Vancouver, British Columbia – (November 11, 2021) – Rover Metals Corp. (TSXV: ROVR) (OTCQB: ROVMF) (“Rover” or the “Company”) has received an update from ALS Canada and expects to be fully reported on the results of its Summer 2021 Phase 2 Drill Program, at its Cabin Gold Project, by the end of November. The Company anticipates issuing a news release on the results in early December.
About the Cabin Gold Project
In September 2020, Rover kicked-off its first exploration drilling program at the historic Cabin Gold Project. The exploration program included both confirmation and expansion drilling of historical high grade gold drill intercepts in the “Arrow Zone” area of the historic Bugow Iron Formation. The Bugow Iron Formation is the controlling structure for the gold mineralization on the property and is over 15 km in at or near surface length. In Q4-2020, the Company reported an intersection of 32 meters of continuous gold averaging 13.6 grams per ton Au from the Arrow Zone. Rover’s 2020 expansion drilling included the discovery of what it believes to be a primary gold bearing ore shoot at the Arrow Zone. The Arrow Zone remains open at depth, underneath Cabin Lake, and is only accessible for expansion drilling in the winter months. Rover’s 2020 drill program was the initial step towards confirming and expanding the historic 100,000 tons at 0.30 Oz/ton Au* historic resource estimate, reported for the Arrow Zone, towards a NI 43-101 compliant mineral resource estimate. The Arrow Zone will see expansion drilling commencing in Q1-2022, as soon as the ice drill pads and ice road to site have been constructed.
In July 2021, Rover commenced a Phase 2 Exploration Program at the Cabin Gold Project. The goal of the Phase 2 Exploration Program was the discovery and definition of new, near surface, gold bearing zones along the Bugow Iron Formation. The Company focussed on five known historic targets areas: (1) the Beaver; (2) the Andrew South; (3) the Andrew North; (4) the Camp South; and (5) Camp North. As of the date hereof, the Company is still waiting on results of its summer exploration program. Any new discoveries will form part of the Company’s Phase 3 Winter Exploration Program slated to begin in Q1-2022.
(*) As per Section 2.4 of NI 43-101, Aber Resources Ltd. reported a mineral inventory (that does not compare to the current CIM Definitions Standards mineral resource categories) of 100,000 tons at 0.30 ounces per ton gold at the Cabin Lake Gold Zone on the north limb of the folded Bugow Iron Formation in their 1986 and 1987 annual reports. The parameters used for the resource calculation are unknown. These results are relevant as to delineate a larger zone of gold mineralization at the Cabin Lake Gold Zone, but further drilling is needed to bring that up to CIM Definition Standards. The reader is cautioned that a Qualified Person has not done sufficient work to classify the historical estimates as current mineral resources and Rover Metals is not treating the historical estimates as current mineral resources.
Technical information in this news release has been approved by Raul Sanabria, M.Sc., P.Geo., Technical Advisor and shareholder of Rover Metals Corp. and a Qualified Person for the purposes of National Instrument 43-101.
About Rover Metals
Rover is a precious metals exploration company specialized in North American precious metal resources, that is currently advancing the gold potential of its existing projects in the Northwest Territories of Canada (60th parallel). The Company commenced Phase 2 Exploration at its Cabin Gold Project in the summer of 2021, and is planning to commence Phase 3 Exploration in Q1-2022.
You can follow Rover on its social media channels:
Twitter: https://twitter.com/rovermetals
LinkedIn: https://www.linkedin.com/company/rover-metals/
Facebook: https://www.facebook.com/RoverMetals/
for daily company updates and industry news, and
YouTube: https://www.youtube.com/channel/UCJsHsfag1GFyp4aLW5Ye-YQ?view_as=subscriber
for corporate videos.
Website: https://www.rovermetals.com/
ON BEHALF OF THE BOARD OF DIRECTORS
“Judson Culter”
Chief Executive Officer and Director
For further information, please contact:
Email: info@rovermetals.com
Phone: +1 (778) 754-2617
Statement Regarding Forward-Looking Information
This news release contains statements that constitute “forward-looking statements.” Such forward-looking statements involve known and unknown risks, uncertainties and other factors that may cause Rover’s actual results, performance or achievements, or developments in the industry to differ materially from the anticipated results, performance or achievements expressed or implied by such forward-looking statements. Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by the words “expects,” “plans,” “anticipates,” “believes,” “intends,” “estimates,” “projects,” “potential” and similar expressions, or that events or conditions “will,” “would,” “may,” “could” or “should” occur. There can be no assurance that such statements be prove to be accurate. Actual results and future events could differ materially from those anticipated in such statements, and readers are cautioned not to place undue reliance on these forward-looking statements. Any factor could cause actual results to differ materially from Rover’s expectations. Rover undertakes no obligation to update these forward-looking statements in the event that management’s beliefs, estimates or opinions, or other factors, should change.
THE FORWARD-LOOKING INFORMATION CONTAINED IN THIS NEWS RELEASE REPRESENTS THE EXPECTATIONS OF THE COMPANY AS OF THE DATE OF THIS NEWS RELEASE AND, ACCORDINGLY, IS SUBJECT TO CHANGE AFTER SUCH DATE. READERS SHOULD NOT PLACE UNDUE IMPORTANCE ON FORWARD-LOOKING INFORMATION AND SHOULD NOT RELY UPON THIS INFORMATION AS OF ANY OTHER DATE. WHILE THE COMPANY MAY ELECT TO, IT DOES NOT UNDERTAKE TO UPDATE THIS INFORMATION AT ANY PARTICULAR TIME EXCEPT AS REQUIRED IN ACCORDANCE WITH APPLICABLE LAWS.
NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OF THIS RELEASE.
Category: Junior Mining
VANCOUVER, BC / ACCESSWIRE / November 10, 2021 / Granite Creek Copper Ltd. (TSXV:GCX)(OTCQB:GCXXF) (“Granite Creek” or the “Company“) is pleased to announce the retention of SGS Geological Services (‘SGS”) to provide an updated National Instrument 43-101 mineral resource estimate on the Company’s Carmacks copper-gold-silver deposit in the Minto Copper Belt located in central Yukon, Canada.
Granite Creek will be incorporating drilling completed in 2017, 2020 and 2021 into an updated resource estimate which will build on the existing NI 43-101 compliant resources last published in 20171,2. Resource expansion drilling completed in 2021 consisted of 22 diamond drill holes primarily targeted at sulfide mineralization in Zones 1, 2000S and 13 and is expected to add to the existing sulfide resource (see news release dated October 28, 2021).
Table 1. Current Mineral Resource Estimate on the Carmacks Copper Project
| Category | Tonnes (000) | Cu (%) | Au (g/t) | Ag (g/t) | |
| Oxide & Transition Mineralization | Measured | 6,484 | 0.86 | 0.41 | 4.24 |
| Indicated | 9,206 | 0.97 | 0.36 | 3.80 | |
| M&I | 15,690 | 0.94 | 0.38 | 3.97 | |
| Inferred | 913 | 0.45 | 0.12 | 1.90 | |
| Sulphide Mineralization | Measured | 1,381 | 0.64 | 0.19 | 2.17 |
| Indicated | 6,687 | 0.69 | 0.17 | 2.34 | |
| M&I | 8,068 | 0.68 | 0.18 | 2.33 | |
| Inferred | 8,407 | 0.63 | 0.15 | 1.99 |
About SGS Geological Services
SGS Geological services has a very strong team, with valuable experience, known, renown and respected in the international mining industry. The team has considerable experience in estimation and modeling of deposits of all types and practical and theoretical experience having realized hundreds of assessments for clients. A multidisciplinary group of qualified persons with a strong understanding of the disclosure requirements for Mineral Resources set out in the NI 43-101 Standards of Disclosure for Mineral Projects (2016), CIM Definition Standards – For Mineral Resources and Mineral Reserves (2014) and a strong understanding of the CIM Estimation of Mineral Resources & Mineral Reserves Best Practice Guidelines 2019.
Resource Road Update
On November 8th the Yukon government announced the following road construction update that directly effects Granite Creek’s Carmacks Project.
“Whitehorse based company Pelly Construction has been awarded the contract for the Carmacks Bypass Project, a $29.6 million investment to construct a new road and bridge near Carmacks. This project is a key component under the Yukon Resource Gateway Program and a collaborative effort between the Government of Yukon and Little Salmon/Carmacks First Nation.
The project, which is anticipated to be complete in 2024, will allow industrial vehicles to bypass the community of Carmacks, creating an enhanced and safer flow of traffic for residents. It will also improve access to mining activities while enabling the Little Salmon/Carmacks First Nation to benefit from contracting, education and training benefits associated with the project.
The Yukon Resource Gateway Program improves infrastructure to Yukon’s most mineral-rich areas. The Carmacks Bypass project is jointly funded by Canada and the Yukon and is the first project to be awarded under the program.”
Granite Creek President & CEO, Tim Johnson, commented, “We are very pleased to have engaged with a top calibre firm like SGS on this key milestone in the Company’s relatively short history. With the amount of highly targeted new drilling we have completed, we anticipate a robust update to the existing resource estimate and that this, along with the mine planning and trade-off studies being developed by Sedgman and Mining Plus, will have a significant impact on the project economics. In our continuing development of Carmacks, the recent announcement by the Yukon government of the start of construction on the Carmacks Bypass is extremely good news. The incremental improvement in access represented by this road upgrade is welcomed and this, combined with an updated resource estimate, will pave the way for and even more extensive exploration program in 2022.”
[1] JDS Energy and Mining. Feb 9, 2017. NI 43-101 Preliminary Economic Assessment Technical Report on the Carmacks Project, Yukon, Canada. Contained metal based on 23.76 million tonnes of NI 43-101 compliant resources in the Measured and Indicated categories grading 0.85% Cu, 0.31 g/t Au, 3.14 g/t Ag.
[2] Arseneau Consulting Services, 2016 Independent Technical Report on the Carmacks Copper Project, Yukon, Canada.
About Granite Creek Copper
Granite Creek, a member of the Metallic Group of Companies, is a Canadian exploration company focused on the 176 square kilometer Carmacks project in the Minto copper district of Canada’s Yukon Territory. The project is on trend with the high-grade Minto copper-gold mine, operated by Minto Explorations Ltd, to the north, and features excellent access to infrastructure with the nearby paved Yukon Highway 2, along with grid power within 12 km. More information about Granite Creek Copper can be viewed on the Company’s website at www.gcxcopper.com.
FOR FURTHER INFORMATION PLEASE CONTACT:
Timothy Johnson, President & CEO
Telephone: 1 (604) 235-1982
Toll-Free: 1 (888) 361-3494
E-mail: info@gcxcopper.com
Website: www.gcxcopper.com
Metallic Group: www.metallicgroup.ca
Qualified Person
Ms. Debbie James, P.Geo., a qualified person for the purposes of National Instrument 43-101, has reviewed and approved the technical disclosure contained in this news release.
Forward-Looking Statements
This news release includes certain statements that may be deemed “forward-looking statements”. All statements in this release, other than statements of historical facts including, without limitation, statements regarding potential mineralization, historic production, estimation of mineral resources, the realization of mineral resource estimates, interpretation of prior exploration and potential exploration results, the timing and success of exploration activities generally, the timing and results of future resource estimates, permitting time lines, metal prices and currency exchange rates, availability of capital, government regulation of exploration operations, environmental risks, reclamation, title, and future plans and objectives of the company are forward-looking statements that involve various risks and uncertainties. Although Granite Creek Copper believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in the forward-looking statements. Forward-looking statements are based on a number of material factors and assumptions. Factors that could cause actual results to differ materially from those in forward-looking statements include failure to obtain necessary approvals, unsuccessful exploration results, changes in project parameters as plans continue to be refined, results of future resource estimates, future metal prices, availability of capital and financing on acceptable terms, general economic, market or business conditions, risks associated with regulatory changes, defects in title, availability of personnel, materials and equipment on a timely basis, accidents or equipment breakdowns, uninsured risks, delays in receiving government approvals, unanticipated environmental impacts on operations and costs to remedy same, and other exploration or other risks detailed herein and from time to time in the filings made by the companies with securities regulators. Readers are cautioned that mineral resources that are not mineral reserves do not have demonstrated economic viability. Mineral exploration and development of mines is an inherently risky business. Accordingly, the actual events may differ materially from those projected in the forward-looking statements. For more information on Granite Creek Copper and the risks and challenges of their businesses, investors should review their annual filings that are available at www.sedar.com.
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
SOURCE: Granite Creek Copper Ltd.
View source version on accesswire.com:
https://www.accesswire.com/672206/Granite-Creek-Copper-Retains-SGS-for-43-101-Mineral-Resource-Update-on-Carmacks-Deposit-in-Yukon-Canada
https://s.yimg.com/rq/darla/4-9-0/html/r-sf-flx.htmlhttps://openweb.jac.yahoosandbox.com/0.8.1/safeframe.html
YERINGTON, Nev., Nov. 10, 2021 (GLOBE NEWSWIRE) — Nevada Copper Corp. (TSX: NCU) (OTC: NEVDF) (FSE: ZYTA) (“Nevada Copper” or the “Company”) is pleased to announce that it has filed a preliminary short form prospectus with the securities commissions in all provinces of Canada, except Quebec, in connection with a marketed public offering (the “Offering”) of units (the “Units”) of the Company seeking to raise aggregate gross proceeds of approximately C$75,000,000. The Company’s largest shareholder, Pala Investments Limited (“Pala”), has committed to purchase, on a private placement basis, an aggregate number of Units to maintain its current shareholding percentage in the Company (the “Private Placement”) after giving effect to both the Offering and the Private Placement (the “Purchased Units”) at the price per Purchased Unit determined in connection with the Offering.
Each Unit will consist of one common share of the Company (each a “Common Share”) and one-half of one common share purchase warrant (each full warrant, a “Warrant” and collectively the “Warrants”). Each Warrant will be exercisable for one Common Share at any time for a period of 18 months following closing of the Offering. Final pricing of the Units, the Warrant exercise price and the determination of the number of Units to be sold pursuant to the Offering will be determined following marketing. The Offering will be conducted on an overnight marketed “best efforts” basis by a syndicate of underwriters to be formed and led by Scotiabank, as lead underwriter and sole-bookrunner (collectively, the “Underwriters”).
The Company intends to grant the Underwriters an option, exercisable in whole or in part, at the sole discretion of the Underwriters, at any time for a period of 30 days from and including the closing of the Offering, to purchase from the Company up to an additional 15% of the Units sold under the Offering, on the same terms and conditions of the Offering to cover over-allotments, if any, and for market stabilization purposes (the “Over-Allotment Option”). The Over-Allotment Option may be exercised by the Underwriters to purchase additional Units, Common Shares, Warrants or any combination thereof.
As announced on October 12, 2021, the Company entered into amendments to its amended and restated credit facility (the “KfW Facility”) with its senior project lender, KfW-IPEX Bank, for a significant deferral and extension of its debt facilities, providing substantially greater balance sheet flexibility and support for the completion of the ramp-up of its underground mining operations and subsequent advancement of its open pit project and broader property exploration targets. The Company expects the effectiveness of the deferral and extensions agreed under the KFW Facility to occur upon the closing of the Offering and the Private Placement.
Additionally, in connection with the Offering, the Company and Pala have agreed to amend the existing non-binding term sheet as previously announced on October 12, 2021 to provide for a binding commitment (the “Binding Term Sheet”) in respect of certain amendments to the credit facility entered into between Company and Pala on February 3, 2021 (as amended, the “Amended Credit Facility”). The Amended Credit Facility will consolidate all outstanding loans owing to Pala and the maturity date will be extended by two years from 2024 to 2026. Net proceeds raised in the Offering will replace the new tranche of up to US$41 million that was contemplated by the non-binding term sheet, which will be a significant improvement to the Company’s balance sheet. See the Company’s October 12, 2021 news release for additional details on the terms of the Amended Credit Facility.
The Company intends to use the net proceeds of the Offering for: (i) the development and ramp-up of the underground mine at the Company’s Pumpkin Hollow project (the “Underground Mine”); (ii) the repayment of bridge loans advanced under the promissory note issued by the Company to Pala on October 1, 2021, as amended and restated on November 1, 2021; and (iii) general corporate purposes. The net proceeds from the Private Placement will be utilized to retire and prepay an equivalent portion of the existing loans outstanding under the promissory note issued by the Company to Pala on June 10, 2021, as amended and restated (the “June Promissory Note”), such that Pala will continue to maintain its current shareholding percentage in the Company after giving effect to the Offering and the Private Placement. The balance of the June Promissory Note will be consolidated and extended under the Amended Credit Facility in accordance with the Binding Term Sheet.
The Offering is expected to close on or about November 29, 2021, or such other date as the Company and the Underwriters may agree. Closing of the Offering is subject to customary closing conditions, including, but not limited to, the execution of an underwriting agreement and the receipt of all necessary regulatory approvals, including the approval of the securities regulatory authorities and the Toronto Stock Exchange. The Private Placement is conditional on the closing of the Offering.
The preliminary short form prospectus is available on SEDAR at www.sedar.com. The Company has also today filed on SEDAR its condensed interim financial statements and the related management’s discussion and analysis for the quarter ended September 30, 2021.
This news release does not constitute an offer to sell or a solicitation of an offer to buy any of securities in the United States. The securities have not been and will not be registered under the U.S. Securities Act or any state securities laws and may not be offered or sold within the United States or to U.S. Persons unless registered under the U.S. Securities Act and applicable state securities laws or an exemption from such registration is available.
About Nevada Copper
Nevada Copper (TSX: NCU) is a copper producer and owner of the Pumpkin Hollow copper project. Located in Nevada, USA, Pumpkin Hollow has substantial reserves and resources including copper, gold and silver. Its two fully permitted projects include the high-grade Underground Mine and processing facility, which is now in the production stage, and a large-scale open pit project, which is advancing towards feasibility status.
NEVADA COPPER CORP.
www.nevadacopper.com
Randy Buffington, President and CEO
For further information contact:
Rich Matthews, Investor Relations
Integrous Communications
rmatthews@integcom.us
+1 604 757 7179
Cautionary Language
This news release includes certain statements and information that constitute forward-looking information within the meaning of applicable Canadian securities laws. All statements in this news release, other than statements of historical facts are forward-looking statements. Such forward-looking statements and forward-looking information specifically include, but are not limited to, statements that relate to the completion of the Offering and the Private Placement and the timing in respect thereof, the entering into of the Amended Credit Facility and the use of proceeds of the Offering and the Private Placement.
Forward-looking statements and information include statements regarding the expectations and beliefs of management. Often, but not always, forward-looking statements and forward-looking information can be identified by the use of words such as “plans”, “expects”, “potential”, “is expected”, “anticipated”, “is targeted”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates”, or “believes” or the negatives thereof or variations of such words and phrases or statements that certain actions, events or results “may”, “could”, “would”, “might” or “will” be taken, occur or be achieved. Forward-looking statements or information should not be read as guarantees of future performance and results. They are subject to known and unknown risks, uncertainties and other factors which may cause the actual results and events to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements or information.
Such risks and uncertainties include, without limitation, those relating to: the ability of the Company to complete the ramp-up of the Underground Mine within the expected cost estimates and timeframe; requirements for additional capital and no assurance can be given regarding the availability thereof; the impact of the COVID-19 pandemic on the business and operations of the Company; the state of financial markets; history of losses; dilution; adverse events relating to milling operations, construction, development and ramp-up, including the ability of the Company to address underground development and process plant issues; failure to obtain the effectiveness of extensions under and amendments to the KfW Facility; failure to enter into the Amended Credit Facility; ground conditions; cost overruns relating to development, construction and ramp-up of the Underground Mine; loss of material properties; interest rates increase; global economy; limited history of production; future metals price fluctuations; speculative nature of exploration activities; periodic interruptions to exploration, development and mining activities; environmental hazards and liability; industrial accidents; failure of processing and mining equipment to perform as expected; labor disputes; supply problems; uncertainty of production and cost estimates; the interpretation of drill results and the estimation of mineral resources and reserves; changes in project parameters as plans continue to be refined; possible variations in ore reserves, grade of mineralization or recovery rates from management’s expectations and the difference may be material; legal and regulatory proceedings and community actions; accidents; title matters; regulatory approvals and restrictions; increased costs and physical risks relating to climate change, including extreme weather events, and new or revised regulations relating to climate change; permitting and licensing; volatility of the market price of the Company’s securities; insurance; competition; hedging activities; currency fluctuations; loss of key employees; other risks of the mining industry as well as those risks discussed in the Company’s Management’s Discussion and Analysis in respect of the year ended December 31, 2020 and in the section entitled “Risk Factors” in the Company’s Annual Information Form dated March 18, 2021. Should one or more of these risks or uncertainties materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those described in forward-looking statements or information. The forward-looking information or statements are stated as of the date hereof. Nevada Copper disclaims any intent or obligation to update forward-looking statements or information except as required by law. Readers are referred to the additional information regarding Nevada Copper’s business contained in Nevada Copper’s reports filed with the securities regulatory authorities in Canada. Although the Company has attempted to identify important factors that could cause actual actions, events, or results to differ materially from those described in forward-looking statements, there may be other factors that could cause actions, events or results not to be as anticipated, estimated or intended. For more information on Nevada Copper and the risks and challenges of its business, investors should review Nevada Copper’s filings that are available at www.sedar.com.
Nevada Copper provides no assurance that forward-looking statements and information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements or information. Accordingly, readers should not place undue reliance on forward-looking statements or information.
Vancouver, British Columbia–(Newsfile Corp. – November 10, 2021) – Playfair’s (TSXV: PLY) (FSE: P1J1) (OTC Pink: PLYFF) extensive drill program on its large (201 square kilometers) 100% RKV Copper Project in South Central Norway has successfully completed seven short holes totaling 385.1 metres to test the Storboren target identified by using a combination of Artificial Intelligence (CARDS) and Mobile Metal Ion (MMI) geochemistry. Drilling at Rødalen was reported in Playfair’s October 8, 2021 News Release.
At Storboren drillhole STB-21-07 encountered at least 6 sulphide zones ranging from 20 cm to 1.5 metres wide within a previously unknown ultramafic intrusive. Sulphides are mostly pyrrhotite with lesser pyrite and chalcopyrite.
NQ core with sulphides in drillhole STB-21-007 at Storborenhttps://s.yimg.com/rq/darla/4-9-0/html/r-sf-flx.html
To view an enhanced version of this graphic, please visit:
https://orders.newsfilecorp.com/files/7302/102756_b432c24794c05848_002full.jpg
Samples have been cut and sent for analysis. Preparation will be at the Malå, Sweden ALS laboratory with analysis at the Loughrea, Ireland ALS laboratory. ALS Minerals is internationally recognized as the global leader in providing geochemical sample preparation, analytical procedures, and data management solutions, with its European hub lab based in Loughrea, Co. Galway.
A total of 99 samples have been submitted and comprised 36 core samples from Rødalen, 60 core samples from Storboren and 3 rock samples.
Playfair will consider future exploration at Rødalen and Storboren once analytical results have been received. Drill testing of the remaining five targets will resume in the Spring.
Promin AS, a Trondheim-based consultancy with extensive experience in the Norwegian Mining industry, provides logistical support and experienced geologists. Helge Rushfeldt assisted greatly in the start-up of the drill program. Kjell Nilsen, one of Norway’s most experienced field geologists who discovered Nussir, Norway’s largest known copper deposit, and Jonas Dombrowski are directly supervising the drilling, core logging and analysis.
Geologists Kjell Nilsen and Jonas Dombrowski examining drillcore
To view an enhanced version of this graphic, please visit:
https://orders.newsfilecorp.com/files/7302/102756_b432c24794c05848_003full.jpg
The man portable drill team is supervised by Canadian drillers (No Limit Diamond Drilling) for Arctic Drilling (based in Finnmark). Local “Muskelgutta” (Muscle Guys) have risen to the challenge of moving the man portable drill. Local community support is greatly appreciated.
In keeping with Playfair’s intent to minimise the impact of its exploration on the natural environment Playfair is using a lightweight drilling machine which can be disassembled and hand-carried to the drill sites. Although lightweight the drill is capable of drilling to 150m depth using BQ sized rods (36.5 mm or 1.437 inches core diameter) and to 100m depth using NQ sized rods (47.8mm or 1.872 inches core diameter).
All seven drill targets show compelling coherent MMI Cu anomalies with multiple MMI Cu values greater than 6,000 ppb. The highest value recorded was 53,300 ppb MMI Cu. A short MMI Report by SGS states that values greater than 6,000 ppb MMI Cu “are likely to be associated with weathering copper sulphides”.
Hillside drill collar location for SB-21-07 at Storboren
To view an enhanced version of this graphic, please visit:
https://orders.newsfilecorp.com/files/7302/102756_b432c24794c05848_004full.jpg
Overall management and execution of Playfair’s RKV drilling program is provided by Ronacher McKenzie Geoscience Inc., an independent consulting group, who, as part of their supervision, will ensure that appropriate quality assurance/quality control (QA/QC) protocols are in place. RMG follows the Canadian Institute of Mining, Metallurgy and Petroleum’s (CIM) Best Practices.
In Norway, Reidar Gaupås, Playfair’s representative, continues to assist Playfair within the local community and enhance Playfair’s profile in Norway.
RKV Project, Norway – 2021 Planned Drill Areas
To view an enhanced version of this graphic, please visit:
https://orders.newsfilecorp.com/files/7302/102756_b432c24794c05848_005full.jpg
RKV Copper Project, Norway – Drill Targets
To view an enhanced version of this graphic, please visit:
https://orders.newsfilecorp.com/files/7302/102756_b432c24794c05848_006.jpg
The drill targets are MMI (Mobile Metal Ion) copper anomalies discovered by sampling target areas generated by Windfall Geotek (TSXV: WIN) (OTCQB: WINKF) using their proprietary Computer Aided Resources Detection System (CARDS).
The seven drill targets were described previously: Storboren (November 07, 2019, and December 05, 2019, News Releases), Sæterfjellet, (January 06, 2021, News Release), Kletten North and Kletten South (January 28, 2021, News Release), Røstvangen Northeast and Røstvangen Southwest (February 17, 2021, News Release) and Rødalen (March 11, 2021, News Release).
A presentation on the drilling plans can be found at this direct link or on Playfair’s website.
The technical contents of this release were approved by Greg Davison, PGeo, a qualified person as defined by National Instrument 43-101.
The road to a cleaner environment includes electric vehicles. Electric vehicles need copper, nickel, and cobalt. There is no green future without minerals.
For further information visit our website at www.playfairmining.com or contact:
Donald G. Moore
CEO and Director
Phone: 604-377-9220
Email: dmoore@wascomgt.com
D. Neil Briggs
Director
Phone: 604-562-2578
Email: nbriggs@wascomgt.com
Forward-Looking Statements: This Playfair Mining Ltd News Release may contain certain “forward-looking” statements and information relating to Playfair which are based on the beliefs of Playfair management, as well as assumptions made by and information currently available to Playfair management. Such statements reflect the current risks, uncertainties and assumptions related to certain factors including, without limitations, exploration and development risks, expenditure and financing requirements, title matters, operating hazards, metal prices, political and economic factors, competitive factors, general economic conditions, relationships with vendors and strategic partners, governmental regulation and supervision, seasonality, technological change, industry practices, and one-time events. Should any one or more of these risks or uncertainties materialize or change, or should any underlying assumptions prove incorrect, actual results and forward-looking statements may vary materially from those described herein.
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
VANCOUVER, BC, Nov. 9, 2021 /PRNewswire/ – Dolly Varden Silver Corporation (“Dolly Varden” or the “Company“) (TSXV: DV) (OTC: DOLLF), is pleased to announce that Andrew Hamilton, P.Geo. has joined the Company as Senior Geologist.
Mr. Hamilton is an exploration geologist with over 30 years of mineral exploration experience, primarily in British Columbia, Nunavut, the Yukon and Mexico, with a focus on gold and copper-gold projects. He brings additional grass roots to advanced stage mineral exploration experience to Dolly Varden with a focus on drill program design and management, mineral resource modelling and estimation, QAQC and data management.
Andrew has been part of technical teams of multiple successful explorers that have transitioned from exploration to production as well as company sale, including Wheaton River Minerals’ Golden Bear Mine, Cumberland Resources’ Meadowbank Project and IDM Mining’s Red Mountain Project. He was mostly recently the Exploration Manager for White Gold Corp. for their Yukon projects.
As an Independent Qualified Person, he has co-authored numerous NI 43-101 Reports and Resource Estimates, as well as audits and reviews of producing Companies Mineral Resources and Reserves and QA/QC. Mr. Hamilton has been lauded in the mining industry for his conservative and balanced approach.
Shawn Khunkhun, Dolly Varden’s CEO, commented: “I am pleased to welcome Andrew to Dolly Varden. His advanced exploration experience in the Golden Triangle, expertise in the design of drill programs for resource delineation and expansion, as well as critical project evaluation skills will complement our current technical team and benefit the Company as we look to dramatically grow in the next two years.”
Mr. Hamilton holds a Bachelor of Science degree in geological sciences from the University of British Columbia and a Bachelor of Arts degree in anthropology from the University of Victoria. He is a registered professional geoscientist (P.Geo.) in the province of British Columbia.
About Dolly Varden Silver Corporation
Dolly Varden Silver Corporation is a mineral exploration company focused on exploration in northwestern British Columbia. Dolly Varden has two projects, the namesake Dolly Varden silver property and the nearby Big Bulk copper-gold property. The Dolly Varden property is considered to be highly prospective for hosting high-grade precious metal deposits, since it comprises the same structural and stratigraphic setting that host numerous other high-grade deposits (Eskay Creek, Brucejack). The Big Bulk property is prospective for porphyry and skarn style copper and gold mineralization similar to other such deposits in the region (Red Mountain, KSM, Red Chris).
Forward Looking Statements
This release may contain forward-looking statements or forward-looking information under applicable Canadian securities legislation that may not be based on historical fact, including, without limitation, statements containing the words “believe”, “may”, “plan”, “will”, “estimate”, “continue”, “anticipate”, “intend”, “expect”, “potential” and similar expressions. Forward-looking statements involve known and unknown risks, uncertainties, and other factors which may cause the actual results, performance, or achievements of Dolly Varden to be materially different from any future results, performance, or achievements expressed or implied by the forward-looking statements. Forward looking statements or information relates to, among other things, completion of the Offering, Exchange approval of the Offering, the use of proceeds with respect to the Offerings, the results of previous field work and programs and the continued operations of the current exploration program, interpretation of the nature of the mineralization at the project and that that the mineralization on the project is similar to Eskay and Brucejack, results of the mineral resource estimate on the project, the potential to grow the project, the potential to expand the mineralization, the planning for further exploration work, the ability to de-risk the potential exploration targets, and our beliefs about the unexplored portion of the property. These forward-looking statements are based on management’s current expectations and beliefs but given the uncertainties, assumptions and risks, readers are cautioned not to place undue reliance on such forward-looking statements or information. The Company disclaims any obligation to update, or to publicly announce, any such statements, events or developments except as required by law.
For additional information on risks and uncertainties, see the Company’s most recently filed annual management discussion & analysis (“MD&A”), which is available on SEDAR at www.sedar.com. The risk factors identified in the MD&A are not intended to represent a complete list of factors that could affect the Company.
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX-V) accepts responsibility for the adequacy or accuracy of this news release.
View original content to download multimedia:https://www.prnewswire.com/news-releases/dolly-varden-silver-strengthens-technical-team-with-andrew-hamilton-pgeo-301419484.html
SOURCE Dolly Varden Silver Corp.
Figure 1. Project location map.
Figure 1. Project location map.
Figure 2. Prospect Location Map
Figure 2. Prospect Location Map
VANCOUVER, British Columbia, Nov. 08, 2021 (GLOBE NEWSWIRE) — Millrock Resources Inc. (TSX-V: MRO, OTCQB: MLRKF) (“Millrock” or the “Company”) is pleased to announce it has signed a binding letter agreement (“Letter Agreement”) with Mine Discovery Fund Pty. Ltd. (“MDF”) concerning its El Batamote porphyry copper exploration project in Mexico. MDF is a private Australian company. In good faith, MDF has made an initial US$50,000 cash payment upon signing the Letter Agreement. A definitive agreement (“Definitive Agreement”) has been prepared will be signed immediately following the formation of a Mexico subsidiary company by MDF. MDF has placed Batamote into a wholly-owned subsidiary company called Latin America Copper Limited(“LatCopper”) along with other assets in Chile. MDF indicates it has commenced compliance documentation for a potential ASX or TSX listing in the first half of 2022.
Millrock President and CEO Gregory Beischer commented: “Batamote has excellent potential to discover a porphyry copper deposit. We know already that breccia-style and porphyry copper mineralization is present. We are particularly excited to drill-test beneath what appears to be a leach cap alteration zone at a prospect called El Choclo NW. The project is situated within a belt that has produced very large porphyry copper deposits being mined by others as evidenced by the Cananea and La Caridad mines.”
Latin American Copper Director Joseph Webb commented: “With the addition of El Batamote, LatCopper has three exceptional cornerstone exploration assets with evidence of Tier 1 scale potential in the globally significant copper belts of Latin America. El Batamote is 25 kilometers northwest of Grupo Mexico’s La Caridad copper mine (5.98 billion tonnes at 0.34% copper equivalent) with an untested leach cap identified along strike from known mineralisation. This indicates potential for supergene mineralisation at Choclo. The Bata Sur definitive mineralised porphyry system intersected by historic drilling remains open along strike.”
Under the terms of the Definitive Agreement, LatCopper will have the option to purchase a 100% interest in the concessions that underlie the Batamote copper project. To earn the interest, LatCopper will have to make cash payments totalling US$1,000,000 over five years, execute US$6,000,000 dollars in exploration work, and pay Millrock US$250,000 in shares when LatCopper becomes a publicly listed company. In the event that LatCopper exercises the option to purchase the Batamote project, annual advanced minimum royalty (“AMR”) payments will be triggered. The first payment will be US$50,000 and the payment will increase by US$50,000 each year until a cap of US$500,000 is reached. Annual payments will then remain at the capped level until a mine reaches commercial production. At that point, a Net Smelter Return production royalty of 1.0% will be triggered. Any AMR payments made by LatCopper can be credited against production royalty payments.
About the El Batamote Project
The project is located 100 kilometers south of the Sonora – Arizona border and 140 kilometers north of the mining hub of Hermosillo in northeastern Sonora State, Mexico. The project is fully accessible by road and covers nearly 4,000 hectares. Millrock previously purchased the concessions and historical exploration data from a subsidiary of Teck Resources Ltd., as announced by Millrock in a November 2015 press release. The project is situated within the Cananea-La Caridad Copper Porphyry belt (Figure 1). This district-scale structural trend is situated within the larger North American porphyry copper province containing over 20 copper-molybdenum deposits and mines in Arizona, New Mexico, and Sonora.
Figure 1. Project location map is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/639437fc-1d2c-4f6a-9a1c-b6e6ac47e702.
El Batamote contains alteration and geochemistry characteristics of a Cu-Mo porphyry system. Important historical work has been conducted on the property by large companies such as Phelps Dodge, BHP, Noranda, Peñoles, and Teck. Abundant information was generated by prior workings in the south and central part of the claim block and includes regional and semi-detail mapping, geochemistry, petrography, spectrometry, geophysics and drilling with more than 10,000 meters of diamond core having been drilled.
The exploration led to the discovery of several key prospects: Bata Sur, El Choclo NW and El Choclo West (Figure 2). Review of the historic data has led Millrock geologists to make new exploration observations, conclusions, and recommendations. Preliminary plans include geophysical surveys at El Choclo NW, where a possible leach cap is situated adjacent to known porphyry mineralization. No drilling has been done beneath the alteration zone. At the Bata Sur prospect, breccia pipe style mineralization has been intersected by prior drilling. Drilling is recommended to test for higher grade and to test previously untested geochemical anomalies. Millrock has drilling permits in hand.
Figure 2. Prospect Location Map is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/b48bb9da-f767-4ecf-af5b-4b76c395f052.
The lithology and alteration at Batamote are similar to that found at the La Caridad and Cananea mines. The mining concession covers Late Cretaceous Laramide age intermediate composition volcanic sequences which are intruded by a large, multi-phase batholith with multiple, mineralized porphyry pulses along a northwest-trending structural corridor. Porphyry dikes cut the system and are followed by later, mid-Tertiary post-mineral tuffaceous rocks, all of which are cut by long-lived northeast-trending and north-south fault structures. Intermediate volcanic rocks are the main host to copper mineralization. These rocks contain strong hydrothermal alteration related to porphyry-type systems in a three-kilometer by six-kilometer area that on the west side, is truncated by north-west to north-south trending post-mineral faults. Quaternary gravels cover bedrock west of these faults, but porphyry mineralization may be concealed below as potentially indicated by geophysical surveys at Choclo W.
Qualified Person
The scientific and technical information disclosed within this document has been prepared, reviewed, and approved by Gregory A. Beischer, President, CEO, and a director of Millrock Resources. Mr. Beischer is a qualified person as defined in NI 43-101.
About Millrock Resources Inc.
Millrock Resources Inc. is a premier project generator to the mining industry. Millrock identifies, packages, and operates large-scale projects for joint venture, thereby exposing its shareholders to the benefits of mineral discovery without the usual financial risk taken on by most exploration companies. The company is recognized as the premier generative explorer in Alaska, holds royalty interests in British Columbia, Canada, and Sonora State, Mexico, is a significant shareholder of junior explorer ArcWest Exploration Inc. and owns a large shareholding in Resolution Minerals Limited. Funding for drilling at Millrock’s exploration projects is primarily provided by its joint venture partners. Business partners of Millrock have included some of the leading names in the mining industry: EMX Royalty, Coeur Explorations, Centerra Gold, First Quantum, Teck, Kinross, Vale, Inmet and, Altius as well as junior explorers Resolution, Riverside, PolarX, Felix Gold, Tocvan, and now Mine Discovery Fund.
About Mine Discovery Fund
Mine Discovery Fund (MDF) is a private investment vehicle backed by some of the industry’s leading technical advisors and professional mining investors. MDF focus is on Tier 1 orebody discovery in the jurisdictions that provide the highest probability of exploration success (in the most fertile Tier 1 Belts and in areas with clear pathways for development potential.
ON BEHALF OF THE BOARD
“Gregory Beischer”
Gregory Beischer, President & CEO
FOR FURTHER INFORMATION, PLEASE CONTACT:
Melanee Henderson, Investor Relations
Toll-Free: 877-217-8978 | Local: 604-638-3164
Twitter | Facebook | LinkedIn
Some statements in this news release may contain forward-looking information (within the meaning of Canadian securities legislation) including without limitation the intention to mount further exploration including drilling in 2021 and 2022, and the intention to enter a definitive agreement with Mine Discovery Fund. These statements address future events and conditions and, as such, involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements to be materially different from any future results, performance or achievements expressed or implied by the statements.
YERINGTON, Nev., Nov. 08, 2021 (GLOBE NEWSWIRE) — Yerington, NV – November 8, 2021 – Nevada Copper Corp. (TSX: NCU) (OTC: NEVDF) (FSE: ZYTA) (“Nevada Copper” or the “Company”) today provided a further update on positive October operational performance at the Company’s underground mine at its Pumpkin Hollow Project (the “Underground Mine”).
October Operational Highlights
- Consistent Progress on Stoping
- Stoping rates continue to accelerate, with four stopes mined in H2 2021, including the most recent stope with an estimated grade of over 2% Cu.
- Mining of the higher-grade Sugar Cube zone is planned to begin next month. This will be the first stope mined in the East North area which is expected to have significantly larger stope sizes.
- Dike Heading Progressing
- The lateral development beyond the completed first dike crossing is progressing at targeted rates. The geotechnical information learned from this crossing has been implemented on the second dike heading, which is now advancing well. This and the first heading will provide access to additional stopes adding to the Company’s growing stope inventory in H1 2022.
- Surface Ventilation Fans
- The surface ventilation fans are scheduled to arrive in late Q4 of this year and are expected to be commissioned on time in line with the requirements of the mine plan as Underground Mine development progresses towards completion of the ramp up.
- Hiring Nearing Completion
- The Company is nearing completion of hiring key mining technical positions, with a new mine manager now onboarded and a technical services manager expected to be hired in November.
- A Project Management Office has now been established on site in order to efficiently complete the remaining key infrastructure items, including the surface ventilation fans and an additional ore pass.
Randy Buffington, President and Chief Executive Officer, commented: “I am very pleased with the progress the team has made through the end of October and to date. The accelerated stope delivery we are starting to see should increase as we continue to benefit from the improving contractor performance levels which has been facilitated by key management hirings and the implementation of enhanced management systems at Pumpkin Hollow.”
Qualified Persons
The technical information and data in this news release was reviewed by Greg French, C.P.G., VP Head of Exploration of Nevada Copper, and Neil Schunke, P.Eng., a consultant to Nevada Copper, who are non-independent Qualified Persons within the meaning of NI 43-101.
About Nevada Copper
Nevada Copper (TSX: NCU) is a copper producer and owner of the Pumpkin Hollow copper project. Located in Nevada, USA, Pumpkin Hollow has substantial reserves and resources including copper, gold and silver. Its two fully permitted projects include the high-grade Underground Mine and processing facility, which is now in the production stage, and a large-scale open pit project, which is advancing towards feasibility status.
NEVADA COPPER CORP.
www.nevadacopper.com
Randy Buffington, President and CEO
For further information contact:
Rich Matthews, Investor Relations
Integrous Communications
rmatthews@integcom.us
+1 604 757 7179
Cautionary Language
This news release includes certain statements and information that constitute forward-looking information within the meaning of applicable Canadian securities laws. All statements in this news release, other than statements of historical facts are forward-looking statements. Such forward-looking statements and forward-looking information specifically include, but are not limited to, statements that relate to mine development, production and ramp-up objectives and equipment installation.
Forward-looking statements and information include statements regarding the expectations and beliefs of management. Often, but not always, forward-looking statements and forward-looking information can be identified by the use of words such as “plans”, “expects”, “potential”, “is expected”, “anticipated”, “is targeted”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates”, or “believes” or the negatives thereof or variations of such words and phrases or statements that certain actions, events or results “may”, “could”, “would”, “might” or “will” be taken, occur or be achieved. Forward-looking statements or information should not be read as guarantees of future performance and results. They are subject to known and unknown risks, uncertainties and other factors which may cause the actual results and events to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements or information.
Such risks and uncertainties include, without limitation, those relating to: the ability of the Company to complete the ramp-up of the Underground Mine within the expected cost estimates and timeframe; requirements for additional capital and no assurance can be given regarding the availability thereof; the impact of the COVID-19 pandemic on the business and operations of the Company; the state of financial markets; history of losses; dilution; adverse events relating to milling operations, construction, development and ramp-up, including the ability of the Company to address underground development and process plant issues; failure to obtain the effectiveness of extensions under and amendments to the Company’s amended and restated senior credit facility with KfW IPEX-Bank; ground conditions; cost overruns relating to development, construction and ramp-up of the Underground Mine; loss of material properties; interest rates increase; global economy; limited history of production; future metals price fluctuations; speculative nature of exploration activities; periodic interruptions to exploration, development and mining activities; environmental hazards and liability; industrial accidents; failure of processing and mining equipment to perform as expected; labor disputes; supply problems; uncertainty of production and cost estimates; the interpretation of drill results and the estimation of mineral resources and reserves; changes in project parameters as plans continue to be refined; possible variations in ore reserves, grade of mineralization or recovery rates from management’s expectations and the difference may be material; legal and regulatory proceedings and community actions; accidents; title matters; regulatory approvals and restrictions; increased costs and physical risks relating to climate change, including extreme weather events, and new or revised regulations relating to climate change; permitting and licensing; volatility of the market price of the Company’s securities; insurance; competition; hedging activities; currency fluctuations; loss of key employees; other risks of the mining industry as well as those risks discussed in the Company’s Management’s Discussion and Analysis in respect of the year ended December 31, 2020 and in the section entitled “Risk Factors” in the Company’s Annual Information Form dated March 18, 2021. Should one or more of these risks or uncertainties materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those described in forward-looking statements or information. The forward-looking information or statements are stated as of the date hereof. Nevada Copper disclaims any intent or obligation to update forward-looking statements or information except as required by law. Readers are referred to the additional information regarding Nevada Copper’s business contained in Nevada Copper’s reports filed with the securities regulatory authorities in Canada. Although the Company has attempted to identify important factors that could cause actual actions, events, or results to differ materially from those described in forward-looking statements, there may be other factors that could cause actions, events or results not to be as anticipated, estimated or intended. For more information on Nevada Copper and the risks and challenges of its business, investors should review Nevada Copper’s filings that are available at www.sedar.com.
Nevada Copper provides no assurance that forward-looking statements and information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements or information. Accordingly, readers should not place undue reliance on forward-looking statements or information.

Vancouver, British Columbia–(Newsfile Corp. – November 8, 2021) – EMX Royalty Corporation (NYSE American: EMX) (TSXV: EMX) (FSE: 6E9) (the “Company“, or “EMX“) is pleased to announce that it has completed the first tranche of its C$ 21.45 million private placement of 6.5 million units by the issuance of 6,337,347 units at C$ 3.30 each for gross proceeds of C$ 20,913,245. The units consisted of one common share of the Company and one-half of one transferable warrant. Each whole warrant entitles the purchase until November 6, 2023 of one common share at C$ 4.00 in the first year and C$ 4.50 in the second year.
EMX paid a 6.0% cash commission and issued that number of non-transferable compensation warrants equal to 6.0% of the number of units sold to investors introduced by the following eligible finders: Sprott Global Resource Investments, Ltd. (C$ 257,505 and 78,032 compensation warrants), Sprott Capital Partners LP (C$ 38,313 and 11,610 compensation warrants), Canaccord Genuity Corp. (C$ 119,295 and 36,150 compensation warrants), Haywood Securities Inc. (C$ 41,877 and 12,690 compensation warrants) and Richardson Wealth Ltd. (C$ 1,980 and 600 compensation warrants). Each compensation warrant entitles the purchase until November 7, 2022 of one common share of the Company for C$ 3.50.
The shares issued and issuable upon the exercise of warrants in the first tranche are subject to a four month restricted resale (hold) period expiring on March 6, 2022.
All of EMX’s directors, as well as certain officers, purchased units in the first tranche. Each of their subscriptions constituted a ‘related party transaction’ under Multilateral Instrument 61-101 Protection of Minority Security Holders in Special Transactions. There was not sufficient time between such subscriptions and the closing of the first tranchefor the Company to file a material change report disclosing such related party transactions with the applicable Canadian Securities Administrators not less than 21 days before the closing. Each of such related party transactions was exempt from the disinterested shareholder approval and valuation requirements of MI 61-101 as the fair market value of each of their subscriptions was less than 25% of the Company’s market capitalization.
This news release does not constitute an offer to sell or a solicitation of an offer to buy any of the securities in the United States. The securities have not been and will not be registered under the United States Securities Act of 1933, as amended (the “1933 Act”), or any U.S. state securities laws and may not be offered or sold within the “United States” or to “U.S. Persons” (as such terms are defined in Regulation S under the 1933 Act) unless registered under the 1933 Act and applicable U.S. state securities laws, or an exemption from such registration is available.
About EMX. EMX is a precious, base and battery metals royalty company. EMX’s investors are provided with discovery, development, and commodity price optionality, while limiting exposure to risks inherent to operating companies. The Company’s common shares are listed on the NYSE American Exchange and TSX Venture Exchange under the symbol EMX, as well as on the Frankfurt exchange under the symbol “6E9”. Please see www.EMXroyalty.com for more information.
For further information contact:
David M. Cole
President and Chief Executive Officer
Phone: (303) 979-6666
Dave@EMXroyalty.com
Scott Close
Director of Investor Relations
Phone: (303) 973-8585
SClose@EMXroyalty.com
Isabel Belger
Investor Relations (Europe)
Phone: +49 178 4909039
Ibelger@EMXroyalty.com
Neither the TSX-V nor its Regulation Services Provider (as that term is defined in policies of the TSX-V) accepts responsibility for the adequacy or accuracy of this release.
Forward-Looking Statements
This news release may contain “forward-looking statements” that reflect the Company’s current expectations and projections about its future results. These forward-looking statements may include statements regarding completion of the transaction, perceived merits of properties, exploration results and budgets, mineral reserves and resource estimates, work programs, capital expenditures, timelines, strategic plans, market prices for precious and base metal, or other statements that are not statements of fact. When used in this news release, words such as “estimate,” “intend,” “expect,” “anticipate,” “will”, “believe”, “potential”, “upside” and similar expressions are intended to identify forward-looking statements, which, by their very nature, are not guarantees of the Company’s future operational or financial performance, and are subject to risks and uncertainties and other factors that could cause the Company’s actual results, performance, prospects or opportunities to differ materially from those expressed in, or implied by, these forward-looking statements. These risks, uncertainties and factors may include, but are not limited to: unavailability of financing, failure to identify commercially viable mineral reserves, fluctuations in the market valuation for commodities, difficulties in obtaining required approvals for the development of a mineral project, increased regulatory compliance costs, expectations of project funding by joint venture partners and other factors. It is possible EMX may not complete the transaction, as a result of failure to fulfill conditions of closing, unavailability of financing or for other reasons EMX cannot anticipate at this time.
Readers are cautioned not to place undue reliance on these forward-looking statements, which speak only as of the date of this news release or as of the date otherwise specifically indicated herein. Due to risks and uncertainties, including the risks and uncertainties identified in this news release, and other risk factors and forward-looking statements listed in the Company’s MD&A for the quarter ended June 30, 2021 and the year ended December 31, 2020 (the “MD&A”), and the most recently filed Revised Annual Information Form (the “AIF”) for the year ended December 31, 2020, actual events may differ materially from current expectations. More information about the Company, including the MD&A, the AIF and financial statements of the Company, is available on SEDAR at www.sedar.com and on the SEC’s EDGAR website at www.sec.gov.
igure 1
Locality map for Novo’s Egina project in the Pilbara region of Western Australia.
Figure 2
Novo tenure (green) in the northern Egina project showing interpreted intrusive targets (red polygons) generated from aeromagnetic data (greyscale 1VD northern Pilbara mosaic). De Grey tenure in yellow.
Figure 3
Significant and coherent As-in-soils anomaly (>2km total strike length) in the northern part of E47/3673 with historical RAB drilling.
HIGHLIGHTS
- Novo has identified multiple discrete untested aeromagnetic anomalies with magnetic characteristics comparable to the “Hemi-style” gold-bearing sanukitoid intrusions being developed by De Grey Mining Ltd. (“De Grey”) (ASX: DEG).
- Novo’s extensive Pilbara land package includes 216 km2 of highly prospective yet under-explored Mallina Basin geology across a significant NE trending mineralized corridor potentially extending to De Grey’s Hemi gold discovery (Figure 1).
- Review of historical exploration has defined two large (> 1 km strike) coincident high-order Au-As-Sb soil anomalies along the structural corridor in the vicinity of the Becher epithermal system.
- Reconnaissance drilling undertaken by another issuer in 1997 (20 x 200 m) within the Au-As-Sb anomalous zones intersected up to 4.38 g/t Au. This information has not been verified by Novo and is not necessarily representative of mineralization throughout the Egina project.
- Exploration planned for early 2022 includes high-resolution aeromagnetics, regolith and basement mapping, grid soil sampling and drilling to test these priority targets.
Figure 1 is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/54d57cee-80e2-4930-b584-df87b4dd99e8
VANCOUVER, British Columbia, Nov. 04, 2021 (GLOBE NEWSWIRE) — Novo Resources Corp. (“Novo” or the “Company”) (TSX: NVO, NVO.WT & NVO.WT.A) (OTCQX: NSRPF) is pleased to announce that it has identified a series of new targets in the northern sector of the Egina project centred on exploration licence 47/3673 (Figure 2). These newly identified targets are located within a broad NE-trending structural corridor which forms part of a network of shear zones and sanukitoid intrusive centres that host De Grey’s recent Hemi discovery1. Hemi is one of Australia’s recent major gold discoveries, hidden under 20 to 30 m of transported cover.
The new targets include multiple discrete magnetic targets identified from detailed aeromagnetic interpretation, interpreted to represent potential intrusive bodies under cover, and extensive Au-As-Sb soil anomalies in the vicinity of the epithermal vein system at Becher.
Figure 2 is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/af5d3d06-2ab9-4d90-9b95-68ca257c4026
Exploration licence 47/3673 has few outcrops (approximately 10% of the tenement contains outcrop and subcrop) and is essentially covered by colluvial and alluvial material, calcrete and several ridges of aeolian sand dunes. The large (> 1 km long) coincident Au-As-Sb soil geochemical anomalies are restricted to areas of weathered outcrop and subcrop only, and thus the bedrock targets remain open under transported cover for several kilometres to the WSW and ENE.
Previous reconnaissance inclined rotary air blast (“RAB”) drilling by Resolute Mining Limited (“Resolute”) (ASX: RSG) in 1997 across the northern Becher Au-As-Sb anomaly yielded encouraging results including multiple gold assays of greater than 1 g/t Au (Figure 3) including:
- 3m @ 3.68 g/t Au from 25m (LGRB306) including 1m @ 4.38 g/t Au from 25m
- 1m @ 1.04 g/t Au from 30m (LGRB294)
- 1m @ 1.63 g/t Au from 26m (LGRB299)
- 2m @ 1.09 g/t Au from 32m (LGRB300)
Table 1 below provides a list of location information plus significant intersections from RAB drilling.
This historical data was disclosed in annual exploration reports (“Reports”) filed by Resolute on the Western Australian Department of Mines, Industry Regulation and Safety’s (“DMIRS”) website in 1997. The technical information contained in Table 1 has been extracted from the Reports. Reference should be made to the Reports which are available on DMIRS’ website (https://geodocs.dmirs.wa.gov.au/Web/documentlist/10/Report_Ref/A55647).
A qualified person has not verified the technical information contained in the Reports, and Novo is unaware of the existence of any technical report prepared in accordance with National Instrument 43-101 Standards of Disclosure for Mineral Projects or the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves in connection with the technical information contained in the Reports. Novo is unable to comment on the reliability of the technical information contained in the Reports and therefore, reliance should not be placed on such technical information.
Figure 3 is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/834c16b4-769b-4a65-9ca4-8a8b14d4be26
“Novo’s exploration team has been diligently reviewing the northern portion of its Egina land holdings for prospectivity for Hemi-type discoveries,” commented Dr. Quinton Hennigh, Non-Executive Co-Chairman and a director of Novo. “Numerous potential intrusive centers resembling sanukitoids like those at Hemi exist along a NE trending corridor extending from Novo’s tenure to Hemi. At Becher, a coincident Au-As-Sb soil anomaly is associated with an interpreted cluster of such intrusions. Novo plans to undertake high-resolution aeromagnetics, regolith and basement mapping and grid soil sampling in preparation for drilling in 2022.”
1 Refer to De Grey’s public disclosure materials which are available at https://degreymining.com.au/
2022 Egina Basement Gold Program
Historical data analysis is ongoing at Egina, with further geophysical and structural interpretation to aid in drill targeting to be completed early in 2022. Drilling is planned to test intrusive targets defined by high-resolution aeromagnetics, the extensive, coincident Au-As-Sb soil anomalies at Becher and targets defined by historic RAB drilling.
Gold analyses from drilling programs will be completed by PhotonAssay through the Intertek Laboratory in Perth, where Novo are currently receiving 7 – 9 day turnaround times for gold assay.
QP STATEMENT
Dr. Quinton Hennigh (P.Geo.) is the qualified person, as defined under National Instrument 43-101 Standards of Disclosure for Mineral Projects, responsible for, and having reviewed and approved, the technical information contained in this news release other than the technical information extracted from the Reports. Dr. Hennigh is the non-executive co-chairman and a director of Novo.
About Novo
Novo operates its flagship Beatons Creek gold project while exploring and developing its prospective land package covering approximately 13,250 square kilometres in the Pilbara region of Western Australia. In addition to the Company’s primary focus, Novo seeks to leverage its internal geological expertise to deliver value-accretive opportunities to its shareholders. For more information, please contact Leo Karabelas at (416) 543-3120 or e-mail leo@novoresources.com.
On Behalf of the Board of Directors,
Novo Resources Corp.
“Michael Spreadborough”
Michael Spreadborough
Executive Co-Chairman
Forward-looking information
Some statements in this news release contain forward-looking information (within the meaning of Canadian securities legislation) including, without limitation, planned exploration activities and the expected timing of receipt of assay results. These statements address future events and conditions and, as such, involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements to be materially different from any future results, performance or achievements expressed or implied by the statements. Such factors include, without limitation, customary risks of the resource industry and the risk factors identified in Novo’s management’s discussion and analysis for the six months ended June 30, 2021, which is available under Novo’s profile on SEDAR at www.sedar.com. Forward-looking statements speak only as of the date those statements are made. Except as required by applicable law, Novo assumes no obligation to update or to publicly announce the results of any change to any forward-looking statement contained or incorporated by reference herein to reflect actual results, future events or developments, changes in assumptions or changes in other factors affecting the forward-looking statements. If Novo updates any forward-looking statement(s), no inference should be drawn that the Company will make additional updates with respect to those or other forward-looking statements.
Analytic Methodology (as set out in the Reports)
Soil samples were taken as 2kg samples sieved to -2mm fraction and submitted to Genalysis Laboratory Services, Perth, for the following analysis:
- Au (B/ETA 1 ppb)
- Cu (B/AAS 1 ppm)
- As (B/AAS 5 ppm)
- Sb (B/ AAS 1 ppm)
Original 4m RAB composites were sampled using a PVC spear and sent to Genalysis Laboratory Services, Perth for the following analysis:
- Au (B/AAS 0.01 ppm)
- As (B/AAS 5 ppm)
- Sb (B/AAS 1 ppm)
- Cu (B/AAS 1 ppm)
Follow-up RAB intervals were taken as single metre splits from the 4m composites and submitted to Analabs, Welshpool for gold (fire assay 0.01 ppm).
Table 1: Significant intercept table for historical single metre split RAB results.
| HOLE ID | COORDSYS | EASTING | NORTHING | HEIGHT | AZI | DIP | DEPTH FROM | DEPTH TO | Au (ppm) | Width (m) | |
| LGRB306 | MGA94_50 | 620341 | 7684248 | 60 | 360 | -60 | 25 | 28 | 3.68 | 3 | |
| LGRB294 | MGA94_50 | 620554 | 7684133 | 60 | 360 | -60 | 30 | 31 | 1.04 | 1 | |
| LGRB299 | MGA94_50 | 620556 | 7684033 | 60 | 360 | -60 | 26 | 27 | 1.66 | 1 | |
| LGRB300 | MGA94_50 | 620556 | 7684013 | 60 | 360 | -60 | 32 | 34 | 1.09 | 2 |
Vancouver, British Columbia – (November 4, 2021) – Rover Metals Corp. (TSXV: ROVR) (OTCQB: ROVMF) (“Rover” or the “Company”) is pleased to announce a non-brokered flow-through unit financing (the “Units”) for $200,000. Each Unit is priced at $0.08 and is comprised of one common share and one-half (1/2) of a common share purchase warrant (the “$0.08 FT Unit Financing”). The warrants have an exercise price of $0.12 per warrant share, and a life of two years. Rover is also pleased to announce that the financing is now fully subscribed and that it has received permission from the Toronto Venture Exchange (the “TSXV”) to close, as of the date hereof. There will be 2,500,000 common shares and 1,250,000 common share purchase warrants issued in connection with this financing. There will be the standard 4-month regulatory hold period for both the common shares and the common share purchase warrants in connection with this financing. No financing fees have been paid in connection with this financing.
Closing of the $0.08 FT Unit Financing
Legendary junior mining investor, Tookie Angus, has purchased 100% of the $0.08 FT Unit Financing allocation, adding to his existing position in the Company.
Use of Proceeds
The use of proceeds of the financing will be for Phase 3 Winter Exploration activities at the Cabin Gold Project. Starting this month, the Company will begin building the ice drill pads on Cabin Lake needed for follow-up drilling at the Arrow Zone. In Q4-2020, the Company reported an intersection of 32 meters of continuous gold averaging 13.6 grams per ton Au from the Arrow Zone. The Arrow Zone remains open at depth, underneath Cabin Lake, and is only accessible for expansion drilling in the winter months. The release of the map location of the ice drill pads will be part of a future updating news release.
Update on Timing of Summer 2021 Phase 2 Exploration Results
COVID-19 logistic delays at the testing laboratories continue to cause delays in the reporting process for junior miners. Rover expects to have a news release out next week with an update on the timing of the release dates of its Summer Phase 2 Exploration Results.
About the Cabin Gold Project
In September 2020, Rover kicked-off its first exploration drilling program at the historic Cabin Gold Project. The exploration program included both confirmation and expansion drilling of historical high grade gold drill intercepts in the “Arrow Zone” area of the historic Bugow Iron Formation. The Bugow Iron Formation is the controlling structure for the gold mineralization on the property and is over 15 km in at or near surface length. Rover’s 2020 expansion drilling included the discovery of what it believes to be a primary gold bearing ore shoot at the Arrow Zone. Rover’s 2020 drill program was the initial step towards confirming and expanding the historic 100,000 tons at 0.30 Oz/ton Au* historic resource estimate, reported for the Arrow Zone, towards a NI 43-101 compliant mineral resource estimate.
In July 2021, Rover commenced a Phase 2 Exploration Program at the Cabin Gold Project. The goal of the Phase 2 Exploration Program was the discovery and definition of new, near surface, gold bearing zones along the Bugow Iron Formation. The Company focussed on five known historic targets areas: (1) the Beaver; (2) the Andrew South; (3) the Andrew North; (4) the Camp South; and (5) Camp North. As of the date hereof, the Company is still waiting on results of its summer exploration program. Any new discoveries will form part of the Company’s Phase 3 Winter Exploration Program slated to begin in Q1-2022.
(*) As per Section 2.4 of NI 43-101, Aber Resources Ltd. reported a mineral inventory (that does not compare to the current CIM Definitions Standards mineral resource categories) of 100,000 tons at 0.30 ounces per ton gold at the Cabin Lake Gold Zone on the north limb of the folded Bugow Iron Formation in their 1986 and 1987 annual reports. The parameters used for the resource calculation are unknown. These results are relevant as to delineate a larger zone of gold mineralization at the Cabin Lake Gold Zone, but further drilling is needed to bring that up to CIM Definition Standards. The reader is cautioned that a Qualified Person has not done sufficient work to classify the historical estimates as current mineral resources and Rover Metals is not treating the historical estimates as current mineral resources.
Technical information in this news release has been approved by Raul Sanabria, M.Sc., P.Geo., Technical Advisor and shareholder of Rover Metals Corp. and a Qualified Person for the purposes of National Instrument 43-101.
About Rover Metals
Rover is a precious metals exploration company specialized in North American precious metal resources, that is currently advancing the gold potential of its existing projects in the Northwest Territories of Canada (60th parallel). The Company commenced Phase 2 Exploration at its Cabin Gold Project in the summer of 2021, and is planning to commence Phase 3 Exploration in Q1-2022.
You can follow Rover on its social media channels:
Twitter: https://twitter.com/rovermetals
LinkedIn: https://www.linkedin.com/company/rover-metals/
Facebook: https://www.facebook.com/RoverMetals/
for daily company updates and industry news, and
YouTube: https://www.youtube.com/channel/UCJsHsfag1GFyp4aLW5Ye-YQ?view_as=subscriber
for corporate videos.
Website: https://www.rovermetals.com/
ON BEHALF OF THE BOARD OF DIRECTORS
“Judson Culter”
Chief Executive Officer and Director
For further information, please contact:
Email: info@rovermetals.com
Phone: +1 (778) 754-2617
Statement Regarding Forward-Looking Information
This news release contains statements that constitute “forward-looking statements.” Such forward-looking statements involve known and unknown risks, uncertainties and other factors that may cause Rover’s actual results, performance or achievements, or developments in the industry to differ materially from the anticipated results, performance or achievements expressed or implied by such forward-looking statements. Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by the words “expects,” “plans,” “anticipates,” “believes,” “intends,” “estimates,” “projects,” “potential” and similar expressions, or that events or conditions “will,” “would,” “may,” “could” or “should” occur. There can be no assurance that such statements be prove to be accurate. Actual results and future events could differ materially from those anticipated in such statements, and readers are cautioned not to place undue reliance on these forward-looking statements. Any factor could cause actual results to differ materially from Rover’s expectations. Rover undertakes no obligation to update these forward-looking statements in the event that management’s beliefs, estimates or opinions, or other factors, should change.
THE FORWARD-LOOKING INFORMATION CONTAINED IN THIS NEWS RELEASE REPRESENTS THE EXPECTATIONS OF THE COMPANY AS OF THE DATE OF THIS NEWS RELEASE AND, ACCORDINGLY, IS SUBJECT TO CHANGE AFTER SUCH DATE. READERS SHOULD NOT PLACE UNDUE IMPORTANCE ON FORWARD-LOOKING INFORMATION AND SHOULD NOT RELY UPON THIS INFORMATION AS OF ANY OTHER DATE. WHILE THE COMPANY MAY ELECT TO, IT DOES NOT UNDERTAKE TO UPDATE THIS INFORMATION AT ANY PARTICULAR TIME EXCEPT AS REQUIRED IN ACCORDANCE WITH APPLICABLE LAWS.
NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OF THIS RELEASE.
