23%.


Forward Looking Statements
This Announcement is provided on the basis that neither the Company nor its representatives make any warranty (express or implied) as to the accuracy, reliability, relevance or completeness of the material contained in the Announcement and nothing contained in the Announcement is, or may be relied upon as a promise, representation or warranty, whether as to the past or the future. The Company hereby excludes all warranties that can be excluded by law. The Announcement contains material which is predictive in nature and may be affected by inaccurate assumptions or by known and unknown risks and uncertainties and may differ materially from results ultimately achieved.


The Announcement contains “forward-looking statements”. All statements other than those of historical facts included in the Announcement are forward-looking statements including estimates of Mineral Resources. However, forward-looking statements are subject to risks, uncertainties and other factors, which could cause actual results to differ materially from future results expressed, projected or implied by such forward-looking statements. Such risks include, but are not limited to, copper, gold and other metals price volatility, currency fluctuations, increased production costs and variances in ore grade recovery rates from those assumed in mining plans, as well as political and operational risks and governmental regulation and judicial outcomes. The Company does not undertake any obligation to release publicly any revisions to any “forward-looking statement” to reflect events or circumstances after the date of the Announcement, or to reflect the occurrence of unanticipated events, except as may be required under applicable securities laws. All persons should consider seeking appropriate professional advice in reviewing the Announcement and all other information with respect to the Company and evaluating the business, financial performance and operations of the Company. Neither the provision of the Announcement nor any information contained in the Announcement or subsequently communicated to any person in connection with the Announcement is, or should be taken as, constituting the giving of investment advice to any person

To read the full announcement click on the below link.

Categories
Base Metals Energy Junior Mining Precious Metals

Group Ten Completes $6 Million Brokered Private Placement


Press Release


Corporate Presentation

https://youtu.be/zTf6Zj9V0XU

Michael Rowley, President and CEO, commented: “We are very pleased to report such strong interest in our 100%-owned Stillwater West project in Montana USA. The additional funding will accelerate and expand our 2021 field program which prioritizes drilling in the most advanced target areas where results are expected to provide the basis for a future update to the inaugural mineral resource estimate which is anticipated mid-2021. We are fully permitted for our planned multi-rig drill program and expanded geophysical survey and look forward to providing additional updates in the near term.”

FOR FURTHER INFORMATION, PLEASE CONTACT:

Michael Rowley, President, CEO & Director

Email: info@grouptenmetals.com             Phone: (604) 357 4790
Web: http://grouptenmetals.com             Toll Free: (888) 432 0075


Categories
Base Metals Energy Junior Mining Project Generators

Skyharbour Expands its Current Drill Program at its High-Grade Moore Uranium Project, Saskatchewan


Press Release


Corporate Presentation

https://youtu.be/Cgd8njEsfng

About Skyharbour Resources Ltd.:

Skyharbour holds an extensive portfolio of uranium exploration projects in Canada’s Athabasca Basin and is well positioned to benefit from improving uranium market fundamentals with six drill-ready projects covering over 240,000 hectares of land. Skyharbour has acquired from Denison Mines, a large strategic shareholder of the Company, a 100% interest in the Moore Uranium Project which is located 15 kilometres east of Denison’s Wheeler River project and 39 kilometres south of Cameco’s McArthur River uranium mine. Moore is an advanced stage uranium exploration property with high grade uranium mineralization at the Maverick Zone that returned drill results of up to 6.0% U3O8 over 5.9 metres including 20.8% U3Oover 1.5 metres at a vertical depth of 265 metres. The Company has plans for upcoming drill programs at the project.

Skyharbour has a joint-venture with industry-leader Orano Canada Inc. at the Preston Project whereby Orano has earned a 51% interest in the project through exploration expenditures and cash payments. Skyharbour now owns a 24.5% interest in the Project. Skyharbour also has a joint-venture with Azincourt Energy at the East Preston Project whereby Azincourt has earned a 70% interest in the project through exploration expenditures, cash payments and share issuance. Skyharbour now owns a 15% interest in the Project. Preston and East Preston are large, geologically prospective properties proximal to Fission Uranium’s Triple R deposit as well as NexGen Energy’s Arrow deposit.

The Company also owns a 100% interest in the South Falcon Uranium Project on the eastern perimeter of the Basin, which contains a NI 43-101 inferred resource totaling 7.0 million pounds of U3Oat 0.03% and 5.3 million pounds of ThO2 at 0.023%. Skyharbour has signed a Definitive Agreement with ASX-listed Valor Resources on the Hooke Lake (previously North Falcon Point) Uranium Project whereby Valor can earn-in 80% of the project through $3,500,000 in total exploration expenditures, $475,000 in total cash payments over three years and an initial share issuance.

Skyharbour’s goal is to maximize shareholder value through new mineral discoveries, committed long-term partnerships, and the advancement of exploration projects in geopolitically favourable jurisdictions.

Skyharbour’s Uranium Project Map in the Athabasca Basin:
http://skyharbourltd.com/_resources/maps/SYH-Athabasca-Map.jpg

To find out more about Skyharbour Resources Ltd. (TSX-V: SYH) visit the Company’s website at www.skyharbourltd.com.

For further information contact:
Spencer Coulter
Corporate Development and Communications
Skyharbour Resources Ltd.
Telephone: 604-687-3376
Toll Free: 800-567-8181
Email: info@skyharbourltd.com