Categories
Base Metals Breaking Energy Junior Mining Precious Metals Silver Bullet Mines

Silver Bullet Mines Continues to Assay for High-Grade Gold and PGMs

Burlington, Ontario–(Newsfile Corp. – October 18, 2022) – On September 26, 2022, Silver Bullet Mines Corp. (TSXV: SBMI) (OTCQB: SBMCF) (‘SBMI’ or ‘the Company’) disclosed it had found significant levels of palladium, platinum, rhodium, osmium and gold in its concentrate.

To help identify with greater precision the location of the source of the platinum, palladium, rhodium, osmium and gold, SBMI recently took samples directly from locations around the Buckeye Silver Mine and the Company’s mill site, including from crushed material, directly from the vein, from diabase samples from the wall rock and from tailings from the run of lower grade material. The location from which those samples were taken and their assay results are below:

Assay Results are in Grams per Tonne
Sample IDAuPdPtRhIrRuOs
Diabase114.323.70.2460.1930.151nd0.415
222.318.90.1720.076ndnd0.333
38.1715.90.0930.083ndndnd
422.318.20.0970.072ndndnd
Crushed ore 115.19.07nd0.157nd0.9490.08
223.211.60.0640.17nd0.7310.063
334.116.20.150.1150.1110.2590.129
416.216.40.1270.1180.083nd0.097
537.915.60.1070.0580.2780.180.053
626.617.90.1270.0850.08ndnd
725.512.10.0850.052nd0.265nd
823.913.70.1060.069ndndnd
Head ore118.813.50.0930.062ndndnd
221.911.70.06ndnd0.218nd
337.2160.105ndnd0.137nd
430.613.60.07ndnd0.306nd
522.9120.07ndnd0.306nd
624.310.40.061ndnd0.251nd
Tailings118.512.20.0790.064nd0.211nd
219.911.50.0630.068nd0.272nd
328.816.50.091ndnd0.174nd
426.816.20.0850.104ndndnd
537.116.90.1020.083ndndnd
631.817.20.0930.051ndndnd

Samples from all locations above were taken to be as representative of the local mineralized material as possible. Samples taken from the crushed ore are by their nature representative of the source mineralized material.

In management’s opinion, this round of results provides further strong evidence for the conclusion that the Buckeye Silver Mine may host economic amounts of platinum, rhodium, palladium, osmium and gold, in addition to the original silver targets. Management has engaged third party engineers, metallurgists and geologists to assist in creating a new process flow sheet and in determining the nature of the mineralized material at the Buckeye Silver Mine. Without effecting selective disclosure, management has also had positive preliminary discussions with potential financiers, pending the delivery of the flow sheet and a rough budget.

QAQC

For each batch, Lone Pine Analytical of Phoenix, Arizona sampled two distinct samples (approx 200mg), digested, filtered, diluted and analyzed. For the digestion, the lab used [1mL HF: 4.5mL Nitric Acid: 4.5mL HCI]. The samples were digested in a microwave in sealed PTFE tubes where the temperature reached 200C with a total cycle time of 40 minutes. Bismuth (Bi) was used the internal standard. A three-point calibration, plotted through zero was used with excellent linear correlation for each element. Thus, the lab used an internal and external standards (instrument calibration). Chain of custody protocols were strictly observed. Lone Pine Analytical, as of September 11, 2022, is in the process of renewing its ISO /IEC-17025 lab accreditation with a scope for metals in soils and rocks.

Readers are cautioned that although management has made every reasonable effort to ensure the samples are as representative of the local mineralized material as possible, the samples above (apart from the crushed ore samples) are ultimately random by nature and may not be representative of the mineralization throughout the Buckeye Silver Mine.

Mr. Robert G. Komarechka, P.Geo., an independent consultant, has reviewed and verified SBMI’s work referred to herein, and is the Qualified Person for this release.

For further information, please contact:

John Carter
Silver Bullet Mines Corp., CEO
cartera@sympatico.ca
+1 (905) 302-3843

Peter M. Clausi
Silver Bullet Mines Corp., VP Capital Markets
pclausi@brantcapital.ca
+1 (416) 890-1232

Cautionary and Forward-Looking Statements

This news release contains certain statements that constitute forward-looking statements as they relate to SBMI and its subsidiaries. Forward-looking statements are not historical facts but represent management’s current expectation of future events, and can be identified by words such as “believe”, “expects”, “will”, “intends”, “plans”, “projects”, “anticipates”, “estimates”, “continues” and similar expressions. Although management believes that the expectations represented in such forward-looking statements are reasonable, there can be no assurance that they will prove to be correct.

By their nature, forward-looking statements include assumptions, and are subject to inherent risks and uncertainties that could cause actual future results, conditions, actions or events to differ materially from those in the forward-looking statements. If and when forward-looking statements are set out in this new release, SBMI will also set out the material risk factors or assumptions used to develop the forward-looking statements. Except as expressly required by applicable securities laws, SBMI assumes no obligation to update or revise any forward-looking statements. The future outcomes that relate to forward-looking statements may be influenced by many factors, including but not limited to: the impact of SARS CoV-2 or any other global virus; reliance on key personnel; the thoroughness of its QA/QA procedures; the continuity of the global supply chain for materials for SBMI to use in the production and processing of ore; shareholder and regulatory approvals; the presence and quantity of minerals in the Company’s properties; activities and attitudes of communities local to the location of the SBMI’s properties; risks of future legal proceedings; income tax matters; fires, floods and other natural phenomena; the rate of inflation; availability and terms of financing; distribution of securities; commodities pricing; currency movements, especially as between the USD and CDN; effect of market interest rates on price of securities; and, potential dilution. SARS CoV-2 and other potential global viruses create risks that at this time are immeasurable and impossible to define.info

  •  
  •  
  •  
Silver Bullet Mines Corp.

Sign up for Alerts

Sign up to receive news releases by email for Silver Bullet Mines Corp. or all companies belonging to the Mining and Metals industry.

SIGN UP

Recent News

Categories
Energy Junior Mining Precious Metals Silver Bullet Mines

Silver Bullet Mines Corp. Closes Financing

Burlington, Ontario–(Newsfile Corp. – August 15, 2022) – Silver Bullet Mines Corp. (TSXV: SBMI) (OTCQB: SBMCF) (‘SBMI’ or ‘the Company’) is very pleased to announce it has closed on its debt financing (the “Financing”), previously announced on August 11, 2022.

The Financing is with SBMI’s largest institutional shareholder (the “Lender”), pursuant to which SBMI has borrowed CDN$650,000 (six hundred and fifty thousand dollars) from the Lender for an 18-month term. The Financing provides for an 8% annual interest rate and a conversion feature, whereby upon conversion the loan may convert into 2,166,667 units (each, a “Unit”) at an effective price of $0.30 per Unit. This is at a premium to the current market price. Each Unit is comprised of one common share and one common share purchase warrant exercisable at $0.35 for a four-year term.

“Management and the board have been working on this for a while,” said SBMI’s CEO, A. John Carter. “We believe this to be very attractive for the lender and friendly to our shareholders.”

SBMI also reports that Sepro Mineral Systems Corp., who assisted in the design of parts of SBMI’s mill in Arizona, is currently onsite and is assisting the Company in fine-tuning various components of the mill. The ramp-up using lower grade material continues.

Silver coming off the shaker table; picture taken Aug 15/22

To view an enhanced version of this photo, please visit:
https://images.newsfilecorp.com/files/8464/133956_a8aaf062a470f82c_001full.jpg

For further information, please contact:

John Carter
Silver Bullet Mines Corp., CEO
cartera@sympatico.ca
+1 (905) 302-3843

Peter M. Clausi
Silver Bullet Mines Corp., VP Capital Markets
pclausi@brantcapital.ca
+1 (416) 890-1232

Cautionary and Forward-Looking Statements

This news release contains certain statements that constitute forward-looking statements as they relate to SBMI and its subsidiaries. Forward-looking statements are not historical facts but represent management’s current expectation of future events, and can be identified by words such as “believe”, “expects”, “will”, “intends”, “plans”, “projects”, “anticipates”, “estimates”, “continues” and similar expressions. Although management believes that the expectations represented in such forward-looking statements are reasonable, there can be no assurance that they will prove to be correct.

By their nature, forward-looking statements include assumptions, and are subject to inherent risks and uncertainties that could cause actual future results, conditions, actions or events to differ materially from those in the forward-looking statements. If and when forward-looking statements are set out in this new release, SBMI will also set out the material risk factors or assumptions used to develop the forward-looking statements. Except as expressly required by applicable securities laws, SBMI assumes no obligation to update or revise any forward-looking statements. The future outcomes that relate to forward-looking statements may be influenced by many factors, including but not limited to: the impact of SARS CoV-2 or any other global virus; reliance on key personnel; the thoroughness of its QA/QA procedures; the continuity of the global supply chain for materials for SBMI to use in the production and processing of ore; shareholder and regulatory approvals; activities and attitudes of communities local to the location of the SBMI’s properties; risks of future legal proceedings; income tax matters; fires, floods and other natural phenomena; the rate of inflation; availability and terms of financing; distribution of securities; commodities pricing; currency movements, especially as between the USD and CDN; effect of market interest rates on price of securities; and, potential dilution. SARS CoV-2 and other potential global viruses create risks that at this time are immeasurable and impossible to define.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/133956

Categories
Base Metals Energy Junior Mining Precious Metals Silver Bullet Mines

(VIDEO) Silver Bullet Mines Corp. Produces Silver

Silver Bullet Mines, Proven and Probable

Burlington, Ontario–(Newsfile Corp. – July 13, 2022) – Silver Bullet Mines Corp. (TSXV: SBMI) (OTCQB: SBMCF) (“SBMI” or “the Company”) is both pleased and proud to announce it has successfully produced silver and copper at its wholly owned 125 metric ton per day mill near Globe, Arizona.

“This production is the result of years of hard work, planning and dedication, and the incredible talents of the Arizona team,” said A. John Carter, SBMI’s CEO. “Over the past ten months, despite COVID-19 and global supply chain issues, we have spent less than three million dollars building this fully functional mill, a staggering feat. This is to my mind a one-of-a-kind experience.”

The mill produced its first silver concentrate from lower grade ore on July 12, 2022 and plans to soon pour its first dore bars. The Company intends to continue to use lower grade ore to optimize recovery efficiency and fine tune the various mill components. Higher grade ore will be introduced into the system once the mill is operating at higher rates of recovery. To date there have been no major setbacks and all components are operating within expected parameters.

Below is a photo of the first band of silver coming off the shaker table. The silver is visible on the left side of the photo. The secondary concentrate line is a silver/copper blend which will be bagged and sold. The initial concentrate and dore should be sold to various refineries, whose apparent demand should account for SBMI’s entire silver and copper production over the coming weeks.



Silver on the shaker table

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8464/130715_1981e644e49d7819_001full.jpg

A video of the shaker table operating can be found at the Company’s website, www.silverbulletmines.com.

The Buckeye Silver Mine is the source of the bulk sample ore for the mill. Both the mill and the Buckeye Mine are 100% controlled by SBMI. At the Buckeye, the field team is currently extracting ore from a vein at a location where it is approximately 12 feet wide. SBMI’s target is to have at least one month (5,000 tonnes) of raw ore available to the mill at all times, meaning management expects ore to be continually shipped from the Buckeye to the mill on a regular schedule.

Over the coming weeks management expects a steady stream of announcements as material milestones are met.

Please check the Company’s website www.silverbulletmines.com, or follow on Twitter @bulletmines or at YouTube “Silver Bullet Mines”.

For further information, please contact:

John Carter
Silver Bullet Mines Corp., CEO
cartera@sympatico.ca
+1 (905) 302-3843

Peter M. Clausi
Silver Bullet Mines Corp., VP Capital Markets
pclausi@brantcapital.ca
+1 (416) 890-1232

Cautionary and Forward-Looking Statements

Silver Bullet Mines Corp. trades on the TSX Venture Exchange under the symbol SBMI and on the OTCQB Venture Market under the symbol SBMCF. The OTCQB Venture Market is for early stage and developing U.S. and international companies. Companies listed there are current in their reporting and undergo an annual verification and management certification process. Investors can find current financial disclosure for the Company on www.otcmarkets.com and at https://money.tmx.com/en/quote/SBMI.

This news release contains certain statements that constitute forward-looking statements as they relate to SBMI and its subsidiaries. Forward-looking statements are not historical facts but represent management’s current expectation of future events, and can be identified by words such as “believe”, “expects”, “will”, “intends”, “plans”, “projects”, “anticipates”, “estimates”, “continues” and similar expressions. Although management believes that the expectations represented in such forward-looking statements are reasonable, there can be no assurance that they will prove to be correct.

By their nature, forward-looking statements include assumptions, and are subject to inherent risks and uncertainties that could cause actual future results, conditions, actions or events to differ materially from those in the forward-looking statements. If and when forward-looking statements are set out in this new release, SBMI will also set out the material risk factors or assumptions used to develop the forward-looking statements. Except as expressly required by applicable securities laws, SBMI assumes no obligation to update or revise any forward-looking statements. The future outcomes that relate to forward-looking statements may be influenced by many factors, including but not limited to: the impact of SARS CoV-2 or any other global virus; reliance on key personnel; the availability of skilled and unskilled labour; the presence and recoverability of mineralization; ongoing availability of infrastructure such as electrical, diesel and road access; the thoroughness of its QA/QA procedures; the continuity of the global supply chain for materials for SBMI to use in the production and processing of ore; shareholder, permitting and regulatory approvals; activities and attitudes of communities local to the location of SBMI’s properties; price increases related to supply chain issues; risks of future legal proceedings; income tax matters; fires, floods and other natural phenomena; the rate of inflation; availability and terms of financing; distribution of securities; commodities pricing; currency movements, especially as between the USD and CDN; effect of market interest rates on price of securities; and, potential dilution. SARS CoV-2 and other potential global viruses create risks that at this time are immeasurable and impossible to define.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/130715

Categories
Base Metals Junior Mining Precious Metals Silver Bullet Mines

Silver Bullet Mines Corp. Announces Settlement of Debt

Burlington, Ontario–(Newsfile Corp. – July 12, 2022) – Silver Bullet Mines Corp. (TSXV: SBMI) (OTCQB: SBMCF) (“SBMI” or “the Company”) announces it has settled a payable to a significant shareholder of the Company in the amount of $70,800 by the issuance of 236,000 common shares at $0.30 cents per share. This shareholder elected to settle the payable by taking equity rather than cash, a strong sign of confidence in SBMI’s business plan.

Please check the Company’s website www.silverbulletmines.com, or follow on Twitter @bulletmines or at YouTube “Silver Bullet Mines”.

For further information, please contact:

John Carter
Silver Bullet Mines Corp., CEO
cartera@sympatico.ca
+1 (905) 302-3843

Peter M. Clausi
Silver Bullet Mines Corp., VP Capital Markets
pclausi@brantcapital.ca
+1 (416) 890-1232

Cautionary and Forward-Looking Statements

Silver Bullet Mines Corp. trades on the TSX Venture Exchange under the symbol SBMI and on the OTCQB Venture Market under the symbol SBMCF. The OTCQB Venture Market is for early stage and developing U.S. and international companies. Companies listed there are current in their reporting and undergo an annual verification and management certification process. Investors can find current financial disclosure for the Company on www.otcmarkets.com and at https://money.tmx.com/en/quote/SBMI.

This news release contains certain statements that constitute forward-looking statements as they relate to SBMI and its subsidiaries. Forward-looking statements are not historical facts but represent management’s current expectation of future events, and can be identified by words such as “believe”, “expects”, “will”, “intends”, “plans”, “projects”, “anticipates”, “estimates”, “continues” and similar expressions. Although management believes that the expectations represented in such forward-looking statements are reasonable, there can be no assurance that they will prove to be correct.

By their nature, forward-looking statements include assumptions, and are subject to inherent risks and uncertainties that could cause actual future results, conditions, actions or events to differ materially from those in the forward-looking statements. If and when forward-looking statements are set out in this new release, SBMI will also set out the material risk factors or assumptions used to develop the forward-looking statements. Except as expressly required by applicable securities laws, SBMI assumes no obligation to update or revise any forward-looking statements. The future outcomes that relate to forward-looking statements may be influenced by many factors, including but not limited to: the impact of SARS CoV-2 or any other global virus; reliance on key personnel; the availability of skilled and unskilled labour; the presence and recoverability of mineralization; ongoing availability of infrastructure such as electrical, diesel and road access; the thoroughness of its QA/QA procedures; the continuity of the global supply chain for materials for SBMI to use in the production and processing of ore; shareholder, permitting and regulatory approvals; activities and attitudes of communities local to the location of SBMI’s properties; price increases related to supply chain issues; risks of future legal proceedings; income tax matters; fires, floods and other natural phenomena; the rate of inflation; availability and terms of financing; distribution of securities; commodities pricing; currency movements, especially as between the USD and CDN; effect of market interest rates on price of securities; and, potential dilution. SARS CoV-2 and other potential global viruses create risks that at this time are immeasurable and impossible to define.

To view the source version of this press release, please visit

Categories
Junior Mining Precious Metals Silver Bullet Mines

Silver Bullet Mines Corp.’s Successful Commissioning of Its Silver Pilot Plant

Burlington, Ontario–(Newsfile Corp. – July 5, 2022) – Silver Bullet Mines Corp. (TSXV: SBMI) (OTCQB: SBMCF) (“SBMI” or “the Company”) announces it has successfully completed commissioning of its wholly owned 125 MTPD state of the art mill near Globe, Arizona. This is the latest major achievement in progressing towards bulk sampling and silver production.

Despite minor delays caused by COVID-19, the commissioning was successfully completed on July 3, 2022. Over the past few weeks all equipment at the mill was test run and synchronized for continuity. No material defects or deficiencies were detected.

“In September of 2021 this was an empty field,” said A. John Carter, SBMI’s CEO. “Now this field hosts a fully functional silver processing facility, ready to start processing a bulk sample of ore from our Buckeye Silver Mine. This could not have been achieved without the incredible skill and dedication of the technical team in Arizona.”

SBMI has commenced crushing ore through the crushing circuit (see video at https://youtu.be/KvhAhqABV74) and is filling the fine ore bin. The photo on the left below shows coarse ore from the Company’s local Buckeye Silver Mine and the photo on the right shows crushed ore in the fine ore bin. The cone crusher and jaw crusher successfully crushed the ore to less than ½ inch in diameter, which is ideal feed for the ball mill.

(Left) Coarse Ore (Right) Fine Ore

To view an enhanced version of this graphic, please visit:
https://orders.newsfilecorp.com/files/8464/130029_image1.jpg

The next step on the path to producing concentrate and dore bars is to start running the fine ore through the grinding and gravity circuit. This will require a ramp-up period until all equipment is running at maximum efficiency.

Samples are being sent to multiple companies which have expressed an interest in buying SBMI’s concentrate and dore.

This is yet another giant leap forward for the Company. SBMI is on the cusp of producing both silver and copper and generating cash flow which will enable it to continue to execute on its business plan.

Please check the Company’s website www.silverbulletmines.com, or follow on Twitter @bulletmines or at YouTube “Silver Bullet Mines”.

For further information, please contact:

John Carter
Silver Bullet Mines Corp., CEO
cartera@sympatico.ca
+1 (905) 302-3843

Peter M. Clausi
Silver Bullet Mines Corp., VP Capital Markets
pclausi@brantcapital.ca
+1 (416) 890-1232

Cautionary and Forward-Looking Statements

Silver Bullet Mines Corp. trades on the TSX Venture Exchange under the symbol SBMI and on the OTCQB Venture Market under the symbol SBMCF. The OTCQB Venture Market is for early stage and developing U.S. and international companies. Companies listed there are current in their reporting and undergo an annual verification and management certification process. Investors can find current financial disclosure for the Company on www.otcmarkets.com and at https://money.tmx.com/en/quote/SBMI.

This news release contains certain statements that constitute forward-looking statements as they relate to SBMI and its subsidiaries. Forward-looking statements are not historical facts but represent management’s current expectation of future events, and can be identified by words such as “believe”, “expects”, “will”, “intends”, “plans”, “projects”, “anticipates”, “estimates”, “continues” and similar expressions. Although management believes that the expectations represented in such forward-looking statements are reasonable, there can be no assurance that they will prove to be correct.

By their nature, forward-looking statements include assumptions, and are subject to inherent risks and uncertainties that could cause actual future results, conditions, actions or events to differ materially from those in the forward-looking statements. If and when forward-looking statements are set out in this new release, SBMI will also set out the material risk factors or assumptions used to develop the forward-looking statements. Except as expressly required by applicable securities laws, SBMI assumes no obligation to update or revise any forward-looking statements. The future outcomes that relate to forward-looking statements may be influenced by many factors, including but not limited to: the impact of SARS CoV-2 or any other global virus; reliance on key personnel; the availability of skilled and unskilled labour; the presence and recoverability of mineralization; ongoing availability of infrastructure such as electrical, diesel and road access; the thoroughness of its QA/QA procedures; the continuity of the global supply chain for materials for SBMI to use in the production and processing of ore; shareholder, permitting and regulatory approvals; activities and attitudes of communities local to the location of SBMI’s properties; price increases related to supply chain issues; risks of future legal proceedings; income tax matters; fires, floods and other natural phenomena; the rate of inflation; availability and terms of financing; distribution of securities; commodities pricing; currency movements, especially as between the USD and CDN; effect of market interest rates on price of securities; and, potential dilution. SARS CoV-2 and other potential global viruses create risks that at this time are immeasurable and impossible to define.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/130029

Categories
Junior Mining Precious Metals Silver Bullet Mines

Silver Bullet Mines Corp.: Invitation to PDAC 2022 Booth 3308

Silver Bullet Mines, Proven and Probable

Burlington, Ontario–(Newsfile Corp. – June 10, 2022) – Silver Bullet Mines Corp. (TSXV: SBMI) invites you to visit them at Booth #3308 at The Prospectors & Developers Association of Canada Convention (PDAC) at the Metro Toronto Convention Centre (MTCC) on Monday June 13 to Wednesday June 15, 2022.

About Silver Bullet Mines Corp.

Silver production is imminent at Silver Bullet’s Buckeye Silver Mine, in Arizona. Only 63M shares outstanding, with 29M in escrow. The company owns its own mill, giving it great control over its costs.

About PDAC

The World’s Premier Mineral Exploration & Mining Convention is the leading convention for people, governments, companies and organizations connected to mineral exploration. In addition to meeting more than 1,100 exhibitors, 2,500 investors and 23,000 attendees in person in 2020, participants could also attend programming, courses and networking events.

The annual convention is held in Toronto, Canada. It has grown in size, stature and influence since it began in 1932 and today is the event of choice for the world’s mineral industry. From 2021 it is also offered as an online event.

For more information and/or to register for the conference please visit: https://www.pdac.ca/convention/registration.

We look forward to seeing you there.

For further information:

Silver Bullet Mines Corp.
Peter Clausi
+14168901232
pclausi@brantcapital.ca
www.silverbulletmines.com

Categories
Breaking Energy Junior Mining Silver Bullet Mines

Commissioning of Silver Bullet Mines Corp.’s Mill Has Begun

Silver Bullet Mines, Proven and Probable

Burlington, Ontario–(Newsfile Corp. – June 9, 2022) – Silver Bullet Mines Corp. (TSXV: SBMI) (OTCQB: SBMCF) (“SBMI” or “the Company”) announces it has commenced commissioning of its wholly owned 125 MTPD state of the art mill located near Globe, Arizona. This is the next step to silver production.

“Commissioning is the culmination of much planning and hard work,” said A. John Carter, SBMI’s CEO. “The field team overcame global supply chain issues to create a functioning 125 MTPD mill, in a location that was an empty field only last September. We are looking forward to processing ore as quickly as possible.”



Water running through piping as part of start of mill commissioning.

To view an enhanced version of this graphic, please visit:
https://orders.newsfilecorp.com/files/8464/127116_fcd72cd6d43ca802_001full.jpg.

Commissioning will take place over the next few weeks and will include the following steps:

  • water will be run through the mill to check for leaks;
  • each motor will be test run individually and sequentially;
  • each piece of equipment will be test run individually and sequentially to confirm technical matters such as the alignment of gears, bearing temperatures, and clearances;
  • the conveyors will be tracked for speed and consistency;
  • the crushers will be adjusted to proper settings as dictated by the conveyors;
  • the ball charge will then be put in the mill, meaning the steel balls will be inserted into the ball mill in anticipation of feedstock;
  • once all the equipment is calibrated, the mill will again be wet run with water to insure pumps and piping are correct; and
  • the installation of ancillary equipment as needed will follow.

SBMI has contracted Sepro Mineral Systems Corp., the manufacturer of the Falcon Concentrators, to provide a start-up technical team to train SBMI’s experienced mill crew, to insure optimum efficiency of each piece of the mill and the mill overall. The third-party electrical engineers will have at least one person on-site during start-up as well.

When the overall mill has been confirmed to be operating properly, test feed material will be added. As previously disclosed the Company has stockpiled at the millsite some lower grade ore from the Buckeye Silver Mine to serve as test feed. This will allow SBMI to fine tune the mill while minimizing the risk of losing valuable metals to tailings.

It is anticipated the entire commissioning process will take a few weeks, following which processing of the higher grade material can begin.

SBMI will provide further updates as it progresses through the commissioning process.

Please check the Company’s website www.silverbulletmines.com, or follow on Twitter @bulletmines or at YouTube “Silver Bullet Mines”.

For further information, please contact:

John Carter
Silver Bullet Mines Corp., CEO
cartera@sympatico.ca
+1 (905) 302-3843

Peter M. Clausi
Silver Bullet Mines Corp., VP Capital Markets
pclausi@brantcapital.ca
+1 (416) 890-1232

Cautionary and Forward-Looking Statements

Silver Bullet Mines Corp. trades on the TSX Venture Exchange under the symbol SBMI and on the OTCQB Venture Market under the symbol SBMCF. The OTCQB Venture Market is for early stage and developing U.S. and international companies. Companies listed there are current in their reporting and undergo an annual verification and management certification process. Investors can find current financial disclosure for the Company on www.otcmarkets.com and at https://money.tmx.com/en/quote/SBMI .

This news release contains certain statements that constitute forward-looking statements as they relate to SBMI and its subsidiaries. Forward-looking statements are not historical facts but represent management’s current expectation of future events, and can be identified by words such as “believe”, “expects”, “will”, “intends”, “plans”, “projects”, “anticipates”, “estimates”, “continues” and similar expressions. Although management believes that the expectations represented in such forward-looking statements are reasonable, there can be no assurance that they will prove to be correct.

By their nature, forward-looking statements include assumptions, and are subject to inherent risks and uncertainties that could cause actual future results, conditions, actions or events to differ materially from those in the forward-looking statements. If and when forward-looking statements are set out in this new release, SBMI will also set out the material risk factors or assumptions used to develop the forward-looking statements. Except as expressly required by applicable securities laws, SBMI assumes no obligation to update or revise any forward-looking statements. The future outcomes that relate to forward-looking statements may be influenced by many factors, including but not limited to: the impact of SARS CoV-2 or any other global virus; reliance on key personnel; the availability of skilled and unskilled labour; the presence and recoverability of mineralization; ongoing availability of infrastructure such as electrical, diesel and road access; the thoroughness of its QA/QA procedures; the continuity of the global supply chain for materials for SBMI to use in the production and processing of ore; shareholder, permitting and regulatory approvals; activities and attitudes of communities local to the location of SBMI’s properties; price increases related to supply chain issues; risks of future legal proceedings; income tax matters; fires, floods and other natural phenomena; the rate of inflation; availability and terms of financing; distribution of securities; commodities pricing; currency movements, especially as between the USD and CDN; effect of market interest rates on price of securities; and, potential dilution. SARS CoV-2 and other potential global viruses create risks that at this time are immeasurable and impossible to define.

Categories
Energy Junior Mining Precious Metals Silver Bullet Mines

Silver Bullet Mines Corp. Near-Term Production at Washington Silver Mine in Idaho

Burlington, Ontario–(Newsfile Corp. – May 5, 2022) – Silver Bullet Mines Corp. (TSXV: SBMI) (OTCQB: SBMCF) (“SBMI” or “the Company”) is pleased to provide an update on operations at its 100%-owned Washington Mine in Idaho. This mine is on patented lands.

“We are pleased to be back at the Washington Mine and moving forward to production,” said A. John Carter, SBMI’s CEO. “The plan is to access the ore zone in June, to commence production in July, and to continue to work through the winter of 22-23.” SBMI is in discussions with an experienced contract miner to commence such work as soon as reasonably possible, subject to a due diligence site visit.

The Washington Mine first saw production in the late 1800’s with an average gold grade of one ounce per ton. It again produced gold in the 1930’s during which time the then-owner lacked the process capability needed to produce silver, so a decision was made to block out the silver mineralization with the intention of returning at a future date to extract it. To the best of SBMI’s knowledge, the blocked-out volume remains in situ. A historical report indicates the blocked-out volume contains an estimated 3 million ounces of silver with a grade of 30 to 90 ounces per ton and 15,000 ounces of gold at 0.3 ounces per ton. (Source, “Geological Evaluation”, Roger G. Stoker, P.G. and Ryne C. Stoker, Student Geologist, Energy Services Inc., December, 1981.)

Stoker also indicated the location of the “Berger Vein”, described as a “gold ore shoot 25 feet wide, 135 feet long, and unknown depth.” Average grades were given as 0.3 oz/ton gold with unknown silver content. Additional notes in Stoker suggest that the Berger Vein was intersected in drifting at the 400-foot level.

The references above to data and observations derived from work not carried out by SBMI are of historical nature only and cannot be relied upon at this time. SBMI does not know the methods by which such work was carried out, or whether all or part of it was under the supervision of a Qualified Person, as that term is defined in NI43-101. SBMI refers to such data and observations to inform its knowledge of the area.

Based in part on the information from Stoker, SBMI took a bulk sample from the Washington Mine, the results of which were disclosed on January 18, 2022. That bulk sample returned 55.5 ounces silver per ton. It is the Company’s intention to exploit that mineralization while developing other vein faces.

To that end the Company’s onsite contractor has cleared small trees that had fallen over the winter, has upgraded the road, and with snowmelt, has cleared access to the main portal.



Small trees being cleared off road to portal

To view an enhanced version of this graphic, please visit:
https://orders.newsfilecorp.com/files/8464/122864_b60aa5b0a4259a0a_001full.jpg

SBMI has also contracted a portable sawmill to be on site in the near future to start cutting timber for the underground workings. There will be cost-savings as SBMI owns the timber rights at the Washington Mine, meaning SBMI can provide most of the required timber. The Company is also installing a water supply and equipment container.

It is intended that SBMI meet the contract miner at the Washington Mine in the next few weeks for a due diligence visit. Some of the items involved in having the contract miner begin removing mineralized material are:

  • Road upgrade permit has been received and the work completed;
  • Mine ID has been applied for and received;
  • A ventilation plan is in progress and should be completed in next few weeks;
  • MSHA approval should be received shortly;
  • Contract negotiations are underway with a Mine Rescue contractor; and
  • Metallurgical testing is ongoing at Montana Technical University with results anticipated in the next few weeks.

It is anticipated the contract miner will take an initial bulk sample of 1500 to 3000 tons in July, for processing at a local mill. Upon completion of the processing of the bulk sample, SBMI intends to start underground development, targeting the parallel zone and the Berger Vein.

All the above items are being completed under the on-site supervision of Mr. Nick Barr, geologist.

The Company is also planning a surface exploration program at the Washington Mine this summer to further delineate the parallel structures discovered during last year’s field program.

Access to the property can be maintained through the winter as SBMI has contracted a local service provider who has the equipment needed to keep the road open. Decisions on the scope of winter work underground will be determined after the Company receives the results of the July bulk sample.

In Arizona at the Buckeye Silver Mine, work continues to complete the 125t/day mill. Wiring the Motor Control Centre to the various parts of the ball mill has begun. The estimated timeline for completion is roughly four weeks, although that is largely out of SBMI’s control. There continues to be some supply chain risk and pricing risk as to when all equipment will be ready and on-site, although SBMI believes it has taken all necessary steps to reduce such risks.

Please check the Company’s website www.silverbulletmines.com, or follow on Twitter @bulletmines or at YouTube “Silver Bullet Mines”.

For further information, please contact:

John Carter
Silver Bullet Mines Corp., CEO
cartera@sympatico.ca
+1 (905) 302-3843

Peter M. Clausi
Silver Bullet Mines Corp., VP Capital Markets
pclausi@brantcapital.ca
+1 (416) 890-1232

Cautionary and Forward-Looking Statements

Silver Bullet Mines Corp. trades on the TSX Venture Exchange under the symbol SBMI and on the OTCQB Venture Market under the symbol SBMCF. The OTCQB Venture Market is for early stage and developing U.S. and international companies. Companies listed there are current in their reporting and undergo an annual verification and management certification process. Investors can find current financial disclosure for the Company on www.otcmarkets.com and at https://money.tmx.com/en/quote/SBMI.

This news release contains certain statements that constitute forward-looking statements as they relate to SBMI and its subsidiaries. Forward-looking statements are not historical facts but represent management’s current expectation of future events, and can be identified by words such as “believe”, “expects”, “will”, “intends”, “plans”, “projects”, “anticipates”, “estimates”, “continues” and similar expressions. Although management believes that the expectations represented in such forward-looking statements are reasonable, there can be no assurance that they will prove to be correct.

By their nature, forward-looking statements include assumptions, and are subject to inherent risks and uncertainties that could cause actual future results, conditions, actions or events to differ materially from those in the forward-looking statements. If and when forward-looking statements are set out in this new release, SBMI will also set out the material risk factors or assumptions used to develop the forward-looking statements. Except as expressly required by applicable securities laws, SBMI assumes no obligation to update or revise any forward-looking statements. The future outcomes that relate to forward-looking statements may be influenced by many factors, including but not limited to: the impact of SARS CoV-2 or any other global virus; reliance on key personnel; the thoroughness of its QA/QA procedures; the continuity of the global supply chain for materials for SBMI to use in the production and processing of ore; shareholder and regulatory approvals; activities and attitudes of communities local to the location of SBMI’s properties; price increases related to supply chain issues; risks of future legal proceedings; income tax matters; fires, floods and other natural phenomena; the rate of inflation; availability and terms of financing; distribution of securities; commodities pricing; currency movements, especially as between the USD and CDN; effect of market interest rates on price of securities; and, potential dilution. SARS CoV-2 and other potential global viruses create risks that at this time are immeasurable and impossible to define.

Categories
Base Metals Energy Junior Mining Silver Bullet Mines

Silver Bullet Mines Corp. Closing of Oversubscribed Financing

Burlington, Ontario–(Newsfile Corp. – March 30, 2022) – On March 25, 2022, Silver Bullet Mines Corp. (TSXV: SBMI) (‘SBMI’ or ‘the Company’) announced an extension to close on the final tranche of its previously announced financing (the “Financing”). The Company announces it has now closed on the final round of the Financing. The gross cash proceeds from the Financing is $2,718,903.

“We thank the shareholders for their continued faith in our business plan and in our ability to execute on it,” said A. John Carter, SBMI’s CEO. “We had planned certain capital expenditures for some months out to improve the recovery rates for silver and copper at our mill in Arizona. The strength of the Financing empowers us to makes those expenditures now, which we expect will increase anticipated revenue and cash flow.”

The oversubscribed total represents 6,797,258 Units, with each Unit priced at $0.40 (forty cents). Each Unit consists of one common share and one full 60-cent (sixty cent) warrant with a 24-month term, with each such warrant being exercisable into a common share (the “Financing”). There is no acceleration clause on such warrants.

The Financing had an original minimum-maximum of $500,000 and $2,000,000 respectively. The Financing was oversubscribed by more than 35% of the original maximum.

In connection with the Financing a total of 79,130 broker warrants were issued as referral fees to registrants, with such warrants having the same characteristics as those issued in the Financing. A total of $73,352 was also paid in cash as referral fees.

An insider of the Company participated in the Financing which is a “related party transaction” within the meaning of Multilateral Instrument 61-101 Protection of Minority Security Holders in Special Transactions (“MI 61-101”). The Company relies upon the exemptions contained in MI61-101 in sections 5.5 and 5.7.

For further information, please contact:

John Carter
Silver Bullet Mines Corp., CEO
cartera@sympatico.ca
+1 (905) 302-3843

Peter M. Clausi
Silver Bullet Mines Corp., VP Capital Markets
pclausi@brantcapital.ca
+1 (416) 890-1232

Cautionary and Forward-Looking Statements

This news release contains certain statements that constitute forward-looking statements as they relate to SBMI and its subsidiaries. Forward-looking statements are not historical facts but represent management’s current expectation of future events, and can be identified by words such as “believe”, “expects”, “will”, “intends”, “plans”, “projects”, “anticipates”, “estimates”, “continues” and similar expressions. Although management believes that the expectations represented in such forward-looking statements are reasonable, there can be no assurance that they will prove to be correct.

By their nature, forward-looking statements include assumptions, and are subject to inherent risks and uncertainties that could cause actual future results, conditions, actions or events to differ materially from those in the forward-looking statements. If and when forward-looking statements are set out in this new release, SBMI will also set out the material risk factors or assumptions used to develop the forward-looking statements. Except as expressly required by applicable securities laws, SBMI assumes no obligation to update or revise any forward-looking statements. The future outcomes that relate to forward-looking statements may be influenced by many factors, including but not limited to: the impact of SARS CoV-2 or any other global virus; reliance on key personnel; the thoroughness of its QA/QA procedures; the continuity of the global supply chain for materials for SBMI to use in the production and processing of ore; shareholder and regulatory approvals; activities and attitudes of communities local to the location of SBMI’s properties; risks of future legal proceedings; income tax matters; fires, floods and other natural phenomena; the rate of inflation; availability and terms of financing; distribution of securities; commodities pricing; currency movements, especially as between the USD and CDN; effect of market interest rates on price of securities; and, potential dilution. SARS CoV-2 and other potential global viruses create risks that at this time are immeasurable and impossible to define.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/118609