Silver Bullet Mines Corp. Updates on Washington Mine in Idaho

Burlington, Ontario–(Newsfile Corp. – August 23, 2022) – Silver Bullet Mines Corp. (TSXV: SBMI) (OTCQB: SBMCF) (‘SBMI’ or ‘the Company’) is pleased to provide an update on its ongoing operations at its 100%-owned Washington Mine in Idaho. This mine is on patented lands.

Site work has commenced to prepare the property for rehabilitation and production. A local portable sawmill operator is on-site to prepare to mill timbers. A contractor has been scheduled to upgrade the access road and to establish site water, electricity and storage. Near-term surface work will focus on rock bolting, screening and shotcreting the historical portal face, as well as preparing timbers and insulation for mine entry support.

Contract terms have been negotiated with an underground mine contractor and, subject to completion of a federal agency filing and the approval of mine design by the Company’s mine engineer, underground rehabilitation is anticipated to begin in or about October. It is not possible at this time to provide a timetable for production as that largely depends upon the rehabilitation process. At some point in time, Mine Safety and Health Administration will carry out an inspection.

The Washington Mine first saw production in the late 1800’s with an average gold grade of one ounce per ton. It again produced gold in the 1930’s during which time the then-owner lacked the process capability needed to produce silver, so a decision was made to block out the silver mineralization with the intention of returning at a future date to extract it. To the best of SBMI’s knowledge, the blocked-out volume remains in situ. A historical report indicates the blocked-out volume contains an estimated 3 million ounces of silver with a grade of 30 to 90 ounces per ton and 15,000 ounces of gold at 0.3 ounces per ton. (Source, “Geological Evaluation”, Roger G. Stoker, P.G. and Ryne C. Stoker, Student Geologist, Energy Services Inc., December, 1981.)

Stoker also indicated the underground location of the “Berger Vein”, described as a “gold ore shoot 25 feet wide, 135 feet long, and unknown depth.” Average grades were given as 0.3 oz/ton gold with unknown silver content. Additional notes in Stoker suggest that the Berger Vein had been intersected in drifting at the 400-foot level.

The references above to data and observations derived from work not carried out by SBMI are of historical nature only and cannot be relied upon at this time. SBMI does not know the methods by which such work was carried out, or whether all or part of it was under the supervision of a Qualified Person, as that term is defined in NI43-101. SBMI refers to such data and observations to inform its knowledge of the area.

SBMI disclosed the results of part of its field program on December 9, 2021 (filed at SEDAR December 15, 2021). A reminder of those strong results is below:

MethodAUAG-GR30AUAG-GR30
ElementGoldSilverSilver
Units[g/t][g/t][oz/ton]
LDL*0.145
WASH-ID-0010.5574350127
WASH-ID-0021.364780139
WASH-ID-0031.264740138
WASH-ID-0040.676203059
WASH-ID-0050.928258075
WASH-ID-0061.69248073
WASH-ID-0070.37129841
WASH-ID-0080.6110735
WASH-ID-009< 0.1488328
WASH-ID-0104.613928126

Based in part on the information from Stoker, and in part on the data above, and from its own other observations, SBMI took a bulk sample from the Washington Mine, the results of which were disclosed on January 18, 2022. That bulk sample returned 55.5 ounces silver per ton, within the historical parameters of 30 to 90 ounces silver per ton.

Further, the Company may have found the surface expression of the Berger Vein in its 2021 field season. As disclosed on December 9, 2021 soil geochemistry returned gold values up to 9 ppm in areas of shallow soil cover. The Company anticipates that future field work comprising of further soil geochemistry and hand trenching could lead to exposure of in-place gold mineralization.

Underground, historical plan maps depict a cross cut at the main portal level at about 200 feet lower in elevation. The Company believes the cross cut accessed the Berger Vein. SBMI intends to access this cross cut during rehabilitation efforts. Once safe passage through the cross cut is secured, SBMI anticipates systematic sampling, evaluation and potential underground drilling in the Berger Vein area.

For further information, please contact:

John Carter
Silver Bullet Mines Corp., CEO
cartera@sympatico.ca
+1 (905) 302-3843

Peter M. Clausi
Silver Bullet Mines Corp., VP Capital Markets
pclausi@brantcapital.ca
+1 (416) 890-1232

Cautionary and Forward-Looking Statements

This news release contains certain statements that constitute forward-looking statements as they relate to SBMI and its subsidiaries. Forward-looking statements are not historical facts but represent management’s current expectation of future events, and can be identified by words such as “believe”, “expects”, “will”, “intends”, “plans”, “projects”, “anticipates”, “estimates”, “continues” and similar expressions. Although management believes that the expectations represented in such forward-looking statements are reasonable, there can be no assurance that they will prove to be correct.

By their nature, forward-looking statements include assumptions, and are subject to inherent risks and uncertainties that could cause actual future results, conditions, actions or events to differ materially from those in the forward-looking statements. If and when forward-looking statements are set out in this new release, SBMI will also set out the material risk factors or assumptions used to develop the forward-looking statements. Except as expressly required by applicable securities laws, SBMI assumes no obligation to update or revise any forward-looking statements. The future outcomes that relate to forward-looking statements may be influenced by many factors, including but not limited to: the impact of SARS CoV-2 or any other global virus; reliance on key personnel; the thoroughness of its QA/QA procedures; the continuity of the global supply chain for materials for SBMI to use in the production and processing of ore; shareholder and regulatory approvals; activities and attitudes of communities local to the location of the SBMI’s properties; risks of future legal proceedings; income tax matters; fires, floods and other natural phenomena; the rate of inflation; availability and terms of financing; distribution of securities; commodities pricing; currency movements, especially as between the USD and CDN; effect of market interest rates on price of securities; and, potential dilution. SARS CoV-2 and other potential global viruses create risks that at this time are immeasurable and impossible to define.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/134542

Categories
Gold Shore Resources Junior Mining Precious Metals

Goldshore Sampling of Historic Core Expands Mineralization with 104.2m at 1.04 g/t Au and Identifies New Parallel Zone

Vancouver, British Columbia–(Newsfile Corp. – August 23, 2022) – Goldshore Resources Inc. (TSXV: GSHR) (OTCQB: GSHRF) (FSE: 8X00) (“Goldshore” or the “Company“), is pleased to announce assay results from previously unsampled historic drill core at the Moss Lake Project in Northwest Ontario, Canada (the “Moss Lake Gold Project”).

Goldshore’s team has retrieved historical core that remains on the Moss Lake Gold Project where the drill collars have been recovered and accurately surveyed. Prior operators selectively sampled core that fit with the model used at the time. This core is now being relogged and sampled by Goldshore. This presents an excellent, cost-effective opportunity for Goldshore to generate significant results without new drilling, particularly in those holes that coincide with Goldshore’s identified targets. This news release presents results from six such historical holes where sampling by prior operators was incomplete.

Highlights:

  • Sampling of unsampled sections of two historic drill holes at the QES Zone have increased the width and grade of gold mineralization over that previously reported. The expanded intercepts include:
    • 104.2m @ 1.04 g/t Au from 422.0m in NS247, including
      • 19.40m @ 2.66 g/t Au from 458.6m
      • This section includes the visible gold reported on April 19, 2022
      • The hole ended in mineralization
    • 56.1m @ 0.42 g/t Au from 493.5m in NS248
  • Sampling has also identified a new southern parallel zone that was previously unrecognized, including:
    • 9.30m @ 1.28 g/t Au from 244.6m depth, including
      • 0.9m @ 10.95 g/t from 253.0m
    • 0.9m @ 35.7 g/t Au from 271.65m and
    • 78.45m @ 0.35 g/t Au from 331.55m in NS247
    • 69.10m @ 0.49 g/t Au from 413.0m in NS248
  • Additional sampling of four drillholes assessing regional prospects confirmed initial results.

President and CEO Brett Richards stated: “All of the work we have conducted at Moss Lake, whether new drilling results or sampling and analysis of the historic drilling, all indicates that the extent of mineralization is far greater than the footprint of the historical resource. These results indicate yet another parallel zone of mineralization not previously identified and will provide new high quality drill targets in the future; as well as meaningful data when conducting the resource estimation.”

Technical Overview

Table 1 shows the significant intercepts. Table 2 and Figure 1 show the drill hole locations.


 
Figure 1: Drill plan showing the drill holes relative to the 2013 resource model and the new parallel zones
 
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8051/134517_10b59bccd42b0b57_002full.jpg

Table 1: Significant downhole gold intercepts

HOLE IDFROMTOLENGTH (m)TRUE
WIDTH (m)
CUT
GRADE

(g/t Au)
UNCUT
GRADE

(g/t Au)
ML-02-006
ML-04-016156.20181.5025.3019.40.510.51
206.80215.909.107.00.730.73
270.20276.206.004.60.860.86
ML-04-017
ML-04-018111.00118.207.204.90.340.34
NS24766.2069.002.801.20.440.44
85.9596.1510.204.20.540.54
121.00123.452.451.00.440.44
244.60253.909.304.41.281.28
including253.00253.900.900.411.011.0
271.65272.550.900.430.035.7
331.55410.0078.4539.80.350.35
422.00526.20104.2054.41.041.04
including458.60478.0019.4010.12.662.66
542.20550.007.804.50.790.79
0.000.0
NS24833.5043.109.604.40.670.67
308.00312.404.402.40.440.44
353.00367.7014.707.90.790.79
413.00482.1069.1042.10.490.49
493.50549.6056.1036.10.420.42
Intersections calculated above a 0.3 g/t Au cut off with a top cut of 30 g/t Au and a maximum internal waste interval of 10 metres. Shaded intervals are intersections calculated above a 1.0 g/t Au cut off. Intervals in bold are those with a grade thickness factor exceeding 20 gram x metres / tonne gold. True widths are approximate and assume a subvertical body. The fact that cut and uncut assays are the same, shows that all samples assayed less than the 30 g/t Au top cut.

Table 2: Location of drill holes in this press release

HOLEEASTNORTHRLAZIMUTHDIPEOH
ML-02-0066700115379164429155-45°318.91m
ML-04-0166710165378230429156°-45°300m
ML-04-0176710395377982429336-45°132m
ML-04-0186710505377959429336-45°171m
NS2476703525379453434336°-69°550m
NS2486699585379129429336°-65°647m
Approximate collar coordinates in NAD 83, Zone 15N

Results have been received for six historical holes that were incompletely sampled in the past and have now been more completely sampled to fully assess the intersected mineralized zones. Two holes (NS247 and NS248) targeted the QES Zone and four holes (ML-02-006, ML-04-016, ML-04-017, and ML-04-018) tested regional prospects south of the Moss Lake Project.

Assays from new sampling at NS247 and NS248 have expanded the widths of the known mineralized intercepts and identified a new parallel zone to the south of QES. They show that gold mineralization at Moss Lake is wider than previously believed and contains additional higher-grade structures beyond that defined by historic drilling. Step back drilling of the QES Zone has begun to determine the extent of the new parallel zones south of the QES Zone.

The broad zone of 104.2m @ 1.04 g/t Au from 422.0m in NS247 compares to an historic interval of 104.2m @ 0.88 g/t Au if the unsampled intervals are assigned zero grade, which seems to be what previous geologists thought. Similarly, the interval 56.1m @ 0.42 g/t Au from 493.5m in NS248 compares to an historic interval of 56.1m @ 0.31 g/t Au.

The high-grade section of NS247(19.40m @ 2.66 g/t Au from 458.6m) includes a narrow quartz-pyrite-chalcopyrite vein zone with visible gold that was reported on April 19, 2022. Surprisingly, this interval returned only 0.3m @ 1.01 g/t Au from 546.8m highlighting the nuggetty nature of gold mineralization. The drill hole ended in gold mineralization suggesting that the mineralized zone is wider.

Infill sampling of ML-04-016 and ML-04-018 yielded minor increases to the width of historic intercepts. No additional mineralized zones were identified in any of the four holes.

Several additional holes have been identified as having unsampled intervals within mineralized drill core. Historical core archives are being reexamined to locate, identify, and recover drill core for further infill sampling.

Pete Flindell, VP Exploration for Goldshore, said “These drill results confirm our contention that previous explorers did not assess the full scale of gold mineralization at Moss Lake. As such, Moss Lake holds significant potential to be a larger gold system. Our assessment of historic drill core will continue in parallel with our 100,000-meter drill program.”

Analytical and QA/QC Procedures

All samples were sent to ALS Geochemistry in Thunder Bay for preparation and analysis was performed in the ALS Vancouver analytical facility. ALS is accredited by the Standards Council of Canada (SCC) for the Accreditation of Mineral Analysis Testing Laboratories and CAN-P-4E ISO/IEC 17025. Samples were analyzed for gold via fire assay with an AA finish (“Au-AA23”) and 48 pathfinder elements via ICP-MS after four-acid digestion (“ME-MS61”). Samples that assayed over 10 ppm Au were re-run via fire assay with a gravimetric finish (“Au-GRA21”).

In addition to ALS quality assurance / quality control (“QA/QC”) protocols, Goldshore has implemented a quality control program for all samples collected through the drilling program. The quality control program was designed by a qualified and independent third party, with a focus on the quality of analytical results for gold. Analytical results are received, imported to our secure on-line database and evaluated to meet our established guidelines to ensure that all sample batches pass industry best practice for analytical quality control. Certified reference materials are considered acceptable if values returned are within three standard deviations of the certified value reported by the manufacture of the material. In addition to the certified reference material, certified blank material is included in the sample stream to monitor contamination during sample preparation. Blank material results are assessed based on the returned gold result being less than ten times the quoted lower detection limit of the analytical method. The results of the on-going analytical quality control program are evaluated and reported to Goldshore by Orix Geoscience Inc.

About Goldshore

Goldshore is an emerging junior gold development company, and owns the Moss Lake Gold Project located in Ontario. Wesdome is currently a large shareholder of Goldshore with an approximate 27% equity position in the Company. Well-financed and supported by an industry-leading management group, board of directors and advisory board, Goldshore is positioned to advance the Moss Lake Gold Project through the next stages of exploration and development.

About the Moss Lake Gold Project

The Moss Lake Gold Project is located approximately 100 km west of the city of Thunder Bay, Ontario. It is accessed via Highway 11 which passes within 1 km of the property boundary to the north. The Moss Lake Gold Project covers 14,292 hectares and consists of 282 unpatented and patented mining claims.

The Moss Lake Gold Project hosts a number of gold and base metal rich deposits including the Moss Lake Deposit, the East Coldstream Deposit (Table 3), the historically producing North Coldstream Mine (Table 4), and the Hamlin Zone, all of which occur over a mineralized trend exceeding 20 km in length. A historical preliminary economic assessment (the “Moss Lake Historical Estimate“) was completed on the Moss Lake Gold Project in 2013 and published by Moss Lake Gold Mines Ltd. (“Moss Lake Gold Mines“)1,3. A historical mineral resource estimate (the “East Coldstream Historical Estimate“) was completed on the East Coldstream Deposit in 2011 by Foundation Resources Inc.2,3 In addition to these zones, the Moss Lake Gold Project also hosts a number of under-explored mineral occurrences which are reported to exist both at surface and in historically drilled holes. The Moss Lake Deposit is a shear-hosted disseminated-style gold deposit which outcrops at surface. It has been drilled over a 2.5 km length and to depths of 300 m with 376 holes completed between 1983 and 2017. The last drilling program conducted in 2016 and 2017 by Wesdome Gold Mines Ltd. (“Wesdome“), which consisted of widely spaced holes along the strike extension of the deposit was successful in expanding the mineralized footprint and hydrothermal system 1.6 km to the northeast. Additionally, the deposit remains largely open to depth. In 2017, Wesdome completed an induced polarization survey which traced the potential extensions of pyrite mineralization associated with the Moss Lake Deposit over a total strike length of 8 km and spanning the entire extent of the survey grids.

The East Coldstream Deposit is a shear-hosted disseminated-style gold deposit which locally outcrops at surface. It has been drilled over a 1.3 km length and to depths of 200 m with 138 holes completed between 1988 and 2017. The deposit remains largely open at depth and may have the potential for expansion along strike. Historic drill hole highlights from the East Coldstream Deposit include 4.86 g/t Au over 27.3 m in C-10-15.

The historically producing North Coldstream Mine is reported to have produced significant amounts of copper, gold and silver4 from mineralization with potential iron-oxide-copper-gold deposit style affinity. The exploration potential immediately surrounding the historic mining area is not currently well understood and historic data compilation is required.

The Hamlin Zone is a significant occurrence of copper and gold mineralization, and also of potential iron-oxide-copper-gold deposit style affinity. Between 2008 and 2011, Glencore tested Hamlin with 24 drill holes which successfully outlined a broad and intermittently mineralized zone over a strike length of 900 m. Historic drill hole highlights from the Hamlin Zone include 0.9 g/t Au and 0.35% Cu over 150.7 m in HAM-11-75.

The Moss Lake, East Coldstream and North Coldstream deposits sit on a mineral trend marked by a regionally significant deformation zone locally referred to as the Wawiag Fault Zone in the area of the Moss Lake Deposit. This deformation zone occurs over a length of approximately 20 km on the Moss Lake Gold Project and there is an area spanning approximately 7 km between the Moss Lake and East Coldstream deposits that is significantly underexplored.

Table 3: Historical Mineral Resources1,2,3

INDICATEDINFERRED
DepositTonnesAu g/tAu ozTonnesAu g/tAu oz
Moss Lake Historical Estimate
Open Pit Potential39,795,0001.11,377,30048,904,0001.01,616,300
Underground Potential1,461,1002.9135,400
Moss Lake Total39,795,0001.11,377,30050,364,0001.11,751,600
East Coldstream Historical Estimate
East Coldstream Total3,516,7000.8596,40030,533,0000.78763,276
Combined Total43,311,7001.081,473,70080,897,0000.982,514,876

Notes:

  1. (1) Source: Poirier, S., Patrick, G.A., Richard, P.L., and Palich, J. “Technical Report and Preliminary Economic Assessment for the Moss Lake Project”, prepared for Moss Lake Gold Mines Ltd. The qualified persons for the Moss Lake Historical Estimate are Pierre-Luc Richard, MSc, PGeo (InnovExplo Inc), and Carl Pelletier, BSc, PGeo (InnovExplo Inc), and the effective date of the Moss Lake Historical Estimate is February 8, 2013. In-Pit results are presented undiluted and in situ, within Whittle-optimized pit shells. Underground results are presented undiluted and in situ, outside Whittle-optimized pit shells. The Moss Lake Historical Estimate includes 18 gold-bearing zones and 1 envelope containing isolated gold intercepts. Whittle parameters: mining cost = C$2.28; pit slope angle = 50.0 degrees; production cost = C$9.55; mining Dilution = 5%; mining recovery = 95%; processing recovery = 80% to 85%; gold price = C$1,500. In-Pit and Underground resources were compiled at cut-off grades from 0.3 to 5.0 g/t Au (for sensitivity characterization). A cut-off grade of 0.5 g/t Au was selected as the official in-pit cut-off grade and a cut-off grade of 2.0 g/t Au was selected as the official underground cut-off grade. The Moss Lake Historical Estimate is based on 352 diamond drill holes (90,978 m) drilled from 1983 and 2008. A fixed density of 2.78 g/cm3 was used. A minimum true thickness of 5.0 m was applied, using the grade of the adjacent material when assayed or a value of zero when not assayed. Capping was established at 35 g/t Au, supported by statistical analysis and the high grade distribution within the deposit. Compositing was done on drill hole sections falling within the mineralized zone solids (composite = 1 m). Resources were evaluated from drill hole samples using the ID2 interpolation method in a multi-folder percent block model using Gems version 6.4. Based on geostatistics, the ellipse range for interpolation was 75m x 67.5m x 40m. The Indicated category is defined by combining the blocks within the two main zones and various statistical criteria, such as average distance to composites, distance to closest composite, quantity of drill holes within the search area. Ounce (troy) = metric tons x grade / 31.10348. Calculations used metric units (metres, tonnes and g/t). The number of metric tonnes was rounded to the nearest thousand. Any discrepancies in the totals are due to rounding effects; rounding followed the recommendations in NI 43-101.
  2. (2) Source: McCracken, T. “Technical Report and Resource Estimate on the Osmani Gold Deposit, Coldstream Property, Northwestern Ontario”, prepared for Foundation Resources Inc. and Alto Ventures Ltd. The East Coldstream Historical Estimate is based on a 0.4 g/t Au cut-off grade. The qualified persons for the East Coldstream Historical Estimate are Todd McCracken, P.Geo. (Tetratech Wardrop), and Jeff Wilson, Ph.D., P.Geo. (Tetratech Wardrop), and the effective date of the East Coldstream Historical Estimate is December 12, 2011. Resources are presented unconstrained, undiluted and in situ. The East Coldstream Historical Estimate includes 2 gold-bearing zones. A cut-off grade of 0.4 g/t Au was selected as the official resource cut-off grade. The East Coldstream Historical Estimate is based on 116 diamond drill holes drilled from 1986 to 2011. A fixed density of 2.78 g/cm3 was used. Capping was established at 5.89 g/t Au and 5.70 g/t Au for domains EC-1 and EC-2, respectively. This is supported by statistical analysis and the high grade distribution within the deposit. Compositing was done on drill hole sections falling within the mineralized zone solids (composite = 1 m). Resources were evaluated from drill hole samples using the ID2 interpolation method in a multi-folder percent block model using Datamine Studio 3 version 3.20.5321.0. Recource categorization is based on spatial continuity based from the variography of the assays within the drillholes. Ounce (troy) = metric tons x grade / 31.10348. Calculations used metric units (metres, tonnes and g/t). The number of metric tonnes was rounded to the nearest thousand. Any discrepancies in the totals are due to rounding effects; rounding followed the recommendations in NI 43-101.
  3. (3) The reader is cautioned that the Moss Lake Historical Estimate East and the East Coldstream Historical Estimate (the “Historical Estimates“) are considered historical in nature and as such is based on prior data and reports prepared by previous property owners. The reader is cautioned not to treat them, or any part of them, as current mineral resources or reserves. The Company has determined these historical resources are reliable, and relevant to be included here in that they demonstrate simply the mineral potential of the Moss Lake Gold Project. A qualified person has not done sufficient work to classify the Historical Estimates as current resources and Goldshore is not treating the Historical Estimates as current resources. Significant data compilation, re-drilling, re-sampling and data verification may be required by a qualified person before the Historical Estimates can be classified as a current resource. There can be no assurance that any of the historical mineral resources, in whole or in part, will ever become economically viable. In addition, mineral resources are not mineral reserves and do not have demonstrated economic viability. Even if classified as a current resource, there is no certainty as to whether further exploration will result in any inferred mineral resources being upgraded to an indicated or measured mineral resource category. The Historical Estimates relating to inferred mineral resources were calculated using prior mining industry standard definitions and practices for estimating mineral resource and mineral reserves. Such prior definitions and practices were utilized prior to the implementation of the current standards of the Canadian Institute of Mining for mineral resource estimation, and have a lower level of confidence.

Table 4: Reported Historical Production from the North Coldstream Deposit4

DepositTonnesCu %Au g/tAgCu lbsAu ozAg oz
Historical Production2,700,00001.890.565.59102,000,00044,000440,000

Note::

  1. (4) Source: Schlanka, R., 1969. Copper, Nickel, Lead and Zinc Deposits of Ontario, Mineral Resources Circular No. 12, Ontario Geological Survey, pp. 314-316.

Peter Flindell, P.Geo., MAusIMM, MAIG, Vice President – Exploration of the Company, a qualified person under NI 43-101 has approved the scientific and technical information contained in this news release.

Neither the TSXV nor its Regulation Services Provider (as that term is defined in the policies of the TSXV) accepts responsibility for the adequacy or accuracy of this release.

For More Information – Please Contact:

Brett A. Richards
President, Chief Executive Officer and Director
Goldshore Resources Inc.

P. +1 604 288 4416
M. +1 905 449 1500
E. brichards@goldshoreresources.com
W. www.goldshoreresources.com

Facebook: GoldShoreRes | Twitter: GoldShoreRes | LinkedIn: goldshoreres

Cautionary Note Regarding Forward-Looking Statements

This news release contains statements that constitute “forward-looking statements.” Such forward looking statements involve known and unknown risks, uncertainties and other factors that may cause the Company’s actual results, performance or achievements, or developments to differ materially from the anticipated results, performance or achievements expressed or implied by such forward-looking statements. Forward looking statements are statements that are not historical facts and are generally, but not always, identified by the words “expects,” “plans,” “anticipates,” “believes,” “intends,” “estimates,” “projects,” “potential” and similar expressions, or that events or conditions “will,” “would,” “may,” “could” or “should” occur.

Forward-looking statements in this news release include, among others, statements relating to expectations regarding the exploration and development of the Moss Lake Gold Project, and other statements that are not historical facts. By their nature, forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause our actual results, performance or achievements, or other future events, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. Such factors and risks include, among others: the Company may require additional financing from time to time in order to continue its operations which may not be available when needed or on acceptable terms and conditions acceptable; compliance with extensive government regulation; domestic and foreign laws and regulations could adversely affect the Company’s business and results of operations; the stock markets have experienced volatility that often has been unrelated to the performance of companies and these fluctuations may adversely affect the price of the Company’s securities, regardless of its operating performance; and the impact of COVID-19.

The forward-looking information contained in this news release represents the expectations of the Company as of the date of this news release and, accordingly, is subject to change after such date. Readers should not place undue importance on forward-looking information and should not rely upon this information as of any other date. The Company undertakes no obligation to update these forward-looking statements in the event that management’s beliefs, estimates or opinions, or other factors, should change.

This news release does not constitute an offer to sell, or a solicitation of an offer to buy, any securities in the United States. The securities have not been and will not be registered under the United States Securities Act of 1933, as amended (the “U.S. Securities Act”) or any state securities laws and may not be offered or sold within the United States or to U.S. Persons unless registered under the U.S. Securities Act and applicable state securities laws or an exemption from such registration is available.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/134517

Categories
Base Metals Energy Junior Mining Nevada Copper

Nevada Copper Provides Operation and Financing Update

Nevada Copper Corp.
Nevada Copper Corp.

YERINGTON, Nev., Aug. 05, 2022 (GLOBE NEWSWIRE) — Nevada Copper (TSX: NCU) (OTC: NEVDF) (FSE: ZYTA) (“Nevada Copper” or the “Company”) provides an update on its operations and financing initiatives and activities at its Pumpkin Hollow copper mine (the “Underground Mine”) located in Yerington, Nevada.

Operational Restart Planning

During July, management has advanced its Underground Mine restart plans, which focus on the acceleration of key capital items followed by the development of a significant stope ore inventory in advance of a mill restart and completion of production ramp-up. The development of restart plans has allowed the Company to advance financing discussions with its key stakeholders. The commencement of restart activities is contingent on the Company obtaining long-term financing, as discussed below.

The Company continues to work with its creditors and vendors to defer payments and maintain the operation in a temporary suspension status, with only limited operational activities being undertaken to protect the Company’s assets, to minimize cash burn until closing of a restart funding package.

Restart Financing

The Company is engaged in active and ongoing discussions with its key financing partners with respect to a substantial funding package for the restart and ramp-up of the Underground Mine (as an alternative to the smaller financing package referred to in the Company’s July 4, 2022 press release which is no longer being pursued in that form).https://embed.fireplace.yahoo.com/embed?ctrl=Monalixa&m_id=monalixa&m_mode=document&site=sports&os=android&pageContext=%257B%2522ctopid%2522%253A%25221542500%253B1577000%2522%252C%2522hashtag%2522%253A%25221542500%253B1577000%2522%252C%2522wiki_topics%2522%253A%2522Company%253BYerington%252C_Nevada%253BBankruptcy%253BDebate%253BUnderground_hard-rock_mining%2522%252C%2522lmsid%2522%253A%2522a0770000002m0AbAAI%2522%252C%2522revsp%2522%253A%2522globenewswire.com%2522%252C%2522lpstaid%2522%253A%2522618b261d-7539-34cc-9b63-9cf83c3f5fd6%2522%252C%2522pageContentType%2522%253A%2522story%2522%257D

The Company has expended the full amount of the previously disclosed US$20 million promissory note from Pala Investments Limited (“Pala”), the Company’s largest shareholder. Pala has indicated that it is prepared to provide additional financing of up to US$20 million through further promissory notes (US$4 million of which has already been advanced) while the Company continues discussions with its financing partners. The Company will continue to require interim financing until a restart funding package is secured and closed. As previously disclosed, pending completion of a financing package, the Company has not made payments due to certain creditors and vendors and is in default of its obligations under certain financing agreements and other contractual arrangements.

There can be no assurance that the Company will obtain additional interim financing or that the longer-term restart funding package will be agreed or completed on terms satisfactory to the Company and within the required timeframe, or at all. In the absence of securing such arrangements or alternative financing arrangements, the Company will not be able to continue carrying on business in the ordinary course and may need to pursue proceedings for creditor protection. The Company’s creditors may also seek to commence enforcement action, including realizing on their security over the Company’s assets.

About Nevada Copper

Nevada Copper (TSX: NCU) is a copper producer and owner of the Pumpkin Hollow copper project. Located in Nevada, USA, Pumpkin Hollow has substantial reserves and resources including copper, gold and silver. Its two fully permitted projects include the high-grade Underground Mine and processing facility, which is now in the production stage, and a large-scale open pit project, which is advancing towards feasibility status.

Randy Buffington
President & CEO

For additional information, please see the Company’s website at www.nevadacopper.com, or contact:

Tracey Thom Vice President, IR and Community Relations
tthom@nevadacopper.com
+1 775 391 9029

Cautionary Language on Forward Looking Statements
This news release contains “forward-looking information” and “forward-looking statements” within the meaning of applicable Canadian securities laws. All statements in this news release, other than statements of historical facts, are forward-looking statements. Such forward-looking information and forward-looking statements specifically include, but are not limited to, statements that relate to mine planning, financing requirements, discussions with financing partners, and creditor protection proceedings.

Forward-looking statements and information include statements regarding the expectations and beliefs of management. Often, but not always, forward-looking statements and forward-looking information can be identified by the use of words such as “plans”, “expects”, “potential”, “is expected”, “anticipated”, “is targeted”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates”, or “believes” or the negatives thereof or variations of such words and phrases or statements that certain actions, events or results “may”, “could”, “would”, “might” or “will” be taken, occur or be achieved. Forward-looking statements or information should not be read as guarantees of future performance and results. They are subject to known and unknown risks, uncertainties and other factors which may cause the actual results and events to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements or information.

Such risks and uncertainties include, without limitation, those relating to: requirements for additional capital and no assurance can be given regarding the availability thereof; the outcome of discussions with creditors and vendors; potential creditor protection proceedings; the ability of the Company to complete the ramp-up of the Underground Mine within the expected cost estimates and timeframe; the impact of COVID-19 on the business and operations of the Company; the state of financial markets; history of losses; dilution; adverse events relating to milling operations, construction, development and ramp-up, including the ability of the Company to address underground development and process plant issues; ground conditions; cost overruns relating to development, construction and ramp-up of the Underground Mine; loss of material properties; interest rates increase; global economy; limited history of production; future metals price fluctuations; speculative nature of exploration activities; periodic interruptions to exploration, development and mining activities; environmental hazards and liability; industrial accidents; failure of processing and mining equipment to perform as expected; labour disputes; supply problems; uncertainty of production and cost estimates; the interpretation of drill results and the estimation of mineral resources and reserves; changes in project parameters as plans continue to be refined; possible variations in ore reserves, grade of mineralization or recovery rates from management’s expectations and the difference may be material; legal and regulatory proceedings and community actions; accidents; title matters; regulatory approvals and restrictions; increased costs and physical risks relating to climate change, including extreme weather events, and new or revised regulations relating to climate change; permitting and licensing; dependence on management information systems and cyber security risks; volatility of the market price of the Company’s securities; insurance; competition; hedging activities; currency fluctuations; loss of key employees; other risks of the mining industry as well as those risks discussed in the Company’s Management’s Discussion and Analysis in respect of the year ended December 31, 2021 and the quarter ended March 31, 2022 and in the section entitled “Risk Factors” in the Company’s Annual Information Form dated March 31, 2022. The forward-looking statements and information contained in this press release are based upon assumptions management believes to be reasonable, including, without limitation: no adverse developments in respect of the property or operations at the project; no material changes to applicable laws; the ramp-up of operations at the Underground Mine in accordance with management’s plans and expectations; no worsening of the current COVID-19 related work restrictions; reduced impacts of COVID-19 going forward; the Company will be able to obtain sufficient additional funding to complete the ramp-up, no material adverse change to the price of copper from current levels; and the absence of any other factors that could cause actions, events or results to differ from those anticipated, estimated or intended.

The forward-looking information and statements are stated as of the date hereof. The Company disclaims any intent or obligation to update forward-looking statements or information except as required by law. Although the Company has attempted to identify important factors that could cause actual actions, events, or results to differ materially from those described in forward-looking information and statements, there may be other factors that could cause actions, events or results not to be as anticipated, estimated or intended. Specific reference is made to “Risk Factors” in the Company’s Management’s Discussion and Analysis in respect of the year ended December 31, 2021 and the quarter ended March 31, 2022 and “Risk Factors” in the Company’s Annual Information Form dated March 31, 2022, for a discussion of factors that may affect forward-looking statements and information. Should one or more of these risks or uncertainties materialize, should other risks or uncertainties materialize or should underlying assumptions prove incorrect, actual results and events may vary materially from those described in forward-looking statements and information. For more information on the Company and the risks and challenges of its business, investors should review the Company’s filings that are available at www.sedar.com.

The Company provides no assurance that forward-looking statements and information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements or information. Accordingly, readers should not place undue reliance on forward-looking statements or information.

Categories
Base Metals Energy Exclusive Interviews Junior Mining Metallic Group Metallic Minerals Precious Metals

Metallic Minerals Closes $4 Million Private Placement Financing

VANCOUVER, BC / ACCESSWIRE / June 9, 2022 / Metallic Minerals (TSX.V:MMG)(OTCQB:MMNGF) (“Metallic Minerals“, or the “Company“) is pleased to report that it has closed its previously announced non-brokered private placement financing for aggregate proceeds of $4,032,000 through the issuance of 9,600,000 units at a price of $0.42 per flow-through unit (the “Private Placement”). Each Unit consists of one flow-through common share and one-half purchase warrant where each whole warrant is exercisable into a flow-through common share for 30 months at a price of $0.50 on the TSX Venture Exchange (“TSX-V”).

Greg Johnson, CEO and Chairman, noted, “We are pleased to complete this premium-to-market Private Placement and to strengthen our shareholder base with new institutional investors. These new funds will be primarily directed toward the ongoing exploration and development of our Keno Silver Project in the high-grade, Keno silver district of Canada’s Yukon Territory. Final planning is underway for the initiation of our 2022 exploration programs at Keno Silver, as well as at our La Plata silver-gold-copper project in Colorado, USA. We look forward to meeting with existing and potential shareholders during PDAC 2022 in Toronto June 13-15, as well as during the Yukon Property Tours and Conference June 20-24 in Dawson City.”

Proceeds from the Private Placement will be used toward eligible Canadian Exploration Expenses, within the meaning of the Income Tax Act (Canada). The Private Placement is subject to the final approval of the TSX-V. The flow-through shares will be subject to a hold period of four months and one day from their date of issuance under applicable Canadian securities law.

The flow-through shares have not been, and will not be, registered under the U.S. Securities Act or any U.S. state securities laws, and may not be offered or sold in the United States or to, or for the account or benefit of, U.S. persons absent registration or any applicable exemption from the registration requirements of the U.S. Securities Act and applicable U.S. state securities laws.

An officer of the Company participated in the private placement for an aggregate of 4,400 FT Units. The participation by the insider in the private placement is considered to be a related-party transaction as defined under Multilateral Instrument 61-101. The transaction is exempt from the formal valuation and minority shareholder approval requirements of MI 61-101, as neither the fair market value of the securities being issued, nor the consideration being paid exceeds 25% of the Company’s market capitalization.

Upcoming Events

PDAC 2022 – Metallic will join fellow Metallic Group members, Stillwater Critical Minerals (formerly Group Ten Metals) and Granite Creek Copper, at PDAC in Toronto, June 13-15 (Booth IE2851).

Yukon Property Tours & Conference – Metallic will be in Dawson City June 20-24 for the 2022 Yukon Property Tours, with President, Scott Petsel, and CEO, Greg Johnson, both visiting the Keno Silver Project for exploration planning.

About Metallic Minerals

Metallic Minerals Corp. is an exploration and development stage company, focused on silver, gold and copper in the high-grade Keno Hill and La Plata mining districts of North America. Our objective is to create shareholder value through a systematic, entrepreneurial approach to making exploration discoveries, growing resources and advancing projects toward development. Metallic Minerals has consolidated the second-largest land position in the historic Keno Hill silver district of Canada’s Yukon Territory, directly adjacent to Alexco Resource Corp’s operations, with more than 300 million ounces of high-grade silver in past production and current M&I resources. In addition, the Company recently announced the inaugural resource estimate for the La Plata silver-gold-copper project in southwestern Colorado. All of the districts in which the Company works have seen significant mineral production and have existing infrastructure, including power and road access. Metallic Minerals is led by a team with a track record of discovery and exploration success on several major precious and base metal deposits, as well as having large-scale development, permitting and project financing expertise.

About the Metallic Group of Companies

The Metallic Group is a collaboration of leading precious and base metals exploration and development companies, with a portfolio of large, brownfields assets in established mining districts adjacent to some of the industry’s highest-grade producers of silver and gold, platinum and palladium, and copper. Member companies include Metallic Minerals in the Yukon’s high-grade Keno Hill silver district and La Plata silver-gold-copper district of Colorado, Granite Creek Copper in the Yukon’s Minto copper district, and Stillwater Critical Minerals (formerly Group Ten Metals) in the Stillwater PGM-nickel-copper district of Montana, USA and Kluane district in the Yukon. The founders and team members of the Metallic Group include highly successful explorationists formerly with some of the industry’s leading explorer/developers and major producers. With this expertise, the companies are undertaking a systematic approach to exploration and development using new models and technologies to facilitate discoveries in these proven, but under-explored, mining districts. Members of the Metallic Group have been recognized as recipients of awards for excellence in environmental stewardship demonstrating commitment to responsible resource development and appropriate ESG practices. The Metallic Group is headquartered in Vancouver, BC, Canada, and its member companies are listed on the Toronto Venture, US OTCQB and Frankfurt stock exchanges.

FOR FURTHER INFORMATION, PLEASE CONTACT:

Website: mmgsilver.com
Phone: 604-629-7800
Email: cackerman@mmgsilver.com
Toll Free: 1-888-570-4420

Forward-Looking Statements

Forward Looking Statements: This news release includes certain statements that may be deemed “forward-looking statements”. All statements in this release, other than statements of historical facts including, without limitation, statements regarding potential mineralization, historic production, estimation of mineral resources, the realization of mineral resource estimates, interpretation of prior exploration and potential exploration results, the timing and success of exploration activities generally, the timing and results of future resource estimates, permitting time lines, metal prices and currency exchange rates, availability of capital, government regulation of exploration operations, environmental risks, reclamation, title, and future plans and objectives of the company are forward-looking statements that involve various risks and uncertainties. Although Metallic Minerals believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in the forward-looking statements. Forward-looking statements are based on a number of material factors and assumptions. Factors that could cause actual results to differ materially from those in forward-looking statements include failure to obtain necessary approvals, unsuccessful exploration results, changes in project parameters as plans continue to be refined, results of future resource estimates, future metal prices, availability of capital and financing on acceptable terms, general economic, market or business conditions, risks associated with regulatory changes, defects in title, availability of personnel, materials and equipment on a timely basis, accidents or equipment breakdowns, uninsured risks, delays in receiving government approvals, unanticipated environmental impacts on operations and costs to remedy same, and other exploration or other risks detailed herein and from time to time in the filings made by the companies with securities regulators. Readers are cautioned that mineral resources that are not mineral reserves do not have demonstrated economic viability. Mineral exploration and development of mines is an inherently risky business. Accordingly, the actual events may differ materially from those projected in the forward-looking statements. For more information on Metallic Minerals and the risks and challenges of their businesses, investors should review their annual filings that are available at www.sedar.com.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

SOURCE: Metallic Minerals Corp.

Categories
Base Metals Breaking Energy Exclusive Interviews Junior Mining Metallic Group Metallic Minerals Precious Metals

Metallic Minerals | High-Grade Silver, Keno Style Intercepts

Metallic Minerals: TSX.V: MMG | OTC: MMNGF)

Website: https://metallic-minerals.com/

Corporate Presentation: https://metallic-minerals.com/investors/presentations/

Categories
Junior Mining Lion One Metals Precious Metals

Lion One Reports Latest Results from Its Phase 2 Infill Drill Program from Tuvatu, Fiji, Demonstrating Significant New Mineralization, Including a Bonanza Intercept of 584.07 g/t Au Over 0.30m

North Vancouver, British Columbia–(Newsfile Corp. – May 31, 2022) – Lion One Metals Limited (TSXV: LIO) (OTCQX: LOMLF) (ASX: LLO) (“Lion One” or the “Company”) is pleased to announce results from ongoing infill drilling at its Tuvatu Alkaline Gold Project in Fiji.

Results for the first 11 holes of Lion One’s Phase 2 infill program on Zone 5 of their fully permitted Tuvatu alkaline gold deposit are here reported. The results to date indicate significant new intercepts of high- to bonanza-grade Au mineralization that was not known to occur as part of the existing resource model. The Phase 2 infill drill program was designed to confirm the location, size, and continuity of the known mineralized lodes, in a portion of the orebody slated for early production (Figure 1A).

Top Intercepts include:

  • 18.47 g/t Au over 1.20m from 104.7-105.9m, and 584.07 g/t Au over 0.30m from 122.4-122.7m from TUDDH-586 (new)
  • 24.72 g/t Au over 0.60m from 187.4-188.0m, incl. 43.34 g/t Au over 0.30m from 187.7-188.0m from TUDDH-580 (new)
  • 25.23 g/t Au over 1.20m from 70.9-72.1m, incl. 78.02 g/t Au over 0.30m from TUG-139
  • 18.77 g/t Au over 2.10m from 118.8-120.9m, incl. 26.07 g/t Au over 1.50m from TUDDH-577
  • 11.95 g/t Au over 2.70m from 55.9-58.6m, incl. 35.91 g/t Au over 0.60m from TUDDH-578
  • 11.18 g/t Au over 1.20m from 153.5-154.7m, incl. 40.05 g/t Au over 0.30m from TUDDH-580

The mineralization reported here is considered to be a highly significant development, representing a substantive addition of Au mineralization at grades well in excess of the average resource grade, intersected at relatively shallow levels in the orebody. As a result, the new high-grade mineralization defined by the ongoing infill drill program can be expected to substantially enhance the early part the production stream and hence the immediate economic viability of Tuvatu.https://embed.fireplace.yahoo.com/embed?ctrl=Monalixa&m_id=monalixa&m_mode=document&site=sports&os=android&pageContext=%257B%2522ctopid%2522%253A%25221542500%253B1480989%253B1481489%2522%252C%2522hashtag%2522%253A%25221542500%253B1480989%253B1481489%2522%252C%2522wiki_topics%2522%253A%2522Lion%253BExploration_diamond_drilling%2522%252C%2522lmsid%2522%253A%2522a0V0W00000HOPDcUAP%2522%252C%2522revsp%2522%253A%2522newsfile_64%2522%252C%2522lpstaid%2522%253A%252290214f74-cd87-30c8-9d72-a6dbadcf0260%2522%252C%2522pageContentType%2522%253A%2522story%2522%257D

Results of the ongoing infill drill program to date are summarized below in Table 1. Highlighted in blue on Table 1 are specific drill intercepts that are outside of the mineralized lodes that make up the existing resource model. Each of these additional intercepts has the potential to add width, grade, and continuity to the resource in this portion of the Tuvatu orebody.

Lion One CEO Walter Berukoff, stated “We are confident that the high-grade intercepts indicated by our infill programs and the increased drilling density will lead to a more robust resource model overall with higher localized grades earlier in the production schedule at Tuvatu. Furthermore, when considering the substantially higher grade near-surface infill results reported here, along with the continuing success of the deep drilling program, this underscores the significance of Tuvatu as a potentially multi-million ounce, world-class high-grade Au producer. As we expand our drilling fleet to eight rigs and our laboratory capacity to 12,000 samples per month, we are well positioned to continue securing impressive results from all three tiers of our exploration strategy: from ongoing near-surface infill drilling; from extensions of deep high-grade feeder targets at Tuvatu; and from our pipeline of regional targets in the surrounding Navilawa caldera”.

Since the start of Phase 2 infill drill program in February 2022, Lion One has to date completed approximately 3,700m out of a planned 8,000m of infill drilling. This news release reports the results from approximately 2,375m of drilling, equivalent to approximately 30% of the planned program.

Infill Drilling Program

Two phases of infill drilling have been planned at Tuvatu with the aim of infilling areas within the current resource and thus augmenting the data density, to further improve the resolution of the geological model in portions of the deposit scheduled for earliest production. Phase 1 infill drilling was completed over Zone 2 (Figure 1A) in mid-February 2022, adding over 8,400m of new drill data, including 7,475m of new drilling and 955m of sampling of previously unsampled historic drill core (see Feb. 23, 2022 News Release).

This release presents final assay data from the initial 11 drill holes completed as part of the Phase 2 infill program, which is planned for approximately 8000m of diamond drilling from surface and underground, and is aimed at upgrading the resource database in Zone 5 of the Tuvatu orebody (Figure 1). The program as planned includes 30 holes totalling 5,400m carried out from 4 separate drill stations at surface, and 34 holes totalling 2,600m carried out from 6 underground drill stations. Phase 2 infill drill program began February 17, 2022 with drill hole TUDDH-577, and is expected to require 5-6 months of drilling using three rigs (two from surface and one from underground) to complete.

The results from the initial approximately 2,375m of drilling in Zone 5 (Figure 2), representing approximately 30% of the planned program total, indicate consistent high-grade to locally bonanza-grade Au mineralization for known mineralized lodes in this portion of the current resource (Table 1). Additionally, the results from the initial 30% of the Phase 2 infill program indicates significant new high-grade mineralization not previously known to occur prior to this program, and therefore not included in the current resource statement.

Overall, results to date suggest higher-than-expected continuity and widths of mineralization, locally at grades above the calculated average grade of the deposit. Indeed, the Phase 2 infill program is confirming, and in certain instances, extending previously modelled lodes in this part of the resource. Intercepts of exceptionally high-grades (e.g. 584.07 g/t Au in TUDDH-586) are in line with bonanza results documented from several intercepts from the previously completed Phase 1 infill drill program, providing further support to the expectation of an overall increase in average grades of the lodes scheduled for earliest phases of mining.

Numerous mineralized intervals, including the 584.07 g/t Au bonanza-grade intercept in hole TUDDH-586 as well as 43.34 g/t Au over 0.30m from 187.7-188.0m in hole TUDDH-580, occur fully outside of existing modelled lodes (Table 1, highlighted), adding to our understanding of the lode geometry, as well as to the overall inventory of high-grade mineralization slated for early production at Tuvatu.

As per the Phase 1 infill program, numerous strategically located historic holes have also been identified for resampling, the results of which will be reported in future news releases.

Figure 1: A) Oblique view looking N060° and down 17° showing the current conceptual mine plan ore panels (gold) highlighting the location of Zone 2 and Zone 5, the exploration decline (yellow) and the planned Zone 5 infill drilling program (blue). The planned drilling consists of 4 surface and 6 underground drill stations. B) Oblique view looking N060° and down 40° showing the UR1 to UR5, URW1A, URW1C, and URW3 lodes (transparent gray), exploration decline (yellow) and the planned Zone 5 infill drilling program (blue).

To view an enhanced version of Figure 1, please visit:
https://orders.newsfilecorp.com/files/2178/125923_lionon2.jpg

Figure 2: Composite vertical section looking N through Zone 5 at Tuvatu, showing the UR1 to UR5, URW1A, URW2A, and URW3 lodes (blue labels) and the trace of the infill drilling reported in this release (yellow traces). Solid lines are in the section, dotted lines are projected to this section.

To view an enhanced version of Figure 2, please visit:
https://orders.newsfilecorp.com/files/2178/125923_lionon4.jpg

Table 1: Drilling intervals returning >0.5 g/t Au (intervals > 3.0 g/t Au cutoff are shown in red, and intervals >9.0 g/t Au or longer than 1.2m are bolded). Intercepts that are outside of the current geological model are highlighted in light blue.

Hole IDFrom (m)To (m)Interval (m)Grade (g/t Au)
TUDDH-5777.28.10.91.25
59.160.31.21.13
100.8101.40.60.86
118.8120.92.118.77
including118.8120.31.526.07
127.5127.80.316.30
135.6136.20.61.09
138.6138.90.324.66
182.2182.80.60.65
TUDDH-57845.445.70.30.72
55.958.62.711.95
including55.956.50.635.91
and58.058.30.322.39
64.365.20.90.58
82.382.90.60.77
100.6101.50.91.39
TUDDH-57922.022.30.30.73
126.1126.40.32.43
129.7131.82.10.94
135.1135.40.313.56
140.5142.31.82.88
including140.5140.80.311.62
and142.0142.30.35.2
161.2163.62.41.78
TUDDH-5808.09.21.24.53
46.747.30.61.67
81.882.40.60.78
83.685.11.51.48
153.5154.71.211.18
including153.5153.80.340.05
157.7158.60.90.66
159.5159.80.30.66
165.2167.01.81.11
including166.7167.00.35.01
173.6173.90.30.76
187.4188.00.624.72
including187.4187.70.36.12
including187.7188.00.343.34
192.8196.43.61.88
including193.1193.40.311.17
including194.6194.90.34.11
TUDDH-58120.921.20.34.12
81.882.40.60.76
100.4101.00.61.56
106.4107.00.60.82
168.5170.01.54.41
including168.5168.80.38.27
and168.8170.01.23.25
179.3182.02.71.32
186.8187.10.30.54
206.6206.90.33.07
208.4209.91.51.91
212.3213.20.90.69
226.1227.91.82.39
including227.0227.30.37.48
249.8250.70.91.38
251.9252.20.32.38
307.4308.91.51.55
TUDDH-58247.648.50.93.21
91.893.61.83.81
including92.493.61.25.22
99.3102.02.73.33
including99.3100.20.95.77
TUDDH-5837.58.10.62.26
46.547.10.61.02
72.072.30.31.48
87.388.51.20.69
96.396.90.62.68
114.0114.30.31.62
121.5122.71.21.48
126.9128.71.81.93
including128.4128.70.34.39
132.0132.30.325.32
137.4137.70.30.66
138.9140.11.23.11
including138.9139.20.37.12
241.2241.50.31.48
TUDDH-5869.311.11.84.28
including10.211.10.97.91
63.664.20.60.53
67.868.40.61.8
84.684.90.35.95
98.198.40.32.95
104.7105.91.218.47
116.7117.30.60.55
122.1122.70.6292.69
including122.4122.70.3584.07
127.5127.80.31.68
129.3129.90.610.74
133.2133.80.63.41
141.6143.72.11.75
including142.5142.80.37.33
238.5241.22.70.95
TUDDH-58717.217.50.30.69
62.863.40.61.11
76.676.90.31.57
89.589.80.30.59
103.6103.90.32.34
146.2146.50.34.43
159.1160.91.81.66
232.9233.50.66.43
including232.9233.20.311.40
234.7235.91.24.27
including235235.60.65.42
237.4238.61.28.89
TUG-13917.818.10.31.42
22.022.30.30.82
26.526.80.31.47
28.929.20.31.42
31.031.30.30.75
48.749.60.91.49
54.459.24.84.20
including54.755.00.35.91
and55.055.30.312.60
and55.655.90.37.27
and55.956.20.35.70
and57.157.40.315.09
70.972.11.225.23
including70.971.20.38.96
and71.271.50.38.32
and71.571.80.35.00
and71.872.10.378.02
82.382.60.32.78
91.691.90.31.66
95.595.80.31.84
TUG-14220.420.70.31.15
29.429.70.31.49
31.236.35.10.65
41.4420.61.88
45.345.60.30.69
61.363.72.43.55
including62.563.10.68.14
additional results pending

Table 2: Survey details of diamond drill holes referenced in this release

Hole NoCoordinates (Fiji map grid)RLfinal depthdipazimuth
NEm(TN)
TUDDH-57739204351876442314.0197.9-39268
TUDDH-57839205201876513348.6150.3-59267
TUDDH-57939204351876513348.6239.0-49269
TUDDH-58039204351876513348.6284.9-60265
TUDDH-58139204351876513348.6311.6-70265
TUDDH-58239204351876442314.0120.2-49267
TUDDH-58339204351876513348.6303.2-44289
TUDDH-58639204351876513348.6302.3-55289
TUDDH-58739204351876513348.6256.8-63289
TUG-13939204801876411103.1123.3+13091
TUG-14239204801876411103.185.8-30090

Qualified Person

In accordance with National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”), Sergio Cattalani, P.Geo, Senior Vice President Exploration, is the Qualified Person for the Company and has reviewed and is responsible for the technical and scientific content of this news release.

QAQC Procedures

Lion One adheres to rigorous QAQC procedures above and beyond basic regulatory guidelines in conducting its sampling, drilling, testing, and analyses. The Company utilizes its own fleet of diamond drill rigs, using PQ, HQ and NQ sized drill core rods. Drill core is logged and split by Lion One personnel on site. Samples are delivered to and analysed at the Company’s geochemical and metallurgical laboratory in Fiji. Duplicates of all samples with grades above 0.5 g/t Au are both re-assayed at Lion One’s lab and delivered to ALS Global Laboratories in Australia (ALS) for check assay determinations. All samples for all high-grade intercepts are sent to ALS for check assays. All samples are pulverized to 80% passing through 75 microns. Gold analysis is carried out using fire assay with an AA finish. Samples that have returned grades greater than 10.00 g/t Au are then re-analysed by gravimetric method. For samples that return greater than 0.50 g/t Au, repeat fire assay runs are carried out and repeated until a result is obtained that is within 10% of the original fire assay run. For samples with multiple fire assay runs, the average of duplicate runs is presented. Lion One’s laboratory can also assay for a range of 71 other elements through Inductively Coupled Plasma Optical Emission Spectrometry (ICP-OES), but currently focuses on a suite of 9 important pathfinder elements. All duplicate anomalous samples are sent to ALS labs in Townsville QLD and are analysed by the same methods (Au-AA26, and Au-GRA22 where applicable). ALS also analyses for 33 pathfinder elements by HF-HNO3-HClO4 acid digestion, HCl leach and ICP-AES (method ME-ICP61).

About Lion One Metals Limited

Lion One’s flagship asset is 100% owned, fully permitted high grade Tuvatu Alkaline Gold Project, located on the island of Viti Levu in Fiji. Lion One envisions a low-cost high-grade underground gold mining operation at Tuvatu coupled with exciting exploration upside inside its tenements covering the entire Navilawa Caldera, an underexplored yet highly prospective 7km diameter alkaline gold system. Lion One’s CEO Walter Berukoff leads an experienced team of explorers and mine builders and has owned or operated over 20 mines in 7 countries. As the founder and former CEO of Miramar Mines, Northern Orion, and La Mancha Resources, Walter is credited with building over $3 billion of value for shareholders.

On behalf of the Board of Directors of
Lion One Metals Limited
Walter Berukoff
Chairman and CEO

For further information
Contact Investor Relations
Toll Free (North America) Tel: 1-855-805-1250
Email: info@liononemetals.com
Website: www.liononemetals.com

Neither the TSX Venture Exchange nor its Regulation Service Provider 
accepts responsibility for the adequacy or accuracy of this release.

This press release may contain statements that may be deemed to be “forward-looking statements” within the meaning of applicable Canadian securities legislation. All statements, other than statements of historical fact, included herein are forward looking information. Generally, forward-looking information may be identified by the use of forward-looking terminology such as “plans”, “expects” or “does not expect”, “proposed”, “is expected”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates” or “does not anticipate”, or “believes”, or variations of such words and phrases, or by the use of words or phrases which state that certain actions, events or results may, could, would, or might occur or be achieved. This forward-looking information reflects Lion One Metals Limited’s current beliefs and is based on information currently available to Lion One Metals Limited and on assumptions Lion One Metals Limited believes are reasonable. These assumptions include, but are not limited to, the actual results of exploration projects being equivalent to or better than estimated results in technical reports, assessment reports, and other geological reports or prior exploration results. Forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of Lion One Metals Limited or its subsidiaries to be materially different from those expressed or implied by such forward-looking information. Such risks and other factors may include, but are not limited to: the stage development of Lion One Metals Limited, general business, economic, competitive, political and social uncertainties; the actual results of current research and development or operational activities; competition; uncertainty as to patent applications and intellectual property rights; product liability and lack of insurance; delay or failure to receive board or regulatory approvals; changes in legislation, including environmental legislation, affecting mining, timing and availability of external financing on acceptable terms; not realizing on the potential benefits of technology; conclusions of economic evaluations; and lack of qualified, skilled labour or loss of key individuals. Although Lion One Metals Limited has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. Accordingly, readers should not place undue reliance on forward-looking information. Lion One Metals Limited does not undertake to update any forward-looking information, except in accordance with applicable securities laws.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/125923

Categories
Energy Junior Mining Precious Metals Silver Bullet Mines

Silver Bullet Mines – Buckeye Mine – Second Access to Treasure Room

From the offices of John Carter, CEO, Silver Bullet Mines

Everyone,

I know I just put an update out just last week but things are really moving fast !
I will make it quick :
Mill site is going great . Last major frame material arrived late but we got it now this week we can complete the screen frame and conveyor install then work on the chutes . Last but not least we are supposed to be drilling our well this week fingers crossed and then electrical. Do not anticipate a problem with supply as all components are NA made . Oh yah one other thing we are starting to stockpile ore at the millsite this week !
At the mine check out the new video on the website and on Utube. We now have our second access to The Treasure Room opened up and our destination is in sight ! Still lots of work but we are up for it !
On the Idaho front I said news is coming and it is . We are really making headway in anticipation of being on site in April! Really exciting.
On the corporate front I hope you saw the pr on the financing really phenomenal that we were able to accomplish this ! Over 80% of the funding came from existing shareholders. We have a few stragglers that will close this week but we did it ! Also I hope you saw the Metaverse PR ? We need to get people excited about SBMI and one of those ways is to think outside the box and that’s what we are doing! Always pushing the rope uphill.
As always make sure you check out the website https://urldefense.proofpoint.com/v2/url?u=http-3A__www.silverbulletmines.com&d=DwIFaQ&c=euGZstcaTDllvimEN8b7jXrwqOf-v5A_CdpgnVfiiMM&r=alXGId5R9cxJuK5Z2z9UoGUtk8y1SZGhzm32O97Bmm8&m=ssPVP96Apg6XkukZTR94OnbkffjURiTeGk9VyKFC45o&s=pkmiaBI8vz5SSc6bLpj5xcc6KreLnv2VSIFUK7XkV2U&e= , follow us on Twitter @bulletmines and Utube silver bullet mines .
Again thank you for your continuing support!
Enjoy!!!!

Categories
Energy Exclusive Interviews Junior Mining Labrador Gold Precious Metals

Labrador Gold – 100,000 Meter Drill Program, 5 Drill Rigs

Labrador Gold is a Canadian-based mineral exploration company focused on the acquisition and exploration of prospective gold projects in Eastern Canada. The Company is advancing the Kingsway Gold Project, located in the Gander Gold District of Newfoundland. The project is strategically located contiguous to New Found Gold’s Queensway Project and lies along strike to the northeast of their recent discovery of 92.86g/t Au over 19.0 meters.

Labrador Gold: https://labradorgold.com/ Ticker: TSX.V: LAB | OTCQX: NKOSF

Corporate Presentation: https://labradorgold.com/investors/presentations/

Telephone: (416) 704-8291 Email: info@labradorgold.com

Labrador Gold is partner/sponsor and we are shareholders.

Website | www.provenandprobable.com

Call me directly at 855.505.1900 or email: Maurice@MilesFranklin.com Precious Metals FAQ – https://www.milesfranklin.com/faq-maurice/

Categories
Base Metals Energy Junior Mining Precious Metals Silver Bullet Mines

Silver Bullet Mines Corp. Second Tranche of Successful Financing

Burlington, Ontario–(Newsfile Corp. – March 11, 2022) – Silver Bullet Mines Corp. (TSXV: SBMI) (‘SBMI’ or ‘the Company’) announces it today has closed on $810,075 in its previously announced financing, bringing the total raised to date to $1,574,075.

This tranche represents 2,205,188 Units, with each Unit priced at $0.40 (forty cents). Each Unit consists of one common share and one full 60-cent (sixty cent) warrant with a 24-month term, with each such warrant being exercisable into a common share (the “Financing”). There is no acceleration clause on such warrants.

This is the second tranche of Units on which SBMI has closed. The first tranche of $764,000 was announced February 18, 2022. SBMI has further subscription agreements in hand which means SBMI will close on at least one further tranche before March 26, 2022.

These proceeds from the Financing will be used to complete the process of putting the Buckeye Silver Mine into pilot production in March, 2022, to advance work at the past-producing silver and gold Washington Mine in Idaho, and for working capital.

“This financing is a success for the company and the shareholders,” said A. John Carter, SBMI’s CEO. “Our original minimum target was $500,000 and the investors blew that number away. The funds raised in this financing have been budgeted to be more than enough to put the Buckeye Mine into production, to complete our mill, and to advance the Washington Mine to where it can be ready for mineral extraction.”

Referral fees may be paid to arm’s length persons in connection with the issuance of the Units. Other than the subscription agreement, there will be no further offering material provided to Existing Security Holders or others related to Financing. The subscription agreement is available at the Company’s website https://www.silverbulletmines.com/technical-corporatedocuments.

For further information, please contact:

John Carter
Silver Bullet Mines Corp., CEO
cartera@sympatico.ca
+1 (905) 302-3843

Peter M. Clausi
Silver Bullet Mines Corp., VP Capital Markets
pclausi@brantcapital.ca
+1 (416) 890-1232

Cautionary and Forward-Looking Statements

This news release contains certain statements that constitute forward-looking statements as they relate to SBMI and its subsidiaries. Forward-looking statements are not historical facts but represent management’s current expectation of future events, and can be identified by words such as “believe”, “expects”, “will”, “intends”, “plans”, “projects”, “anticipates”, “estimates”, “continues” and similar expressions. Although management believes that the expectations represented in such forward-looking statements are reasonable, there can be no assurance that they will prove to be correct.

By their nature, forward-looking statements include assumptions, and are subject to inherent risks and uncertainties that could cause actual future results, conditions, actions or events to differ materially from those in the forward-looking statements. If and when forward-looking statements are set out in this new release, SBMI will also set out the material risk factors or assumptions used to develop the forward-looking statements. Except as expressly required by applicable securities laws, SBMI assumes no obligation to update or revise any forward-looking statements. The future outcomes that relate to forward-looking statements may be influenced by many factors, including but not limited to: the impact of SARS CoV-2 or any other global virus; reliance on key personnel; the thoroughness of its QA/QA procedures; the continuity of the global supply chain for materials for SBMI to use in the production and processing of ore; shareholder and regulatory approvals; activities and attitudes of communities local to the location of the SBMI’s properties; risks of future legal proceedings; income tax matters; fires, floods and other natural phenomena; the rate of inflation; availability and terms of financing; distribution of securities; commodities pricing; currency movements, especially as between the USD and CDN; effect of market interest rates on price of securities; and, potential dilution. SARS CoV-2 and other potential global viruses create risks that at this time are immeasurable and impossible to define.

Categories
Base Metals Breaking Energy Junior Mining Metallic Group Precious Metals Stillwater Critical Minerals

Group Ten Reports High-Grade Drill Results Spanning Seven Kilometers at Stillwater West, Demonstrating Significant Potential for Expansion of Critical Mineral Resources in Montana, USA

VANCOUVER, BC / ACCESSWIRE / March 7, 2022 / Group Ten Metals Inc. (TSX.V:PGE; OTCQB:PGEZF; FSE:5D32) (the “Company” or “Group Ten”) today reports partial results from four drill holes in a second tranche of drill results from the 14-hole resource expansion campaign completed at the Company’s flagship Stillwater West PGE-Ni-Cu-Co + Au project in Montana, USA.

Results continue to support the Company’s priority objective of expanding the October 2021 inaugural mineral resource estimates, with multiple wide and highly mineralized intervals returned in step-out drilling at three deposit areas that span seven kilometers of the 12-kilometer core project area (see Figure 1). Mineralization remains open to expansion along trend and at depth in all deposit areas.

2021 Drill Highlights:

  • IM2021-04 returned 115 meters of 0.37% Nickel Equivalent (“NiEq”), or 0.98 g/t Palladium Equivalent (“PdEq”) in a step-out hole to the south of the HGR deposit area at Iron Mountain. Mineralization starts at surface and runs the entire length that has been assayed to date, returning 369 meters at 0.22% NiEq (0.60 g/t PdEq). Assays are pending from the bottom 53 meters of the 422-meter hole. As shown in Table 1, successive contained higher-grade intervals include:
    • 9.8 meters of 1.43 g/t 3E (Pd+Pt+Au) plus Ni, Cu, and Co values for total mineralization of 0.74% NiEq, or 1.98 g/t PdEq, and;
    • 4.8 meters of 1.35% NiEq (equal to 3.60 g/t PdEq) as 0.74% Ni, 0.65% Cu, 0.07% Co, and 0.24 g/t 3E.
  • CM2021-03 returned 0.24% NiEq (0.63 g/t PdEq) across its entire 428-meter length in step-out drilling in the DR and Hybrid deposit area, including contained intervals at higher grades:
    • 30.3 meters of 0.99 g/t 3E plus Ni, Cu, and Co values for a total of 0.51% NiEq, or 1.36 g/t PdEq;
    • 0.50% NiEq, or 1.34 g/t PdEq, over 9.2 meters, and;
    • 0.50% NiEq, or 1.34 g/t PdEq over 7.2 meters in a separate, lower interval.
  • CM2021-02 returned top-to-bottom mineralization with 333 meters at 0.23% NiEq, or 0.61 g/t PdEq, and successive higher-grade intervals including 17.0 meters of 0.51% NiEq (1.35 g/t PdEq).
  • These results, in addition to results released December 20, 2021, demonstrate significant potential to expand the October 2021 mineral resource estimates with multiple long intervals at grades well above the 0.20% NiEq cut-off grade used in that study. Moreover, as shown in Figures 2 and 3, these results provide important intercepts in step-out drill holes located up to several hundred meters from three of the five deposits modeled in the 2021 resource estimate:
    • CM2021-02 and -03 are two of six holes drilled in 2021 in the DR and Hybrid deposit area to step out from high-grade nickel sulphide-PGE mineralization identified in hole CM2020-04. In addition, these holes also returned potentially significant extensions of hybrid-type mineralization. Hole CM2021-01, reported December 20, 2021, was drilled south from the same pad as CM2021-02 and returned 728 meters of continuous sulphide mineralization at 0.27% NiEq, or 0.73 g/t PdEq, with multiple contained intervals at successively higher grades;
    • CZ2021-02 is one of two holes drilled in 2021 to step-out to the south of the CZ deposit in the area of wide, high-grade mineralization returned in hole CZ2019-01. Hole CZ2021-01, reported December 20, 2021, returned the widest high-grade intercept to date on the project being 63.7 meters of 0.92% NiEq (2.46 g/t PdEq) in this area;
    • IM2021-04 is one of six holes drilled in the HGR deposit area with the objective of expanding on wide intervals of high-grade mineralization returned in hole IM2019-03 which returned 272 meters at 0.43% NiEq (1.16 g/t PdEq) including 26.8 meters at 1.24 g/t 4E, 0.34% Ni, 0.15% Cu, and 0.019% Co, for 0.96% NiEq (2.55 g/t PdEq).
  • Assay results remain pending from eight holes, in addition to rhodium assay results on the majority of mineralized intervals reported to date.

Michael Rowley, President and CEO, commented, “The Stillwater Igneous Complex has been a large-scale American source of critical minerals for many decades, from chromium mined in the 1940s and 1950s to palladium and platinum that became essential in the 1980s. Our “Platreef-in-Montana” model is well-timed for what we believe will be the next phase of the Stillwater district’s contribution to critical mineral supply and commodity independence in the USA; world-class nickel and copper sulphide deposits, enriched in palladium, platinum, rhodium, gold, and cobalt and hosted in the lower Stillwater complex at Stillwater West.”

“This second tranche of drill results from our resource expansion campaign builds nicely upon the first results and continues to advance us towards expanded resource estimates in three of the five deposit areas on a priority basis. We continue to see demonstrations of a large mineralized system with an impressive endowment of eight of the commodities listed as critical by the US government in numerous holes across the 12-kilometer core project area. In addition, we continue to see good optionality on possible mining methods with successively higher-grade intervals contained within wider intervals of hundreds of meters of lower grade mineralization. We look forward to reporting additional drill results, exploration plans for 2022, and other news in the near term.”

Table 1 – Highlight Results from 2021 Expansion Drill Campaigns at the DR, Hybrid, CZ, and HGR Deposit Areas

Assays pending for rhodium and certain intervals denoted by *. Highlighted significant intercepts with grade-thickness values over 20 gram-meter PdEq are presented above, except as noted. Grade thickness values cover significant mineralized intervals with total palladium and nickel equivalent grade-thickness determined by multiplying the thickness of continuous mineralization (in meters) by the palladium equivalent grade (in grams/tonne) to provide gram-meter values (g-m) or by multiplying the nickel equivalent grade (in percent) to provide percent-meter values as shown. Total nickel and palladium equivalent calculations reflect total gross metal content using metals prices as follows (all USD): $7.00/lb nickel (Ni), $3.50/lb copper (Cu), $20.00/lb cobalt (Co), $1,000/oz platinum (Pt), $1,800/oz palladium (Pd), and $1,600/oz gold (Au). Equivalent values have not been adjusted to reflect metallurgical recoveries. Total metal equivalent values include both base and precious metals. In terms of dollar value, 0.20% nickel equates to a copper value of 0.40%, or a palladium value of 0.53 g/t, using the above metal values. Intervals are reported as drilled widths and are believed to be representative of the actual width of mineralization.

Upcoming News and Events

Jeffrey Christian, Managing Director of CPM Group, will join Group Ten CEO Michael Rowley for a live webinar on March 8, 2022, at 10:00 am PT (1:00 pm ET) for a concise overview and update on the Company and the Stillwater West PGE-Ni-Cu-Co+Au project with in-depth discussion on the global macro-economic picture, trends and implications for the broader commodities sector and critical minerals, in particular.

This will be an interactive event with participants encouraged to submit questions and comments throughout.

To register, click here or the graphic below.

About Stillwater West

Group Ten is rapidly advancing the Stillwater West PGE-Ni-Cu-Co + Au project towards becoming a world-class source of low-carbon, sulphide-hosted nickel, copper, and cobalt, critical to the electrification movement, as well as key catalytic metals including platinum, palladium and rhodium used in catalytic converters, fuel cells, and the production of green hydrogen. Stillwater West positions Group Ten as the second-largest landholder in the Stillwater Complex, with a 100%-owned position adjoining and adjacent to Sibanye-Stillwater’s PGE mines in south-central Montana, USA1. The Stillwater Complex is recognized as one of the top regions in the world for PGE-Ni-Cu-Co mineralization, alongside the Bushveld Complex and Great Dyke in southern Africa, which are similar layered intrusions. The J-M Reef, and other PGE-enriched sulphide horizons in the Stillwater Complex, share many similarities with the highly prolific Merensky and UG2 Reefs in the Bushveld Complex. Group Ten’s work in the lower Stillwater Complex has demonstrated the presence of large-scale disseminated and high-sulphide battery metals and PGE mineralization, similar to the Platreef in the Bushveld Complex2. Drill campaigns by the Company, complemented by a substantial historic drill database, have delineated five deposits of Platreef-style mineralization across a core 12-kilometer span of the project, all of which are open for expansion into adjacent targets. Multiple earlier-stage Platreef-style and reef-type targets are also being advanced across the remainder of the 32-kilometer length of the project based on strong correlations seen in soil and rock geochemistry, geophysical surveys, geologic mapping, and drilling.

About Group Ten Metals Inc.

Group Ten Metals Inc. is a TSX-V-listed Canadian mineral exploration company focused on the development of high-quality platinum, palladium, nickel, copper, cobalt, and gold exploration assets in top North American mining jurisdictions. The Company’s core asset is the Stillwater West PGE-Ni-Cu-Co + Au project adjacent to Sibanye-Stillwater’s high-grade PGE mines in Montana, USA. Group Ten also holds the high-grade Black Lake-Drayton Gold project adjacent to Treasury Metals’ development-stage Goliath Gold Complex in northwest Ontario, and the Kluane PGE-Ni-Cu-Co project on trend with Nickel Creek Platinum‘s Wellgreen deposit in Canada‘s Yukon Territory.

About the Metallic Group of Companies

The Metallic Group is a collaboration of leading precious and base metals exploration companies, with a portfolio of large, brownfield assets in established mining districts adjacent to some of the industry’s highest-grade producers of silver and gold, platinum and palladium, and copper. Member companies include Metallic Minerals in the Yukon’s high-grade Keno Hill silver district and La Plata silver-gold-copper district of Colorado, Group Ten Metals in the Stillwater PGM-nickel-copper district of Montana, and Granite Creek Copper in the Yukon’s Minto copper district. The founders and team members of the Metallic Group include highly successful explorationists formerly with some of the industry’s leading explorers/developers and major producers. With this expertise, the companies are undertaking a systematic approach to exploration using new models and technologies to facilitate discoveries in these proven, but under-explored, mining districts. The Metallic Group is headquartered in Vancouver, BC, Canada, and its member companies are listed on the Toronto Venture, US OTC, and Frankfurt stock exchanges.

Note 1: References to adjoining properties are for illustrative purposes only and are not necessarily indicative of the exploration potential, extent or nature of mineralization or potential future results of the Company’s projects.

Note 2: Magmatic Ore Deposits in Layered Intrusions-Descriptive Model for Reef-Type PGE and Contact-Type Cu-Ni-PGE Deposits, Michael Zientek, USGS Open-File Report 2012-1010.

FOR FURTHER INFORMATION, PLEASE CONTACT:

Michael Rowley, President, CEO & Director
Email: info@grouptenmetals.com Phone: (604) 357 4790
Web: http://grouptenmetals.com Toll Free: (888) 432 0075

Quality Control and Quality Assurance

2021 drill core samples were analyzed by ACT Labs in Vancouver, B.C. Sample preparation: crush (< 7 kg) up to 80% passing 2 mm, riffle split (250 g) and pulverize (mild steel) to 95% passing 105 µm included cleaner sand. Gold, platinum, and palladium were analyzed by fire assay (1C-OES) with ICP finish. Selected major and trace elements were analyzed by peroxide fusion with 8-Peroxide ICP-OES finish to insure complete dissolution of resistate minerals. Following industry QA/QC standards, blanks, duplicate samples, and certified standards were also assayed.

Mr. Mike Ostenson, P.Geo., is the qualified person for the purposes of National Instrument 43-101, and he has reviewed and approved the technical disclosure contained in this news release.

Forward-Looking Statements

Forward Looking Statements: This news release includes certain statements that may be deemed “forward-looking statements”. All statements in this release, other than statements of historical facts including, without limitation, statements regarding potential mineralization, historic production, estimation of mineral resources, the realization of mineral resource estimates, interpretation of prior exploration and potential exploration results, the timing and success of exploration activities generally, the timing and results of future resource estimates, permitting time lines, metal prices and currency exchange rates, availability of capital, government regulation of exploration operations, environmental risks, reclamation, title, and future plans and objectives of the company are forward-looking statements that involve various risks and uncertainties. Although Group Ten believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in the forward-looking statements. Forward-looking statements are based on a number of material factors and assumptions. Factors that could cause actual results to differ materially from those in forward-looking statements include failure to obtain necessary approvals, unsuccessful exploration results, changes in project parameters as plans continue to be refined, results of future resource estimates, future metal prices, availability of capital and financing on acceptable terms, general economic, market or business conditions, risks associated with regulatory changes, defects in title, availability of personnel, materials and equipment on a timely basis, accidents or equipment breakdowns, uninsured risks, delays in receiving government approvals, unanticipated environmental impacts on operations and costs to remedy same, and other exploration or other risks detailed herein and from time to time in the filings made by the companies with securities regulators. Readers are cautioned that mineral resources that are not mineral reserves do not have demonstrated economic viability. Mineral exploration and development of mines is an inherently risky business. Accordingly, the actual events may differ materially from those projected in the forward-looking statements. For more information on Group Ten and the risks and challenges of their businesses, investors should review their annual filings that are available at www.sedar.com.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

SOURCE: Group Ten Metals Inc.



View source version on accesswire.com:
https://www.accesswire.com/691772/Group-Ten-Reports-High-Grade-Drill-Results-Spanning-Seven-Kilometers-at-Stillwater-West-Demonstrating-Significant-Potential-for-Expansion-of-Critical-Mineral-Resources-in-Montana-USA