Categories
Base Metals Blog Energy Exclusive Interviews Precious Metals

BOB MORIARTY – Civil War, EU Breakup, Precious Metals

Legendary Bob Moriarty of 321Gold sits down with us to discuss a number of geopolitical events ranging from Civil War, the Breakup of the EU, the World Economic Forum, President Biden, President Trump, Russia, Ukraine, Germany, Netherlands, the United States, and Precious Metals! Need I say more?

0:00 Introduction
1:00 Thoughts on Biden’s Attack on America at the Independence Hall
2:28 What is Next?
3:17 Praetorian Guards
5:00 Civil War
7:17 Why does Russia not what to supply gas to Germany
8:51 How are the sanctions impacting Russia
9:33 What is China doing
9:53 Wholesale Price of Electricity in France and Germany
10:33 Russia has given 2 important choices to Europe
10:55 EU Breakup
11:45 What are the European Governments doing to solve high energy costs
12:35 Use now Pay later
13:44 Is NATO going to break up
16:42 Who is the World Economic Forum (WEF), Klaus Schwab, Bill Gates, George Soros
18:02 What does history teach us about the WEF
18:47 Who is behind Antifa, BLM, Climate Change, Green Energy, The Flu, Ukraine
20:17 Direct relationship between fossil fuels and population
21:22 One set of rules from them, and one set of rules for us
22:16 Modern Monetary Theory
23:13 Why is the WEF targeting farmers in Europe
25:00 How does Money, Gold and Silver, fit into the narrative
27:15 Gold Backed Currency
27:55 Next 4 Months more change than in the last 50 years
28:25 What are you choices
29:07 Have the metals bottomed
30:00 What metals is Bob buying
30:50 The Art of Peace
31:30 Best place to buy Precious Metals (gold, silver, platinum, palladium, rhodium), Precious Metal IRA’s, and Segregated, Insured Storage with BRINKS
30:20 Listed to what Bob predicted in 2016
35:53 Where can you find Bob’s Books

Websitehttps://www.provenandprobable.com

Contact: Contact@provenandprobable.com

PRECIOUS METALS INQUIRIES:
Call me directly at 855.505.1900 or email: Maurice@MilesFranklin.com
Precious Metals FAQ – https://www.milesfranklin.com/faq-maurice/

Proven and Probable
Where we deliver Mining Insights & Bullion Sales. I’m a licensed broker for Miles Franklin Precious Metals Investments, where we provide unlimited options to expand your precious metals portfolio, from physical delivery, offshore depositories, and Precious Metal IRA’s. Call me directly at (855) 505-1900 or you may email maurice@milesfranklin.com.

Proven and Probable provides insights on mining companies, junior miners, gold mining stocks, uranium, silver, platinum, zinc & copper mining stocks, silver and gold bullion in Canada, the US, Australia, and beyond.

Categories
Junior Mining Miles Franklin Precious Metals

$1.49 OVER SPOT | RCM 1000 oz. SILVER BARS

Miles Franklin, Proven and Probable
Click Image for Ordering FAQ’s or Better Call Me @ 855.505.1900

What are the Benefits of buying Brand New RCM 1000 oz Silver Bars?

  • Royal Canadian Mint Bars are Brand New, never owned before. Unlike Comex Silver Bars that are previously owned and commonly found in almost 99% of all 1000oz silver Bar Programs. Know what you are buying with a trusted name and a brand-new product.
  • RCM Silver bars range from 900 – 990+ ounces each, exact weights available
  • The Royal Canadian Mint is known for their purity & expertise in providing a high-quality product
  • Miles Franklin has immediate availability of 1000 oz. Royal Canadian Mint silver bars
  • Royal Canadian Mint Bars include Insured Shipping to Brink’s Vaults
  • Royal Canadian Mint Bars can be stored at either Brink’s Toronto or Brink’s New York JFK

Miles Franklin Precious Metal Storage Details:

  • Bars are exclusively your private property. They are not registered with any commodity exchange
  • 1000oz. Silver bars offer the most competitive and lowest pricing and premiums possible
  • Rates start at $490 per year per $100,000 in value, billed quarterly
  • 3 Bar Minimum for initial account set up, 1 Bar per order there-after to qualify for this rate
  • Bars with Miles Franklin are fully segregated and never commingled
  • Extremely Liquid, bars may be sold back to Miles Franklin at any time
Categories
Base Metals Gold Shore Resources Junior Mining Precious Metals

Goldshore Announces Strong Initial Drilling Results from the East Coldstream Deposit 13 Kilometers Northeast of Moss Lake

Vancouver, British Columbia–(Newsfile Corp. – September 12, 2022) – Goldshore Resources Inc. (TSXV: GSHR) (OTCQB: GSHRF)  (FSE: 8X00) (“Goldshore” or the “Company“), is pleased to announce assay results from eight holes drilled to test gold mineralization at the East Coldstream deposit at the Moss Lake Project in Northwest Ontario, Canada (the “Moss Lake Gold Project“).

Highlights:

  • Results for eight holes, drilled to better define the gold mineralization of the East Coldstream deposit, have confirmed three broad lenses of gold mineralization within the two main shear zones with best intercepts of:
  • 23m @ 1.34 g/t Au from 244m depth in CED-22-004, including
    • 7.35m @ 3.77 g/t Au from 254.2m
  • 17.3m @ 1.55 g/t Au from 487m depth in CED-22-005

  • 20m @ 1.15 g/t Au from 402m depth in CED-22-006
  • 26m @ 1.66 g/t Au from 451m, including
    • 7.9m @ 4.20 g/t Au from 465m
  • 25.7m @ 2.07 g/t Au from 488m
  • 37.05m @ 1.54 g/t Au from 209.3m depth in CED-22-007
  • 27.9m @ 1.14 g/t Au from 387m depth in CED-22-008, including
    • 13m @ 2.14 g/t Au from 401m
  • The better intercepts are all centered around five high-grade gold zones of mineralized breccia, including:
  • 1.05m @ 15.8 g/t Au from 257.95m depth in CED-22-004
  • 0.9m @ 14.3 g/t Au from 472m depth in CED-22-006, and
  • 0.65m @ 13.5 g/t Au from 502m
  • 0.85m @ 10.6 g/t Au from 244.35m depth in CED-22-007, and
  • 0.4m @ 12.6 g/t Au from 418m
  • These results show that the three gold mineralized lenses have a clear steep plunge and highlight significant upside potential at depth within structurally controlled shoots.

President and CEO Brett Richards stated: “These first results are extremely encouraging and significant to the overarching strategy of developing a secondary resource to Moss Lake. This will provide optionality that can only help improve the new PEA study next yearThe results also point to a second significant project within our land package, which highlights the potential for further discoveries.”

Technical Overview

Figure 1 shows the location of the East Coldstream deposit relative to the Moss Lake deposit and the Archean Shebandowan Greenstone Belt. Table 1 and Figure 3 show the significant intercepts. Table 2 and Figure 2 show the drill hole locations. Figures 4 and 5 show a cross section through CED-22-006 and long section along the southern zone, respectively.



Figure 1: Location map showing East Coldstream relative to Moss Lake

To view an enhanced version of Figure 1, please visit:
https://images.newsfilecorp.com/files/8051/136640_94a2d25c448d2bce_002full.jpg



Figure 2: Drill plan showing drill holes (long section is Figure 5)

To view an enhanced version of Figure 2, please visit:
https://images.newsfilecorp.com/files/8051/136640_94a2d25c448d2bce_003full.jpg



Figure 3: Drill plan showing best of several +1 g/t Au intercepts

To view an enhanced version of Figure 3, please visit:
https://images.newsfilecorp.com/files/8051/136640_94a2d25c448d2bce_004full.jpg



Figure 4: Drill section through CED-22-006 and the Main Lens

To view an enhanced version of Figure 4, please visit:
https://images.newsfilecorp.com/files/8051/136640_94a2d25c448d2bce_005full.jpg



Figure 5: Long section through the Main and Sanders Lenses

To view an enhanced version of Figure 5, please visit:
https://images.newsfilecorp.com/files/8051/136640_94a2d25c448d2bce_006full.jpg

Table 1: Significant downhole gold intercepts

HOLE IDFROMTOLENGTH
(m)
TRUE
WIDTH (m)
CUT
GRADE

(g/t Au)
UNCUT
GRADE

(g/t Au)
CED-22-001322.00324.452.451.80.800.80
420.00428.508.506.60.510.51
 
CED-22-002No significant assays
  
CED-22-003168.85171.903.052.20.610.61
252.30258.806.504.80.760.76
including253.95256.902.952.21.071.07
269.55288.7019.1514.40.610.61
including283.30288.705.404.11.311.31
  
CED-22-0045.007.002.001.00.760.76
149.00157.008.004.40.450.45
168.00216.0048.0027.50.390.39
including168.95173.004.052.31.291.29
244.00267.0023.0013.61.341.34
including254.20261.557.354.33.773.77
0.0
CED-22-005487.00504.3017.3011.01.551.55
including489.00504.3015.309.71.691.69
571.55575.003.452.20.550.55
  
CED-22-006311.00322.4011.406.40.330.33
334.90346.0011.106.30.410.41
394.00440.0046.0026.80.630.63
including402.00422.0020.0011.61.151.15
451.00477.0026.0015.51.661.66
including457.00460.003.001.81.511.51
and465.00472.907.904.74.204.20
488.00513.7025.7016.32.072.07
including488.00513.0025.0015.92.102.10
  
CED-22-007209.30246.3537.0521.61.541.54
including213.30246.3533.0519.31.671.67
289.00291.002.001.20.430.43
319.00321.152.151.30.710.71
367.10376.008.905.50.600.60
387.75390.602.851.80.630.63
438.00440.002.001.30.640.64
446.00460.5014.509.20.580.58
  
CED-22-00891.9594.002.051.40.870.87
300.80312.0011.208.90.540.54
387.00414.9027.9022.81.141.14
including401.00414.0013.0010.62.142.14
Intersections calculated above a 0.3 g/t Au cut off with a top cut of 30 g/t Au and a maximum internal waste interval of 10 metres. Bordered intervals are intersections calculated above a 1.0 g/t Au cut off. Intervals in bold are those with a grade thickness factor exceeding 20 gram x metres / tonne gold. True widths are approximate and assume a subvertical body.

Table 2: Location of drill holes in this press release

HOLEEASTNORTHRLAZIMUTHDIPEOH
CED-22-001681,1365,386,570479337°-50°483.0m
CED-22-002681,4205,386,640479335°-50°494.85m
CED-22-003680,5075,386,473481336°-50°360.0m
CED-22-004680,0085,386,430477155°-60°302.8m
CED-22-005680,5595,386,340486342°-60°810.1m
CED-22-006680,0105,386,586475140°60°600.0m
CED-22-007680,0855,386,604473138°-59°657.05m
CED-22-008680,5595,386,340483340°-50°603.0m
Approximate collar coordinates in NAD 83, Zone 15N

Results have been received for eight of the initial 17 holes in the first pass drilling program at East Coldstream. These drillholes tested the existing mineralized lenses, as well as possible eastern and down-dip extensions.

Our work on the mineralization paragenesis and its structural controls has shown that gold mineralization is related to pervasive silica-hematite alteration and sulfide veining associated with an extensional brecciation event following extensive shearing. At the deposit scale, this formed three lenticular bodies within two main shear zones (Figure 1). Based on structural measurements from oriented core, each body has a steeply west-dipping plunge and a gently east-pitching stretching lineation that creates an internal fabric to mineralization (Figure 4). This structural control creates the potential for additional high-grade mineralization to occur below the shallowly drilled portions of the shears zones such as encountered in CED-22-007.

CED-22-001 and -002 tested a similar geophysical feature to the east of the East Coldstream deposit. CED-22-001 was drilled closest to East Coldstream and encountered narrow zones of mineralization, while CED-22-002 was drilled 300 meters further east and did not encounter significant results. This sterilizes the immediate extension, but given the lenticular geometry of mineralization, leaves open the prospectively of the structure further to the east.

CED-22-003 and -004 drilled the North and Main Lenses, respectively. Both holes intersected broad low-grade mineralized zones, including 19.15m @ 0.61 g/t Au from 269.55m in CED-22-003; and 48m @ 0.39 g/t Au from 168m and 23m @ 1.34 g/t Au in CED-22-004.

Holes CED-22-005 to -008 tested down plunge extensions of the known mineralization. All holes intersected variable widths of higher grade mineralization, including 17.3m @ 1.55 g/t Au from 487m in CED-22-005; 20.0m @ 1.15 g/t Au from 402m, 26.0m @ 1.66 g/t Au from 451m, and 25.7m @ 2.07 g/t Au from 488m in CED-22-006; 37.05m @ 1.54 g/t Au from 209.3m in CED-22-007; and 27.9m @ 1.14 g/t Au from 387m in CED-22-008.

Pete Flindell, VP Exploration for Goldshore, said “Our analysis of drill results at East Coldstream confirms the two parallel shear zones that were modelled in the past. The recognition of a greater structural control within these shears has led to the modelling of three steeply dipping lenticular shoots that remain open at depth. A gently dipping internal fabric suggests that mineralization is focused within discrete structures that may allow us to model a higher-grade resource than exists in the historic estimate.”

Analytical and QA/QC Procedures

All samples were sent to ALS Geochemistry in Thunder Bay for preparation and analysis was performed in the ALS Vancouver analytical facility. ALS is accredited by the Standards Council of Canada (SCC) for the Accreditation of Mineral Analysis Testing Laboratories and CAN-P-4E ISO/IEC 17025. Samples were analyzed for gold via fire assay with an AA finish (“Au-AA23”) and 48 pathfinder elements via ICP-MS after four-acid digestion (“ME-MS61”). Samples that assayed over 10 ppm Au were re-run via fire assay with a gravimetric finish (“Au-GRA21”).

In addition to ALS quality assurance / quality control (“QA/QC”) protocols, Goldshore has implemented a quality control program for all samples collected through the drilling program. The quality control program was designed by a qualified and independent third party, with a focus on the quality of analytical results for gold. Analytical results are received, imported to our secure on-line database and evaluated to meet our established guidelines to ensure that all sample batches pass industry best practice for analytical quality control. Certified reference materials are considered acceptable if values returned are within three standard deviations of the certified value reported by the manufacture of the material. In addition to the certified reference material, certified blank material is included in the sample stream to monitor contamination during sample preparation. Blank material results are assessed based on the returned gold result being less than ten times the quoted lower detection limit of the analytical method. The results of the on-going analytical quality control program are evaluated and reported to Goldshore by Orix Geoscience Inc.

About Goldshore

Goldshore is an emerging junior gold development company, and owns the Moss Lake Gold Project located in Ontario. Wesdome Gold Mines Ltd. (“Wesdome“), is currently a large shareholder of Goldshore with an approximate 27% equity position in the Company. Well-financed and supported by an industry-leading management group, board of directors and advisory board, Goldshore is positioned to advance the Moss Lake Gold Project through the next stages of exploration and development.

About the Moss Lake Gold Project

The Moss Lake Gold Project is located approximately 100 km west of the city of Thunder Bay, Ontario. It is accessed via Highway 11 which passes within 1 km of the property boundary to the north. The Moss Lake Gold Project covers 14,292 hectares and consists of 282 unpatented and patented mining claims.

The Moss Lake Gold Project hosts a number of gold and base metal rich deposits including the Moss Lake Deposit, the East Coldstream Deposit (Table 3), the historically producing North Coldstream Mine (Table 4), and the Hamlin Zone, all of which occur over a mineralized trend exceeding 20 km in length. A historical preliminary economic assessment (the “Moss Lake Historical Estimate“) was completed on the Moss Lake Gold Project in 2013 and published by Moss Lake Gold Mines Ltd. (“Moss Lake Gold Mines“)1,3. A historical mineral resource estimate (the “East Coldstream Historical Estimate“) was completed on the East Coldstream Deposit in 2011 by Foundation Resources Inc.2,3 In addition to these zones, the Moss Lake Gold Project also hosts a number of under-explored mineral occurrences which are reported to exist both at surface and in historically drilled holes. The Moss Lake Deposit is a shear-hosted disseminated-style gold deposit which outcrops at surface. It has been drilled over a 2.5 km length and to depths of 300 m with 376 holes completed between 1983 and 2017. The last drilling program conducted in 2016 and 2017 by Wesdome, which consisted of widely spaced holes along the strike extension of the deposit was successful in expanding the mineralized footprint and hydrothermal system 1.6 km to the northeast. Additionally, the deposit remains largely open to depth. In 2017, Wesdome completed an induced polarization survey which traced the potential extensions of pyrite mineralization associated with the Moss Lake Deposit over a total strike length of 8 km and spanning the entire extent of the survey grids.

The East Coldstream Deposit is a shear-hosted disseminated-style gold deposit which locally outcrops at surface. It has been drilled over a 1.3 km length and to depths of 200 m with 138 holes completed between 1988 and 2017. The deposit remains largely open at depth and may have the potential for expansion along strike. Historic drill hole highlights from the East Coldstream Deposit include 4.86 g/t Au over 27.3 m in C-10-15.

The historically producing North Coldstream Mine is reported to have produced significant amounts of copper, gold and silver4 from mineralization with potential iron-oxide-copper-gold deposit style affinity. The exploration potential immediately surrounding the historic mining area is not currently well understood and historic data compilation is required.

The Hamlin Zone is a significant occurrence of copper and gold mineralization, and also of potential iron-oxide-copper-gold deposit style affinity. Between 2008 and 2011, Glencore tested Hamlin with 24 drill holes which successfully outlined a broad and intermittently mineralized zone over a strike length of 900 m. Historic drill hole highlights from the Hamlin Zone include 0.9 g/t Au and 0.35% Cu over 150.7 m in HAM-11-75.

The Moss Lake, East Coldstream and North Coldstream deposits sit on a mineral trend marked by a regionally significant deformation zone locally referred to as the Wawiag Fault Zone in the area of the Moss Lake Deposit. This deformation zone occurs over a length of approximately 20 km on the Moss Lake Gold Project and there is an area spanning approximately 7 km between the Moss Lake and East Coldstream deposits that is significantly underexplored.

Table 3: Historical Mineral Resources1,2,3

INDICATEDINFERRED
DepositTonnesAu g/tAu ozTonnesAu g/tAu oz
Moss Lake Historical Estimate
Open Pit Potential39,795,0001.11,377,30048,904,0001.01,616,300
Underground Potential1,461,1002.9135,400
Moss Lake Total39,795,0001.11,377,30050,364,0001.11,751,600
East Coldstream Historical Estimate
East Coldstream Total3,516,7000.8596,40030,533,0000.78763,276
Combined Total43,311,7001.081,473,70080,897,0000.982,514,876

Notes:

  1. Source: Poirier, S., Patrick, G.A., Richard, P.L., and Palich, J. “Technical Report and Preliminary Economic Assessment for the Moss Lake Project”, prepared for Moss Lake Gold Mines Ltd. The qualified persons for the Moss Lake Historical Estimate are Pierre-Luc Richard, MSc, PGeo (InnovExplo Inc), and Carl Pelletier, BSc, PGeo (InnovExplo Inc), and the effective date of the Moss Lake Historical Estimate is February 8, 2013. In-Pit results are presented undiluted and in situ, within Whittle-optimized pit shells. Underground results are presented undiluted and in situ, outside Whittle-optimized pit shells. The Moss Lake Historical Estimate includes 18 gold-bearing zones and 1 envelope containing isolated gold intercepts. Whittle parameters: mining cost = C$2.28; pit slope angle = 50.0 degrees; production cost = C$9.55; mining Dilution = 5%; mining recovery = 95%; processing recovery = 80% to 85%; gold price = C$1,500. In-Pit and Underground resources were compiled at cut-off grades from 0.3 to 5.0 g/t Au (for sensitivity characterization). A cut-off grade of 0.5 g/t Au was selected as the official in-pit cut-off grade and a cut-off grade of 2.0 g/t Au was selected as the official underground cut-off grade. The Moss Lake Historical Estimate is based on 352 diamond drill holes (90,978 m) drilled from 1983 and 2008. A fixed density of 2.78 g/cm3 was used. A minimum true thickness of 5.0 m was applied, using the grade of the adjacent material when assayed or a value of zero when not assayed. Capping was established at 35 g/t Au, supported by statistical analysis and the high grade distribution within the deposit. Compositing was done on drill hole sections falling within the mineralized zone solids (composite = 1 m). Resources were evaluated from drill hole samples using the ID2 interpolation method in a multi-folder percent block model using Gems version 6.4. Based on geostatistics, the ellipse range for interpolation was 75m x 67.5m x 40m. The Indicated category is defined by combining the blocks within the two main zones and various statistical criteria, such as average distance to composites, distance to closest composite, quantity of drill holes within the search area. Ounce (troy) = metric tons x grade / 31.10348. Calculations used metric units (metres, tonnes and g/t). The number of metric tonnes was rounded to the nearest thousand. Any discrepancies in the totals are due to rounding effects; rounding followed the recommendations in NI 43-101.
  2. Source: McCracken, T. “Technical Report and Resource Estimate on the Osmani Gold Deposit, Coldstream Property, Northwestern Ontario”, prepared for Foundation Resources Inc. and Alto Ventures Ltd. The East Coldstream Historical Estimate is based on a 0.4 g/t Au cut-off grade. The qualified persons for the East Coldstream Historical Estimate are Todd McCracken, P.Geo. (Tetratech Wardrop), and Jeff Wilson, Ph.D., P.Geo. (Tetratech Wardrop), and the effective date of the East Coldstream Historical Estimate is December 12, 2011. Resources are presented unconstrained, undiluted and in situ. The East Coldstream Historical Estimate includes 2 gold-bearing zones. A cut-off grade of 0.4 g/t Au was selected as the official resource cut-off grade. The East Coldstream Historical Estimate is based on 116 diamond drill holes drilled from 1986 to 2011. A fixed density of 2.78 g/cm3 was used. Capping was established at 5.89 g/t Au and 5.70 g/t Au for domains EC-1 and EC-2, respectively. This is supported by statistical analysis and the high-grade distribution within the deposit. Compositing was done on drill hole sections falling within the mineralized zone solids (composite = 1 m). Resources were evaluated from drill hole samples using the ID2 interpolation method in a multi-folder percent block model using Datamine Studio 3 version 3.20.5321.0. Recource categorization is based on spatial continuity based from the variography of the assays within the drillholes. Ounce (troy) = metric tons x grade / 31.10348. Calculations used metric units (metres, tonnes and g/t). The number of metric tonnes was rounded to the nearest thousand. Any discrepancies in the totals are due to rounding effects; rounding followed the recommendations in NI 43-101.
  3. The reader is cautioned that the Moss Lake Historical Estimate East and the East Coldstream Historical Estimate (the “Historical Estimates“) are considered historical in nature and as such is based on prior data and reports prepared by previous property owners. The reader is cautioned not to treat them, or any part of them, as current mineral resources or reserves. The Company has determined these historical resources are reliable, and relevant to be included here in that they demonstrate simply the mineral potential of the Moss Lake Gold Project. A qualified person has not done sufficient work to classify the Historical Estimates as current resources and Goldshore is not treating the Historical Estimates as current resources. Significant data compilation, re-drilling, re-sampling and data verification may be required by a qualified person before the Historical Estimates can be classified as a current resource. There can be no assurance that any of the historical mineral resources, in whole or in part, will ever become economically viable. In addition, mineral resources are not mineral reserves and do not have demonstrated economic viability. Even if classified as a current resource, there is no certainty as to whether further exploration will result in any inferred mineral resources being upgraded to an indicated or measured mineral resource category. The Historical Estimates relating to inferred mineral resources were calculated using prior mining industry standard definitions and practices for estimating mineral resource and mineral reserves. Such prior definitions and practices were utilized prior to the implementation of the current standards of the Canadian Institute of Mining for mineral resource estimation, and have a lower level of confidence.

Table 4: Reported Historical Production from the North Coldstream Deposit4

DepositTonnesCu %Au g/tAgCu lbsAu ozAg oz
Historical Production2,700,00001.890.565.59102,000,00044,000440,000

Note:

  1. Source: Schlanka, R., 1969. Copper, Nickel, Lead and Zinc Deposits of Ontario, Mineral Resources Circular No. 12, Ontario Geological Survey, pp. 314-316.

Peter Flindell, P.Geo., MAusIMM, MAIG, Vice President – Exploration of the Company, a qualified person under NI 43-101 has approved the scientific and technical information contained in this news release.

Neither the TSXV nor its Regulation Services Provider (as that term is defined in the policies of the TSXV) accepts responsibility for the adequacy or accuracy of this release.

For More Information – Please Contact:

Brett A. Richards
President, Chief Executive Officer and Director
Goldshore Resources Inc.

P. +1 604 288 4416 M. +1 905 449 1500
E. brichards@goldshoreresources.com
W. www.goldshoreresources.com

Facebook: GoldShoreRes | Twitter: GoldShoreRes | LinkedIn: goldshoreres

Cautionary Note Regarding Forward-Looking Statements

This news release contains statements that constitute “forward-looking statements.” Such forward-looking statements involve known and unknown risks, uncertainties and other factors that may cause the Company’s actual results, performance or achievements, or developments to differ materially from the anticipated results, performance or achievements expressed or implied by such forward-looking statements. Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by the words “expects,” “plans,” “anticipates,” “believes,” “intends,” “estimates,” “projects,” “potential” and similar expressions, or that events or conditions “will,” “would,” “may,” “could” or “should” occur.

Forward-looking statements in this news release include, among others, statements relating to expectations regarding the exploration and development of the Moss Lake Gold Project, and other statements that are not historical facts. By their nature, forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause our actual results, performance or achievements, or other future events, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. Such factors and risks include, among others: the Company may require additional financing from time to time in order to continue its operations which may not be available when needed or on acceptable terms and conditions acceptable; compliance with extensive government regulation; domestic and foreign laws and regulations could adversely affect the Company’s business and results of operations; the stock markets have experienced volatility that often has been unrelated to the performance of companies and these fluctuations may adversely affect the price of the Company’s securities, regardless of its operating performance; and the impact of COVID-19.

The forward-looking information contained in this news release represents the expectations of the Company as of the date of this news release and, accordingly, is subject to change after such date. Readers should not place undue importance on forward-looking information and should not rely upon this information as of any other date. The Company undertakes no obligation to update these forward-looking statements in the event that management’s beliefs, estimates or opinions, or other factors, should change.

This news release does not constitute an offer to sell, or a solicitation of an offer to buy, any securities in the United States. The securities have not been and will not be registered under the United States Securities Act of 1933, as amended (the “U.S. Securities Act”) or any state securities laws and may not be offered or sold within the United States or to U.S. Persons unless registered under the U.S. Securities Act and applicable state securities laws or an exemption from such registration is available.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/136640

Categories
Base Metals Collective Mining Energy Junior Mining

Collective Mining Releases 2021 ESG Report

Collective Mining Ltd.
Collective Mining Ltd.

TORONTO, Sept. 09, 2022 (GLOBE NEWSWIRE) — Collective Mining Ltd. (TSXV: CNL) (OTCQX: CNLMF) (“Collective” or the “Company”) is proud to announce the publication of its inaugural 2021 ESG Report, detailing the Company’s commitments and contributions to environmental, social and governance (ESG) factors, practices and management. The report offers stakeholders a clear and comprehensive understanding of its most material sustainability topics in key areas that include health and safety, environmental stewardship, social management, governance, inclusion, and diversity. It also highlights the Company’s initiatives and commitments for the 2021 calendar year, as well as the Company’s plans and priorities for 2022.

“I am very pleased to present Collective Mining’s first ESG report, which summarizes the significant efforts we have made since our young Company began operations in Colombia a little over two years ago. The report discloses our Company’s approach and performance on a series of sustainability topics which are part of our core beliefs. We continue our commitment to achieving our ESG goals and creating value that benefits all stakeholders, employees, host communities and the environment,” commented Ari Sussman, Executive Chairman.

The report is available on the Company’s website at www.collectivemining.com under ESG.

About Collective Mining Ltd.

To see our latest corporate presentation and related information, please visit www.collectivemining.com.https://embed.fireplace.yahoo.com/embed?ctrl=Monalixa&m_id=monalixa&m_mode=document&site=sports&os=android&pageContext=%257B%2522ctopid%2522%253A%25221542500%253B1577000%2522%252C%2522hashtag%2522%253A%25221542500%253B1577000%2522%252C%2522wiki_topics%2522%253A%2522TSX_Venture_Exchange%253BZijin_Mining%253BCompany%253BBasic_belief%253BColombia%253BEnvironmental_stewardship%2522%252C%2522lmsid%2522%253A%2522a0770000002m0AbAAI%2522%252C%2522revsp%2522%253A%2522globenewswire.com%2522%252C%2522lpstaid%2522%253A%2522be8a4532-cc1d-3024-ba14-1301d900f699%2522%252C%2522pageContentType%2522%253A%2522story%2522%257D

Collective Mining is an exploration and development company focused on identifying and exploring prospective mineral projects in South America. Founded by the team that developed and sold Continental Gold Inc. to Zijin Mining for approximately $2 billion in enterprise value, the mission of the Company is to repeat its past success in Colombia by making significant new mineral discoveries and advance the projects to production. Management, insiders and close family and friends own nearly 45% of the outstanding shares of the Company and as a result, are fully aligned with shareholders.

The Company currently holds an option to earn up to a 100% interest in two projects located in Colombia. As a result of an aggressive exploration program on both the Guayabales and San Antonio projects, a total of eight major targets have been defined. The Company has made significant grassroot discoveries at both projects with near-surface discovery holes at the Guayabales project yielding 302 metres at 1.11g/t AuEq at the Olympus target, 163 metres at 1.3 g/t AuEq at the Donut target and recently, at the Apollo target, 207.15 metres at 2.68 g/t AuEq, 180.6metres at 2.43 g/t AuEg and 87.8 metres at 2.49 g/t AuEg. At the San Antonio project, the Company intersected, from surface, 710 metres at 0.53 AuEq. (See related press releases on our website for AuEq calculations)

Contact Information

Collective Mining Ltd. 
Steven Gold, Vice President, Corporate Development and Investor Relations
Tel. (416) 648-4065

FORWARD-LOOKING STATEMENTS

This news release contains certain forward-looking statements. Wherever possible, words such as “may”, “will”, “should”, “could”, “expect”, “plan”, “intend”, “anticipate”, “believe”, “estimate”, “predict” or “potential” or the negative or other variations of these words, or similar words or phrases, have been used to identify these forward-looking statements. These statements reflect management’s current beliefs and are based on information currently available to management as at the date hereof.

Forward-looking statements involve significant risk, uncertainties, and assumptions. Many factors could cause actual results, performance, or achievements to differ materially from the results discussed or implied in the forward-looking statements. These factors should be considered carefully, and readers should not place undue reliance on the forward-looking statements. Although the forward-looking statements contained in this news release are based upon what management believes to be reasonable assumptions, Collective cannot assure readers that actual results will be consistent with these forward-looking statements. These forward-looking statements are made as of the date of this news release, and Collective assumes no obligation to update or revise them to reflect new events or circumstances, except as required by law.

Neither the TSXV nor its Regulation Services Provider (as that term is defined in the policies of the TSXV) accepts responsibility for the adequacy or accuracy of this news release.

Categories
Base Metals Emx Royalty Energy Junior Mining Precious Metals Project Generators

EMX Receives initial production royalty payments from Gediktepe

(In U.S. dollars unless otherwise noted)

Vancouver, British Columbia–(Newsfile Corp. – September 9, 2022) – EMX Royalty Corporation (NYSE American: EMX) (TSXV: EMX) (FSE: 6E9) (the “Company” or “EMX”)is pleased to announce the receipt of initial royalty production payments from its Gediktepe royalty property in western Turkey. EMX holds a 10% net smelter return (“NSR”) royalty on oxide gold production at Gediktepe, a newly commissioned mine operated by Polimetal Madencilik Sanayi ve Ticaret A.S. (“Polimetal”), a private Turkish company. EMX has received payments for production from the months of June and July totaling $1,842,452 inclusive of $281,052 in Value Added Tax (“VAT”) for which EMX has credits to recover. These represent the first royalty production payments received from Gediktepe after receiving notice that the definition of commercial production had been satisfied in early June (see EMX News Release dated July 13, 2022).

The June and July payments are based upon the sales of 4,490 ounces of gold and 23,309 ounces of silver in June and 4,030 ounces of gold and 44,164 ounces of silver in July. It should be noted that the payment for June was pro-rated for the portion of the month’s sales that took place after the satisfaction of the definition of commercial production in the royalty agreement, which took place on June 8.

In addition to the oxide gold royalty, EMX also owns a 2% NSR royalty on production from an underlying polymetallic copper, zinc, lead and gold deposit that is slated for future development.

Polimetal had informed EMX earlier in 2022 that it expects to produce between 35,000 and 45,000 ounces of gold per year from Gediktepe (with additional contributions from silver production) while mining the oxide gold cap over the next 3-4 years. The production proceeds received for June and July production are consistent with those projections. The Gediktepe royalty is the subject of a NI 43-101 technical report authored by Dama Engineering with an effective date of February 1, 2022. This technical report has been filed on SEDAR under the Company’s profile and contains historical mining reserve and mineral resource estimates.

Gediktepe VMS Deposit: The Gediktepe volcanogenic massive sulfide (“VMS”) deposit is a polymetallic system with precious metal, copper, and zinc rich domains. The upper portion of the deposit is oxidized, forming a precious metal-enriched gossanous cap that will be mined first, followed by production from the underlying polymetallic sulfide deposit.

Gediktepe was discovered in 2012 by a joint venture between Alacer Gold Corporation (which merged with SSR in 2020) and Lidya Madencilik Sanayi ve Ticaret A.S. (“Lidya”), a private Turkish company. Alacer Gold Corp later converted its 50% joint venture interest at Gediktepe into the royalty interests now owned by EMX. Polimetal is a wholly owned subsidiary of Lidya and serves as the operator for the Gediktepe project.

More information on the Gediktepe royalty asset can be found at www.EMXroyalty.com.

Dr. Eric P. Jensen, CPG, a Qualified Person as defined by National Instrument 43-101 and employee of the Company, has reviewed, verified and approved the disclosure of the technical information contained in this news release.

About EMX. EMX is a precious, base and battery metals royalty company. EMX’s investors are provided with discovery, development, and commodity price optionality, while limiting exposure to risks inherent to operating companies. The Company’s common shares are listed on the NYSE American Exchange and the TSX Venture Exchange under the symbol EMX, and also trade on the Frankfurt exchange under the symbol “6E9”. Please see www.EMXroyalty.com for more information.

For further information contact:

David M. Cole
President and Chief Executive Officer
Phone: (303) 973-8585
Dave@emxroyalty.com

Scott Close
Director of Investor Relations Phone: (303) 973-8585
SClose@emxroyalty.com

Isabel Belger
Investor Relations (Europe)
Phone: +49 178 4909039
IBelger@EMXroyalty.com

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Forward-Looking Statements

This news release may contain “forward looking statements” that reflect the Company’s current expectations and projections about its future results. These forward-looking statements may include statements regarding perceived merit of properties, exploration results and budgets, mineral reserve and resource estimates, work programs, capital expenditures, timelines, strategic plans, market prices for precious and base metal, or other statements that are not statements of fact. When used in this news release, words such as “estimate,” “intend,” “expect,” “anticipate,” “will”, “believe”, “potential”, “go forward” and similar expressions are intended to identify forward-looking statements, which, by their very nature, are not guarantees of the Company’s future operational or financial performance, and are subject to risks and uncertainties and other factors that could cause the Company’s actual results, performance, prospects or opportunities to differ materially from those expressed in, or implied by, these forward-looking statements. These risks, uncertainties and factors may include, but are not limited to: unavailability of financing, failure to identify commercially viable mineral reserves, fluctuations in the market valuation for commodities, difficulties in obtaining required approvals for the development of a mineral project, increased regulatory compliance costs, expectations of project funding by joint venture partners and other factors.

Readers are cautioned not to place undue reliance on these forward-looking statements, which speak only as of the date of this news release or as of the date otherwise specifically indicated herein. Due to risks and uncertainties, including the risks and uncertainties identified in this news release, and other risk factors and forward-looking statements listed in the Company’s MD&A for the quarter ended June 30, 2022 (the “MD&A”) and the most recently filed Annual Information Form (the “AIF”) for the year ended December 31, 2021, actual events may differ materially from current expectations. More information about the Company, including the MD&A, the AIF and financial statements of the Company, is available on SEDAR at www.sedar.com and on the SEC’s EDGAR website at www.sec.gov.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/136416

Categories
Junior Mining Lion One Metals Precious Metals Uncategorized

Lion One Announces New High-Grade, Near-Surface Gold in Drill Results from Phase 2 Infill Program at Tuvatu, Fiji

North Vancouver, British Columbia–(Newsfile Corp. – September 8, 2022) – Lion One Metals Limited (TSXV: LIO) (OTCQX: LOMLF) (ASX: LLO) (“Lion One” or the “Company”) is pleased to announce the results from 20 additional drill holes, as part of ongoing infill drilling at its high-grade, fully permitted Tuvatu Alkaline Gold Project in Fiji.

Drill results for 20 holes totalling approximately 3,900m of diamond drilling in Zone 5 cover a portion of the Tuvatu gold project, part of the Navilawa volcanic caldera which is host to numerous gold occurrences. outcropping mineralization, as well as the high-grade Tuvatu Alkaline gold deposit.

The drill program represents a significant improvement to the extent of known mineralization; additions are highlighted in blue in Table 1. The main orebody (Figure 1), is scheduled to enter production in Q2 of 2023. Its dimensions and continuity are further defined and expanded with the infill program which adds to the 11 earlier holes in Zone 5 (Lion One news release: May 31, 2022). The additional data outlines high-grade to bonanza-grade mineralized lode swarms <100m from surface. Vein-hosted mineralization remains open along strike and at depth. Lion One is upgrading its resource model which is expected to be significantly improved by this round of drill results. The mineralization reported here is a significant development which is expected to upgrade the resource model, as it represents a critical addition of gold mineralisation to the resources model that grades well above the average resource grade, at relatively shallow levels. As a result, the newly identified mineralization will enhance the economic model, likely upgrading the production stream at Tuvatu.

Top Intercepts include:

  • 20.59 g/t Au over 3.9m from 98.4-102.3m, including 52.89 g/t Au over 1.5m, including 171.5 g/t Au over 0.3m, and 79.18 g/t Au over 0.3m from TUG-144
  • 12.22 g/t Au over 3.3m from 54.9-58.2m, including 32.08 g/t Au over 0.6m, 24.08 g/t Au over 0.6m from TUG-143
  • 56.90 g/t Au over 1.8m from 144.6-146.4m, including 163.19 g/t Au over 0.6m from TUDDH-604
  • 35.98 g/t Au over 1.8m from 53.0-54.8m, including 194.00 g/t Au over 0.3m from TUDDH-609
  • 9.13 g/t Au over 3.3m from 60.3-63.6m, including 44.85 g/t Au over 0.6m from TUG-146, as well as 8.15 g/t Au over 5.1m from 97.5-102.6m, including 19.70 g/t Au over 1.8m from 99.3-101.7 including 13.28 g/t Au over 0.6, 11.73 g/t Au over 0.6m, and 34.08 g/t Au over 0.6m also from TUG-146
  • 9.33 g/t Au over 1.5m from 10.5-12.0m, including 37.42 g/t Au over 0.3m from TUG-144
  • 7.14 g/t Au over 3.0m from 107.5-110.5m, including 28.56 g/t Au over 0.3m, 10.54 g/t Au over 0.3m, and 28.74 g/t Au over 0.3m from TUDDH-591
  • 6.80 g/t Au over 4.2m from 92.1-96.3m including 10.39 g/t Au over 0.3m, 24.57 g/t Au over 0.6m, and 9.62 g/t Au over 0.6m from TUDDH-596
  • 17.85 g/t Au over 0.6m from 127.9-128.5m including 26.79 g/t Au over 0.3m, 5.52 g/t Au over 2.7m from 161.8-164.5m incl. 36.81 g/t Au over 0.3m from TUDDH-605
https://embed.fireplace.yahoo.com/embed?ctrl=Monalixa&m_id=monalixa&m_mode=document&site=sports&os=android&pageContext=%257B%2522ctopid%2522%253A%25221542500%253B1480989%253B1481489%2522%252C%2522hashtag%2522%253A%25221542500%253B1480989%253B1481489%2522%252C%2522wiki_topics%2522%253A%2522Exploration_diamond_drilling%253BLion%2522%252C%2522lmsid%2522%253A%2522a0V0W00000HOPDcUAP%2522%252C%2522revsp%2522%253A%2522newsfile_64%2522%252C%2522lpstaid%2522%253A%2522467d0cc8-0df1-31ff-81a2-a2369a566e12%2522%252C%2522pageContentType%2522%253A%2522story%2522%257D

Results are summarized below in Table 1, with vertical sections including all of the newly reported drill holes presented as Figures 2-8. Highlighted in blue on Table 1 are drill intercepts outside of the mineralized lodes that define the existing resource model. Each additional intercept will likely add width, grade, and continuity to the resource in the near-surface portion of the Tuvatu orebody.

Lion One Drilling Programs in Progress
Lion One reports that in addition to its Zone 5 infill drilling it is progressing with deep extensional drilling on the 500 Zone, where TUDDH-608, targeting the high-grade intersection of TUG-141 and TUDD-601, has been terminated at a depth of 678.1m. Visible veining and sulphide mineralization has been recorded from approximately ~530m to 645m depth along the drill hole. Assay results for TUDDH-608 have been commissioned from the Lion One Lab with preliminary results expected soon. Drilling on TUG-147 from the underground decline, targeting the same dilational zone further to the north and deeper has also commenced this week.

The Company has also mobilized a drill rig 2km northeast of Tuvatu to test the Batiri Creek occurrence, the new regional discovery in the Navilawa Caldera (see news release dated August 29, 2022), and underground development continues toward the near-surface Zone 2 of the Tuvatu resource with the No. 2 decline having advanced >80m. Finally, results from a separate batch of 6 PQ diameter diamond drill holes aimed at collecting a 300 kg composite sample for metallurgical testing of Zone 2 mineralization have also been received and compiled. The company will continue to provide further progress updates and results on these activities.

Lion One CEO, Walter Berukoff, stated, “We are confident that the high-grade intercepts indicated by our infill programs and the increased drilling density will lead to a more robust resource model. The high-grade near-surface infill results, along with the continuing success of the deep-drilling program, underscores the potential of Tuvatu to be a multi-million-ounce, high-grade Au producer. Lion One is well positioned to continue advancing all three tiers of our exploration strategy: ongoing, near-surface infill drilling; extensions of deep, high-grade feeder targets, and from our pipeline of regional targets in the surrounding Navilawa caldera.”

Infill Drilling Program
Two phases of infill drilling have been planned at Tuvatu with the aim of infilling areas within the current resource and thus augmenting the data density, to further improve the resolution of the geological model in portions of the deposit scheduled for earliest production. Phase 1 infill drilling was completed over Zone 2 (Figure 1) in mid-February 2022, adding over 8,400m of new data from drill core, including 7,475m of new drilling and 955m of sampling of previously unsampled historic drill core (see Feb. 23, 2022 News Release).

This release presents final assay data from 20 previously unreported drill holes completed as part of the Phase 2 infill program, which is planned for approximately 8,200m of diamond drilling from surface and underground, and which is aimed at upgrading the resource database in Zone 5 of the Tuvatu orebody. The Phase 2 program as planned includes 30 holes totalling 5,475m carried out from 4 separate drill stations at surface, and 35 holes totalling 2,695m carried out from 6 underground drill stations. Phase 2 infill drill program began February 17, 2022, with drill hole TUDDH-577, and is expected to require 8-9 months of drilling using three rigs (two from surface and one from underground) to complete.

Results from the initial approximately 6,200m of drilling in Zone 5, represent approximately 75% of the planned program total, indicating and indeed confirming consistent high-grade to locally bonanza-grade Au mineralization for known mineralized lodes in this portion of the current resource, as well as new high-grade mineralization that was not identified prior to this drill program (Table 1, highlighted), and therefore not included in the current resource model.

Numerous high-grade mineralized intervals occur outside of existing modelled lodes. These notably include 35.98 g/t Au over 1.8m which includes a bonanza grade intercept of 194.00 g/t Au from a downhole depth of only 53.0m in hole TUDDH-609, as well as 19.70 g/t Au over 1.8m from only 99.3m downhole depth in hole TUG-146. These additional near-surface intercepts will add significantly to the overall inventory of high-grade mineralization slated for early production at Tuvatu. 



Figure 1: A) Oblique view looking N060° and down 17° showing the current conceptual mine plan ore panels (gold) highlighting the location of Zone 2 and Zone 5, the exploration decline (yellow) and the planned Zone 5 infill drilling program (blue). The planned drilling consists of 4 surface and 6 underground drill stations. B) Oblique view looking N060° and down 40° showing the UR1 to UR5, URW1A, URW1C, and URW3 lodes (transparent grey), exploration decline (yellow) and the planned Zone 5 infill drilling program (blue).

Cannot view Figure 1? Visit:
https://images.newsfilecorp.com/files/2178/136388_figure1.jpg



Cannot view Figure 2? Visit:
https://images.newsfilecorp.com/files/2178/136388_figure2.jpg



Cannot view Figure 3? Visit:
https://images.newsfilecorp.com/files/2178/136388_figure3.jpg



Cannot view Figure 4? Visit:
https://images.newsfilecorp.com/files/2178/136388_figure4.jpg



Cannot view Figure 5? Visit:
https://images.newsfilecorp.com/files/2178/136388_figure5.jpg



Cannot view Figure 6? Visit:
https://images.newsfilecorp.com/files/2178/136388_figure6.jpg



Cannot view Figure 7? Visit:
https://images.newsfilecorp.com/files/2178/136388_figure7.jpg



Figures 2-8: Composite vertical sections through Zone 5 at Tuvatu, showing the UR1 to UR5, URW1A, URW2A, and URW3 lodes (labelled) and the traces of the infill drilling reported in this release (drill holes are labelled). Grade legend is as follows: orange = >3g/t Au; red = >10 g/t Au; magenta = >30 g/t Au. All figures are at the same scale with views as indicated.

Cannot view Figure 8? Visit:
https://images.newsfilecorp.com/files/2178/136388_figure8.jpg

Table 1: Drilling intervals returning >0.5 g/t Au (intervals > 3.0 g/t Au cutoff are shown in red, and intervals >9.0 g/t Au or longer than 1.2m are bolded). Intercepts that are outside of the current geological model are highlighted in light blue.

Hole IDFrom (m)To (m)Interval (m)Grade (g/t Au)
TUDDH-58919.119.40.30.91
85.185.40.30.81
89.691.41.81.44
113113.60.617.33
170.9171.20.37.36
209.3209.60.30.96
210.822413.23.79
Incl.213.2213.50.317.03
Incl.213.8214.10.37.85
Incl.215.6215.90.37.17
Incl.216.5216.80.311.41
Incl.218218.30.333.30
Incl.222.5222.80.37.21
Incl.223.72240.315.34
     
TUDDH-59173.474.00.61.04
102.3102.60.39.28
103.7104.60.90.93
106.1106.60.52.01
107.5110.53.07.14
Incl.107.5107.80.328.56
Incl.108.1108.40.310.54
Incl.109.0109.30.328.74
112.0112.60.60.73
113.2113.50.30.84
117.7118.60.92.02
126.3127.81.51.29
129.0130.21.20.65
132.9134.11.20.88
142.7143.60.91.71
     
TUDDH-59214.614.90.31.83
18.518.80.30.55
75.275.50.30.55
101.6102.20.615.24
147.5148.71.20.74
158.9159.20.37.76
184.1184.70.68.32
Incl.184.4184.70.310.36
     
TUDDH-5939.911.71.84.49
Incl.10.511.10.68.98
28.229.41.20.54
34.534.80.30.69
88.589.71.24.31
140.1140.40.33.50
152.7154.21.50.78
168.9170.41.51.42
     
TUDDH-594105.0105.30.313.10
189.9191.11.28.01
195.0195.30.31.80
203.4207.64.20.85
203.4203.70.33.67
     
TUDDH-59554.956.11.20.64
112.2112.80.60.85
114.0114.30.380.65
121.8123.92.11.61
190.2191.10.92.20
194.4194.70.33.75
201.3201.60.31.31
209.7211.51.81.88
213.6213.90.32.18
224.4225.91.51.46
234.9235.50.60.52
236.7238.21.53.19
247.5247.80.31.10
     
TUDDH-59677.177.40.30.8
88.891.22.41.35
92.196.34.26.8
Incl.92.192.40.310.39
Incl.93.393.90.624.57
Incl.94.895.40.69.62
102.3102.90.67.77
     
TUDDH-59791.191.70.61.24
137.9138.50.68.59
Incl.137.9138.20.316.50
152.9153.50.61.37
176.6178.41.80.81
189.5190.40.90.55
194.9195.80.98.89
     
TUDDH-59896.7970.30.84
139.6140.50.91.85
144.1144.70.69.19
170.2173.83.64.68
Incl.170.2170.50.312.89
Incl.171.4172.61.28.37
209.5209.80.30.65
     
TUDDH-6006565.30.30.55
73.4773.62.66
Incl.7474.30.35.75
Incl.74.975.20.310.95
78.879.40.60.96
147.8148.70.91.26
     
TUDDH-602127.4127.70.32.73
152153.21.20.79
182.3182.60.31.03
209.6210.50.93.12
Incl.210.2210.50.37.45
214.4214.70.31.10
225.2225.50.37.12
     
TUDDH-60328.730.51.81.64
     
TUDDH-60484.684.90.30.64
144.6146.41.856.90
Incl.144.6145.20.6163.19
167.1170.73.68.75
Incl.167.1167.70.645.36
     
TUDDH-605127.9128.50.617.85
Incl.127.9128.20.326.79
Incl.128.2128.50.38.90
157.6158.50.94.10
Incl.158.2158.50.310.21
161.8164.52.75.52
Incl.164.2164.50.336.81
190190.60.61.21
193.9194.50.60.71
197.21991.80.64
201.1201.70.62.05
214214.30.31.09
     
TUDDH-60666.066.60.60.88
98.498.70.31.00
     
TUDDH-60953.054.81.835.98
Incl.53.954.20.3194.0
Incl.54.254.80.69.32
     
TUG-14314.715.30.62.96
17.117.70.60.89
30.330.90.60.93
32.433.00.61.29
54.958.23.312.22
Incl.54.955.50.632.08
Incl.5757.60.624.08
Incl.57.658.20.68.82
60.961.20.317.23
66.6670.42.26
67.868.40.61.24
71.173.22.10.86
74.474.70.37.19
80.480.70.32.2
89.489.70.38.48
     
TUG-1446.98.41.56.82
Incl.6.97.50.68.07
Incl.7.57.80.39.77
10.512.01.59.33
Incl.11.111.40.337.42
30.631.50.94.25
Incl.30.631.20.65.77
43.543.80.30.9
45.645.90.30.9
5151.60.60.95
52.8541.22.03
64.266.62.40.81
68.469.91.53.93
Incl.68.468.70.38.35
Incl.69.669.90.311.08
75.376.20.91.83
77.778.30.60.78
84.386.72.41.52
93.995.11.28.3
Incl.93.994.50.612.48
98.4102.33.920.59
Incl.98.499.91.552.89
which includes98.498.70.311.35
and99.099.30.3171.5
and99.699.90.379.18
103.8106.83.04.76
Incl.104.4104.90.517.11
Incl.105.3105.90.65.80
115.5115.80.30.64
119.1121.52.41.46
     
TUG-1463.33.60.33.86
10.811.40.61.73
12.913.50.66.30
38.439.30.95.48
Incl.38.438.70.310.97
60.363.63.39.13
Incl.60.360.90.644.85
68.470.82.41.41
97.5102.65.18.15
which includes99.3101.71.819.70
Incl.99.399.90.613.28
and99.9100.50.611.73
and101.1101.70.634.08
105109.54.53.95
Incl.106.5107.10.68.29
Incl.107.71080.37.62
110.71110.39.37
111.9113.11.21.44
114.3119.45.12.76
Incl.115.5115.80.38.27
144.3145.20.95.59
Incl.144.3144.60.314.63

Table 2: Survey details of diamond drill holes referenced in this release

Hole NoCoordinates (Fiji map grid)RLfinal depthdipazimuth
NEm(TN)
TUDDH-58918765133920435348.5266.6-65255
TUDDH-59118764423920520314.0149.3-65297
TUDDH-59218765133920435348.6221.6-55220
TUDDH-59318765133920435348.6224.4-45220
TUDDH-59418765273920502309.6239.3-45200
TUDDH-59518765273920502309.6265.9-56225
TUDDH-59618764423920520314.0132.0-55297
TUDDH-59718765273920502309.6227.3-42200
TUDDH-59818765273920502309.6296.3-52280
TUDDH-60018764423920519311.1150.8-71251
TUDDH-60218765303920503309.8251.4-54275
TUDDH-60318765293920503309.8234.6-40290
TUDDH-60418765293920503309.9212.4-45291
TUDDH-60518765303920503309.7254.5-57288
TUDDH-60618764423920519311.1142.5-65249
TUDDH-60918764423920519311.4in progress-54250
TUG-14239204861876411102.085.8-12090
TUG-14339204861876412103.797.7+30087
TUG-14439204861876411101.3156.3-40089
TUG-14639204861876411101.3163.9-45089

Qualified Person
In accordance with National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”), Sergio Cattalani, P.Geo, Senior Vice President Exploration, is the Qualified Person for the Company and has reviewed and is responsible for the technical and scientific content of this news release.

QAQC Procedures
Lion One adheres to rigorous QAQC procedures above and beyond basic regulatory guidelines in conducting its sampling, drilling, testing, and analyses. The Company utilizes its own fleet of diamond drill rigs, using PQ, HQ and NQ sized drill core rods. Drill core is logged and split by Lion One personnel on site. Samples are delivered to and analysed at the Company’s geochemical and metallurgical laboratory in Fiji. Duplicates of all samples with grades above 0.5 g/t Au are both re-assayed at Lion One’s lab and delivered to ALS Global Laboratories in Australia (ALS) for check assay determinations. All samples for all high-grade intercepts are sent to ALS for check assays. All samples are pulverized to 80% passing through 75 microns. Gold analysis is carried out using fire assay with an AA finish. Samples that have returned grades greater than 10.00 g/t Au are then re-analysed by gravimetric method. For samples that return greater than 0.50 g/t Au, repeat fire assay runs are carried out and repeated until a result is obtained that is within 10% of the original fire assay run. For samples with multiple fire assay runs, the average of duplicate runs is presented. Lion One’s laboratory can also assay for a range of 71 other elements through Inductively Coupled Plasma Optical Emission Spectrometry (ICP-OES), but currently focuses on a suite of 9 important pathfinder elements. All duplicate anomalous samples are sent to ALS labs in Townsville QLD and are analysed by the same methods (Au-AA26, and Au-GRA22 where applicable). ALS also analyses for 33 pathfinder elements by HF-HNO3-HClO4 acid digestion, HCl leach and ICP-AES (method ME-ICP61).

About Lion One Metals Limited
Lion One’s flagship asset is 100% owned, fully permitted high grade Tuvatu Alkaline Gold Project, located on the island of Viti Levu in Fiji. Lion One envisions a low-cost high-grade underground gold mining operation at Tuvatu coupled with exciting exploration upside inside its tenements covering the entire Navilawa Caldera, an underexplored yet highly prospective 7km diameter alkaline gold system. Lion One’s CEO Walter Berukoff leads an experienced team of explorers and mine builders and has owned or operated over 20 mines in 7 countries. As the founder and former CEO of Miramar Mines, Northern Orion, and La Mancha Resources, Walter is credited with building over $3 billion of value for shareholders.

On behalf of the Board of Directors of
Lion One Metals Limited
Walter Berukoff
Chairman and CEO

For further information
Contact Investor Relations
Toll Free (North America) Tel: 1-855-805-1250
Email: info@liononemetals.com
Website: www.liononemetals.com

Neither the TSX Venture Exchange nor its Regulation Service Provider
accepts responsibility for the adequacy or accuracy of this release.

This press release may contain statements that may be deemed to be “forward-looking statements” within the meaning of applicable Canadian securities legislation. All statements, other than statements of historical fact, included herein are forward-looking information. Generally, forward-looking information may be identified by the use of forward-looking terminology such as “plans”, “expects” or “does not expect”, “proposed”, “is expected”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates” or “does not anticipate”, or “believes”, or variations of such words and phrases, or by the use of words or phrases which state that certain actions, events or results may, could, would, or might occur or be achieved. This forward-looking information reflects Lion One Metals Limited’s current beliefs and is based on information currently available to Lion One Metals Limited and on assumptions Lion One Metals Limited believes are reasonable. These assumptions include, but are not limited to, the actual results of exploration projects being equivalent to or better than estimated results in technical reports, assessment reports, and other geological reports or prior exploration results. Forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of Lion One Metals Limited or its subsidiaries to be materially different from those expressed or implied by such forward-looking information. Such risks and other factors may include, but are not limited to: the stage development of Lion One Metals Limited, general business, economic, competitive, political and social uncertainties; the actual results of current research and development or operational activities; competition; uncertainty as to patent applications and intellectual property rights; product liability and lack of insurance; delay or failure to receive board or regulatory approvals; changes in legislation, including environmental legislation, affecting mining, timing and availability of external financing on acceptable terms; not realizing on the potential benefits of technology; conclusions of economic evaluations; and lack of qualified, skilled labour or loss of key individuals. Although Lion One Metals Limited has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. Accordingly, readers should not place undue reliance on forward-looking information. Lion One Metals Limited does not undertake to update any forward-looking information, except in accordance with applicable securities laws.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/136388

Categories
Base Metals

Bravo Continues to Intersect High-Grade PGM’s and Ni Sulphide at Luanga

Bravo Mining, Proven and Probable

Highlights include 16.9m @ 2.82g/t PGM + Au, plus 0.23% Ni Sulphide, and

13.6m @ 2.67g/t PGM + Au, plus 0.23% Ni Sulphide

VANCOUVER, BC, Sept. 7, 2022 /CNW/ – Bravo Mining Corp. (TSX.V: BRVO), (“Bravo” or the “Company“) today announced that it has received assay results from a further twelve infill diamond drill holes (“DDH”), from its wholly owned Luanga PGM (palladium + platinum + rhodium) + gold + nickel project (“Luanga“), located in the Carajás Mineral Province, state of Pará, Brazil. Samples for a further 34 drill holes (including 18 re-assay holes) are already at the laboratory for analysis with results pending. Both downhole and surface electromagnetic (“EM”) programs are also underway to follow up on the previously announced massive sulphide intercept.

“The infill drilling and historic core re-assay programs continue to advance rapidly. As we receive more assay results, we continue to see results comparable to the historic grades and thicknesses, increasing our confidence in the prior work completed at Luanga,” said Luis Azevedo, Chairman and CEO of Bravo. “The Company is also following up on the recently discovered nickel and copper massive sulphide mineralization that had not been previously identified at Luanga. Downhole EM assisted with the placement of the two follow-up holes (results pending) and the design for drilling on the next drill section. Surface EM will also start shortly, which we hope will greatly assist in vectoring-in and following these potential feeder zone(s).”

Highlights

  • Assay results from infill drilling continue to compare well with the drill holes on their neighbouring historic drill sections in both tenor and mineralized thicknesses.
  • Highlights of Bravo’s recent intercepts are tabulated below, with details attached:
HOLE-IDFrom(m)To(m)Thickness
(m)
Pd(g/t)Pt(g/t)Rh(g/t)Au
(g/t)
Ni %
(Sulphide)
PGM + Au
(g/t)
TYPE
DDH22LU00593.0124.031.01.190.590.090.110.161.98FR
DDH22LU01890.8107.716.91.600.890.220.100.232.82FR
DDH22LU0190.064.264.20.580.290.040.07NA0.99Ox/FR
Including50.664.213.61.580.800.140.160.222.67FR
Notes:All ‘From’, ‘To’ depths, and ‘Thicknesses’ are downhole.
Given the orientation of the holes and the mineralization, the intercepts are estimated to range from ~75 to 95% of true thickness.
Type: Ox = Oxide. FR = Fresh Rock. Recovery methods and results will differ based on the type of mineralization.
NA: Not Applicable as intercept is oxide or a mix of oxide and fresh rock mineralization.
  • Additional results from historic drill hole re-assaying are expected in the following weeks.
  • Downhole (DH) Transient Electromagnetic (TEM) survey completed on previously reported (August 16rd, 2022 news release) high-grade Ni/Cu massive sulphide hole DDH22LU047;
  • Following DHTEM, two new drill holes on the same section have been completed (results pending);
  • Drilling on the next section to the north is expected to start soon; and
  • Surface Fixed Loop TEM (FLTEM) surveying is expected to commence shortly.
  • 67 drill holes have been completed, for a total of 11,091 metres (or 43% of Phase 1 Drilling Program), including 5 twin holes and 6 metallurgical holes.
  • 9,621 samples submitted for assay to date including 2,943 re-assay samples from historic drill core.
  • 6 drill rigs operating onsite.

Luanga Drill Program

The Phase 1 diamond drill program continues as planned at Luanga. With six drill rigs on site, drilling is now progressing in various locations along the entire 7km strike length of the known Luanga mineralized envelope (defined by historic drilling), including to the north where high-grade massive sulphide nickel/copper mineralization was intersected (see August 16rd, 2022 news release). DHTEM has been completed on this hole (see picture below), and two more drill holes have been completed on the same drill section (results pending), with two more holes about to commence on the section to the north. Surface FLTEM surveying is expected to start soon, to the south of the massive sulphide intercept. To date, 67 DDH have been completed for a total of 11,091m from the planned 25,500m Phase 1 drill program.

Phase 1 drilling is primarily designed to confirm, infill, and step out from the previously defined PGM+Au+Ni mineralization in order to increase confidence in the geological model and provide the basis for future mineral resource estimates. Additionally, drilling will target potential extensions to the mineralization at depth and, given the more recent discovery of massive sulphides, evaluate the potential of this new style of mineralization.

Commencement of DHTEM Surveying at Luanga – DDH22LU049 (CNW Group/Bravo Mining Corp.)
Commencement of DHTEM Surveying at Luanga – DDH22LU049 (CNW Group/Bravo Mining Corp.)
Location of Bravo Drilling Reported in this Document (CNW Group/Bravo Mining Corp.)
Location of Bravo Drilling Reported in this Document (CNW Group/Bravo Mining Corp.)

Complete Table of Assay Results

HOLE-IDFrom(m)To(m)Thickness
(m)(1)
Pd(g/t)Pt(g/t)Rh(g/t)Au
(g/t)
Ni %
(Sulphide)
PGM + Au
(g/t)
TYPE
DDH22LU00593.0124.031.01.190.590.090.110.161.98FR
DDH22LU00947.662.414.81.010.550.080.020.201.67FR
DDH22LU01029.733.03.30.710.450.130.010.081.30FR
And47.955.07.10.650.330.050.010.081.04FR
And64.073.19.10.770.350.060.010.101.19FR
And87.498.411.00.600.340.060.010.081.02FR
DDH22LU01184.288.24.00.980.460.090.030.141.56FR
DDH22LU012No Significant Result
DDH22LU0130.05.95.90.490.300.050.01NA0.86Ox
And98.9EOH1.31.010.180.050010.131.25FR
DDH22LU01425.331.76.40.770.290.050.01NA1.12Ox
And43.461.418.00.550.220.040.030.090.83FR
And66.070.04.00.850.320.050.020.141.23FR
And81.090.09.00.890.350.050.020.151.31FR
And102.0111.69.61.070.390.060.030.081.55FR
DDH22LU0150.028.028.00.310.140.020.04NA0.52Ox
And57.871.013.20.590.230.050.010.360.88FR
And88.5100.512.00.250.130.020.030.310.42FR
DDH22LU0170.011.211.20.810.470.090.02NA1.39Ox
And18.223.25.00.520.510.080.01NA1.12Ox
And85.988.93.01.150.440.060.010.051.66FR
And126.0141.015.01.220.540.100.080.171.95FR
DDH22LU01859.971.912.00.550.260.080.040.190.93FR
And90.8107.716.91.600.890.220.100.232.82FR
DDH22LU0190.064.264.20.580.290.040.07NA0.99Ox/FR
Including50.664.213.61.580.800.140.160.222.67FR
And74.278.84.60.600.520.070.020.101.21FR
DDH22LU0200.09.09.01.380.520.100.02NA2.02Ox
And13.031.718.70.980.380.070.04NA1.46Ox/FR
And55.4117.462.00.350.250.010.010.010.61FR
Notes:All ‘From’, ‘To’ depths, and ‘Thicknesses’ are downhole.
Given the orientation of the holes and the mineralization, the intercepts are estimated to range from ~75 to 95% of true thickness.
Type: Ox = Oxide. FR = Fresh Rock. Recovery methods and results will differ based on the type of mineralization.
NA: Not Applicable as intercept is oxide or a mix of oxide and fresh rock mineralization.

About Bravo Mining Corp.

Bravo is a Canada and Brazil-based mineral exploration and development company focused on advancing its Luanga PGM + Au + Ni Project in the world-class Carajás Mineral Province of Brazil.

The Luanga Project benefits from being in a location close to operating mines, with excellent access and proximity to existing infrastructure, including road, rail and clean and renewable hydro grid power. The project area was previously de-forested for agricultural grazing land. Bravo’s current Environmental, Social and Governance activities includes replanting trees in the project area, hiring and contracting locally, and ensuring protection of the environment during its exploration activities.

Bravo was founded by a management team and board with extensive Brazilian and PGM exploration, permitting, project financing, construction and operating experience. This includes Luis Azevedo, Executive Chairman & CEO; Simon Mottram, President; Alex Penha, EVP Corporate Development; and Independent Directors, Dr. Nicole Adshead-Bell (Lead Director), Stuart Comline, Tony Polglase and Stephen Quin.

Technical Disclosure

Technical information in this news release has been reviewed and approved by Simon Mottram, F.AusIMM (Fellow Australia Institute of Mining and Metallurgy), President of Bravo Mining Corp. who serves as the Company’s “qualified person”, as defined in National Instrument 43-101 Standards of Disclosure for Mineral Projects (“NI 43-101“). Mr. Mottram has verified the technical data and opinions contained in this news release.

Forward Looking Statements

This news release contains forward-looking information which is not comprised of historical facts. Forward-looking information is characterized by words such as “expectations”, “confirm”, “hope”, “potential”, “designed”, “increase confidence”, “interpreted”, “pending”, and other similar words, phrases or statements that certain events or conditions “should”, or “will” occur. In particular, this news release contains forward-looking information pertaining to the Company’s ongoing re-assay and drill programs and the results thereof; the expected arrival of geophysical equipment and the results of such surveys; the potential for the definition o new styles of mineralization and extensions to depth and the Company’s plans in respect thereof. Forward-looking information involves risks, uncertainties and other factors that could cause actual events, results, and opportunities to differ materially from those expressed or implied by such forward-looking information. Factors that could cause actual results to differ materially from such forward-looking information include, but are not limited to, changes in the state of equity and debt markets, fluctuations in commodity prices, delays in obtaining required regulatory or governmental approvals, environmental risks, limitations on insurance coverage; and other risks and uncertainties involved in the mineral exploration and development industry. Forward-looking information in this news release is based on the opinions and assumptions of management considered reasonable as of the date hereof, including, but not limited to, the assumption that the assay results confirm the interpreted mineralization contains significant values of nickel, copper and also contain PGMs and Au; final drill and assay results will be in line with management’s expectations; that activities will not be adversely disrupted or impeded by regulatory, political, community, economic, environmental and/or healthy and safety risks; that the Luanga Project will not be materially affected by potential supply chain disruptions; and general business and economic conditions will not change in a materially adverse manner. Although the Company believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information. The Company disclaims any intention or obligation to update or revise any forward-looking information, other than as required by applicable securities laws.

Schedule 1: Drill Hole Collar Details

HOLE-IDCompanyEast (m)North (m)RL (m)DatumDepth
(m)
AzimuthDip
DDH22LU005Bravo657399.979339804.76259.36SIRGAS2000 UTM22S152.35360.00-60.00
DDH22LU009Bravo659101.849341075.30232.45SIRGAS2000 UTM22S200.50360.00-60.00
DDH22LU010Bravo659852.149341580.93221.61SIRGAS2000 UTM22S160.25330.00-60.00
DDH22LU011Bravo659028.759341007.34241.87SIRGAS2000 UTM22S100.20330.00-60.00
DDH22LU012Bravo659850.549341825.16255.78SIRGAS2000 UTM22S200.10330.00-60.00
DDH22LU013Bravo659938.899341630.21219.39SIRGAS2000 UTM22S151.1090.00-60.00
DDH22LU014Bravo656999.909339580.01270.50SIRGAS2000 UTM22S100.15330.00-60.00
DDH22LU015Bravo659925.019341825.05265.24SIRGAS2000 UTM22S151.35360.00-60.00
DDH22LU017Bravo659913.939341673.10231.91SIRGAS2000 UTM22S199.0590.00-60.00
DDH22LU018Bravo659164.679341072.65235.07SIRGAS2000 UTM22S150.30330.00-60.00
DDH22LU019Bravo659924.989341725.04239.05SIRGAS2000 UTM22S150.25330.00-60.00
DDH22LU020Bravo657000.039339654.43288.60SIRGAS2000 UTM22S150.00330.00-60.00

Schedule 2: Assay Methodologies and QAQC

Samples follow a chain of custody between collection, processing and delivery to the ALS laboratory in Parauapebas, state of Pará, Brazil. The drill core is delivered to the core shack at Bravo’s Luanga site facilities and processed by geologists who insert certified reference materials, blanks and duplicates into the sampling sequence. Drill core is half cut and placed in secured polyurethane bags, then in security-sealed sacks before being delivered directly from the Luanga site facilities to the Parauapebas ALS laboratory by Bravo staff. Additional information about the methodology can be found on the ALS global website (ALS) in the analytical guides.

Quality Assurance and Quality Control (“QAQC“) is maintained internally at the lab through rigorous use of internal certified reference materials, blanks, and duplicates. An additional QAQC program is administered by Bravo using certified reference materials, duplicate samples and blank samples that are blindly inserted into the sample batch. If a QAQC sample returns an unacceptable value an investigation into the results is triggered and when deemed necessary, the samples that were tested in the batch with the failed QAQC sample are re-tested.

Bravo ALS
PreparationMethodMethodMethodMethod
For All ElementsPt, Pd, AuRhNi-SulphideTrace Elements
PREP-31BPGM-ICP27Rh-MS25Ni-ICP05ME-ICP61
www.bravomining.com (CNW Group/Bravo Mining Corp.)
www.bravomining.com (CNW Group/Bravo Mining Corp.)

SOURCE Bravo Mining Corp.

Cision
Cision

View original content to download multimedia: http://www.newswire.ca/en/releases/archive/September2022/07/c5634.html

Categories
Base Metals Diamcor Mining Junior Mining

Diamcor Announces Strong Tender and Sales Results Including 59.35 Carat Special Gem Diamond

Diamcor Mining, Proven and Probable

Diamcor Mining Inc.Diamcor Mining Inc.Wed, September 7, 2022 at 9:00 AMIn this article:

  • DMIFF-4.47%

KELOWNA, BC / ACCESSWIRE / September 7, 2022 / Diamcor Mining Inc. (TSX-V.DMI)(OTCQB:DMIFF)(FRA:DC3A), (“Diamcor” or, the “Company”) announces today the results of its second tender and sale of rough diamonds recovered from the processing of quarry material from the Company’s Krone-Endora at Venetia Project (the “Project”) held during the current quarter. In the second tender and sale of its second fiscal quarter, the Company sold a total of 1,836.52 carats of rough diamonds including the previously announced 59.35 carat gem diamond, generating gross revenues of USD $1,621,559.42, resulting in an average price of USD $882.95 per carat.

Highlights

  • The larger gem quality 59.35 carat special rough diamond clearly enhanced the overall average dollar per carat achieved in the second tender and sale of the quarter, and is further confirmation of the potential for these types of rough diamonds to be recovered from the deposits and positively affect gross revenues.
  • The results of the tender and sale exclusive of the 59.35 carat special rough diamond was 1,777.17 carats, generating gross revenues of USD $425,423.42, resulting in an average price of USD $239.38 per carat.
  • Although the total number of carats sold to date this quarter is greater than the previous quarter, the total number of carats offered for tender and sale was lower than anticipated, largely a result of the significant Eskom power outages experienced in South Africa during July and August, and the resulting loss of operational hours during those months. Additionally, while the average dollar per carat net of the 59.35 carat rough diamond remained consistent with recent sales, the percentage of +2.0 carat rough diamonds appeared to be lower than normal. This deficiency is believed to be the result of errors in the Project’s final recovery systems, which may have been caused by repeated power supply issues. With both the Eskom outages and power variations now ended for the most part, the Company has undertaken a full review of these systems to ensure any potential for further issues in this area have been minimized moving forward.
  • In total, 3,776.33 carats have now been sold in the current quarter to date, generating gross revenues of USD $2,099,951.32 resulting in an average price of USD $556.08 per carat inclusive of the 59.35 carat special rough diamond. These gross revenues in the current quarter represent a 276% increase from the gross revenues generated in the previous quarter ending June 30, 2022.

We are very pleased with the strong results achieved at our latest tender and sale, despite dealing with the significant challenges of operational interruptions and the resulting lower processing volumes caused by the rolling blackouts implemented by South Africa’s national power supplier, Eskom.”, stated Mr. Dean Taylor, Diamcor CEO. “The revenues achieved confirm the potential and value of recovering large gem quality rough diamonds in the specials category, and with the country’s power supply now appearing to have stabilized, we look forward to increased processing volumes through to the end of this year and the potential of recovering additional large rough diamonds in the specials category.”

Update on the Annual Filings and Revocation of the MCTO

The Company is also pleased to announce that the delay in filing its audited financial statements and corresponding management’s discussion and analysis for the year ended March 31, 2022, resulting from the ongoing delays in South Africa related to Stage 6 load-shedding (also known as rolling blackouts) in July by the state-owned electricity utility, Eskom, has been rectified. The Company is now current in its required filings, and the Management Cease Trade Order detailed in its news releases on July 29, 2022, and August 12, 2022, has been revoked by the British Columbia Securities Commission.

About Diamcor Mining Inc.

Diamcor Mining Inc. is a fully reporting publicly traded junior diamond mining company which is listed on the TSX Venture Exchange under the symbol V.DMI, and on the OTC QB International under the symbol DMIFF. The Company has a well-established operational and production history in South Africa and extensive prior experience supplying rough diamonds to the world market.

About the Tiffany & Co. Alliance

The Company has established a long-term strategic alliance and first right of refusal with Tiffany & Co. Canada, a subsidiary of world famous New York based Tiffany & Co., to purchase up to 100% of the future production of rough diamonds from the Krone-Endora at Venetia Project at then current prices to be determined by the parties on an ongoing basis. In conjunction with this first right of refusal, Tiffany & Co. Canada also provided the Company with financing to advance the Project. Tiffany & Co. is now owned by Moet Hennessy Louis Vuitton SE (LVMH), a publicly traded company which is listed on the Paris Stock Exchange (Euronext) under the symbol LVMH and on the OTC under the symbol LVMHF. For additional information on Tiffany & Co., please visit their website at www.tiffany.com.

About Krone-Endora at Venetia

In February 2011, Diamcor acquired the Krone-Endora at Venetia Project from De Beers Consolidated Mines Limited, consisting of the prospecting rights over the farms Krone 104 and Endora 66, which represent a combined surface area of approximately 5,888 hectares directly adjacent to De Beers’ flagship Venetia Diamond Mine in South Africa. On September 11, 2014, the Company announced that the South African Department of Mineral Resources had granted a Mining Right for the Krone-Endora at Venetia Project encompassing 657.71 hectares of the Project’s total area of 5,888 hectares. The Company has also submitted an application for a mining right over the remaining areas of the Project. The deposits which occur on the properties of Krone and Endora have been identified as a higher-grade “Alluvial” basal deposit which is covered by a lower-grade upper “Eluvial” deposit. The deposits are proposed to be the result of the direct-shift (in respect to the “Eluvial” deposit) and erosion (in respect to the “Alluvial” deposit) of material from the higher grounds of the adjacent Venetia Kimberlite areas. The deposits on Krone-Endora occur in two layers with a maximum total depth of approximately 15.0 metres from surface to bedrock, allowing for a very low-cost mining operation to be employed with the potential for near-term diamond production from a known high-quality source. Krone-Endora also benefits from the significant development of infrastructure and services already in place due to its location directly adjacent to the Venetia Mine.

Qualified Person Statement:

Mr. James P. Hawkins (B.Sc., P.Geo.), is Manager of Exploration & Special Projects for Diamcor Mining Inc., and the Qualified Person in accordance with National Instrument 43-101 responsible for overseeing the execution of Diamcor’s exploration programmes and a Member of the Association of Professional Engineers and Geoscientists of Alberta (“APEGA”). Mr. Hawkins has reviewed this press release and approved of its contents.

On behalf of the Board of Directors

Mr. Dean H. Taylor
President & CEO
Diamcor Mining Inc.
www.diamcormining.com

For further information contact:

Mr. Dean H. Taylor
Diamcor Mining Inc
DeanT@Diamcor.com
+1 250 862-3212

Mr. Rich Matthews
Integrous Communications
rmatthews@integcom.us
+1 (604) 355-7179

This press release contains certain forward-looking statements. While these forward-looking statements represent our best current judgement, they are subject to a variety of risks and uncertainties that are beyond the Company’s ability to control or predict and which could cause actual events or results to differ materially from those anticipated in such forward-looking statements. Further, the Company expressly disclaims any obligation to update any forward looking statements. Accordingly, readers should not place undue reliance on forward-looking statements.

WE SEEK SAFE HARBOUR

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

SORUCE: Diamcor Mining Inc.



View source version on accesswire.com:
https://www.accesswire.com/714936/Diamcor-Announces-Strong-Tender-and-Sales-Results-Including-5935-Carat-Special-Gem-Diamond

Categories
Base Metals Collective Mining Energy Junior Mining Precious Metals

Collective Mining Discovers New High-Grade Vein and Breccia Systems at Apollo Including 17.5 Metres at 12.79 g/t Gold and 21 g/t Silver

Collective Mining Ltd.

Collective Mining Ltd.

Figure 1

Plan View of the Guayabales Project Highlighting the Apollo Target Area
Plan View of the Guayabales Project Highlighting the Apollo Target Area

Figure 2

Plan View of the Apollo Target Area Outlining the Porphyry and Breccia Targets, their Related Soil Anomalies and Drill Holes Completed or Currently Underway
Plan View of the Apollo Target Area Outlining the Porphyry and Breccia Targets, their Related Soil Anomalies and Drill Holes Completed or Currently Underway

Figure 3

Plan View of Apollo with Drill Hole Traces Completed to Date Highlighting the New High-Grade Vein System and Northern Breccia System Discoveries from Pad 2 and Pad 1 Respectively
Plan View of Apollo with Drill Hole Traces Completed to Date Highlighting the New High-Grade Vein System and Northern Breccia System Discoveries from Pad 2 and Pad 1 Respectively
  • APC-4, which is the first hole drilled to test a grassroot generated vein target located shallower and above the Main Breccia discovery at Apollo cut a near surface zone of sheeted veins and returned:
    • 17.5 metres @ 12.79 g/t gold and 21 g/t silver (65 metres vertical)
  • APC-7 and predecessor scout hole OLCS-3 were drilled to test a grassroot generated breccia target located 250 metres to the north of the Main Breccia discovery at Apollo and intersected multiple zones of mineralization between 45 metres and 320 metres below surface including:
    • 41.8 metres @ 1.07 g/t gold equivalent; and
    • 38.4 metres @ 1.51 g/t gold equivalent
  • Four rigs continue to actively drill at the Guayabales project with assay results anticipated in the near term for two holes as follows:
    • APC-6 and APC-8 tested the Main Breccia discovery at Apollo with both holes intersected more than 265 metres of potentially favourable mineralization

TORONTO, Sept. 07, 2022 (GLOBE NEWSWIRE) — Collective Mining Ltd. (TSXV: CNL) (OTCQX: CNLMF) (“Collective” or the “Company”) is pleased to announce assay results from reconnaissance holes completed designed to test new ideas at the Apollo target (“Apollo”) at the Company’s Guayabales project located in Caldas, Colombia. Targets within Apollo consists of hydrothermal breccia, porphyry and vein systems including the recently discovered copper-gold-silver Main Breccia highlighted by drill hole APC-2, which intersected 207.15 metres @ 2.68 g/t AuEq (see press release dated August 10, 2022). Apollo is one of eight porphyry-related target zones situated within a three-by-four-kilometre cluster area generated by the Company through grassroots exploration at the Guayabales project. As part of its fully funded 20,000+ metre drill program for 2022, there are currently three diamond drill rigs operating at the Apollo target with an additional rig drilling from underground at the Olympus target.

“Our very first reconnaissance drill holes undertaken outside of the Main Breccia at Apollo has led to some very positive and exciting surprises which include the presence of a high grade late-stage porphyry related CBM vein zone adjacent to our exciting Main Breccia discovery. These discoveries attest to the amazing potential of the Apollo target area, which continues to expand as we step-out with drilling. Over the coming months, our drilling will be aggressively focused on flushing out the multi-million-ounce potential of the Main Breccia discovery at Apollo, but without question the new discoveries announced today highlight excellent additional opportunities for follow up in the future,” commented Ari Sussman, Executive Chairman.

Details (See Table 1 and Figures 1 – 3)

The Company recently completed five scout and reconnaissance diamond drill holes to test various conceptual targets locating within the Apollo area but outside of the Main Breccia discovery. APC-4 was designed to test a zone of northwest trending high grade, carbonate base metal veins (“CBM”), located shallower and above the Main Breccia system. APC-7 and the earlier drilled scout hole, OLCS-3, drilled beneath surface soil anomalies and discovered new, mineralized breccia bodies located approximately 250 metres north of the Main Breccia system.

APC-4, which was drilled to the southeast from Pad 2, intersected a high-grade zone of sheeted CBM veins and returned:

  • 17.5 metres @ 12.79 g/t Au and 21 g/t Ag from 132.3 metres (65 metres vertical) including 0.65 metres @ 331.47 g/t Au and 53 g/t Ag

Mineralization relates to multiple sheeted CBM veins hosting sphalerite and pyrite sulphides.

APC-7 and OLCS-3 were drilled to the southwest from Pad 1 and intersected multiple mineralized breccia bodies at various depths and returned the following intercepts:

  • APC-7: 25.55 metres @ 0.69 g/t AuEq from 85.65 metres (98 metres vertical);
  • APC-7: 38.40 metres @ 1.51 g/t AuEq from 199.85 metres (195 metres vertical);
  • APC-7: 20.45 metres @ 0.89 g/t AuEq from 325.0 metres (320 metres vertical); and
  • OLCS-3: 41.8 metres @ 1.07 g/t AuEq from 37.0 metres (45 metres vertical)

In addition to the new CBM vein discoveries a further two reconnaissance holes were drilled south from Pad 1 and southeast from Pad 2 to respectively test for breccia mineralisation and a mineralised porphyry body. Diamond Hole APC-9 had to be discontinued due to drilling problems and stopped short of the target zone. Diamond Hole APC-10 intersected altered quartz diorites with a porphyry vein stockwork and hosting anomalous copper, molybdenum, and gold values. The hole is interpreted to be peripheral to the main porphyry target as defined by copper soil anomalism and surface mapping. Further drilling is warranted in the future to better test both conceptual targets. Drill holes APC-12, APC-13 and APC-14 are underway with all three holes targeting the Main Breccia discovery at Apollo. Assay results for holes APC-6 and APC-8 are expected in the near term, with both holes intercepting more than 265 metres of potentially favourable mineralization.

The Apollo target area, as defined to date by surface mapping, rock sampling and copper and molybdenum soil geochemistry, covers an 800 metre X 700 metre area. The Apollo target area hosts the Company’s new grassroots Main Breccia discovery plus additional yet untested breccia, porphyry and vein targets. The Apollo target area also remains open for further expansion.

Table 1: Assays Results

HoleIDFrom
(m)
To
(m)
Intercept
(m)
Au
(g/t)
Ag
(g/t)
AuEq
(g/t)*
Notes
APC-4132.30149.8017.5012.7921 New sheeted vein discovery
 143.60144.250.65331.4753  
APC-785.65111.2025.550.40230.69New Northern Breccia discovery
Incl110.10111.201.105.621587.48 
APC-7199.85238.2538.401.30211.51 
Incl207.10222.3515.252.29332.62 
and325.00345.4520.450.49310.89 
OLCS-337.0078.8041.800.64341.07New Northern Breccia discovery
Incl38.5048.9010.401.67362.08 
 73.6078.805.200.781172.33 
APC-9      NSV**
APC-10      NSV**

*AuEq (g/t) is calculated as follows: (Au (g/t) x 0.95) + (Ag g/t x 0.014 x 0.95) utilizing metal prices of Ag – $20/oz and Au – US$1,400/oz and recovery rates of 95% for Au, Ag. Recovery rate assumptions are speculative as no metallurgical work has been completed to date. A 0.2 g/t AuEq cut-off grade was employed with no more than 15% internal dilution. True widths are unknown, and grades are uncut.
** NSV: No significant Values

Figure 1: Plan View of the Guayabales Project Highlighting the Apollo Target Area
https://www.globenewswire.com/NewsRoom/AttachmentNg/f6c9e1d6-62a3-458c-a1e7-62ad29f1ce07

Figure 2: Plan View of the Apollo Target Area Outlining the Porphyry and Breccia Targets, their Related Soil Anomalies and Drill Holes Completed or Currently Underway
https://www.globenewswire.com/NewsRoom/AttachmentNg/b01745dd-572d-4aec-8188-2e96d863e5a4

Figure 3: Plan View of Apollo with Drill Hole Traces Completed to Date Highlighting the New High-Grade Vein System and Northern Breccia System Discoveries from Pad 2 and Pad 1 Respectively
https://www.globenewswire.com/NewsRoom/AttachmentNg/6973bcf0-0397-4440-9052-1464d12d4ec8

About Collective Mining Ltd.

To see our latest corporate presentation and related information, please visit www.collectivemining.com

Collective Mining is an exploration and development company focused on identifying and exploring prospective mineral projects in South America. Founded by the team that developed and sold Continental Gold Inc. to Zijin Mining for approximately $2 billion in enterprise value, the mission of the Company is to repeat its past success in Colombia by making significant new mineral discoveries and advance the projects to production. Management, insiders and close family and friends own nearly 45% of the outstanding shares of the Company and as a result, are fully aligned with shareholders.

The Company currently holds an option to earn up to a 100% interest in two projects located in Colombia. As a result of an aggressive exploration program on both the Guayabales and San Antonio projects, a total of eight major targets have been defined. The Company has made significant grassroot discoveries at both projects with near-surface discovery holes at the Guayabales project yielding 302 metres at 1.11 g/t AuEq at the Olympus target, 163 metres at 1.3 g/t AuEq at the Donut target and recently, at the Apollo target, 207.15 metres at 2.68 g/t AuEq, 180.6 metres at 2.43 g/t AuEg and 87.8 metres at 2.49 g/t AuEg. At the San Antonio project, the Company intersected, from surface, 710 metres at 0.53 AuEq. (See related press releases on our website for AuEq calculations)

Qualified Person (QP) and NI43-101 Disclosure

David J Reading is the designated Qualified Person for this news release within the meaning of National Instrument 43-101 (“NI 43-101”) and has reviewed and verified that the technical information contained herein is accurate and approves of the written disclosure of same. Mr. Reading has an MSc in Economic Geology and is a Fellow of the Institute of Materials, Minerals and Mining and of the Society of Economic Geology (SEG).
Technical Information

Rock and core samples have been prepared and analyzed at SGS laboratory facilities in Medellin, Colombia and Lima, Peru. Blanks, duplicates, and certified reference standards are inserted into the sample stream to monitor laboratory performance. Crush rejects and pulps are kept and stored in a secured storage facility for future assay verification. No capping has been applied to sample composites. The Company utilizes a rigorous, industry-standard QA/QC program.

Contact Information

Collective Mining Ltd. 
Steven Gold, Vice President, Corporate Development and Investor Relations
Tel. (416) 648-4065

FORWARD-LOOKING STATEMENTS  
This news release contains certain forward-looking statements, including, but not limited to, statements about the drill programs, including timing of results, and Collective’s future and intentions. Wherever possible, words such as “may”, “will”, “should”, “could”, “expect”, “plan”, “intend”, “anticipate”, “believe”, “estimate”, “predict” or “potential” or the negative or other variations of these words, or similar words or phrases, have been used to identify these forward-looking statements. These statements reflect management’s current beliefs and are based on information currently available to management as at the date hereof.   

Forward-looking statements involve significant risk, uncertainties, and assumptions. Many factors could cause actual results, performance, or achievements to differ materially from the results discussed or implied in the forward-looking statements. These factors should be considered carefully, and readers should not place undue reliance on the forward-looking statements. Although the forward-looking statements contained in this news release are based upon what management believes to be reasonable assumptions, Collective cannot assure readers that actual results will be consistent with these forward-looking statements. These forward-looking statements are made as of the date of this news release, and Collective assumes no obligation to update or revise them to reflect new events or circumstances, except as required by law.

Neither the TSXV nor its Regulation Services Provider (as that term is defined in the policies of the TSXV) accepts responsibility for the adequacy or accuracy of this news release.

Categories
Base Metals Energy Junior Mining Metallic Group Metallic Minerals Precious Metals

Metallic Minerals Announces Acquisition of Additional High-Grade Claims in the Keno Hill Silver District

VANCOUVER, BC / ACCESSWIRE / September 7, 2022 / Metallic Minerals (TSX.V:MMG)(OTCQB:MMNGF) (“Metallic Minerals“, or the “Company“) is pleased to announce that it has acquired 100% interest in 5 square kilometres (“km2“) of new mineral properties in the Keno Hill silver district of Canada’s Yukon Territory, bringing the Company’s total district hard-rock land position to 171 km2. Each of these newly acquired properties have demonstrated the presence of high-grade Keno-style silver-lead-zinc mineralization and are adjacent to, or contiguous with, Metallic Minerals’ Keno Silver property and the Keno Hill properties now owned by Hecla Mining following the completion of the acquisition of Alexco Resources (see Figure 1).

Acquisition Highlights

  • Nabob and Faro Claims – In the Keno Summit area, the Nabob claim hosts the Keno Hill “Main” vein and its numerous offshoots where drilling in 2012 returned impressive results (NA-12-02, 0.4 meters (m) of 4,090.6 grams per ton (g/t) Silver Equivalent (Ag Eq) (3,140 g/t Ag, 0.86 g/t Au, 22.37% Pb and 0.25% Cu), that led to high-grade surface mining of 65 tons of ore material over 4,200 g/t Ag (see Table 1)1. The Nabob Main vein was successfully targeted by two Metallic Minerals drill holes in its 2022 field program and assay results are pending.
  • Rage 1-3 Claims – The Rage claims cover the Rain and Shine target area where a typical Keno-style Ag-Pb-Zn vein has been sampled at surface and returned grades to 889.1 g/t Ag Eq in grab samples from the vein. The Rain and Shine mineralization appears to occur at the intersection of the Flame & Moth and Onek trends, which host 41.5 million ounces of silver (“Moz Ag”) and 4.3 Moz Ag respectively, in mineral reserves and M&I resources2. Well located regarding infrastructure, the Rage claims are crossed by the Bellekeno mine-to-mill haul road, only 600 meters from the Hecla Mill.
  • The Tveter-Pavlovich claims on the south side of Sourdough Hill, 500 meters from Hecla’s Bellekeno mine, is associated with extension of structures from the Bellekeno deposit which has produced 7.9 Moz Ag5 and hosts 4.75 Moz Ag in current reserves and M&I resources2. These potential extensions were tested by drilling at the Tveter-Pavlovich claim boundary in 2018 returning 3.3 m of 469.3 g/t Ag Eq (63.1 g/t Ag, 0.93% Pb, 0.92% Zn) including 0.2 m of 1,120.5 g/t Ag Eq (832.0 g/t Ag, 3.34%1)4. In addition to the Bellekeno vein extensions, historic exploration identified and exposed two additional vein occurrences with high-grade Ag-Pb-Zn and gold potential called the Mo vein showings on the property3.

Metallic Minerals President, Scott Petsel, stated, “We are very pleased to have been able to add these significant and very prospective properties in the high-grade Keno Hill silver district, and to immediately initiate drill testing of the Nabob vein as a historically drilled, potentially ‘resource-ready’ target.”

“Additionally, Metallic’s 171 km2 land position is the second largest in the prolific Keno Hill camp and now contains five ‘resource-ready’ advanced-stage targets, 11 ‘growth-stage’ targets with initial positive drilling and over 20 early-stage drill-ready targets with numerous additional untested soil anomalies of greater than 6.0 g/t Ag Eq., all in a district with over 100 years of mining history and over 300 million ounces of past silver production and current resources5. We are currently wrapping up our exploration program at the Keno Silver Project and we anticipate receiving initial results over the coming months from our core drilling and surface sampling programs including results from the Nabob target drilling.”

Keno District Alluvial Claims

In addition to the recently acquired hard-rock properties mentioned above, Metallic Minerals has been assembling, through acquisition and staking, a significant package of alluvial claims and leases in prospective areas in the Keno District. These claim groupings, including the Granite Creek East claims, the Allen/Faith Creek Claims and the Badger and Honey claims total over 20 miles of prospective alluvial deposits to explore and develop. Claims in the Granite Creek area have produced over 16,000 ounces of gold between 2015 and 2020 and gold production continues in multiple operations6. Metallic intends to pursue royalty agreements with known operators interested in alluvial claim development and production. A further update on Metallic’s alluvial claim and activities at both Keno and in the Klondike is expected in the coming weeks.

Upcoming Events

Metals Investor Forum – Metallic Minerals will be participating in the upcoming Metals Investor Forum in Vancouver on September 9-10, during which the Company will provide a live presentation with Q&A. For more information and to register click here.

Precious Metals Summit – Metallic Minerals will be attending the 2022 Precious Metals Summit in Beaver Creek, Colorado, where the Company will participate in 1-on-1 meetings with institutional investors and deliver a live presentation update. For more information and to register, click here.

Figure 1 – Keno Silver District Map Highlighting Metallic Minerals Property and New Acquisitions

Metallic Minerals Corp., Wednesday, September 7, 2022, Press release picture
Metallic Minerals Corp., Wednesday, September 7, 2022, Press release picture

Table 1 – Highlight Assay Results from Historic Drilling and Sampling at Recent Acquisition Targets

Target AreaDDH or Sample IDSample TypeFrom (m)To (m)Width (m)Ag Eq (g/t)1Ag (g/t)Au (g/t)Pb (%)Zn (%)Cu (%)
Rage113362Grab565.356.80.030.2210.540.03
Rage113363Grab193.026.00.310.072.800.03
Rage113364Grab660.4198.04.510.400.100.14
Rage10-06-LBGrab889.136.01.410.0514.420.38
Rage11-06-LBGrab301.5263.00.220.380.07Nil
RageRS-01-06Grab326.7275.00.250.590.12Nil
RageRS-02-06Chip259.328.00.010.054.87Nil
Nabob2NA-12-02Core21.2424.643.4637.5466.50.124.060.080.01
Nabob2Incl.Core21.2421.640.44090.63140.00.8622.370.250.09
Nabob2NA-12-03Core22.523.71.2292.5169.70.132.690.150.01
Nabob2NA-12-04Core16.7617.761236.7122.00.072.330.400.01
Nabob2NA-12-06Core2020.750.75240.4200.00.130.600.090.01
Nabob2NA-12-11Core4.755.550.81202.01019.00.293.600.280.05
Nabob2NA-12-11Core16.116.70.6251.6172.00.051.560.270.03
Nabob2NA-12-12Core7.058.251.21125.4798.70.417.100.360.02
Nabob2Incl.Core7.057.450.42951.92142.00.7118.630.670.04
Nabob2NA-12-13Core8.610.11.5211.5119.20.440.580.600.01
Nabob2NA-12-14Core5.26.10.9779.8655.00.441.560.340.08
Nabob2NA-12-15Core11.3513.001.65455.3394.00.150.400.650.01
Tveter -Pavlovich3K-18-0695Core285.3289.54.1583.833.90.010.820.38
incl.Core287.652880.35724.2354.00.018.990.61
Tveter -Pavlovich3K-18-0697Core230.5233.83.3469.363.10.010.930.92
Incl.Core230.5230.70.21120.5832.00.143.343.17

Table Notes: 1 – Silver equivalent (Ag Eq) values assume Ag $19/oz, Pb $1.05/lb, Zn $1.30/lb, Au $1,800/oz, Cu $3.00/lb and 100% metallurgical recovery. Sample intervals are based on measured drill intercept lengths. 2 – Historic Nabob drill samples were subject to highly selective sampling procedures for the purpose of evaluating high-grade mining opportunities and may not be representative of the entire mineralized widths of the Nabob vein system. 3 – Drilled by Alexco Resources at the Tveter-Pavlovich property boundary while the property was under option to Alexco Resources.

Nabob Target Area

The Nabob target, located in the Keno Summit target area, directly adjoins other holdings for Metallic. It was one of the original four claims filed on the Keno Summit discovery in 1919. The fact that it still has exposed high-grade Ag-Pb-Zn vein material, and in the 2010s saw 65 tons of very-high-grade silver production, emphasizes the overall prospectivity of this under-explored part of the district.

Hosted by the Nabob claim the “Main” vein and its transverse offshoots are exposed for 250 m on strike. Work completed in 2012 included rock sampling, trenching, geophysics and the drilling of 17 holes (490.7 m). As reported from the 2012 work, a bulk sample ran 1,618 g/t Ag, 18.5% Pb and 0.51 g/t Au underscoring the high-grade nature of the Nabob target1. After review of the available drill data and surface exposures, Metallic Minerals chose to drill two holes at the Nabob target in 2022 which have successfully encountered the vein structure and assay results are pending. The Nabob claim acquisition is accompanied by the equally prospective but undrilled Faro claim, also in the Keno Summit area. Together the claims enhance and expand Metallic’s holdings at the Keno Summit and add to the potential to rapidly develop a resource for the target area.

Metallic Minerals Corp., Wednesday, September 7, 2022, Press release picture
2022 Drill set up at the Nabob target

Rain and Shine (Rage 1-3) Target Area

The Rage claims, vended with the Nabob and Faro claims, host the Rain and Shine Ag-Pb-Zn-Au vein target. Mineralization at Rain and Shine is exposed at surface and has been sampled by Metallic Minerals returning substantial grades in grab sampling (see Table 1). The proximity of the Rain and Shine target to existing infrastructure, including Hecla’s operating mill and the Bellekeno haul road as well as being 750 m from underground developments at Hecla’s Flame & Moth mine (41.5 million silver ounces of combined reserves and M&I resources2), bode well for its exploration and development prospects. Mineralization at Rain and Shine is known to have occasional high grade gold numbers associated with the typical Ag-Pb-Zn mineralization and the exposed vein system is parallel to, and similar in style and mineralogy to the vein system being mined at the Flame & Moth. The Rain and Shine is a drill-ready target that Metallic will evaluate for drilling in 2023.

Tveter-Pavlovich Target Area

Consisting of 23 quartz mineral claims (Mo 1-8, Caroline 1-2, Rex 1-2, Boso 1-5, Casy 1-3, Bonny, Chrissie G and the Windy 1), the Tveter-Pavlovich claim block was optioned by Alexco Resources in 2017 with four holes drilled to test the extension of veins in the hanging wall of the Bellekeno 48 vein in the Bellekeno mine. Two of these drill holes encountered significant mineralization up to 1,120.5 g/t Ag Eq (see Table 1) with mineralization open to expansion with follow-up drilling.

Mineralization also outcrops on the Tveter-Pavlovich claims at the Mo target where historic trenching, dozing, shafting and the driving of an adit have exposed two parallel veins with select high-grade sample assays up to 9,771 g/t Ag, 80.5% Pb and 1.7 g/t Au3. Additionally, trenching in 1980 is reported to have exposed a segment of the Mo vein which ran up to 13,719 g/t Ag.

About Metallic Minerals

Metallic Minerals Corp. is an exploration and development stage company, focused on silver, gold and copper in the high-grade Keno Hill and La Plata mining districts of North America. Our objective is to create shareholder value through a systematic, entrepreneurial approach to making exploration discoveries, growing resources and advancing projects toward development. Metallic Minerals has consolidated the second-largest land position in the historic Keno Hill silver district of Canada’s Yukon Territory, directly adjacent Hecla Mining’s operations, with more than 300 million ounces of high-grade silver in past production and current M&I resources. Hecla Mining Company, the largest primary silver producer in the USA and third largest in the world, completed the acquisition of Alexco in September 2022. Metallic recently announced the inaugural NI 43-101 mineral resource estimate for its La Plata silver-gold-copper project in southwestern Colorado. The Company also continues to add new production royalty leases on its holdings in the Klondike gold district in the Yukon. All three districts have seen significant mineral production and have existing infrastructure, including power and road access. Metallic Minerals is led by a team with a track record of discovery and exploration success on several major precious and base metal deposits, as well as having large-scale development, permitting and project financing expertise.

About the Metallic Group of Companies

The Metallic Group is a collaboration of leading precious and base metals exploration and development companies, with a portfolio of large, brownfields assets in established mining districts adjacent to some of the industry’s highest-grade producers of silver and gold, platinum and palladium, and copper. Member companies include Metallic Minerals in the Yukon’s high-grade Keno Hill silver district and La Plata silver-gold-copper district of Colorado, Granite Creek Copper in the Yukon’s Minto copper district, and Stillwater Critical Minerals in the Stillwater PGE-nickel-copper district of Montana and Kluane district in the Yukon. The founders and team members of the Metallic Group include highly successful explorationists formerly with some of the industry’s leading explorer/developers and major producers. With this expertise, the companies are undertaking a systematic approach to exploration and development using new models and technologies to facilitate discoveries in these proven, but under-explored, mining districts. Members of the Metallic Group have been recognized as recipients of awards for excellence in environmental stewardship demonstrating commitment to responsible resource development and appropriate ESG practices. The Metallic Group is headquartered in Vancouver, BC, Canada, and its member companies are listed on the Toronto Venture, US OTCQB and Frankfurt stock exchanges.

Footnotes

  1. Blackburn, L. R., Assessment Report, Nabob Project, Keno Hill Yukon Territory, Canada, Keno Hill Exploration Corp., Yukon, 2014
  2. Alexco Resource Corp Technical Report, titled “NI 43-101 Technical Report on Updated Mineral Resource and Reserve Estimate of the Keno Hill Silver District” with an effective date of April 1, 2021 and issue date of May 26, 2021.
  3. Yukon MINFILE – Mineral Occurrence 105M 013 – Version 2004-1. Yukon Geological Survey, Energy, Mines and Resources, Yukon Government, 2004.
  4. Stammers, et al., Assessment Report, 2018 Pavlovich Option Sourdough Hill, Alexco Resources, Yukon, 2019.
  5. Cathro, R. J., Great Mining Camps of Canada 1. The History and Geology of the Keno Hill Silver Camp, Yukon Territory. Geoscience Canada, Sept. 2006. ISSN 1911-4850.
  6. Steinke, et al., Public Presentation, Placer Gold Settings in an Alpine Glaciated Environment, Granite Creek, Yukon, Placer Forum 2022.

References to adjoining properties are for illustrative purposes only and are not necessarily indicative of the exploration potential, extent or nature of mineralization or potential future results of the Company’s projects.

FOR FURTHER INFORMATION, PLEASE CONTACT:

Website: www.mmgsilver.com Phone: 604-629-7800
Email: cackerman@mmgsilver.com Toll Free: 1-888-570-4420

Qualified Person

The disclosure in this news release of scientific and technical information regarding exploration projects on Metallic Minerals’ mineral properties has been reviewed and approved by Scott Petsel, P.Geo., President, who is a Qualified Person as defined by National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”).

Forward-Looking Statements

This news release includes certain statements that may be deemed “forward-looking statements”. All statements in this release, other than statements of historical facts including, without limitation, statements regarding potential mineralization, historic production, estimation of mineral resources, the realization of mineral resource estimates, interpretation of prior exploration and potential exploration results, the timing and success of exploration activities generally, the timing and results of future resource estimates, permitting time lines, metal prices and currency exchange rates, availability of capital, government regulation of exploration operations, environmental risks, reclamation, title, and future plans and objectives of the company are forward-looking statements that involve various risks and uncertainties. Although Metallic Minerals believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in the forward-looking statements. Forward-looking statements are based on a number of material factors and assumptions. Factors that could cause actual results to differ materially from those in forward-looking statements include failure to obtain necessary approvals, unsuccessful exploration results, changes in project parameters as plans continue to be refined, results of future resource estimates, future metal prices, availability of capital and financing on acceptable terms, general economic, market or business conditions, risks associated with regulatory changes, defects in title, availability of personnel, materials and equipment on a timely basis, accidents or equipment breakdowns, uninsured risks, delays in receiving government approvals, unanticipated environmental impacts on operations and costs to remedy same, and other exploration or other risks detailed herein and from time to time in the filings made by the companies with securities regulators. Readers are cautioned that mineral resources that are not mineral reserves do not have demonstrated economic viability. Mineral exploration and development of mines is an inherently risky business. Accordingly, the actual events may differ materially from those projected in the forward-looking statements. For more information on Group Ten and the risks and challenges of their businesses, investors should review their annual filings that are available at www.sedar.com

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

SOURCE: Metallic Minerals Corp.



View source version on accesswire.com:
https://www.accesswire.com/714932/Metallic-Minerals-Announces-Acquisition-of-Additional-High-Grade-Claims-in-the-Keno-Hill-Silver-District