Categories
Base Metals Energy Exclusive Interviews Junior Mining Precious Metals

Collective Mining – Discovers Long Gold Intersection of 2.68 G/T AuEq over 207.15 Meters

PRESS RELEASE:

Collective Mining Drills 207.15 Metres @ 2.68 AuEq at its Newly Discovered Apollo Target

Collective Mining Ltd.
Collective Mining Ltd.

Figure 1

Plan View of the Guayabales Project Highlighting the Apollo Target
Plan View of the Guayabales Project Highlighting the Apollo Target

Figure 2

Plan View of the Apollo Target Area Outlining the Porphyry and Breccia Targets, their Related Soil Anomalies and Drill Holes Completed or Currently Underway
Plan View of the Apollo Target Area Outlining the Porphyry and Breccia Targets, their Related Soil Anomalies and Drill Holes Completed or Currently Underway

Figure 3

Plan View With Drill Hole Traces of the Main Breccia Discovery Made at Apollo
Plan View With Drill Hole Traces of the Main Breccia Discovery Made at Apollo

Figure 4

Apollo Target Cross Section N-S with Core Photo Highlights for APC-2
Apollo Target Cross Section N-S with Core Photo Highlights for APC-2
  • APC-2 intersected a broad zone of high-grade breccia mineralization with overprinting carbonate base metal veins beginning at 100 metres below surface returning:
    • 207.15 metres @ 2.68 g/t gold equivalent
  • APC-1W also intersected the main breccia structure with overprinting veining but was stopped short of the final target depth in a post mineral dyke due to rig capacity limits yet still yielded:
    • 89.40 metres @ 2.46 g/t gold equivalent
  • Drilled dimensions of the Apollo target now measure 300 metres along strike by up to 100 metres across by 400 metres vertical and remains open in all directions

  • Assay results for drill holes APC-3 and APC-5 are expected in the near term. Both holes cut more than 200 metres of continuous mineralization in the main breccia body

TORONTO, Aug. 10, 2022 (GLOBE NEWSWIRE) — Collective Mining Ltd. (TSXV: CNL) (OTCQX: CNLMF) (“Collective” or the “Company”) is pleased to announce assay results from two additional holes completed at the Apollo target (“Apollo”) at the Company’s Guayabales project located in Caldas, Colombia. Apollo is a newly discovered high-grade copper-gold-silver porphyry-related breccia and is one of eight porphyry-related targets situated within a three-by-four-kilometre cluster area generated by the Company through grassroots exploration at the project. As part of its fully funded 20,000+ metre drill program for 2022, there are currently three diamond drill rigs operating at the Apollo target with an additional rig being mobilized to site to begin the Phase II program at the Olympus target in August 2022.

“With assay results in hand for three drill holes and visual observations from additional holes either recently completed or underway, it is becoming abundantly clear that we are dealing with a large mineralized system. Importantly, Apollo appears to be blessed with multiple pulses of fluids depositing metal into the system resulting in high-grade bulk drilling intervals. Our reconnaissance work in and around Apollo suggests we may only be on the tip of the iceberg in terms of understanding this system as our technical team believes that the main breccia discovery at Apollo may be the first in a series of porphyry and breccia discoveries in this area,” commented Ari Sussman, Executive Chairman.

A short video presented by Richard Tosdal and David Reading discussing the assay results and related drill core can be seen by clicking here.

Details (See Table 1 and Figures 1 – 4)

Three diamond drill holes with accompanying assay results confirm that the Apollo target has the potential to evolve into a significant high-grade, bulk tonnage mineralized system. New assay results for holes APC-2 and APC-1W are reported herein as follows:

  • APC-2:
        207.15 metres @ 2.68 g/t AuEq from 154.5 metres down hole (100m vertical) including
        17.40 metres @ 7.33 g/t AuEq from 192.5 metres down hole and
        20.95 metres @ 5.21 g/t AuEq from 270.6 metres down hole.

APC-2 is the first hole drilled from a newly constructed pad located approximately 200 metres to the southeast of the initial pad from which drill holes APC-1 and APC-1W were drilled. APC-2 was drilled orthogonal to APC-1 and APC-1W and intersected bulk mineralization hosted within porphyry related breccia with overprinting carbonate base metal veins (“CBM”).

  • APC-1W:
        89.40 metres @ 2.46 g/t AuEq from 293 metres down hole (175m vertical) including
        19.35 metres @ 3.87 g/t AuEq from 93.8 metres down hole and
        15.30 metres @ 2.31 g/t AuEq from 164.36 metres down hole.

APC-1W was drilled as a wedge hole from discovery hole APC-1 to the east and at a steeper inclination. The hole was stopped short of the target depth in a post-mineral dyke due to rig capacity issues. The hole was expected to re-enter the main mineralized breccia after clearing the dyke and extend the zone further to the south. Future drilling will test the area south of APC-1W to determine if mineralization extends beyond the post-mineral dyke in this location.

  • Mineralization is remarkably continuous along the axis of both intercepts and is hosted within an angular breccia with a sulphide matrix consisting of chalcopyrite (Cu), pyrite and pyrrhotite. Additionally, overprinting carbonate base metal porphyry veins flood the breccia matrix in various locations along the mineralized interval yielding the higher-grade intercepts in both holes. The breccia clasts are all quartz diorite and diorite in composition and this hydrothermal system is clearly linked to a porphyry system.
  • APC-2 was drilled perpendicular to APC-1W and has extended the mineralized breccia at least 200 metres to the northeast and 100 metres to the southwest. Two further holes, APC-3 and APC-5 have been completed with more than 200 metres of favorable mineralization intersected in both holes. Assay results for APC-3 and APC-5 are anticipated the near term.
  • Assay results and visual observation from all holes completed to date confirm that the main mineralized breccia has a minimum strike length of 300 metres in a northeast-southwest direction, is up to 100 metres thick and extends to at least 400 metres vertically below surface. The target remains open in all directions for expansion.
  • The Apollo target area, as defined to date by surface mapping, rock sampling and copper and molybdenum soil geochemistry, covers an 800 metre X 700 metre area. The Apollo target area hosts the Company’s new grassroots main breccia discovery plus additional yet untested breccia, porphyry and vein targets. The Apollo target area also remains open for further expansion.

Table 1: Assays Results

HoleI DFrom (m)To (m)Intercept (m)**Au (g/t)Ag (g/t)Cu %Zn %Pb %Mo %AuEq (g/t)*
APC1-W293382.489.400.89580.390.070.060.0012.46
Incl296.6315.919.351.041280.530.130.120.0013.87
 367.1382.415.301.90160.140.010.000.0012.31
APC-2154.7361.9207.151.46450.310.0750.050.0022.68
Incl192.5209.917.406.57440.080.2850.230.0037.33
 270.6291.620.953.67680.410.0340.030.0025.21

*AuEq (g/t) is calculated as follows: (Au (g/t) x 0.95) + (Ag g/t x 0.014 x 0.95) + (Cu (%) x 1.96 x 0.95) + (Mo (%) x 7.35 x 0.95)+(Zn(%)x 0.86 x 0.95)+ (Pb(%)x 0.44 x 0.95) utilizing metal prices of Cu – US$4.00/lb, Mo – US$15.00/lb, Zn – US$1.75/lb, Pb – US$0.9/lb, Ag – $20/oz and Au – US$1,400/oz and recovery rates of 95% for Au, Ag, Cu, Mo, Zn and Mo. Recovery rate assumptions are speculative as no metallurgical work has been completed to date.
** A 0.4 g/t AuEq cut-off grade was employed with no more than 10% internal dilution. True widths are unknown, and grades are uncut.

Figure 1: Plan View of the Guayabales Project Highlighting the Apollo Target
https://www.globenewswire.com/NewsRoom/AttachmentNg/748c2e74-07e0-4a35-bb4e-a498f2c48301

Figure 2: Plan View of the Apollo Target Area Outlining the Porphyry and Breccia Targets, their Related Soil Anomalies and Drill Holes Completed or Currently Underway
https://www.globenewswire.com/NewsRoom/AttachmentNg/69495b4e-a5c4-43bf-b978-9832ff92fa42

Figure 3: Plan View With Drill Hole Traces of the Main Breccia Discovery Made at Apollo
https://www.globenewswire.com/NewsRoom/AttachmentNg/8997b6cb-6594-48cd-8b7d-aa60fdeec92a

Figure 4: Apollo Target Cross Section N-S with Core Photo Highlights for APC-2
https://www.globenewswire.com/NewsRoom/AttachmentNg/b5bd44e2-8754-4913-a727-ab5e97711d93

About Collective Mining Ltd.

Twitter: @CollectiveMini1
Instagram: CollectiveMining
LinkedIn: Collective Mining
Facebook: Collective Mining Colombia

To see our latest corporate presentation, please visit www.collectivemining.com

Collective Mining is an exploration and development company focused on identifying and exploring prospective mineral projects in South America. Founded by the team that developed and sold Continental Gold Inc. to Zijin Mining for approximately $2 billion in enterprise value, the mission of the Company is to repeat its past success in Colombia by making significant new mineral discoveries and advance the projects to production. Management, insiders and close family and friends own nearly 45% of the outstanding shares of the Company and as a result, are fully aligned with shareholders.

The Company currently holds an option to earn up to a 100% interest in two projects located in Colombia. As a result of an aggressive exploration program on both the Guayabales and San Antonio projects, a total of eight major targets have been defined. The Company has made significant grassroot discoveries at both projects with near-surface discovery holes at the Guayabales project yielding 302 metres at 1.11 g/t AuEq at the Olympus target, 163 metres at 1.3 g/t AuEq at the Donut target and recently, at the Apollo target, 207.15 metres at 2.68 g/t AuEq, 89.4 metres at 2.46 g/t AuEg and 87.8 metres at 2.49 g/t AuEg. At the San Antonio project, the Company intersected, from surface, 710 metres at 0.53 AuEq. (See related press releases on our website for AuEq calculations)

Qualified Person (QP) and NI43-101 Disclosure

David J Reading is the designated Qualified Person for this news release within the meaning of National Instrument 43-101 (“NI 43-101”) and has reviewed and verified that the technical information contained herein is accurate and approves of the written disclosure of same. Mr. Reading has an MSc in Economic Geology and is a Fellow of the Institute of Materials, Minerals and Mining and of the Society of Economic Geology (SEG).

Technical Information

Rock and core samples have been prepared and analyzed at SGS laboratory facilities in Medellin, Colombia and Lima, Peru. Blanks, duplicates, and certified reference standards are inserted into the sample stream to monitor laboratory performance. Crush rejects and pulps are kept and stored in a secured storage facility for future assay verification. No capping has been applied to sample composites. The Company utilizes a rigorous, industry-standard QA/QC program.

Contact Information

Collective Mining Ltd. 
Steven Gold, Vice President, Corporate Development and Investor Relations
Tel. (416) 648-4065

FORWARD-LOOKING STATEMENTS

This news release contains certain forward-looking statements, including, but not limited to, statements about the drill programs, including timing of results, and Collective’s future and intentions. Wherever possible, words such as “may”, “will”, “should”, “could”, “expect”, “plan”, “intend”, “anticipate”, “believe”, “estimate”, “predict” or “potential” or the negative or other variations of these words, or similar words or phrases, have been used to identify these forward-looking statements. These statements reflect management’s current beliefs and are based on information currently available to management as at the date hereof.

Forward-looking statements involve significant risk, uncertainties, and assumptions. Many factors could cause actual results, performance, or achievements to differ materially from the results discussed or implied in the forward-looking statements. These factors should be considered carefully, and readers should not place undue reliance on the forward-looking statements. Although the forward-looking statements contained in this news release are based upon what management believes to be reasonable assumptions, Collective cannot assure readers that actual results will be consistent with these forward-looking statements. These forward-looking statements are made as of the date of this news release, and Collective assumes no obligation to update or revise them to reflect new events or circumstances, except as required by law.

Neither the TSXV nor its Regulation Services Provider (as that term is defined in the policies of the TSXV) accepts responsibility for the adequacy or accuracy of this news release.

Categories
Junior Mining Precious Metals

Goldshore Intercepts 2.65 g/t Au over 14.6m in 200 m Step-Out Hole at Moss Lake

Vancouver, British Columbia–(Newsfile Corp. – August 10, 2022) – Goldshore Resources Inc. (TSXV: GSHR) (OTCQB: GSHRF) (FSE: 8X00) (“Goldshore” or the “Company“), is pleased to announce assay results from its ongoing 100,000-meter drill program at the Moss Lake Project in Northwest Ontario, Canada (the “Moss Lake Gold Project“).

Highlights:

  • Four holes drilled to evaluate the eastern extension of the Southwest Zone have confirmed gold mineralization within anastomosing shears in altered diorite with intercepts of:
    • 39.75m @ 1.18 g/t Au from 44.25m depth in MMD-22-023, including
      • 14.60m @ 2.65 g/t Au from 462.2m 
    • 11.65m @ 1.05 g/t Au from 37.35m depth, and
    • 18.70m @ 1.37 g/t Au from 151.1m in MMD-22-031
    • 10.00m @ 1.05 g/t Au from 290.0m in MMD-22-035

President and CEO Brett Richards stated: “We are excited to continue to deliver consistent drilling results. I am encouraged about the high-grade sections we are seeing and have shared previously with the market, as this will provide optionality when we model the resource later in the year and start to look at economic pit shells. With this step out hole from historically drilled areas at Moss Lake, it will further increase the optionality.”

Technical Overviewhttps://embed.fireplace.yahoo.com/embed?ctrl=Monalixa&m_id=monalixa&m_mode=document&site=sports&os=android&pageContext=%257B%2522ctopid%2522%253A%25221542500%253B1577000%253B1580500%2522%252C%2522hashtag%2522%253A%25221542500%253B1577000%253B1580500%2522%252C%2522lmsid%2522%253A%2522a0V0W00000HOPDcUAP%2522%252C%2522revsp%2522%253A%2522newsfile_64%2522%252C%2522lpstaid%2522%253A%252252ed9616-6bdd-3e2e-8c5d-430b03b8b1a6%2522%252C%2522pageContentType%2522%253A%2522story%2522%257D

Table 1 shows the significant intercepts. Table 2 and Figure 1 show the drill hole locations.

Table 1: Significant downhole gold intercept

HOLE IDFROMTO
LENGTH
(m)
 
TRUE
WIDTH (m)

CUT
GRADE 
(g/t Au)

UNCUT
GRADE 
(g/t Au)
MMD-22-023375.95379.303.352.50.370.37
440.25502.1061.8549.40.840.88
Including440.25480.0039.7531.71.181.24
Including462.20476.8014.6011.72.652.83
and490.35502.1011.759.60.320.32
527.00529.002.001.70.360.36
565.40584.3518.9516.20.320.32
       
MMD-22-02722.8028.005.203.30.760.76
42.0048.006.003.90.540.54
58.6082.0023.4015.70.370.37
95.10220.00124.9091.30.480.48
including171.50175.453.952.92.602.60
and207.00210.653.652.83.263.26
260.00262.702.702.20.460.46
305.65314.008.356.90.420.42
336.10351.2015.1012.90.470.47
375.15379.554.403.90.320.32
386.00394.008.007.10.560.56
       
MMD-22-03115.5064.3048.8033.30.610.61
including25.0029.004.002.71.431.43
and37.3549.0011.657.91.051.05
74.4580.005.553.91.761.76
91.95174.4582.5060.30.660.66
including106.80112.806.004.31.301.30
and151.10169.8018.7013.91.371.37
193.00200.007.005.40.380.38
212.00231.6019.6015.40.370.37
including214.00216.002.001.61.911.91
273.00275.102.101.70.490.49
       
MMD-22-03583.3087.003.702.50.380.38
92.00111.0019.0013.00.490.49
135.80138.002.201.50.610.61
156.00166.0010.007.30.560.56
184.75322.40137.65109.90.370.37
including196.00201.005.003.81.301.30
and290.00300.0010.008.31.051.05
332.85355.5522.7019.70.470.47
including332.85338.005.154.41.371.37
366.00375.559.558.40.350.35
415.00435.0020.0018.10.460.46
470.00476.106.105.71.031.03
498.25514.9516.7015.80.400.40
538.00542.004.003.80.830.83
including540.00542.002.001.91.231.23
Intersections calculated above a 0.3 g/t Au cut off with a top cut of 30 g/t Au and a maximum internal waste interval of 10 metres. Shaded intervals are intersections calculated above a 1.0 g/t Au cut off. Intervals in bold are those with a grade thickness factor exceeding 20 gram x metres / tonne gold. True widths are approximate and assume a subvertical body. The fact that cut and uncut assays are the same, shows that all samples assayed less than the 30 g/t Au top cut.



Figure 1: Drill plan showing the drill holes relative to the 2013 resource model and the new parallel zones

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8051/133310_7659ee27e47ab9b1_002full.jpg

Table 2: Location of drill holes in this press release

HOLEEASTNORTHRLAZIMUTHDIPEOH
MMD-22-0236683005378663433135°-50°643.8m
MMD-22-0276684755378300438150°-50°494.0m
MMD-22-0316685005378300439120°-50°521.0m
MMD-22-0356684005378387479150°-50°623.05m
Approximate collar coordinates in NAD 83, Zone 15N

Results have been received for four holes that have tested the previously undrilled eastern extension of the Southwest Zone. They show that mineralization is continuous in several structurally-controlled zones. The Southwest Zone remains open in both the east and west directions.

These holes intersected several broad zones of low-grade mineralization within the altered diorite intrusion host. Examples include 61.85m @ 0.84 g/t Au from 440.25m in MMD-22-023; 124.9m @ 0.48 g/t Au from 95.1m in MMD-22-027; 64.3m @ 0.61 g/t Au from 15.5m and 82.5m @ 0.66 g/t Au from 91.95m in MMD-22-031; and 137.65m @ 0.37 g/t Au from 184.75m in MMD-22-035 among several 10-20 meter wide zones of low-grade gold mineralization throughout all holes.

All of these low-grade zones occur as envelopes to higher-grade structures. An analysis of oriented core by structural geologist, Dr. Brett Davis, confirmed that these form a three-dimensional, anastomosing shear network that has developed in response to strain on the altered diorite intrusion. Results include the broad zones of +1 g/t Au mineralization shown in the highlights (e.g., 39.75m @ 1.18 g/t Au from 440.25m in MMD-22-023) and several narrow high-grade intervals, including 0.8m @ 33.3 g/t Au from 462.2m in MMD-22-023; 0.3m @ 14.3 g/t Au from 172.3m in MMD-22-027; and 0.65m @ 15.5 g/t Au from 167.35m in MMD-22-031.

Pete Flindell, VP Exploration for Goldshore, said, “These drill results confirm the potential of the Moss Lake Gold Project. Drilling to test potential expansions to these parallel zones of mineralization will continue into the end of the year.”

Analytical and QA/QC Procedures

All samples were sent to ALS Geochemistry in Thunder Bay for preparation and analysis was performed in the ALS Vancouver analytical facility. ALS is accredited by the Standards Council of Canada (SCC) for the Accreditation of Mineral Analysis Testing Laboratories and CAN-P-4E ISO/IEC 17025. Samples were analyzed for gold via fire assay with an AA finish (“Au-AA23”) and 48 pathfinder elements via ICP-MS after four-acid digestion (“ME-MS61”). Samples that assayed over 10 ppm Au were re-run via fire assay with a gravimetric finish (“Au-GRA21”).

In addition to ALS quality assurance / quality control (“QA/QC”) protocols, Goldshore has implemented a quality control program for all samples collected through the drilling program. The quality control program was designed by a qualified and independent third party, with a focus on the quality of analytical results for gold. Analytical results are received, imported to our secure on-line database and evaluated to meet our established guidelines to ensure that all sample batches pass industry best practice for analytical quality control. Certified reference materials are considered acceptable if values returned are within three standard deviations of the certified value reported by the manufacture of the material. In addition to the certified reference material, certified blank material is included in the sample stream to monitor contamination during sample preparation. Blank material results are assessed based on the returned gold result being less than ten times the quoted lower detection limit of the analytical method. The results of the on-going analytical quality control program are evaluated and reported to Goldshore by Orix Geoscience Inc.

About Goldshore

Goldshore is an emerging junior gold development company, and owns the Moss Lake Gold Project located in Ontario. Wesdome is currently a large shareholder of Goldshore with an approximate 27% equity position in the Company. Well-financed and supported by an industry-leading management group, board of directors and advisory board, Goldshore is positioned to advance the Moss Lake Gold Project through the next stages of exploration and development.

About the Moss Lake Gold Project

The Moss Lake Gold Project is located approximately 100 km west of the city of Thunder Bay, Ontario. It is accessed via Highway 11 which passes within 1 km of the property boundary to the north. The Moss Lake Gold Project covers 14,292 hectares and consists of 282 unpatented and patented mining claims.

The Moss Lake Gold Project hosts a number of gold and base metal rich deposits including the Moss Lake Deposit, the East Coldstream Deposit (Table 3), the historically producing North Coldstream Mine (Table 4), and the Hamlin Zone, all of which occur over a mineralized trend exceeding 20 km in length. A historical preliminary economic assessment (the “Moss Lake Historical Estimate“) was completed on the Moss Lake Gold Project in 2013 and published by Moss Lake Gold Mines Ltd. (“Moss Lake Gold Mines“)1,3. A historical mineral resource estimate (the “East Coldstream Historical Estimate“) was completed on the East Coldstream Deposit in 2011 by Foundation Resources Inc.2,3 In addition to these zones, the Moss Lake Gold Project also hosts a number of under-explored mineral occurrences which are reported to exist both at surface and in historically drilled holes. The Moss Lake Deposit is a shear-hosted disseminated-style gold deposit which outcrops at surface. It has been drilled over a 2.5 km length and to depths of 300 m with 376 holes completed between 1983 and 2017. The last drilling program conducted in 2016 and 2017 by Wesdome Gold Mines Ltd. (“Wesdome“), which consisted of widely spaced holes along the strike extension of the deposit was successful in expanding the mineralized footprint and hydrothermal system 1.6 km to the northeast. Additionally, the deposit remains largely open to depth. In 2017, Wesdome completed an induced polarization survey which traced the potential extensions of pyrite mineralization associated with the Moss Lake Deposit over a total strike length of 8 km and spanning the entire extent of the survey grids.

The East Coldstream Deposit is a shear-hosted disseminated-style gold deposit which locally outcrops at surface. It has been drilled over a 1.3 km length and to depths of 200 m with 138 holes completed between 1988 and 2017. The deposit remains largely open at depth and may have the potential for expansion along strike. Historic drill hole highlights from the East Coldstream Deposit include 4.86 g/t Au over 27.3 m in C-10-15.

The historically producing North Coldstream Mine is reported to have produced significant amounts of copper, gold and silver4 from mineralization with potential iron-oxide-copper-gold deposit style affinity. The exploration potential immediately surrounding the historic mining area is not currently well understood and historic data compilation is required.

The Hamlin Zone is a significant occurrence of copper and gold mineralization, and also of potential iron-oxide-copper-gold deposit style affinity. Between 2008 and 2011, Glencore tested Hamlin with 24 drill holes which successfully outlined a broad and intermittently mineralized zone over a strike length of 900 m. Historic drill hole highlights from the Hamlin Zone include 0.9 g/t Au and 0.35% Cu over 150.7 m in HAM-11-75.

The Moss Lake, East Coldstream and North Coldstream deposits sit on a mineral trend marked by a regionally significant deformation zone locally referred to as the Wawiag Fault Zone in the area of the Moss Lake Deposit. This deformation zone occurs over a length of approximately 20 km on the Moss Lake Gold Project and there is an area spanning approximately 7 km between the Moss Lake and East Coldstream deposits that is significantly underexplored.

Table 3: Historical Mineral Resources1,2,3

INDICATEDINFERRED
DepositTonnesAu g/tAu ozTonnesAu g/tAu oz
Moss Lake Historical Estimate
Open Pit Potential39,795,0001.11,377,30048,904,0001.01,616,300
Underground Potential1,461,1002.9135,400
Moss Lake Total39,795,0001.11,377,30050,364,0001.11,751,600
East Coldstream Historical Estimate
East Coldstream Total3,516,7000.8596,40030,533,0000.78763,276
Combined Total43,311,7001.081,473,70080,897,0000.982,514,876


Notes:

(1) Source: Poirier, S., Patrick, G.A., Richard, P.L., and Palich, J. “Technical Report and Preliminary Economic Assessment for the Moss Lake Project”, prepared for Moss Lake Gold Mines Ltd. The qualified persons for the Moss Lake Historical Estimate are Pierre-Luc Richard, MSc, PGeo (InnovExplo Inc), and Carl Pelletier, BSc, PGeo (InnovExplo Inc), and the effective date of the Moss Lake Historical Estimate is February 8, 2013. In-Pit results are presented undiluted and in situ, within Whittle-optimized pit shells. Underground results are presented undiluted and in situ, outside Whittle-optimized pit shells. The Moss Lake Historical Estimate includes 18 gold-bearing zones and 1 envelope containing isolated gold intercepts. Whittle parameters: mining cost = C$2.28; pit slope angle = 50.0 degrees; production cost = C$9.55; mining Dilution = 5%; mining recovery = 95%; processing recovery = 80% to 85%; gold price = C$1,500. In-Pit and Underground resources were compiled at cut-off grades from 0.3 to 5.0 g/t Au (for sensitivity characterization). A cut-off grade of 0.5 g/t Au was selected as the official in-pit cut-off grade and a cut-off grade of 2.0 g/t Au was selected as the official underground cut-off grade. The Moss Lake Historical Estimate is based on 352 diamond drill holes (90,978 m) drilled from 1983 and 2008. A fixed density of 2.78 g/cm3 was used. A minimum true thickness of 5.0 m was applied, using the grade of the adjacent material when assayed or a value of zero when not assayed. Capping was established at 35 g/t Au, supported by statistical analysis and the high grade distribution within the deposit. Compositing was done on drill hole sections falling within the mineralized zone solids (composite = 1 m). Resources were evaluated from drill hole samples using the ID2 interpolation method in a multi-folder percent block model using Gems version 6.4. Based on geostatistics, the ellipse range for interpolation was 75m x 67.5m x 40m. The Indicated category is defined by combining the blocks within the two main zones and various statistical criteria, such as average distance to composites, distance to closest composite, quantity of drill holes within the search area. Ounce (troy) = metric tons x grade / 31.10348. Calculations used metric units (metres, tonnes and g/t). The number of metric tonnes was rounded to the nearest thousand. Any discrepancies in the totals are due to rounding effects; rounding followed the recommendations in NI 43-101.

(2) Source: McCracken, T. “Technical Report and Resource Estimate on the Osmani Gold Deposit, Coldstream Property, Northwestern Ontario”, prepared for Foundation Resources Inc. and Alto Ventures Ltd. The East Coldstream Historical Estimate is based on a 0.4 g/t Au cut-off grade. The qualified persons for the East Coldstream Historical Estimate are Todd McCracken, P.Geo. (Tetratech Wardrop), and Jeff Wilson, Ph.D., P.Geo. (Tetratech Wardrop), and the effective date of the East Coldstream Historical Estimate is December 12, 2011. Resources are presented unconstrained, undiluted and in situ. The East Coldstream Historical Estimate includes 2 gold-bearing zones. A cut-off grade of 0.4 g/t Au was selected as the official resource cut-off grade. The East Coldstream Historical Estimate is based on 116 diamond drill holes drilled from 1986 to 2011. A fixed density of 2.78 g/cm3 was used. Capping was established at 5.89 g/t Au and 5.70 g/t Au for domains EC-1 and EC-2, respectively. This is supported by statistical analysis and the high grade distribution within the deposit. Compositing was done on drill hole sections falling within the mineralized zone solids (composite = 1 m). Resources were evaluated from drill hole samples using the ID2 interpolation method in a multi-folder percent block model using Datamine Studio 3 version 3.20.5321.0. Recource categorization is based on spatial continuity based from the variography of the assays within the drillholes. Ounce (troy) = metric tons x grade / 31.10348. Calculations used metric units (metres, tonnes and g/t). The number of metric tonnes was rounded to the nearest thousand. Any discrepancies in the totals are due to rounding effects; rounding followed the recommendations in NI 43-101.

(3) The reader is cautioned that the Moss Lake Historical Estimate East and the East Coldstream Historical Estimate (the “Historical Estimates“) are considered historical in nature and as such is based on prior data and reports prepared by previous property owners. The reader is cautioned not to treat them, or any part of them, as current mineral resources or reserves. The Company has determined these historical resources are reliable, and relevant to be included here in that they demonstrate simply the mineral potential of the Moss Lake Gold Project. A qualified person has not done sufficient work to classify the Historical Estimates as current resources and Goldshore is not treating the Historical Estimates as current resources. Significant data compilation, re-drilling, re-sampling and data verification may be required by a qualified person before the Historical Estimates can be classified as a current resource. There can be no assurance that any of the historical mineral resources, in whole or in part, will ever become economically viable. In addition, mineral resources are not mineral reserves and do not have demonstrated economic viability. Even if classified as a current resource, there is no certainty as to whether further exploration will result in any inferred mineral resources being upgraded to an indicated or measured mineral resource category. The Historical Estimates relating to inferred mineral resources were calculated using prior mining industry standard definitions and practices for estimating mineral resource and mineral reserves. Such prior definitions and practices were utilized prior to the implementation of the current standards of the Canadian Institute of Mining for mineral resource estimation, and have a lower level of confidence.

Table 4: Reported Historical Production from the North Coldstream Deposit4

DepositTonnesCu %Au g/tAgCu lbsAu ozAg oz
Historical Production2,700,00001.890.565.59102,000,00044,000440,000


Note:

(4) Source: Schlanka, R., 1969. Copper, Nickel, Lead and Zinc Deposits of Ontario, Mineral Resources Circular No. 12, Ontario Geological Survey, pp. 314-316.

Peter Flindell, P.Geo., MAusIMM, MAIG, Vice President – Exploration of the Company, a qualified person under NI 43-101 has approved the scientific and technical information contained in this news release.

Neither the TSXV nor its Regulation Services Provider (as that term is defined in the policies of the TSXV) accepts responsibility for the adequacy or accuracy of this release.

For More Information – Please Contact:

Brett A. Richards
President, Chief Executive Officer and Director
Goldshore Resources Inc.

P. +1 604 288 4416
M. +1 905 449 1500
E. brichards@goldshoreresources.com
W. www.goldshoreresources.com

Facebook: GoldShoreRes | Twitter: GoldShoreRes | LinkedIn: goldshoreres

Cautionary Note Regarding Forward-Looking Statements

This news release contains statements that constitute “forward-looking statements.” Such forward looking statements involve known and unknown risks, uncertainties and other factors that may cause the Company’s actual results, performance or achievements, or developments to differ materially from the anticipated results, performance or achievements expressed or implied by such forward-looking statements. Forward looking statements are statements that are not historical facts and are generally, but not always, identified by the words “expects,” “plans,” “anticipates,” “believes,” “intends,” “estimates,” “projects,” “potential” and similar expressions, or that events or conditions “will,” “would,” “may,” “could” or “should” occur.

Forward-looking statements in this news release include, among others, statements relating to expectations regarding the exploration and development of the Moss Lake Gold Project, and other statements that are not historical facts. By their nature, forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause our actual results, performance or achievements, or other future events, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. Such factors and risks include, among others: the Company may require additional financing from time to time in order to continue its operations which may not be available when needed or on acceptable terms and conditions acceptable; compliance with extensive government regulation; domestic and foreign laws and regulations could adversely affect the Company’s business and results of operations; the stock markets have experienced volatility that often has been unrelated to the performance of companies and these fluctuations may adversely affect the price of the Company’s securities, regardless of its operating performance; and the impact of COVID-19.

The forward-looking information contained in this news release represents the expectations of the Company as of the date of this news release and, accordingly, is subject to change after such date. Readers should not place undue importance on forward-looking information and should not rely upon this information as of any other date. The Company undertakes no obligation to update these forward-looking statements in the event that management’s beliefs, estimates or opinions, or other factors, should change.

This news release does not constitute an offer to sell, or a solicitation of an offer to buy, any securities in the United States. The securities have not been and will not be registered under the United States Securities Act of 1933, as amended (the “U.S. Securities Act”) or any state securities laws and may not be offered or sold within the United States or to U.S. Persons unless registered under the U.S. Securities Act and applicable state securities laws or an exemption from such registration is available.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/133310

Categories
Base Metals Junior Mining Precious Metals

Stuhini Exploration LTD. Closes First Tranche of Private Placement

Vancouver, British Columbia – August 4, 2022 ‑ Stuhini Exploration Ltd. (the “Company” or “Stuhini”) (TSX-V: STU and OTCPK: STXPF) is pleased to announce that it has closed the first tranche of its non-brokered private placement (the “Private Placement”) previously announced on August 2, 2022 for aggregate gross proceeds to the Company of $1,026,125.

Under the first tranche of the Private Placement, the Company has issued a total of 2,142,500 flow-through units of the Company (“FT Units”) at a price of $0.45 per FT Unit (the “FT Unit Offering”) for total gross proceeds to the Company of $964,125. Each FT Unit consists of one (1) flow-through common share of the Company and one half (1/2) of one common share purchase warrant (each whole warrant, an “FT Warrant”). The FT Units will qualify as “flow-through shares” for the purposes of the Income Tax Act (Canada) (the “Tax Act”). Each FT Warrant will entitle the holder thereof to acquire one common share in the capital of the Company (each, a “Common Share”) at a price of $0.60 per Common Share for a period of two years from the date of issuance.

The aggregate gross proceeds from the FT Unit Offering will be used to incur “Canadian exploration expenses” which qualify as “flow-through mining expenditures” (within the meaning of the Tax Act) (“Qualifying Expenditures”) in order to fund exploration programs on Stuhini’s Ruby Creek Project and Big Ledge Project which are located in British Columbia. The Company will renounce these expenses to the purchasers with an effective date of not later than December 31, 2022.

The Company also issued a total of 155,000 non-flow through units of the Company (“NFT Units”) at a price of $0.40 per NFT Unit (the “NFT Unit Offering”) for total gross proceeds to the Company of $62,000. Each NFT Unit consists of one Common Share and one-half of one common share purchase warrant (each whole warrant, an “NFT Warrant”). Each NFT Warrant will entitle the holder thereof to acquire one Common Share at a price of $0.60 per Common Share for a period of two years from the date of issuance.

The aggregate gross proceeds from the NFT Unit Offering will be used to fund exploration programs on the Company’s other mineral properties, including the Que Project in the Yukon Territory, the South Thompson Nickel project in Manitoba, and any additional exploration projects acquired or staked in the United States through the Company’s wholly owned subsidiary, Arizada Metals Corp, as well as general and administrative expenses.

In connection with the closing of the first tranche of the Private Placement, the Company paid finders’ fees of $43,200 to Mine Equities Ltd. (“Mine Equities”) representing 6% of the proceeds raised from the sale of FT Units placed by Mine Equities.

A certain insider of the Company purchased a total of 60,000 NFT Units under the first tranche of the Private Placement. The issuance of securities to such person is considered to be a “related party transaction” within the meaning of TSX Venture Exchange (“TSXV”) Policy 5.9 and Multilateral Instrument 61-101 – Protection of Minority Security Holders in Special Transactions (“MI 61‑101”) adopted in the Policy. The Company intends to rely on the exemptions from the formal valuation and minority shareholder approval requirements of MI 61‑101 contained in sections 5.5(a) and 5.7(1)(a) of MI 61‑101 in respect of related party participation in the Private Placement as neither the fair market value (as determined under MI 61‑101) of the subject matter of, nor the fair market value of the consideration for, the transaction, insofar as it involves interested parties, is expected to exceed 25% of the Company’s market capitalization (as determined under MI 61‑101).   

Closing of the second tranche of the Private Placement is expected to occur on or before August 19th, 2022, and is subject to certain conditions including, but not limited to, the receipt of all necessary approvals including the approval of the TSXV. All securities issued pursuant to the first tranche of the Private Placement are subject to a hold period of four months and one day expiring on December 5, 2022.

About Stuhini Exploration Ltd.
Stuhini is a mineral exploration company focused on the exploration and development of it’s base and precious metal properties. The Company’s portfolio of exploration properties includes: its flagship, the Ruby Creek Property, located approximately 20 km east of Atlin, BC; the Que Project located approximately 70 km north of Johnson’s Crossing in the Yukon; the South Thompson Project located approximately 35 km northwest of Grand Rapids, Manitoba; and the Big Ledge Property located approximately 57 km south of Revelstoke, BC.

Forward-Looking Statements
This news release contains “forward-looking statements” within the meaning of Canadian securities legislation. Such forward-looking statements concern, without limitation, the intended use of proceeds of the Private Placement and the renunciation of Qualifying Expenditures. Such forward‑looking statements or information are based on a number of assumptions which may prove to be incorrect. Assumptions have been made regarding, among other things: conditions in general economic and financial markets; timing and amount of capital expenditures; timing and amount of Qualifying Expenditures incurred; and effects of regulation by governmental agencies. The actual results could differ materially from those anticipated in these forward‑looking statements as a result of risk factors including, but not limited to: the availability of funds; the timing and content of work programs; results of exploration activities of mineral properties; the interpretation of drilling results and other geological data; general market and industry conditions; and failure to incur Qualifying Expenditures. Forward‑looking statements are based on the expectations and opinions of the Company’s management on the date the statements are made. The assumptions used in the preparation of such statements, although considered reasonable at the time of preparation, may prove to be imprecise and, as such, readers are cautioned not to place undue reliance on these forward-looking statements, which speak only as of the date the statements were made. The Company undertakes no obligation to update or revise any forward-looking statements included in this news release if these beliefs, estimates and opinions or other circumstances should change, except as otherwise required by applicable law.  

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

For further information please contact: 
David O’Brien 
President & Chief Executive Officer
Stuhini Exploration Ltd.  
Email: dobrien@stuhini.com 
Phone: (604) 835-4019
Web: www.stuhini.com

Categories
Junior Mining Precious Metals

Lion One Announces Extension of Tuvatu Mine Lease to 2035

This image has an empty alt attribute; its file name is 2d26afd49c61f845bada429872591f65

North Vancouver, British Columbia–(Newsfile Corp. – August 8, 2022) – Lion One Metals Limited (TSXV: LIO) (OTCQX: LOMLF) (ASX: LLO) (“Lion One” or the “Company”) announces that the Government of Fiji has granted an extension of the Tuvatu Mining Lease (SML 62) for an additional 10 year term renewable on Feb. 28, 2035.

SML 62 is the Company’s cornerstone permit enabling Lion One to build mining and milling operations at Tuvatu, forming part of its 100% owned, high-grade Tuvatu Alkaline Gold Project, located 24km from Fiji’s International Airport in Nadi.

In an official ceremony attended by over 300 dignitaries at Tuvatu yesterday, Lion One CEO Walter Berukoff thanked Fiji’s Attorney General Aiyaz Sayed-Khaiyum, the Mineral Resource Department, and Lion One’s Chief Operating Patrick Hickey, commenting, “I am proud to say that it is with great elation that the Government of Fiji has renewed our special mining lease for the Tuvatu Alkaline Gold Project for another ten years. This lease extension sends a clear message to the world that Fiji continues to be open to public markets which can access critical capital to enable responsible mining projects to be built. Responsible mining will enhance the local socio-economic conditions for all Fijians. To date, we have invested over $140 million into the local economy.”

The development of Tuvatu is guided by Lion One Chief Operating Officer Patrick Hickey, an accomplished engineer with extensive executive-level experience in mine building roles for companies such as Newmont Mining Corporation and Kinross Gold Corp. across Africa, Asia, and North America. Mr. Hickey leads a management team of nine and staff that includes some of the most skilled and experienced exploration and underground mining experts in the South Pacific. Under Mr. Hickey’s leadership, the Company has ramped up its mining development activities at Tuvatu. There are six active drill rigs, an Exploration decline measuring over one kilometre in length, and a fully operational on-site analytical sampling laboratory at production levels threefold from earlier this year.

Mr. Hickey commented, “We very pleased to have been granted this extension after the rigorous assessment process that factored not only the geological and economic potential of Tuvatu, but our environmental risk management strategy, and local landowners and community relationships. This milestone demonstrates the tremendous support the Fiji Government has for both Lion One and its mining industry as we continue our commitment to the communities that we operate in to provide direct employment opportunities and peripheral economic stimulus.”

About Lion One Metals Limited

Lion One’s flagship asset is 100% owned, fully permitted high grade Tuvatu Alkaline Gold Project, located on the island of Viti Levu in Fiji. Lion One envisions a low-cost high-grade underground gold mining operation at Tuvatu coupled with exciting exploration upside inside its tenements covering the entire Navilawa Caldera, an underexplored yet highly prospective 7km diameter alkaline gold system. Lion One’s CEO Walter Berukoff leads an experienced team of explorers and mine builders and has owned or operated over 20 mines in 7 countries. As the founder and former CEO of Miramar Mines, Northern Orion, and La Mancha Resources, Walter is credited with building over $3 billion of value for shareholders.

Photo 1: Patrick Hickey and Walter Berukoff at Tuvatu ceremony

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/2178/133123_ff09dd2ab45fc990_001full.jpg



Figure 1: Tuvatu Project area

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/2178/133123_ff09dd2ab45fc990_002full.jpg

Qualified Person

In accordance with National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”), Patrick Hickey, P. Eng., Lion One’s Chief Operating Officer, is the Qualified Person for the Company and has reviewed and is responsible for the content of this news release.

On behalf of the Board of Directors of
Lion One Metals Limited
Walter Berukoff
Chairman and CEO

For further information
Contact Investor Relations
Toll Free (North America) Tel: 1-855-805-1250
Email: info@liononemetals.com
Website: www.liononemetals.com

Neither the TSX Venture Exchange nor its Regulation Service Provider
accepts responsibility for the adequacy or accuracy of this release.

This press release may contain statements that may be deemed to be “forward-looking statements” within the meaning of applicable Canadian securities legislation. All statements, other than statements of historical fact, included herein are forward looking information. Generally, forward-looking information may be identified by the use of forward-looking terminology such as “plans”, “expects” or “does not expect”, “proposed”, “is expected”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates” or “does not anticipate”, or “believes”, or variations of such words and phrases, or by the use of words or phrases which state that certain actions, events or results may, could, would, or might occur or be achieved. This forward-looking information reflects Lion One Metals Limited’s current beliefs and is based on information currently available to Lion One Metals Limited and on assumptions Lion One Metals Limited believes are reasonable. These assumptions include, but are not limited to, the actual results of exploration projects being equivalent to or better than estimated results in technical reports, assessment reports, and other geological reports or prior exploration results. Forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance, or achievements of Lion One Metals Limited or its subsidiaries to be materially different from those expressed or implied by such forward-looking information. Such risks and other factors may include, but are not limited to: the stage development of Lion One Metals Limited, general business, economic, competitive, political and social uncertainties; the actual results of current research and development or operational activities; competition; uncertainty as to patent applications and intellectual property rights; product liability and lack of insurance; delay or failure to receive board or regulatory approvals; changes in legislation, including environmental legislation, affecting mining, timing and availability of external financing on acceptable terms; not realizing on the potential benefits of technology; conclusions of economic evaluations; and lack of qualified, skilled labour or loss of key individuals. Although Lion One Metals Limited has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. Accordingly, readers should not place undue reliance on forward-looking information. Lion One Metals Limited does not undertake to update any forward-looking information, except in accordance with applicable securities laws.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/133123

Categories
Junior Mining Precious Metals

Is Gold a safeguard in times of recession?

By Luis Eduardo Azevedo

The current inflation of the United States is a concern to the whole world’s economy, and many believe that the scenario will only get worse. In order to contain the situation, the Fed is constantly raising interest rates. James Rickards, an economist and investment banker, believes that the interest rate could get as high as 5% in the near future. Also, the EUR/USD=x is currently at a five-year low and every time this ratio goes down, the interest rate goes up.

In opposition to a common belief that printing a lot of money equals high inflation, the government has been printing trillions of dollars in recent years even though the inflation never went further than 3%. The current inflationary type is the cost inflation. It occurs when prices rise due to increases in production costs such as wages and raw materials. In addition to this scenario, the employment rate went down to 59%.

One of the factors that have contributed to this crisis are the war sanctions against Russia. The biggest country in the world has negotiated more oil and natural gas at higher prices than before the Ukraine war, causing a slowdown in global production. Also, the BRICS is expecting Egypt, Saudi Arabia and Turkey to join their organization soon. They are working on an alternative reserve currency that would rival the IMF’s SD, the contingent Reserves Arrangement. Moreover, China is developing a new way to buy gold using the digital yuan, the Shanghai gold exchange.

Turkey also wants to ditch the dollar and start buying energy from Russia using other currencies. The same goes for India, which is now accepting rupees for payments and is activating a new shorter corridor to Russia, making it far easier to import and export.

All countries mentioned in the last two paragraphs, together with other 139 countries, are participating in the Belt and Road initiative. It is a strategy that seeks to connect Asia with Africa and Europe via land and maritime networks, looking forward to improving regional integration, increasing trade and stimulating economic growth.

If all this comes to fruition, 75% of the world’s population and 45% of the world’s GDP would be using another reserve currency, Saudi Arabia would open oil sales and all these countries would decrease their use of American dollars. With all these dollars coming back to the United States’ economy, hyperinflation would be a sure thing.

All these issues have contributed to the current recession and confirm that the world is creeping towards de-dollarisation.

As we have seen during other periods of high inflation in history, like the 1970s when it averaged 7% a year, assets with value, virtue, safety, and scarcity such as gold outperformed the stock market by a lot. The reason this metal is an excellent asset to protect your money from depreciation is because it has a positive correlation with inflation rates. In other words, the price of gold increases with inflation.

For example, from 1970 to 1974 inflation went as high as 12% a year. During that span of time, The Dow Industrial Average depreciated about 40% while gold went from $35/ounce to $180/ounce. As you can see gold is so valued that it joined the U.S. as the only tier #1 assets in the world.

Given all these facts, it is safe to say that the American dollar and the United States are losing their dominance over the world’s economy and gold is one of the best assets to protect your money from this scenario.

Text citations

● Kenton, W. (2022, March 27). Cost-push inflation. Investopedia. Retrieved July 27, 2022, from

https://www.investopedia.com/terms/c/costpushinflation.asp#:~:text=Key%20Takeaways,total%20production).

● Rickards, J. (2022, June 2). James Rickards. Wikipedia. Retrieved July 27, 2022, from

https://en.m.wikipedia.org/wiki/James_Rickards#:~:text=James%20G.,He%20lives%20in%20New%20Hampshire.

● Cox, J. (2022, July 26). The numbers show the U.S. economy is at least teetering on a recession. CNBC. Retrieved July 27, 2022, from

https://www.cnbc.com/2022/07/25/the-numbers-show-the-us-economy-is-at-least-teetering-on-a-recession.html

● Gallant, C. (2022, July 8). How central banks can increase or decrease money supply. Investopedia. Retrieved July 28, 2022, from

https://www.investopedia.com/ask/answers/07/central-banks.asp

● EBRD, E. B. for R. and D. (n.d.). Belt and road initiative (BRI). European Bank for Reconstruction and Development (EBRD). Retrieved July 29, 2022, from

https://www.ebrd.com/what-we-do/belt-and-road/overview.html

● Kramer, L. (2022, June 28). The great inflation of the 1970s. Investopedia. Retrieved July 29, 2022, from

https://www.investopedia.com/articles/economics/09/1970s-great-inflation.asp#:~:text=It%20grew%20from%20%24228%20billion,to%20Federal%20Reserve%20Board%20numbers.&text=In%20the%20winters%20of%201972,it%20would%20go%20to%2012%25.

● WANG, C. N. E. D. O. P. I. L. (n.d.). Countries of the belt and road initiative (BRI). Green Finance & Development Center. Retrieved July 29, 2022, from

https://greenfdc.org/countries-of-the-belt-and-road-initiative-bri/#:~:text=In%20March%202022%2C%20the%20number,)%20with%20China%20is%20147*.&text=The%20countries%20of%20the%20Belt,are%20in%20Sub%2DSaharan%20Africa

● Wikipedia. (2021, September 10). 1973–1974 stock market crash. Wikipedia. Retrieved July 29, 2022, from

https://en.m.wikipedia.org/wiki/1973%E2%80%931974_stock_market_crash

Categories
Junior Mining Precious Metals

Tectonic Metals Announces the Appointment of a New Director

Tectonic Metals, Proven and Probable

VANCOUVER, BC / ACCESSWIRE / August 4, 2022 / Tectonic Metals Inc. (TSXV:TECT); (OTCQB:TETOF); (FSE:T15B) (the “Company” or “Tectonic”) is pleased to announce the appointment of Mr. Joseph J. Perkins to the Company’s Board of Directors as an independent director. Over the course of his 40-year legal career, Mr. Perkins, in some capacity, has been involved with every major resource project in Alaska, including the Greens Creek, Fort Knox, Red Dog, and Pogo mines and many high-profile transactions. He has represented mining companies, oil and gas companies, Alaska Native corporations, and financial institutions in connection with mining and oil and gas transactions, properties, and projects.

Joseph J. Perkins, Director, stated, “Over the course of my career I have been privileged to work with a remarkable array of individuals and organizations in Alaska’s resource sector. I was introduced to Tectonic in 2018 when I assisted the Company in the development of their initial project lease agreements with one of Alaska’s leading Native Regional Corporations. Tectonic’s approach to mineral exploration, the pedigree of its team and their vision of being a leading exploration company, creating value for both shareholders and other stakeholders, impressed me from day one. I could not be more excited to join Tectonic’s board to work alongside this highly accomplished and motivated team of professionals, all of whom are committed to executing on behalf of shareholders.”

Allison Rippin Armstrong, Chair of the Board, commented, “On behalf of the Board of Directors, I am pleased to welcome Joe to the Tectonic Board. Joe brings a wealth of knowledge and legal experience and is highly respected in the Alaska resource sector. Joe’s unique perspective will make a significant contribution to the Board, and the growth of the Company.

About Mr. Perkins

Joe has practiced natural resources law in Alaska since 1979-first with Guess & Rudd P.C. and then, for the last 14 years, with Stoel Rives LLP. He has represented mining companies, oil and gas companies, Alaska Native corporations, and financial institutions in connection with natural resource transactions, properties, and projects. Joe has worked in some capacity on every major resource project in Alaska (including the Greens Creek, Fort Knox, Red Dog, and Pogo mines), on many major transactions, and hundreds of smaller transactions.

Throughout his career, Joe has devoted significant time and energy to the Foundation for Natural Resources and Energy Law (formerly the Rocky Mountain Mineral Law Foundation). He is co-author of Title VI (“Alaska Lands and Mineral Interests”) of the American Law of Mining (2d ed. 1984 and regular updates), is the author or co-author of eight papers presented at continuing legal education programs offered by the Foundation and has served as a trustee of the Foundation and on the Scholarship Committee of the Foundation.

Joe received his law degree (J.D., 1979) from the University of Denver College of Law (now the Sturm College of Law) and his undergraduate degree (B.S.E. in Geological Engineering, 1976) from Princeton University. After more than 40 years in Alaska, Joe now resides in Portland, Oregon, where he is in his last year as senior counsel to Stoel Rives LLP.

Stock Option Grant

The Company announces that it has granted Mr. Perkins an aggregate of 500,000 incentive stock options to purchase up to 500,000 common shares in the capital of Tectonic. The incentive stock options have a term of five years from the date of grant and an exercise price of $0.10 per share.

To learn more about Tectonic, please click here.

On behalf of Tectonic Metals Inc.,

Tony Reda
President and Chief Executive Officer

For further information about Tectonic Metals Inc. or this news release, please visit our website at www.tectonicmetals.com or contact Bill Stormont, Investor Relations, at toll-free 1.888.685.8558 or by email at info@tectonicmetals.com.

Facebook:https://www.facebook.com/TectonicMetals/
Twitter:https://twitter.com/TectonicMetals
Instagram:https://www.instagram.com/tectonicmetals/
LinkedIn:https://www.linkedin.com/company/tectonic-metals

Neither the TSX Venture Exchange nor its Regulation Service Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

SOURCE: Tectonic Metals Inc.



View source version on accesswire.com:
https://www.accesswire.com/710788/Tectonic-Metals-Announces-the-Appointment-of-a-New-Director

Categories
Base Metals Energy Junior Mining Precious Metals

Bravo Intercepts Massive Sulphide Mineralization at its Luanga (PGM + Au + Ni) Project

Bravo Mining, Proven and Probable

11m* Zone of Massive and Brecciated Semi-Massive Nickel/Copper Sulphides Intersected

VANCOUVER, BC, Aug. 3, 2022 /CNW/ – Bravo Mining Corp. (TSX.V: BRVO), (“Bravo” or the “Company“) today announced that a diamond drill hole at its Luanga Project (“Luanga“), located in the Carajás Mineral Province, state of Pará, Brazil, intersected massive sulphide and semi-massive sulphide mineralization. Based on visual inspection by experienced geologists the core is interpreted to contain pyrrhotite, pentlandite (a primary nickel sulphide mineral) and chalcopyrite (a primary copper sulphide mineral). This style of sulphide mineralization, in these concentrations, has not previously been observed at the Luanga platinum group metals (palladium + platinum + rhodium) + gold + nickel (PGM+Au+Ni) project. Likewise, primary copper mineralization (interpreted as chalcopyrite) has previously only been observed in trace amounts at Luanga.

DDH22LU047: Massive sulphide mineralization interpreted as pyrrhotite + lesser pentlandite (a nickel mineral) and chalcopyrite (a copper mineral), from 136.0 to 137.6m* (CNW Group/Bravo Mining Corp.)
DDH22LU047: Massive sulphide mineralization interpreted as pyrrhotite + lesser pentlandite (a nickel mineral) and chalcopyrite (a copper mineral), from 136.0 to 137.6m* (CNW Group/Bravo Mining Corp.)

“Intersecting this style of massive sulphide mineralization for what we believe to be the first time at Luanga is a potentially material development,” said Luis Azevedo, Chairman and CEO of Bravo. “The drill hole has already been cased with PVC for planned downhole electromagnetic survey (DHTEM), and we will shortly be commencing a detailed ground gravity survey. Both geophysical techniques could help guide follow-up drill holes. We believe that further discovery potential exists at Luanga, particularly regarding prospective zones below the PGM mineralization and the geophysics could help direct that work.”

Highlights

  • Subsequent to executing the remaining land access agreements, the first of the planned northern drill holes (DDH22LU047) intersected massive and semi-massive sulphides that are interpreted to contain both pentlandite (a primary nickel mineral) and chalcopyrite (a primary copper mineral). PGM+Au+Ni assays are pending.
  • DDH22LU047 is already PVC cased ready for DHTEM, a highly successfully geophysical tool for defining and targeting conductors generated by massive sulphides.
  • Bravo plans to commence a detailed ground gravity survey. Gravity surveys are ideally suited to detecting differences in density, such as the high densities native to massive sulphides.

Luanga Drill Program

The Phase 1 diamond drill program continues as planned at Luanga. With six drill rigs on site, drilling is now in progress in various locations along the entire 7km strike length of the project, including to the north where the latest and final surface access agreements were recently signed.

Phase 1 drilling is designed to confirm, infill and step out from the previously defined mineralization in order to increase confidence in the geological model and provide the basis for future mineral resource estimates. Additionally, deeper drilling will target extensions and exploration targets at Luanga.

DDH22LU047: Breccia sulphide interpreted as pyrrhotite + pentlandite (a nickel mineral) + chalcopyrite (a copper mineral), from 137.0 to 137.5m* (CNW Group/Bravo Mining Corp.)
DDH22LU047: Breccia sulphide interpreted as pyrrhotite + pentlandite (a nickel mineral) + chalcopyrite (a copper mineral), from 137.0 to 137.5m* (CNW Group/Bravo Mining Corp.)
DDH22LU047: Drill core showing massive and brecciated semi massive sulphides, from 131.1m to 142.1m* (CNW Group/Bravo Mining Corp.)
DDH22LU047: Drill core showing massive and brecciated semi massive sulphides, from 131.1m to 142.1m* (CNW Group/Bravo Mining Corp.)

* Depths and widths are downhole

About Bravo Mining Corp.

Bravo is a Canada and Brazil-based mineral exploration and development company focused on advancing its Luanga PGM+Au+Ni Project in the world-class Carajás Mineral Province of Brazil.

The Luanga Project benefits from being in a location close to operating mines, with excellent access and proximity to existing infrastructure, including road, rail and clean and renewable hydro grid power. The project area was previously de-forested for agricultural grazing land. Bravo’s current Environmental, Social and Governance activities includes replanting trees in the project area, hiring and contracting locally, and ensuring protection of the environment during its exploration activities.

Bravo was founded by a management team and board with extensive Brazilian and PGM exploration, permitting, project financing, construction and operating experience. This includes Luis Azevedo, Executive Chairman & CEO; Simon Mottram, President; Alex Penha, EVP Corporate Development; and Independent Directors, Dr. Nicole Adshead-Bell (Lead Director), Stuart Comline, Tony Polglase and Stephen Quin.

Technical Disclosure

Technical information in this news release has been reviewed and approved by Simon Mottram, F.AusIMM (Fellow Australia Institute of Mining and Metallurgy), President of Bravo Mining Corp. who serves as the Company’s “qualified person”, as defined in National Instrument 43-101 Standards of Disclosure for Mineral Projects (“NI 43-101“). Mr. Mottram has verified the technical data and opinions contained in this news release.

For further information about Bravo, please visit www.bravomining.com or contact:

Forward Looking Statements

This news release contains forward-looking information which is not comprised of historical facts. Forward-looking information is characterized by words such as “confirm”, “designed”, “increase confidence”, “interpreted”, “pending”, and other similar words, phrases or statements that certain events or conditions “may” or “will” occur. In particular, this news release contains forward-looking information pertaining to the Company’s ongoing re-assay and drill programs; the expected arrival of additional drill rigs and delivery of historic core; and the Company’s plans in respect thereof. Forward-looking information involves risks, uncertainties and other factors that could cause actual events, results, and opportunities to differ materially from those expressed or implied by such forward-looking information. Factors that could cause actual results to differ materially from such forward-looking information include, but are not limited to, changes in the state of equity and debt markets, fluctuations in commodity prices, delays in obtaining required regulatory or governmental approvals, environmental risks, limitations on insurance coverage; and other risks and uncertainties involved in the mineral exploration and development industry. Forward-looking information in this news release is based on the opinions and assumptions of management considered reasonable as of the date hereof, including, but not limited to, the assumption that the assay results confirm the interpreted mineralization contains significant values of nickel, copper and also contain PGMs and Au; final drill and assay results will be in line with management’s expectations; that activities will not be adversely disrupted or impeded by regulatory, political, community, economic, environmental and/or healthy and safety risks; that the Luanga Project will not be materially affected by potential supply chain disruptions; and general business and economic conditions will not change in a materially adverse manner. Although the Company believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information. The Company disclaims any intention or obligation to update or revise any forward-looking information, other than as required by applicable securities laws.

Bravo Mining LOGO (CNW Group/Bravo Mining Corp.)
Bravo Mining LOGO (CNW Group/Bravo Mining Corp.)

SOURCE Bravo Mining Corp.

Categories
Base Metals Energy Junior Mining Precious Metals

Granite Creek Copper Appoints Geordan Clark to its Board of Directors

VANCOUVER, BC / ACCESSWIRE / August 3, 2022 / Granite Creek Copper Ltd. (TSX.V:GCX | OTCQB:GCXXF) (“Granite Creek” or the “Company“) is pleased to announce the appointment of Mr. Geordan Clark as an Independent Director.

Granite Creek Copper Ltd., Wednesday, August 3, 2022, Press release picture
Granite Creek Copper Ltd., Wednesday, August 3, 2022, Press release picture

Geordan Clark is a Yukon-based entrepreneur with extensive project management and business development experience including an MBA from Cape Breton University. A citizen of the Kluane First Nation from Burwash Landing, Geordan worked as a business consultant with the Kluane First Nation, Tr’ondëk Hwëch’in, Na-Cho Nyäk Dun Development Corporation, Carcross Tagish First Nation, Chu Níikwän LP (Kwanlin Dun), Champagne Aishihik Community Development Corporation, as well as providing consulting services to many other Yukon First Nations small business owners. Mr. Clark was formerly the Executive Director of the Kluane Development Corporation and is currently General Manager and co-owner of Vision Quest Explorations, a Yukon First Nation drilling and exploration company. With a passion for Community Economic Development, Geordan is dedicated to supporting the progression of Yukon First Nation’s business and advancement of the Yukon’s economy.

Geordan Clark, Director, stated, “I am very pleased to be joining Granite Creek Copper and look forward to working with the team to further advance the project including developing and strengthening relationships within the local communities and First Nations in Yukon.”

Tim Johnson, President & CEO, stated, “Geordan is a well-known and respected Yukon businessman and leader. It is an absolute pleasure to have him join our team and we very much look forward to his involvement and guidance as we continue to advance the Carmacks Copper project. Our goal is to continue to develop and build on our relationships with First Nations, including Little Salmon/Carmacks First Nation on whose Traditional Territory the project is located, and to have a positive impact within local communities, as well as the Yukon at large. We look forward to providing additional updates on both the project and other initiatives in the coming weeks, including the updated Preliminary Economic Assessment (“PEA”) which remains on track for completion in Q4.”

Granite Creek further announces it has granted 360,000 incentive stock options (the “Options”) to certain Directors, Officers, employees and consultants of the Company. Each Option will allow the holder to purchase one common share of the Company at a price of $0.10 per share and is exercisable for up to five years, expiring on August 3, 2027.

About Granite Creek Copper

Granite Creek, a member of the Metallic Group of Companies, is a Canadian exploration company focused on the 176-square-kilometer Carmacks project in the Minto copper district of Canada’s Yukon Territory. The project is on trend with the high-grade Minto copper-gold mine, operated by Minto Metals Corp., to the north, and features excellent access to infrastructure with the nearby paved Yukon Highway 2, along with grid power within 12 km. The project is located within the Traditional Territory of Little Salmon/Carmacks First Nation. More information about Granite Creek Copper can be viewed on the Company’s website at www.gcxcopper.com.

FOR FURTHER INFORMATION PLEASE CONTACT:

Timothy Johnson, President & CEO
Telephone: 1 (604) 235-1982
Toll-Free: 1 (888) 361-3494
E-mail: info@gcxcopper.com
Website: www.gcxcopper.com
Metallic Group: http://www.metallicgroup.ca/
Twitter: @yukoncopper

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

SOURCE: Granite Creek Copper Ltd.

Categories
Base Metals Energy Exclusive Interviews Junior Mining Precious Metals

(VIDEO) Stillwater Critical Minerals – Exclusive Stillwater West Core Shack Footage

Stillwater Critical Minerals (TSX.V: PGE | OTCQB: PGEZF) is a Canadian mineral exploration company focused on its flagship Stillwater West PGE-Ni-Cu-Co + Au project in the iconic and famously productive Stillwater mining district of Montana, USA.

Stillwater Critical Minerals (TSX.V: PGE | OTC: PGEZF)
Website | https://criticalminerals.com/
Corporate Presentation | https://criticalminerals.com/investors/presentations/
Stillwater Critical Minerals
Suite 904 – 409 Granville Street
Vancouver, BC V6C 1T2

Tel: +1 (604) 357-4790
Toll Free: +1 (888) 432-0075
Email: info@grouptenmetals.com

Categories
Base Metals Energy Junior Mining Precious Metals

Bravo Intersects High Grade PGMs (including Rhodium), Au & Ni at Luanga, Brazil

Bravo Mining, Proven and Probable

CORPORATE PRESENTATION: https://bravomining.com/pdf/20220801_BravoMining_CorporatePresentation.pdf

OFFICIAL PRESS RELEASE: https://bravomining.com/pdf/2022-07-26_NR.pdf

Highlights include 11.0m @ 6.50g/t PGM + Au (including 0.34g/t Rhodium), and 0.32% Ni Sulphide, and 8.6m @ 6.45g/t PGM + Au (including 0.36g/t Rhodium)

VANCOUVER, BC, July 26, 2022 /CNW/ – Bravo Mining Corp. (TSXV: BRVO), (“Bravo” or the “Company“) today announced it has received assay results from a further five diamond drill holes (“DDH”) (four infill drill holes and one twin drill hole), bringing the total to 42 drill holes (including four twin drill holes) completed to date at its wholly owned Luanga platinum group metals (palladium + platinum + rhodium) + gold + nickel (PGM+Au+Ni) project (“Luanga“), located in the Carajás Mineral Province, state of Pará, Brazil. Samples for a further 15 drill holes are already at the laboratory for analysis.

“We are very pleased with the successful launch of Bravo Mining on the TSXV, especially given current market conditions, and believe this underscores the quality of the Luanga Project and its management team.  Results from our Luanga Phase 1 (25,500m) confirmation, infill, step out and twin hole drill program continue to both support the historical results and build our ongoing confidence in the Luanga deposit”, said Luis Azevedo, Chairman and CEO of Bravo. “We look forward to providing regular updates as our drilling and re-assay programs continue to ramp up, and our metallurgical and environmental baseline programs get underway.”

Highlights

  • 42 DDH drilled to date, including 4 twin holes, for a total of 6,678m out of Phase 1 25,500m drilling program;
  • 5,833 samples submitted for assay and results pending for 15 DDH;
  • 5 drill rigs onsite; to be increased to 6 in August 2022;
  • Assay results of the twin hole (the third of seven planned twin holes) closely correlate with the immediately adjacent VALE SA historic (“historic” or “historical”) drill hole in both tenor and mineralized thickness, while assays from the four planned drill holes aimed at infilling the existing wide spaced drilling, confirm the tenor, widths and continuity of mineralization seen in adjacent historic drill sections;
  • Highlights of Bravo’s intercepts are tabulated below, with details attached.
HOLE-IDFrom(m)To(m)Thickness
(m)
Pd(g/t)Pt(g/t)Rh(g/t)Au (g/t)Ni % (Sulphide)PGM + Au (g/t)TYPE
DDH22LU00333.270.036.81.530.700.100.300.172.64FR
And89.094.25.21.510.720.110.170.152.52FR
DDH22LU00478.691.613.01.630.770.140.060.132.60FR
DDH22LU007105.6131.025.42.171.110.190.170.203.64FR
Including120.0131.011.03.841.980.340.330.326.50FR
DDH22LU0080.08.68.63.392.660.360.03NA6.45Ox
And27.642.615.00.820.340.070.03NA1.25Ox
Including32.642.610.01.090.410.070.04NA1.60Ox
All ‘From’, ‘To’ depths, and ‘Thicknesses’ are downhole.Given the orientation of the holes and the mineralization, the intercepts are estimated to range from ~75 to 90% of true thickness.Ox = Oxide. FR = Fresh Rock. Recovery methods and results will differ based on the type of mineralization.NA: Not Applicable as intercept is oxide or a mix of oxide and fresh rock mineralization.

Luanga Drill Program

The Phase 1 drill program at Luanga is designed to confirm, infill and step out from the previously defined mineralization in order to increase confidence in the geological model and provide the basis for future mineral resource estimates.

As part of the Phase 1 program, Bravo has received final assay results (including palladium, platinum, rhodium, gold and nickel sulphide) for the third twin hole and the first four infill drill holes (shown below and listed in Schedule 1). Samples were submitted to ALS Brasil Limitada’s (“ALS“) preparatory laboratory in Parauapebas, located approximately 72km from Luanga, and then sent to their laboratories in Peru and Vancouver for assaying (Schedule 2).

Drilling by Bravo on new infill sections has, in several parts of the Luanga deposit, intersected zones containing significant amounts of coarser disseminated sulphides not previously observed in historic drilling.  An example is shown in the photo below of samples from drill hole DDH22LU039 (assays pending). In some cases, these zones also include narrow bands of semi-massive sulphides. Pending assay results will determine how these zones correlate to grades.

Drill Core from DDH22LU039 – Selected samples from between 128.80m and 131.50m (CNW Group/Bravo Mining Corp.)
Drill Core from DDH22LU039 – Selected samples from between 128.80m and 131.50m (CNW Group/Bravo Mining Corp.)
Location of Bravo Drilling Reported in this Document (CNW Group/Bravo Mining Corp.)
Location of Bravo Drilling Reported in this Document (CNW Group/Bravo Mining Corp.)
Cross Section Showing Twin Hole DDH22LU007 (CNW Group/Bravo Mining Corp.)
Cross Section Showing Twin Hole DDH22LU007 (CNW Group/Bravo Mining Corp.)

A comparison of the original historic intercept with the Bravo twin hole intercept is tabulated below. Bravo’s twin hole intercept closely correlates with the adjacent historic drill hole in both thicknesses and grade, noting that Bravo nickel grades are for sulphide nickel which is representative of actual potentially recoverable (by froth flotation treatment) nickel, and does not include non-recoverable silicate nickel whereas VALE’s assays were total nickel, including both sulphide and non-recoverable silicate nickel.

Comparison of assay results from Bravo twin diamond drill hole of historic VALE SA diamond drill hole

TWIN of Historic Hole PPT-LUAN-FD0069
HOLE-IDFrom(m)To(m)Thickness (m)HISTORIC SGSPGM + Au (g/t)BRAVO ALSPGM + Au (g/t)
DDH22LU007105.6131.025.353.64
PPT-LUAN-FD003699.0124.025.003.88
All From/To depths, and Thicknesses are downhole.Given the orientation of the holes and the mineralization, the intercepts are estimated to range from ~75 to 90% of true thickness.

Drilling Progress

Bravo now has five diamond drill rigs operating at Luanga, with the sixth rig off site for servicing. The Phase 1 drill program is focused on confirming the results of the extensive historic drilling that included 252 core holes aggregating 50,353m completed by the previous owner in the early 2000s.  The footprint of the Luanga deposit encompasses 238 of these holes. Bravo has now completed 42 holes (aggregating 6,678m of drilling) including four twin holes. Holes are being systematically logged, sampled and sent for assay. To date, 5,833 samples have been submitted for assay. Assay results are currently pending for 15 drill holes.

Drill holes DDH22LU003, 004, 007 and 008 all successfully intersected the main Luanga mineralized zone, which lies at the contact between the mafic and ultramafic rock sequences, confirming the tenor, width and continuation of mineralization seen in nearby wide spaced historic drill sections. DDH22LU008 was collared on top of the main mineralized zone, intersecting grade from surface, while DDH22LU002 was drilled too far north, intersecting the mafic sequence in the hangingwall, which still contains low grade zones of mineralization.

Complete Table of Assay Results

HOLE-IDFrom(m)To(m)Thickness (m)Pd(g/t)Pt(g/t)Rh(g/t)Au (g/t)Ni % (Sulphide)PGM + Au (g/t)TYPE
DDH22LU00299.6131.032.40.240.270.03<0.01<0.010.54FR
DDH22LU0030.02.42.40.710.280.050.07NA0.92Ox
And25.428.22.80.570.250.040.07NA0.92Ox
And33.270.036.81.530.700.100.300.172.64FR
And75.082.07.00.200.090.020.060.130.37FR
And89.094.25.21.510.720.110.170.152.52FR
And115.5138.022.50.240.210.01<0.01<0.010.47FR
DDH22LU00478.691.613.01.630.770.140.060.132.60FR
And60.676.616.00.240.130.020.040.060.42FR
And126.6130.23.60.240.750.12<0.01<0.011.11FR
DDH22LU007100.6131.030.41.900.970.170.140.203.19FR
Including105.6131.025.42.171.110.190.170.203.64FR
Including120.0131.011.03.841.980.340.330.326.50FR
DDH22LU0080.08.68.63.392.660.360.03NA6.45Ox
And27.642.615.00.820.340.070.03NA1.25Ox
Including32.642.610.01.090.410.070.04NA1.60Ox
All From To depths, and Thicknesses are downholeGiven the orientation of the holes and the mineralization, the intercepts are estimated to range from ~75 to 90% of true thickness.Ox = Oxide. FR = Fresh Rock. Recovery methods and results will differ based on the type of mineralizationNA: Not Applicable as intercept is oxide or a mix of oxide and fresh rock mineralization.

About Bravo Mining Corp.

Bravo is a Canada and Brazil-based mineral exploration and development company focused on advancing its Luanga PGM+Au+Ni Project in the world-class Carajás Mineral Province of Brazil.

The Luanga Project benefits from being in a location close to operating mines, with excellent access and proximity to existing infrastructure, including road, rail and clean and renewable hydro grid power. The project area was previously de-forested for agricultural grazing land. Bravo’s current Environmental, Social and Governance activities includes replanting trees in the project area, hiring and contracting locally, and ensuring protection of the environment during its exploration activities.

Bravo was founded by a management team and board with extensive Brazilian and PGM exploration, permitting, project financing, construction and operating experience. This includes Luis Azevedo, Executive Chairman & CEO; Simon Mottram, President; Alex Penha, EVP Corporate Development; and Independent Directors, Dr. Nicole Adshead-Bell (Lead Director), Stuart Comline, Tony Polglase and Stephen Quin.

Technical Disclosure

Technical information in this news release has been reviewed and approved by Simon Mottram, F.AusIMM (Fellow Australia Institute of Mining and Metallurgy), President of Bravo Mining Corp. who serves as the Company’s “qualified person”, as defined in National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101“). Mr. Mottram has verified the technical data and opinions contained in this news release.

Historical Information

This news release includes historical drilling and historical assay results generated by the prior owner of Luanga that have been reviewed by the Company’s geological team. The Company’s review of the historical records and information reasonably substantiate the validity of the historical information presented in this news release; however, the Company cannot directly verify the accuracy of the historical data, including the procedures used for sample collection and analysis. Therefore, the Company encourages investors to exercise appropriate caution when evaluating the historical results. Further data review, drilling of twin holes and infill drilling is underway in order to verify the validity of the data for use, alongside Bravo’s new drilling and re-assay data, in any future NI 43-101 compliant mineral resource estimate.

Forward Looking Statements

This news release contains forward-looking information which is not comprised of historical facts. Forward-looking information is characterized by words such as “closely”, “confirm”, “continuity”, “correlate”, “designed”, “determine”, “increase confidence”, “look forward”, “pending”, “ramp up” and other similar words, phrases or statements that certain events or conditions “may” or “will” occur. In particular, this news release contains forward-looking information pertaining to the Company’s ongoing re-assay and drill programs; the expected arrival of additional drill rigs and delivery of historic core; and the Company’s plans in respect thereof. Forward-looking information involves risks, uncertainties and other factors that could cause actual events, results, and opportunities to differ materially from those expressed or implied by such forward-looking information. Factors that could cause actual results to differ materially from such forward-looking information include, but are not limited to, changes in the state of equity and debt markets, fluctuations in commodity prices, delays in obtaining required regulatory or governmental approvals, environmental risks, limitations on insurance coverage; and other risks and uncertainties involved in the mineral exploration and development industry. Forward-looking information in this news release is based on the opinions and assumptions of management considered reasonable as of the date hereof, including, but not limited to, the assumption that the additional drill rigs and historic core will arrive within the anticipated timeframe; final drill and assay results will be in line with management’s expectations; that activities will not be adversely disrupted or impeded by regulatory, political, community, economic, environmental and/or healthy and safety risks; that the Luanga Project will not be materially affected by potential supply chain disruptions; and general business and economic conditions will not change in a materially adverse manner. Although the Company believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information. The Company disclaims any intention or obligation to update or revise any forward-looking information, other than as required by applicable securities laws.

Schedule 1: Drill Hole Collar Details

HOLE-IDCompanyEast (m)North (m)RL (m)DatumDepth (m)AzimuthDip
DDH22LU002Bravo657099.999339714.97277.355SIRGAS2000 UTM22S152.35360.00-60.00
DDH22LU003Bravo657199.989339715.45254.52SIRGAS2000 UTM22S150.50360.00-60.00
DDH22LU004Bravo657300.039339777.59252.05SIRGAS2000 UTM22S203.40360.00-60.00
DDH22LU007Bravo659092.899341002.10241.231SIRGAS2000 UTM22S230.40330.00-60.00
DDH22LU008Bravo659827.139341623.78242.572SIRGAS2000 UTM22S150.60330.00-60.00

Schedule 2: Assay Methodologies and QAQC

Samples followed chain of custody between collection, processing and delivery to the ALS laboratory in Parauapebas, state of Pará, Brazil. The drill core was delivered to the core shack at Bravo’s Luanga site facilities and processed by geologists who inserted certified reference materials, blanks and duplicates into the sampling sequence. Drill core was half cut and placed in secured polyurethane bags, then in security-sealed sacks before being delivered directly from the Luanga site facilities to the Parauapebas ALS laboratory by Bravo staff. Additional information about the methodology can be found on the ALS global website (ALS) in the analytical guides. Information regarding preparation and analysis of historic drill core is also presented in the table below, where the information is known.

Quality Assurance and Quality Control (“QAQC“) is maintained internally at the lab through rigorous use of internal certified reference materials, blanks, and duplicates. An additional QAQC program is administered by Bravo using certified reference materials, duplicate samples and blank samples that are blindly inserted into the sample batch. If a QAQC sample returns an unacceptable value an investigation into the results is triggered and when deemed necessary, the samples that were tested in the batch with the failed QAQC sample are re-tested.

Bravo ALS
PreparationMethodMethodMethodMethod
For All ElementsPt, Pd, AuRhNi-SulphideTrace Elements
PREP-31BPGM-ICP27Rh-MS25Ni-ICP05ME-ICP61
Historic Drill Assaying SGS Geosol
PreparationMethodMethodMethodMethod
For All ElementsPt, Pd, AuRhTOTAL NiTrace Elements
Crushed to <200 meshFA30AFA30BICP-117ICP-117
Bravo Mining logo (CNW Group/Bravo Mining Corp.)
Bravo Mining logo (CNW Group/Bravo Mining Corp.)

SOURCE Bravo Mining Corp.