Categories
Base Metals Energy Granite Creek Copper Junior Mining

Granite Creek Copper Holds $2.5 Billion Worth of Copper

Bob Moriarty
Archives
Nov 4, 2021

Granite Creek Copper (GCX-V) has 100% ownership of a 176 square km copper/gold/silver property named the Carmacks project located in the Minto Copper Belt in the Yukon. The high-grade copper project is on trend with the Minto copper mine. We shall see why that is very important to the future of the company shortly.

The project had completed a 43-101 in 2018 showing an M&I resource of 23.76 MT of 0.85% Cu, 0.31 g/t Au and 3.41 g/t Ag. A 12,000-meter drill program has been completed in 2021 directed at expanding the resource and converting inferred sulphides material to M&I. An updated 43-101 is expected in early 2022 based on results from the 2021 program. In addition there will be an updated PEA in the first half of 2022 to include both oxide and sulphide material.

At today’s price of copper, that 43-101 resource is worth $104.26/tonne in the ground. Naturally copper going any higher will make this project far more desirable. As we see from the ongoing COP26 conference there seems to be a general agreement that the world needs to reduce its carbon footprint by using more “Green Energy.”

Well, Green Energy requires enormous quantities of copper, lithium and graphite, far more than today. The world is short of copper now and is going to run even shorter. Prices will have to go up. Granite Creek Copper is in the catbird’s seat ready to move to production.

As I mentioned above Minto Exploration is important to GCX for several reasons. Minto is about to build a mill and is in the process of going public imminently. Minto has only three years reserves at presently planned production. In their financing pitch deck they clearly refer to GCX with references to potential M&A activities within the Minto Copper Belt. Guess whom they are talking about?

A week ago Granite Creek released the final results from the Phase 1 of three different phases. The Phase 1 program was designed to add sulfide tonnage to the existing oxide resource. It consisted of 19 diamond core drill holes and totaled 6355 meters. Results from the Phase 2 and Phase 3 programs are still in the lab. Phase 2 did 20 RC holes and about 3000 meters in total. Phase 3 was using the diamond core rig again and did about 2700 meters.

Granite Creek is a really easy call. As of today the company has a $22 million market cap with $1 million in cash and $500,000 in callable warrants. In addition there are a bunch of $.15 warrants expiring in January 2022 so the company is well cashed up.

I’m not a big expert on copper but Granite Creek has to be one of the lowest market cap copper stories with a real asset. When Minto goes public and goes into production, I am certain they will pay attention.

Granite Creek is an advertiser. I have participated in the last private placement so naturally I am biased. Do your own due diligence.

Granite Creek Copper
GCX-V $.18 (Nov 02, 2021)

GCXXF-OTCQB 121 million shares

Granite Creek website

###

Bob Moriarty
President: 321gold
Archives

321gold Ltd

Categories
Base Metals Energy Granite Creek Copper Junior Mining

Granite Creek Copper Reports Final Results from Phase 1 of 2021 Drill Program, Including 23.30 Meters of 2.27 % Copper Equivalent, at the Carmacks Copper-Gold-Silver Project in Yukon, Canada

VANCOUVER, BC / ACCESSWIRE / October 28, 2021 / Granite Creek Copper Ltd. (TSX.V:GCX | OTCQB:GCXXF) (“Granite Creek” or the “Company“) is pleased to announce the third and final tranche of assay results from Phase 1 of the Company’s three-phase 2021 drill program at the 100%-owned Carmacks project.

The Phase 1 campaign focused on expansion and upgrade of resources in zones 1, 2000S, and 13 by testing the sulfide potential of these priority areas. In addition to the Phase 1 program, the Company also completed Phase 2 RC drilling at early-stage targets, and a Phase 3 diamond drill program to follow up on the success of Phase 1. All activity has been completed at site for the 2021 field season with assays for Phases 2 and 3 pending.

Granite Creek President & CEO, Tim Johnson, commented, “We are extremely pleased with the results of our 2021 exploration program which achieved many of our objectives and exceeded our expectations in several important respects. We expanded sulfide mineralization in three of the main zones at Carmacks which will be reflected in an updated NI 43-101 resource estimate followed by a new mine plan which is being developed to incorporate both oxide and sulfide material. We anticipate the sulfide resources could make a significant difference to the mine life and economics of the Carmacks deposit and we look forward to further defining that potential.”

Highlights

  • In Zone 1, diamond drill hole CRM21-019 intersected 67.35m of 1.23% Copper Equivalent (“CuEq”) mineralization including 23.30m of 2.27 CuEq.
  • In Zone 1, diamond drill hole CRM21-013 intersected 67.90m of 0.90% CuEq including 22.88m of 1.14% CuEq and 12.91m of 1.73% CuEq.
  • In Zone 13, diamond drill hole CRM21-021 intersected 96.85m of 0.84% CuEq including 35.85m of 1.04 CuEq and 21.35m of 1.21 CuEq.
  • Granite Creek believes these intercepts, plus others listed in the table below, have the potential to increase the grade and confidence of the resource model in Zone 1 and increase the grade and total size of Zones 2000S and 13.
  • Updated resource model being developed.

Table 1 – Highlights from of 2021 Phase 1 Diamond Drill Assays at the Carmacks Project

Drillhole
From(m)To(m)Length*(m)Cu(%)Mo(%)Au(g/t)Ag(g/t)CuEq** (%)
CRM21-012400.65415.7515.100.340.0060.112.130.47Zone 1ThisRelease
Including405.85411.205.350.550.0160.153.010.75
CRM21-013311.00378.9067.900.730.0050.182.690.90
Including324.75343.6322.880.920.0060.233.761.14
and including355.09368.0012.911.390.0060.375.291.73
CRM21-014355.70423.4567.750.930.0090.265.161.20
Including398.00423.4524.451.530.0090.416.211.91
CRM21-017317.42363.2045.780.420.0010.152.410.55
Including323.50335.8512.350.670.0020.283.900.92
CRM21-019277.95345.3067.350.930.0110.314.231.23
Including322.00345.3023.301.70.0160.577.512.27
CRM21-004323.50367.0043.501.120.0280.203.411.40Zone 1PreviousRelease
Including338.50367.0028.501.570.0420.294.531.96
and including352.00†367.0015.001.800.0660.334.812.31
CRM21-007222.52226.604.080.910.0060.196.321.13
CRM21-010450.00513.4063.400.270.0030.081.310.35
Including450.00482.2532.250.300.0040.081.410.39
Including488.90513.4024.500.300.0030.091.470.39
CRM21-01892.40110.4018.000.910.0080.176.791.12Zone 2000SThisRelease
and158.80170.0011.200.720.0130.144.270.91
and233.60249.0015.400.390.0240.092.090.56
and263298.9035.900.350.0080.102.620.48
including287.00298.9011.900.670.0170.193.530.90
CRM21-003146.35†214.5068.150.590.0280.143.690.83Zone 2000SPreviousRelease
Including161.40179.8018.040.810.0330.214.801.13
CRM21-005137.05179.8043.240.740.0470.163.821.06
Including142.05158.4016.351.200.0360.266.111.58
CRM21-006194.40278.2083.800.640.0120.133.230.81
Including229.20278.2049.000.870.0180.173.881.10
Including248.76266.2017.441.210.0330.225.111.53
CRM21-008195.80228.4032.600.800.0190.173.881.02
Including201.55215.5514.001.100.0230.244.861.40
CRM21-009190.50243.8553.350.590.0120.142.710.75
Including191.30201.7010.400.870.0040.253.701.09
and including209.00225.9516.950.620.0090.132.760.77
and including229.90235.255.351.210.0640.284.881.68
CRM21-011223.98329.50105.520.960.0130.184.061.18
Including223.98245.2021.222.170.0100.369.132.56
and including260.32260.820.5018.970.0080.4638.319.72
CRM21-01536.6949.3812.690.230.0030.040.960.27Zone 13 ThisRelease
CRM21-01691.30238.50147.200.380.0250.102.280.56
CRM21-021132.15229.0096.850.620.0140.203.040.84
Including132.15168.0035.850.820.0130.203.801.04
and including207.65229.0021.350.800.021`0.433.511.21

** Copper equivalent (Cu Eq) values assume Cu $3.35/lb, Au $1600/oz, Ag $24/oz, Mo $12/lb and 100% recovery. *Weighted average intercepts shown. Estimated true widths vary but, based on geological interpretation of cross-sections, are estimated to be typically 60-70% of the intersected widths.

† Part of zone has poor recovery

Figure 1 – Carmacks Copper Project Plan View

Zone 1

Eight holes were drilled in Zone 1 with the objective of increasing confidence in the inferred portion of the sulfide resource of this zone as well as evaluating the down-dip continuation of the inferred resource. Drilling was successful in achieving its objectives of delineating the depth extent of mineralization, expanding the mineralization below the current resource model, and confirming the grade and anticipated thickness in the inferred portion of the sulfide resource in this zone. Of the total reported meterage with significant mineralization, 67% returned mineralized intercepts grading greater than those reported in the inferred category of the resource estimate completed in 2017. While only preliminary, the Company feels that these intercepts have the potential to significantly increase the grade and the confidence in this area of the resource model.

While the Preliminary Economic Assessment (“PEA”) published in 2017(1,2) looked only at the oxide material in Zones 1,4, and 7, work being conducted by Sedgman and Mining Plus (see news release dated May 18, 2021) is looking at various scenarios to process the sulfide portion of Zone 1, and other sulfide zones of the deposit, to build a basis for an updated PEA that would include both oxide and sulfide ore.

Zone 2000S

Zone 2000S has the potential to add tonnage in the sulfide domain of resource category and in doing so could add significant value to an updated PEA that included sulfide resources. During Phase 1, six diamond drillholes were drilled in this zone to evaluate the continuation of bornite-chalcopyrite mineralization down dip, and two additional holes were drilled during Phase 2 with assays still pending. Drill hole CRM21-011, along with all other drillholes from the 2021 program (see release dated August 22, 2021) extended known mineralization in the zone from 30m to 100m below the current block model. CRM21-018, a technical hole drilled subparallel to the mineralization to evaluate the geological concept of a southern W-E striking fault, was successful in locating the fault and extends mineralization to depth beneath the current resource model

Zone 13

Three diamond drill holes were completed at Zone 13 in Phase 1, and an additional two holes were completed in Phase 3 with the intent of evaluating the northern continuity of sulfide mineralization, and infilling an open area of the block model. Building on success from the company’s inaugural drill program in 2020 which included 127 metres of continuous copper mineralization in drillhole CRM20-001, grading 0.85% CuEq and including 28.65m of 1.74% CuEq and 19.2m of 1.19% CuEq (see news release dated February 11,2021), all five diamond drill holes were successful in extending and infilling mineralization from Zone 13 in the Carmacks deposit including CRM21-021 which intercepted 96.85m grading 0.84% CuEq including 35.85m of 1.04% CuEq and 21.35m of 1.21% CuEq. Drill hole CRM21-020 drilled from the same pad as CRM21-021 deviated from planed direction and was not completed.

COVID-19 Protocols

Granite Creek has worked closely with the Yukon government to develop a COVID-19 safety plan that enables the Company to implement an effective work plan while maintaining the highest degree of safety of our workers and surrounding communities. The Company strictly adheres to mandates put in place by health authorities at the Federal and Territorial government level and hold the health and safety of our workers, and the citizens of the communities in which work in the highest regard.

[1] JDS Energy and Mining. Feb 9, 2017. NI 43-101 Preliminary Economic Assessment Technical Report on the Carmacks Project, Yukon, Canada. Contained metal based on 23.76 million tonnes of NI 43-101 compliant resources in the Measured and Indicated categories grading 0.85% Cu, 0.31 g/t Au, 3.14 g/t Ag.

[2] Arseneau Consulting Services, 2016 Independent Technical Report on the Carmacks Copper Project, Yukon, Canada.

About Granite Creek Copper

Granite Creek, a member of the Metallic Group of Companies, is a Canadian exploration company focused on the 176 square kilometer Carmacks project in the Minto copper district of Canada’s Yukon Territory. The project is on trend with the high-grade Minto copper-gold mine, operated by Minto Explorations Ltd, to the north and features excellent access to infrastructure with the nearby paved Yukon Highway 2, along with grid power within 12 km. More information about Granite Creek Copper can be viewed on the Company’s website at www.gcxcopper.com.

FOR FURTHER INFORMATION PLEASE CONTACT:

Timothy Johnson, President & CEO
Telephone: 1 (604) 235-1982
Toll Free: 1 (888) 361-3494
E-mail: info@gcxcopper.com
Website: www.gcxcopper.com

Qualified Person

Ms. Debbie James, P.Geo., a qualified person for the purposes of National Instrument 43-101, has reviewed and approved the technical disclosure contained in this news release.

Quality Control and Quality Assurance

Quality assurance and quality control procedures include the systematic insertion of duplicate, blank and standard samples, making up 12% of the sample stream. Drill core samples were sawn in half, labelled, placed in sealed bags and shipped directly to the Bureau Veritas preparation laboratory in Whitehorse. All geochemical analyses were performed by Bureau Veritas in Vancouver. Copper and silver analysis was performed by four-acid digestion with an ICP-ES finish. Non-sulphide copper was determined through a sulphuric acid leach with an AAS finish. Gold was analyzed by igniting a 15 g sample followed by an aqua regia digestion with an ICP-MS finish.

Forward-Looking Statements

This news release includes certain statements that may be deemed “forward-looking statements”. All statements in this release, other than statements of historical facts including, without limitation, statements regarding potential mineralization, historic production, estimation of mineral resources, the realization of mineral resource estimates, interpretation of prior exploration and potential exploration results, the timing and success of exploration activities generally, the timing and results of future resource estimates, permitting time lines, metal prices and currency exchange rates, availability of capital, government regulation of exploration operations, environmental risks, reclamation, title, and future plans and objectives of the company are forward-looking statements that involve various risks and uncertainties. Although Granite Creek Copper believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in the forward-looking statements. Forward-looking statements are based on a number of material factors and assumptions. Factors that could cause actual results to differ materially from those in forward-looking statements include failure to obtain necessary approvals, unsuccessful exploration results, changes in project parameters as plans continue to be refined, results of future resource estimates, future metal prices, availability of capital and financing on acceptable terms, general economic, market or business conditions, risks associated with regulatory changes, defects in title, availability of personnel, materials and equipment on a timely basis, accidents or equipment breakdowns, uninsured risks, delays in receiving government approvals, unanticipated environmental impacts on operations and costs to remedy same, and other exploration or other risks detailed herein and from time to time in the filings made by the companies with securities regulators. Readers are cautioned that mineral resources that are not mineral reserves do not have demonstrated economic viability. Mineral exploration and development of mines is an inherently risky business. Accordingly, the actual events may differ materially from those projected in the forward-looking statements. For more information on Granite Creek Copper and the risks and challenges of their businesses, investors should review their annual filings that are available at www.sedar.com.

Categories
Base Metals Energy Granite Creek Copper Junior Mining

Granite Creek Copper Receives Positive Metallurgical Results at Carmacks Copper-Gold Project in Yukon, Canada

VANCOUVER BC / ACCESSWIRE / October 14, 2021 / Granite Creek Copper Ltd. (TSXV:GCX)(OTCQB:GCXXF) (“Granite Creek” or the “Company“) is pleased to announce the receipt of positive results from metallurgy testing completed on sulfide mineralized core samples from the Company’s Carmacks project.

Testing was completed as part of trade-off studies now underway under the direction of Sedgman Canada and Mining Plus with the objective of developing the basis for an updated Preliminary Economic Assessment (“PEA”) on the project. Two representative samples of copper sulfide material and one sample of copper oxide material were delivered to Bureau Veritas Commodities, Metallurgy Division, for rougher flotation kinetic testing and open cleaner flotation testing. The purpose of the testing was to determine how amenable the sulfide mineralization present at the Carmacks deposit was to concentration by flotation, what recoveries could be expected, and to lay the groundwork for further testing. A preliminary copper flotation recovery model was generated at a fixed 25% copper concentrate grade with test results as summarized below:

  • Recoveries of greater than 95% for copper into a 25% copper concentrate are possible.
  • Copper sulfide minerals are well-liberated for rougher recovery via flotation at P80 of 150 µm.
  • A secondary regrind size at P80 of 25 µm can achieve 25% copper grade and high cleaner stage recovery.
  • Gold is associated primarily with copper sulfide minerals and minor pyrite. Flotation of gold with copper concentrate is likely the most economical way to recover gold.
  • High chalcopyrite content as the copper mineral and low pyrite content within the samples indicate a simple reagent scheme and relatively easy copper flotation upgrade.

The preliminary tests indicate that well-established flotation methods with known reagents will likely be the preferred processing method for sulfide material at Carmacks. The next stage of metallurgical test work will involve greater variability of samples to validate copper and gold recoveries as well as assessing potential levels of silver and molybdenum recoveries.https://s.yimg.com/rq/darla/4-9-0/html/r-sf-flx.html

Granite Creek President and CEO, Tim Johnson, commented, “These initial metallurgical results are very encouraging and are an important step in bringing the sulfide resources present at the Carmacks deposit into an updated mine plan and PEA. The Company’s belief in, and focus on, the copper sulfide potential at Carmacks and Carmacks North is being validated and advanced with every phase of work completed. We look forward to continuing to roll out the Carmacks story with substantive news flow throughout the remainder of the year and into 2022, including drill results from the recently completed, three-phase 2021 campaign.”

About Granite Creek Copper

Granite Creek, a member of the Metallic Group of Companies, is a Canadian exploration company focused on the 176-square-kilometer Carmacks project in the Minto copper district of Canada’s Yukon Territory. The project is on trend with the high-grade Minto copper-gold mine, operated by Minto Explorations Ltd, to the north, and features excellent access to infrastructure with the nearby paved Yukon Highway 2, along with grid power within 12 km. More information about Granite Creek Copper can be viewed on the Company’s website at www.gcxcopper.com.

FOR FURTHER INFORMATION PLEASE CONTACT:

Timothy Johnson, President & CEO
Telephone: 1 (604) 235-1982
Toll-Free: 1 (888) 361-3494
E-mail: info@gcxcopper.com
Website: www.gcxcopper.com
Metallic Group: www.metallicgroup.ca

Qualified Person

Mr (Sam) Yoon Seong Cho, MASC P.Eng., a qualified person for the purposes of National Instrument 43-101, has reviewed and approved the technical disclosure contained in this news release.

Forward-Looking Statements

This news release includes certain statements that may be deemed “forward-looking statements”. All statements in this release, other than statements of historical facts including, without limitation, statements regarding potential mineralization, historic production, estimation of mineral resources, the realization of mineral resource estimates, interpretation of prior exploration and potential exploration results, the timing and success of exploration activities generally, the timing and results of future resource estimates, permitting timelines, metal prices and currency exchange rates, availability of capital, government regulation of exploration operations, environmental risks, reclamation, title, and future plans and objectives of the company are forward-looking statements that involve various risks and uncertainties. Although Granite Creek Copper believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in the forward-looking statements. Forward-looking statements are based on a number of material factors and assumptions. Factors that could cause actual results to differ materially from those in forward-looking statements include failure to obtain necessary approvals, unsuccessful exploration results, changes in project parameters as plans continue to be refined, results of future resource estimates, future metal prices, availability of capital and financing on acceptable terms, general economic, market or business conditions, risks associated with regulatory changes, defects in title, availability of personnel, materials and equipment on a timely basis, accidents or equipment breakdowns, uninsured risks, delays in receiving government approvals, unanticipated environmental impacts on operations and costs to remedy same, and other exploration or other risks detailed herein and from time to time in the filings made by the companies with securities regulators. Readers are cautioned that mineral resources that are not mineral reserves do not have demonstrated economic viability. Mineral exploration and development of mines is an inherently risky business. Accordingly, the actual events may differ materially from those projected in the forward-looking statements. For more information on Granite Creek Copper and the risks and challenges of their businesses, investors should review their annual filings that are available at www.sedar.com.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

SOURCE: Granite Creek Copper Ltd.



View source version on accesswire.com:
https://www.accesswire.com/668103/Granite-Creek-Copper-Receives-Positive-Metallurgical-Results-at-Carmacks-Copper-Gold-Project-in-Yukon-Canada

Categories
Base Metals Energy Granite Creek Copper Junior Mining

Granite Creek Copper Launches Phase 3 of 2021 Drill Program at Carmacks Copper-Gold Project

VANCOUVER, BC / ACCESSWIRE / September 15, 2021 / Granite Creek Copper Ltd. (TSX.V:GCX)(OTCQB:GCXXF) (“Granite Creek” or the “Company“) is pleased to announce the successful completion of Phase 2 of its 2021 drilling program, consisting of 20 holes of reverse circulation (“RC”) drilling on Zones 2, 5 and 12 at the Carmacks deposit, as well as step-out drilling at Zone A in the Carmacks North target area. The Company has now launched the third and final phase of the 2021 drill campaign, returning to Zone 2000S at the Carmacks deposit to complete offsets of hole CRM21-011 where the Company intercepted a 105.52-meter interval of copper sulphide mineralization grading 1.18% CuEq (0.96% Cu, 0.01% Mo, 0.18 g/t Au, and 4.06 g/t Ag), including a high-grade intercept of 2.55% CuEq (2.17% Cu, 0.01% Mo, 0.36 g/t Au and 9.13 g/t Ag) over 21.22 meters (see news release dated August 24, 2021). The goal of Phase 3 is to continue to expand known resources and confirm the geometry in Zone 2000S to support the development of a mine plan for the sulphide portion of the deposit now underway by Sedgman and Mining Plus.

Granite Creek drilled 19 diamond core holes in the first phase of 2021 drilling, with assays from 9 holes released to date and results from the remaining 10 holes expected in the near term. Samples from the RC program have been sent for assay and will be announced over the next quarter as they become available.

Granite Creek President & CEO, Tim Johnson, commented, “We are very pleased with our 2021 exploration season to date and are excited to enter the final phase of drilling for the year. Given the very strong results we have seen from the first phase of diamond drilling and the positive implications we expect them to have for our resource expansion efforts, the Company adjusted the third phase to return to Zone 2000S where we see substantial opportunity to define additional new areas of mineralization outside the current resource model. Bringing this sulphide material into the model is expected to increase the current NI 43-101 mineral resource estimate in our planned update, with a view to a potentially significant extension of the projected mine life in an updated PEA for Q1 2022. We look forward to continued, substantive news flow throughout the remainder of the year and into 2022.”https://s.yimg.com/rq/darla/4-9-0/html/r-sf-flx.html

Figure 1 – First hole of Phase 3 drill program ready for logging at the Carmacks Project, September 2021

Live Webinar

Granite Creek Copper will be hosting a live webinar with Q&A on Tuesday, September 21 at 9 am Pacific Time. President & CEO, Tim Johnson, will provide a brief overview of the Carmacks Copper-Gold project, followed by an update on progress and discussion of the Company’s near and longer-term development plans. To register, please click here.

About Granite Creek Copper

Granite Creek, a member of the Metallic Group of Companies, is a Canadian exploration company focused on the 176 square kilometer Carmacks project in the Minto copper district of Canada’s Yukon Territory. The project is on trend with the high-grade Minto copper-gold mine, operated by Minto Explorations Ltd, to the north, and features excellent access to infrastructure with the nearby paved Yukon Highway 2, along with grid power within 12 km. More information about Granite Creek Copper can be viewed on the Company’s website at www.gcxcopper.com.

Qualified Person

Ms. Debbie James, P.Geo., a qualified person for the purposes of National Instrument 43-101, has reviewed and approved the technical disclosure contained in this news release.

FOR FURTHER INFORMATION PLEASE CONTACT:

Timothy Johnson, President & CEO
Telephone: 1 (604) 235-1982
Toll-Free: 1 (888) 361-3494
E-mail: info@gcxcopper.com
Website: www.gcxcopper.com
Metallic Group: www.metallicgroup.ca

Forward-Looking Statements

This news release includes certain statements that may be deemed “forward-looking statements”. All statements in this release, other than statements of historical facts including, without limitation, statements regarding potential mineralization, historic production, estimation of mineral resources, the realization of mineral resource estimates, interpretation of prior exploration and potential exploration results, the timing and success of exploration activities generally, the timing and results of future resource estimates, permitting time lines, metal prices and currency exchange rates, availability of capital, government regulation of exploration operations, environmental risks, reclamation, title, and future plans and objectives of the company are forward-looking statements that involve various risks and uncertainties. Although Granite Creek Copper believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in the forward-looking statements. Forward-looking statements are based on a number of material factors and assumptions. Factors that could cause actual results to differ materially from those in forward-looking statements include failure to obtain necessary approvals, unsuccessful exploration results, changes in project parameters as plans continue to be refined, results of future resource estimates, future metal prices, availability of capital and financing on acceptable terms, general economic, market or business conditions, risks associated with regulatory changes, defects in title, availability of personnel, materials and equipment on a timely basis, accidents or equipment breakdowns, uninsured risks, delays in receiving government approvals, unanticipated environmental impacts on operations and costs to remedy same, and other exploration or other risks detailed herein and from time to time in the filings made by the companies with securities regulators. Readers are cautioned that mineral resources that are not mineral reserves do not have demonstrated economic viability. Mineral exploration and development of mines is an inherently risky business. Accordingly, the actual events may differ materially from those projected in the forward-looking statements. For more information on Granite Creek Copper and the risks and challenges of their businesses, investors should review their annual filings that are available at www.sedar.com.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

SOURCE: Granite Creek Copper Ltd.

Categories
Base Metals Energy Exclusive Interviews Junior Mining Metallic Group Precious Metals Stillwater Critical Minerals

Group Ten Metals – Maiden 43-101 Nickel-PGE Resource Update

Maurice:

Joining us for a conversation is Michael Rowley, the CEO of Group Ten Metals. Glad to be speaking with you today, as you have a big announcement for shareholders regarding the Black Lake–Drayton gold project. Before we begin, Mr. Rowley, please introduce us to Group Ten Metals and the opportunity the company presents to shareholders.

Michael Rowley:

Group Ten is focused on advancing our Stillwater West project as a premier source of low-carbon ‘green metals’ in Montana’s Stillwater district, beside Sibanye-Stillwater’s mine complex. Within the next few weeks, we expect to debut our maiden resource estimates of nickel, copper, palladium, platinum, rhodium, gold and cobalt, on that project which we expect will compare favorably with our peers and position us for growth based on this years drill campaign.

Along with owning half of the iconic Stillwater district in Montana, Group Ten also has two other district-scale land positions, the Black Lake Drayton gold project in Ontario that you mentioned a minute ago, and the Kluane PGE-Ni-Cu-Co project in the Yukon.  All three of these are big brownfield land positions in great districts, and they are 100% owned by Group Ten because we were acquiring them strategically during the bear market when great assets were available inexpensively. We are focused more than ever on Stillwater, and with that our non-core assets are effectively up for sale or spin-out in the first in a series in that regard.

Maurice:

Well, let’s begin today in Ontario is Group Ten Metals has just announced (Press Release) a letter of intent with Heritage Mining on the sale of the Black Lake–Drayton gold project. Congratulations, sir.

Michael Rowley:

Thank you, we are excited about the potential we see there.  Heritage Mining is a new listing with an excellent team, and they are well equipped to focus on Black Lake and give it the attention it deserves while granting excellent exposure to that success.

Black Lake is a rare asset that is hard to find in this current, improving market with increasing activity in junior exploration.  It checks all the boxes.  It is a big land position that shares an emerging district with a 3Moz development-stage high-grade gold project, yet is underexplored. So there is lots of smoke, someone just needs to find the fire.  Treasury Metals has done great work to the west of us consolidating the rest of the district, and Rainy River, farther to the west is now in production with New Gold. This whole belt was late to the game because of limited access and shallow ground cover, but developments at Rainy River in the 1990s changed that, and now there is over 14Moz in the belt, and growing.

Maurice:

All right, let’s get into the exciting stuff, sir. Please share the terms of the agreement with us and in particular, the cash and share compensation that group 10 metals will be receiving along with the carried interest in the potential for discovery payments.

Michael Rowley:

It’s a great deal for both parties. Group Ten will gain a major share position in a newly listed company that’s focused on precious metals and focused on developing tier one assets, developing resources. And we get that 10% free carried interest through to feasibility study. So we can be at the table at a later stage to negotiate the sale of that during a possible broader consolidation play in the district. We received $320,000 in cash payments in the first two years of the deal as well. And we receive bonus payments of $1 for every ounce of gold that is formerly brought on the books in any category at any time and even in multiple stages. That has a $10 million cap on that, the district already hosts more than 10 million ounces. So that figure is certainly possible given the area.

Maurice:

So that we better appreciate the terms. Would you please provide us with a quick bio on Heritage Mining and what they bring to the table?

Michael Rowley:

Heritage Mining is a very experienced team with an excellent track record of raising cash and advancing projects, especially in Ontario and Quebec. Heritage is familiar with this geology. They’re keen to hit the ground, which is very pleasing to us because the point of this deal is that we want someone else to raise the $5 million and advance this asset the way we think it can be advanced. So they certainly appear to be capable of that. They have an excellent record of proving ounces, developing mines, operating companies, and marketing, raising capital.

Maurice:

Where will this transaction put Group Ten Metals in terms of ownership, percentage on the share structure for Heritage Mining?

Michael Rowley:

Well, we’ll have to see what their first placement looks like once they’re trading and that’s a couple of months out from now. But we expect to be about 10% of the company initially, and then maintain between the 5% and 10% level from there. A key point on that note also is that we have that bonus structure having a carried interest. Therefore, we are not relying solely on our share position for value. We’ve got several avenues here to be exposed to that success that we expect them to have.

Maurice:

And when does Group Ten Metals expect the transaction will close?

Michael Rowley:

We look good to close around the 60-day mark around mid-October.

Maurice:

Leaving Ontario and onto the Yukon where Group Ten Metals has another non-core asset within his property bank that is equally has been receiving a lot of interest from prospective buyers. And I’m speaking of the Kluane PGE, nickel, copper project in the Yukon. Sir, any updates for us?

Michael Rowley:

The Kluane is another explored project. We have over 250 square kilometers in the under-explored Kluane Belt, which is a fantastic belt of deposits. Another ultramafic system like Stillwater reaching from BC through into Alaska. The most advanced one. There is Nickel Creek Platinum, formerly Wellgreen. And the news there is that they’ve been increasingly active in the past year. And that’s good to see. They’ve been drilling, they’ve been doing geophysics and they’ve been doing it up on the northwest end of the system towards us, which is music to our ears. We’ll be seeing them at Beaver Creek and we’re looking forward to further activity from them. You’re correct that we’re getting more interested in those projects and that they like Black Lake are effectively for sale. We just have low carrying costs. Then we’re taking our time looking for the right deals.

Maurice:

Leaving the Yukon less visit Montana, which hosts your flagship Stillwater West project. But before we get into the latest news on the Stillwater West, would you please remind us about the unique value proposition before us on your flagship project?

Michael Rowley:

The Stillwater West is fantastic.  In 2017, the opportunity was presented to us to own half of the iconic Stillwater District, which sounds too good to be true in a way. But thanks to several factors that came together at the right time. Most of all, a local vendor who had spotted a bankruptcy that left these claims available, and he was quick, he bought the data from the past operators and he tied up the claims. We’ve since tripled land position. We now own half the district we’ve built a terrific database, predictive geologic model. The point is that we are well on our way to proving ourselves as a primary source of green metals, battery-grade nickel, copper, cobalt, with platinum group elements, palladium, platinum, rhodium, and also gold.

In a US district beside three mines and a smelter complex. These are big disseminated, sulfide deposits. They convert easily and cleanly to nickel sulfate. And we are weeks away from our first resources on the project, which is a very exciting moment for any junior exploration company. This will be a solid debut, it’ll position us nicely among our peers. And we see terrific room to grow from there. If you’ve seen our news release back in April, where we related the 3D models from our IP survey, the emerging images of our Resource models, and the potential we have for expansion.

Maurice:

The Stillwater West is currently undergoing its largest exploration program to date, which is a 10,000-meter drill program there recently added a second drill rig, sir, take us on-site and get us up to speed on the program.

Michael Rowley:

We have 2 rigs turning, which is music to our ears. We’re hitting sulfide very nicely in both, massive sulfide in places, net texture, and disseminated in others. The predictive model that we’ve been working up the past few years is working beautifully. And that’s a key point. We’re now hitting with a high degree of predictability, which is what geologists want to see. The district is well mineralized.  Our neighbor has 87 million ounces in current resources, reserves, and 14 million ounces in past production of the highest-grade palladium-platinum in the world.

That’s a single magmatic pulse laid down across 40 kilometers. These things are staggering in scale, and it’s also a nickel-copper-sulfide deposit that is worth noting. We are just below them in that stratigraphy. And we’re seeing similar continuity of these horizons. We are hitting new ones all the time, they seem to run for great lengths and it’s easy to add ounces and pounds. The program that you mentioned that’s underway now should do very nicely for expanding the inaugural resources as fast as we can in 2022. So we’ll debut numbers here in summer 2021, and then look to expand them as fast as possible in 2022.

Maurice:

All right, you have two truth machines drilling away. Do you already have some core in the lab and any timeframe on when we may receive some assays?

Michael Rowley:

The first one and a half holes are in the labs, include some nice-looking core. The labs are saying six weeks though, give me into October to get those into a news release.

Maurice:

Now we will hold you to that, but we will hold the labs to that. All right, switching gears, let’s look at some numbers. Sir, please provide the capital structure for Group Ten Metals.

Michael Rowley:

Group Ten Metals has 163 million shares outstanding at today’s price. That puts us around a $50 million market cap. We feel that significantly below where we could be based on our peers. I think a good peer might be Canada Nickel, for example. Noting of course they don’t have the platinum group element component that we have. However, they are four or five times our market cap with a similar, large, lower-grade nickel project. And we think that makes it a compelling comparison. We have$ 6 million cash in the bank and we have $13 million in the money options and warrants. Those are priced between .21 and .30 cents. No placements are planned for the foreseeable future and a fully funded, fully permitted for this year’s program. And even into next year at this point.

Maurice:

Speaking of those warrants. Expect for me to go ahead and exercise mine. Speaking of the shares, Group Ten Metals recently upgraded its DTC eligibility. What does that mean for shareholders? I

Michael Rowley:

I had to look into it myself to be reminded. DTC is an electronic clearing service. This simplifies the process of trading and enhances liquidity For American traders, which we have a really good US shareholder base. So this is, meaningful in terms of fast and efficient settling of those trades.

Maurice:

Before we close Mr. Rowley, what would you like to say to shareholders?

Michael Rowley:

This is an exciting time for Group Ten Metals! If you’re familiar with the Lassonde Curve value creation in junior miners were at that just pre-discovery phase where you get that rapid increase in value. And it’s quite a privilege to be here. It’s exciting to be systematically exploring the Stillwater Complex, which is famously metal-rich, and yet also under-explored and it’s remarkable, but the 215 drill holes to date across 32 kilometers of claims, 61 square kilometers. That’s not a lot. And we’re testing things all the time that have never been drilled and we’re finding nice-looking sulfides there. So to be the ones systematically adding value and looking like, in terms of the market, that we’re on the left end of the Lassonde Curve, but knowing that we’re much farther along in terms of having comfort about some size and grade here. Pretty exciting.

Maurice:

Last question. What did I forget to ask?

Michael Rowley:

Well, it’s probably a good point to touch on the broader commodity markets and you know metal markets are going sideways at the moment but there are the fundamentals are in place perhaps more than ever for a really good steady increase. We’re looking for all the metals in our suite of commodity baskets to resume their upward momentum likely this fall. We’ve got the FED meeting behind us today. Things look positive the fundamentals are there and we’re looking forward to increased value for all our commodities, especially, in nickel. We’re hearing increasingly of the coming shortfall in nickel sulfide, in particular clean nickel that’s good for batteries or rather makes nickel sulfate in the most environmentally friendly manner. We’re excited to be part of that and we’re looking forward to that renewed momentum. This is a good buying opportunity to buy shares in Group Ten Metals. 

Maurice

Sir, for readers that want to get more information on Group Ten Metals, please share the website address.

Michael Rowley:

www.grouptenmetals.com

Maurice:

Mr. Rowley, it’s been a pleasure speaking with you today, wishing you and Group Ten Metals the absolute best sir.

Categories
Base Metals Energy Exclusive Interviews Granite Creek Copper Junior Mining

Granite Creek Copper – Resource Expansion on the High-Grade Copper Carmacks Project

Maurice:

Joining us for conversation is Tim Johnson, the CEO of Granite Creek Copper (TSX.V: GCX | OTCQB: GCXXF).

Tim Johnson:

Thank you, Maurice. It’s always a pleasure to be here.

Maurice:

What an exciting time to be speaking with you as Granite Creek Copper has just released some very exciting results to the market, which look to further extend the resource at the high-grade Carmacks copper-gold project. Before we begin, Mr. Johnson, please introduce us to Granite Creek Copper and the opportunity the company presents to shareholders.

Tim Johnson:

Granite Creek Copper is an exploration stage copper-focused company. We’re focusing on our Carmacks project in the center of Yukon, Canada, which is a great jurisdiction for development and we have excellent access to power and a highway. And just released some very exciting news of which we are very pleased and I appreciate this opportunity to discuss them and put them into context for readers.

Maurice:

Granite Creek Copper began its inaugural drill campaign back in November, which was quite successful, yielding 127 meters of 0.85% copper equivalent at Carmacks’s zone 13, and 4.6 meters of 7.5% copper equivalent at Carmacks north zone A, which was followed up in May with phase one of three drill programs slated for 2021.

In July, Granite Creek released the first string of asset results from phase one and the results were quite impressive. Just the other day, the company released a single hole, hole 11, which has some spectacular results. It would seem that there will be much more bluesky on the horizon on the Carmacks deposit. Mr. Johnson, I have table one from the press release before us. Please walk us through the asset results and in particular, hole 11.

Tim Johnson:

Hole 11 was a bit of an eye-opener for us. It was targeted in zone 2000 south. When we went into the campaign, we knew that there was some significant potential to grow the resources in 2000 South, and  I must say Hole 11 delivered, along with a few other holes drilled in the 2000 south zone all intercepted mineralization well below the current resource model, so giving us the potential to significantly expand that resource. We’re pretty pleased. We think not only can we expand the resource, but if you notice that, looking at the resource table in the news release, that just about all the intercepts are of a higher grade than what’s in the table. That gives us the potential to not only grow the resource and as far as tonnage, but also potentially deliver a higher-grade resource on an updated resource estimate that we’re working on right now.

Tim Johnson:

Hole 11 intercepted 105 meters at 1.18% copper on an equivalent basis and above 0.97% copper on its own. Within that, there were 22 meters of over 2% copper. Those grades are pretty spectacular, and we think, again, that’s going to make a significant upgrade to the resource once we can complete a few more holes and model that. We don’t think this is a one-off hole. We think from the geophysics and what we’re seeing that we will be able to expand the resource in a much higher grade. Of course, we’ve got some more drilling to do to be able to deliver that, but we’re pretty bullish about that. We’ve refocused our phase three program, which we expect to start in a week or two, to target that area of 2000 south, and also to see if we can connect the 2000 south up to some of the other zones at Carmacks to make a more continuous ore body.

Maurice:

Now sticking with zone 2000 south, I have table two before us. What do these results seem to indicate?

Tim Johnson:

Table two is a resource calculation done by previous operators. This was published in 2017. You can see it’s quite a small resource, about 600,000 tons in the sulfide domain, which readers should know that the sulfide domain is what we’re targeting. The oxide, there is limited oxide in 2000 south. I think this is one of the reasons why this target is still here, because previous operators, again, we’re more focused on a small oxide operation. So they weren’t targeting the sulfide, but we see the real potential here to be the sulfide. This hole seems to verify that. Again, the grade on this hole is above what the grade of the resource, the current resource is. So good delivery on a couple of fronts, both potential tonnage increase, and potential grade increase.

Maurice:

And I do wish to highlight the geological acumen of Granite Creek Copper, as the Carmacks has had over 50,000 meters of exploration in the past and they were not able to locate the success you have in hole 11.  What does that say about GCX and the success of the company moving forward?

Tim Johnson:

There’s a couple of reasons for that. The previous operators and there was nothing wrong with this, felt they had an economic resource in the oxide. The oxide is fairly near surface. Therefore, there was a lot of drilling done to prove up that resource, but there was very little drilling done to expand the resource into the sulfide material or to look for adjacent potential like we have at Carmacks North. Previous operators had quite a small land package for various reasons. They had to let some go in some of the tougher times in the industry, and we benefited from that, by having that land package available for us when we acquired it and then subsequently acquired coper north, of course, to consolidate the district.

Tim Johnson:

So yeah, you’re right. I mean 50,000 meters have been drilled, but a lot of it, as I said, was very near-surface, oxide focused, and left us the opportunity to come in and recognize the potential for significant expansion beneath the oxide into the sulfide, and really not that deep. The transition zone from oxide to sulfide occurs about 200 meters plus or minus below surface, so still well within an economic mining range, and really, a lot of bluesky left and a lot of discovery potential on the combined land package.

Maurice:

In previous interviews, we’ve discussed resource expansion. How does today’s press release increase the impact on the pending 43-101 mineral resource estimate?

Tim Johnson:

It significantly impacts mineral resource estimate.  When consider where Hole 11 fits in relation to the current resource, and the entirety of the 105 meters of significant mineralization is below the current resource. So giving us up to 100, maybe 120 meters of down-dip extension on that resource. Now, we do need to infill around it. You can’t build a resource on a single hole, but some of the other holes that we’ve had that we released in July also support that down-dip extension of the resource. So we see significant growth potential here in this zone.

Tim Johnson:

We did drill again this year on Zone 13. We’re still waiting for those assays, but we see potential to grow in 13 as well. We also see potential to grow in the sulfide portion of Zone 1, which some of those assays were also released in our first release in July. So basically, three zones that we have resource growth potential, and we’re working on modeling those right now. We’re working with a third party to bring that resource into view, and we hope to be able to deliver that to the market in a fairly timely manner.

Maurice:

I referenced that Granite Creek will embark on three drill programs this year. When can shareholders expect the remaining results from phase one?

Tim Johnson:

That’s a really tough question to answer. As we move into the fall, the labs get busier and busier. So it’s really hard for me to nail down, but we would expect hopefully by late September to early October, we’d have final results on phase one. The phase two program we’re currently going on is an RC or a reverse circulation program. It’s targeting some of the earlier stage targets both at Carmacks north, which is a northern extension of our land package, and some of the earlier stage targets around the Carmacks deposit itself. Then the phase three program, which is now being re-imagined in and around 2000 south, will be starting in the coming weeks. Then that should give us fairly good assay flow and be able to continue to deliver results to the market as we move through the fall and into the winter months.

Maurice:

By the way, is phase three, is that an RC or is that diamond core, sir?

Tim Johnson:

Phase three is a diamond program. What we did this year, we budgeted for 10,000 meters. We completed 6,300 meters in the initial program, and we kept back some meterage to get the results in and to understand the geology of the orientation of the deposits. Now that those results are coming in as I said, we’re refocusing our efforts to build out where we have the best results and try to get … increase the tonnage and increase the grade in the zones that we think are going to make the most difference to the resource.

Maurice:

When we last spoke, Granite Creek Copper announced that it had entered into a contract with Sedgman and Mining Plus. What are the latest developments there?

Tim Johnson:

We working forward with Sedgman and Mining Plus. One of the big reasons we brought them in is two-fold. One of the reasons we brought them in was to optimize the process for both the oxide and sulfide processing that was initially developed in the 2017 PEA, and then also to develop a mine plan that would bring the sulfide in as well. The previous PEA only spoke to the oxide resource. It contemplated about a 7 mine life. We saw at least double that in the sulfide resource, but there was no mine plan for it. Sedgman and Mining Plus are working very hard to bring that into view. What’s going to happen, we’ll take that information and that will inform our next economic study to be done on the project. We will look at updating the preliminary economic assessment once we have all the results in both from the work that Sedgman and Mining Plus are doing, and of course, with an updated resource that is being currently worked on to bring both the tonnage and the mine plan and the processing plan all into one economic study.

Maurice:

Leaving the Carmacks project, sir, please provide us with an update on the capital structure for Granite Creek Copper.

Tim Johnson:

Granite Creek Copper has 127 million shares issued and outstanding. We’ve have warrants that are right at the strike price of the warrants, about $4.8 million in cash value of those warrants with the strike price at 20 cents. We see strength in the market moving into the fall, and we expect those warrants to assist the company in continuing on with our economic studies and upcoming programs. Meaning that we won’t be looking to conduct a dilutive financing in the near term. We expect strength in the copper market hopefully will allow us to delay any large financing for a while.

Maurice:

Before we close, Mr. Johnson, what would you like to say to shareholders?

Tim Johnson:

I think the copper space is an excellent space for speculative shareholders to be to be looking we think that the copper market is going to have strength moving through the remainder of this year and into next year.  We’ve got an excellent project with excellent exposure to copper and to precious metals as well in a very good jurisdiction. I think it’s worth adding granite creek copper to your watch list and making sure you follow along with our story.

Maurice: Last question sir what did i forget to ask?

Tim Johnson:

Well as usual Maurice, you did an excellent job.  I think the questions you asked are very good and I appreciate your time.

Maurice:

Thank you sir. Mr Johnson for someone that wants to get more information on granite creek copper please share the contact details.

Tim Johnson:

Please visit us at www.gcxcopper.com.

Maurice:

Mr. Johnson is always a pleasure to speak with you wishing you and Granite Creek Copper the absolute best sir.

And as a reminder, I am a licensed representative to buy and sell precious metals through Miles Franklin Precious Metals Investments, where we have several options to expand your precious metals portfolio, from physical delivery of gold, silver, platinum, palladium, and rhodium, to offshore depositories, and precious metals IRA’s. Give me a call at 855.505.1900 or you may email: Maurice@MilesFranklin.com.  Finally, please subscribe to www.provenandprobable.com, where we provide: Mining Insights and Bullion Sales, subscription is free.

Categories
Base Metals Breaking Energy Granite Creek Copper

Granite Creek Copper Intercepts 105 Meters of 1.18% Copper Equivalent Including 21.22 Meters of 2.55% CuEq at the Carmacks Copper-Gold-Silver Project in Yukon, Canada

VANCOUVER, BC / ACCESSWIRE / August 24, 2021 / Granite Creek Copper Ltd. (TSX.V:GCX)(OTCQB:GCXXF) (“Granite Creek” or the “Company“) is pleased to announce results from diamond drill hole CRM21-011 which intersected copper sulfide mineralization grading 1.18% CuEq (0.96% Cu, 0.01% Mo, 0.18 g/t Au, and 4.06 g/t Ag) over a 105.52-meter interval. The long interval included a high-grade intercept of 2.55% CuEq (2.17% Cu, 0.01% Mo, 0.36 g/t Au and 9.13 g/t Ag) over 21.22 meters (See table 1 below). Also, within the 105m interval, grades reached an impressive 19.72 CuEq (18.97% Cu, 0.46 g/t Au and 38.3 g/t Ag) in 0.5 meters of semi-massive chalcopyrite (see Photo 1 below).

Drill hole CRM21-011, along with four other drillholes from the 2021 Phase 1 program (see release dated July 22, 2021) have extended known mineralization in Zone 2000S from 30m to 100m below the current block model. The Company believes these results will add significant additional tonnage to an updated NI 43-101 mineral resource estimate currently being developed. The entire mineralized section encountered in CRM21-011 is outside the current block model, providing a greater than 100-meter potential expansion below the current resource area (see Figures 1 and 2 below).

Table 1 – Highlights from Diamond Drill hole CRM 21-011 and previous results from Zone 2000S

Drillhole 

 
From(m)To(m)Length*(m)Cu(%)Mo(%)Au(g/t)Ag(g/t)CuEq** (%)
Results from this release
CRM21-011223.98329.50105.520.960.010.184.061.18
Including223.98245.2021.222.170.010.369.132.55
and including260.32260.820.518.970.010.4638.319.72
Previously released results
CRM21-003146.35†214.5068.150.590.030.143.690.83
Including161.40179.8018.040.810.030.214.801.13
CRM21-005137.05179.8043.240.740.050.163.821.06
Including142.05158.4016.351.200.030.266.111.58
CRM21-006194.40278.2083.800.640.010.133.230.81
Including229.20278.20490.870.020.173.881.10
Including248.76266.2017.441.210.030.225.111.53
CRM21-008195.80228.4032.60.800.020.173.881.02
Including201.55215.55141.100.020.244.861.40
CRM21-009190.50243.8553.350.590.010.142.710.75
Including191.30201.7010.40.87BDL0.253.701.09
and including209.00225.9516.950.620.010.132.760.77
and Including229.90235.255.351.210.060.284.881.68

** Copper equivalent (Cu Eq) values assume Cu $3.35/lb, Au $1600/oz, Ag $24/oz, Mo $12/lb and 100% recovery. *Weighted average intercepts shown. Estimated true widths vary but, based on geological interpretation of cross-section, are estimated to be 50-70% of the intersected width. † Zone has poor recovery

President & CEO, Tim Johnson, commented, “The extent of high-grade mineralization in this drill hole, coupled with the clear potential for further expansion of the zone, indicates that, despite over 50,000 meters of historical drilling completed to date, tremendous exploration potential remains on the Carmacks project. All core samples from the remaining nine holes of the Phase 1 diamond drill program are currently at the lab for assay. The Company looks forward to releasing these results over the coming weeks as well as those from the Phase 2 reverse circulation program currently underway, and also the upcoming Phase 3 diamond drill program, as they become available.”

Zone 2000S

Zone 2000S, originally discovered in 2006 following an IP geophysical survey, has the potential to add resource tonnage in the sulfide domain. Located approximately 300 meters south of zones 1,4 & 7 the zone is cut off by a fault on the southern end. The north end of the 2000S zone may be the fault offset continuation of zone 4 or zone 7 and this theory will be drill tested in phase 3 of the company’s drill campaign. The mineral resource on this zone (shown in table 2)is based on a 0.25% sulphide copper grade cut-off for the sulphide resource and 0.15% acid soluble Cu cut-off in the oxide resource. Using the same copper equivalent calculation that the company used to report CuEq in this news release the sulfide resources in Zone 2000S would be 0.85% CuEq in the measured and indicated category and 0.89% in the inferred. With a significant portion of the 2021 drill intercepts grading higher than the current resource an updated resource estimate not only has the potential to add tonnage in this zone but also in increase in grade. 1Six diamond drillholes were completed on this zone in the first phase of drilling with the intent of evaluating the continuation of bornite-chalcopyrite mineralization down dip. Results from five of the six holes have been released (July 22, 2021 news release) with all five holes intercepting mineralization below the current resource model.

Table 2 – Zone 2000S current mineral resources1

CategoryTonnesCu (%)Acid soluble Cu (%)Sulphide Cu (%)Au (g/t)Ag (g/t)
Measure & IndicatedOxide899,0000.550.400.150.182.67
Inferred Oxide23,0000.560.370.180.172.80
Measure & IndicatedSulfide740,0000.700.070.630.173.28
Inferred Sulfide636,0000.730.050.680.183.50

1Mineral resource prepared by Dr. Gilles Arseneau, P.Geo., reported in JDS Energy and Mining Inc 2017 Ni 43-101 [1] JDS Energy and Mining. Feb 9, 2017. NI 43-101 Preliminary Economic Assessment Technical Report on the Carmacks Project, Yukon, Canada., with updated resource for Zones 2000S, 12 and 13 as reported in April 9, 2018 by Copper North Mining.

Photo 1: CRM 21-011 260.32m to 260.82m over 18.97% Cu

Figure 1: Cross Section of CRM21-011

Figure 2: Long section of Zone 2000S

Photo 2: CRM 21-011 231.35 to 233.35

Upcoming Events

Granite Creek Copper will be participating in the 2021 Yukon Exploration Investment Summit on Tuesday, August 31, at 10am PT, a live panel session with Q&A, hosted by Invest Yukon and moderated by Trevor Hall. Click here to register.

COVID-19 Protocols

Granite Creek has worked closely with the Yukon government to develop a COVID-19 safety plan that enables the Company to implement an effective work plan while maintaining the highest degree of safety of our workers and surrounding communities. The Company strictly adheres to mandates put in place by health authorities at the Federal and Territorial government level and hold the health and safety of our workers, and the citizens of the communities in which work in the highest regard.

[1] JDS Energy and Mining. Feb 9, 2017. NI 43-101 Preliminary Economic Assessment Technical Report on the Carmacks Project, Yukon, Canada. Contained metal based on 23.76 million tonnes of NI 43-101 compliant resources in the Measured and Indicated categories grading 0.85% Cu, 0.31 g/t Au, 3.14 g/t Ag.

[2] Arseneau Consulting Services, 2016 Independent Technical Report on the Carmacks Copper Project, Yukon, Canada.

About Granite Creek Copper

Granite Creek, a member of the Metallic Group of Companies, is a Canadian exploration company focused on the 176 square kilometer Carmacks project in the Minto copper district of Canada’s Yukon Territory. The project is on trend with the high-grade Minto copper-gold mine, operated by Minto Explorations Ltd, to the north and features excellent access to infrastructure with the nearby paved Yukon Highway 2, along with grid power within 12 km. More information about Granite Creek Copper can be viewed on the Company’s website at www.gcxcopper.com.

FOR FURTHER INFORMATION PLEASE CONTACT:

Timothy Johnson, President & CEO
Telephone: 1 (604) 235-1982
Toll Free: 1 (888) 361-3494
E-mail: info@gcxcopper.com
Website: www.gcxcopper.com

Qualified Person

Ms. Debbie James, P.Geo., a qualified person for the purposes of National Instrument 43-101, has reviewed and approved the technical disclosure contained in this news release.

Quality Control and Quality Assurance

Quality assurance and quality control procedures include the systematic insertion of duplicate, blank and standard samples, making up 12% of the sample stream. Drill core samples were sawn in half, labelled, placed in sealed bags and shipped directly to the Bureau Veritas preparation laboratory in Whitehorse. All geochemical analyses were performed by Bureau Veritas in Vancouver. Copper and silver analysis was performed by four-acid digestion with an ICP-ES finish. Non-sulphide copper was determined through a sulphuric acid leach with an AAS finish. Gold was analyzed by igniting a 15 g sample followed by an aqua regia digestion with an ICP-MS finish.

Forward-Looking Statements

This news release includes certain statements that may be deemed “forward-looking statements”. All statements in this release, other than statements of historical facts including, without limitation, statements regarding potential mineralization, historic production, estimation of mineral resources, the realization of mineral resource estimates, interpretation of prior exploration and potential exploration results, the timing and success of exploration activities generally, the timing and results of future resource estimates, permitting time lines, metal prices and currency exchange rates, availability of capital, government regulation of exploration operations, environmental risks, reclamation, title, and future plans and objectives of the company are forward-looking statements that involve various risks and uncertainties. Although Granite Creek Copper believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in the forward-looking statements. Forward-looking statements are based on a number of material factors and assumptions. Factors that could cause actual results to differ materially from those in forward-looking statements include failure to obtain necessary approvals, unsuccessful exploration results, changes in project parameters as plans continue to be refined, results of future resource estimates, future metal prices, availability of capital and financing on acceptable terms, general economic, market or business conditions, risks associated with regulatory changes, defects in title, availability of personnel, materials and equipment on a timely basis, accidents or equipment breakdowns, uninsured risks, delays in receiving government approvals, unanticipated environmental impacts on operations and costs to remedy same, and other exploration or other risks detailed herein and from time to time in the filings made by the companies with securities regulators. Readers are cautioned that mineral resources that are not mineral reserves do not have demonstrated economic viability. Mineral exploration and development of mines is an inherently risky business. Accordingly, the actual events may differ materially from those projected in the forward-looking statements. For more information on Granite Creek Copper and the risks and challenges of their businesses, investors should review their annual filings that are available at www.sedar.com.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

SOURCE: Granite Creek Copper Ltd.

Categories
Base Metals Energy Granite Creek Copper Junior Mining

Granite Creek Copper Reports First Results from Phase 1 of 2021 Drill Program, Including 43.50 Meters of 1.40 % Copper Equivalent, at the Carmacks Copper-Gold-Silver Project in Yukon, Canada

Thu, July 22, 2021, 8:00 AMIn this article:

Explore the topics mentioned in this articleMy WatchlistMy WatchlistView my watchlists

VANCOUVER, BC / ACCESSWIRE / July 22, 2021 / Granite Creek Copper Ltd. (TSX.V:GCX)(OTCQB:GCXXF) (“Granite Creek” or the “Company“) is pleased to announce the first tranche of assays from Phase 1 of the Company’s 2021 drilling program on its 100%-owned Carmacks project. This recently completed first phase consisted of nineteen diamond drill holes, totalling 6355 meters, focused on the existing resource area with the goals of strengthening confidence in the resource model, evaluating opportunities for resource expansion and/or upgrading the sulphide portion of Zones 1 and 2000S from an inferred to indicated resource, and evaluating continuity of mineralization in Zone 13 (Figure 1).

Granite Creek President & CEO, Tim Johnson, commented, “The Company is extremely pleased with the progress of 2021 exploration program at Carmacks. A Phase 3 drilling program is under development and projected to commence in mid-August of this year. The addition of this third stage would expand the overall 2021 campaign to include a total of 10,000 meters of diamond drilling as well as 3000m of reverse circulation drilling. We expect this program will significantly expand the total contained metal on the project, resulting in a substantially and form the basis for a new Preliminary Economic Assessment.”

Table 1 – Highlights from first tranche of 2021 Diamond Drill Assays at the Carmacks Project

Drillhole
From(m)To(m)Length*(m)Cu(%)Mo(%)Au(g/t)Ag(g/t)CuEq** (%)Zone
CRM21-004323.50367.0043.501.120.030.203.411.40Zone 1
Including338.50367.0028.501.570.040.294.531.96
and including352.00†367.0015.001.800.070.334.812.31
CRM21-007222.52223.704.080.910.010.196.321.13
CRM21-010450.00513.4063.400.27BDL0.081.310.35
Including450.00482.2532.250.30BDL0.081.410.39
Including478.32482.253.930.580.010.202.850.78
Including488.90513.4024.500.30BDL0.091.470.39
including502.90509.756.850.410.010.161.930.57
2000 S
CRM21-003146.35†214.5068.150.590.030.143.690.830
Including161.40179.8018.040.810.030.214.801.13
CRM21-005137.05179.8043.240.740.050.163.821.06
Including142.05158.4016.351.200.030.266.111.58
CRM21-006194.40278.2083.800.640.010.133.230.81
Including229.20278.20490.870.020.173.881.10
Including248.76266.2017.441.210.030.225.111.53
CRM21-008195.80228.4032.60.800.020.173.881.02
Including201.55215.55141.100.020.244.861.40
CRM21-009190.50243.8553.350.590.010.142.710.75
Including191.30201.7010.40.87BDL0.253.701.09
and including209.00225.9516.950.620.010.132.760.77
and Including229.90235.255.351.210.060.284.881.68
https://s.yimg.com/rq/darla/4-8-0/html/r-sf-flx.html

** Copper equivalent (Cu Eq) values assume Cu $3.35/lb, Au $1600/oz, Ag $24/oz, Mo $12/lb and 100% recovery. *Weighted average intercepts shown. Estimated true widths vary but, based on geological interpretation of cross-sections, are estimated to be typically 60-70% of the intersected widths. † Zone has poor recovery

Figure 1 – Carmacks Copper Project Plan View

Zone 1

Eight holes were drilled in Zone 1 with the objective of increasing confidence in the inferred portion of the sulfide resource of this zone as well as evaluating the southern down-dip continuation of the inferred resource (Figure 2). The drilling was successful in achieving its objectives of delineating the depth extent of mineralization, expanding the mineralization below the current resource model and confirming the grade and anticipated thickness in the inferred portion of the sulphide resource in this zone.

Table 2 – Zone 1 mineral resource[1]

CategoryTonnes (000’s)Cu (%)Acid soluble Cu (%)Sulphide Cu (%)Au (g/t)Ag (g/t)
Measure & IndicatedOxide11,980,0001.070.860.210.464.58
Inferred Oxide90,0000.730.530.20.131.81
Measure & IndicatedSulfide4,340,0000.750.030.720.222.33
Inferred Sulfide4,031,0000.710.010.70.181.90

1 Mineral resource prepared by Dr. Gilles Arseneau, P.Geo., reported in JDS Energy and Mining Inc 2017 Ni 43-101 [1] JDS Energy and Mining. Feb 9, 2017. NI 43-101 Preliminary Economic Assessment Technical Report on the Carmacks Project, Yukon, Canada., with updated resource for Zones 2000S, 12 and 13 as reported in April 9, 2018 by Copper North Mining.

While the Preliminary Economic Assessment (“PEA”) published in 2017(1,2) only looked at the oxide material in Zones 1,4 & 7, work being conducted by Sedgman and Mining Plus (see news release dated May 18, 2021) is looking at various scenarios to process the sulfide portion of Zone 1 and other sulfide zones of the deposit building a basis for an updated PEA that would include both oxide and sulfide ore.

Figure 2– Long section of Zone 1 looking west

Zone 2000S

Zone 2000S, originally discovered in 2006 as the result of an IP survey, has the potential to add tonnage in the sulfide domain of resource category. The mineral resource on this zone is shown in Table 3, which was based on a 0.25% total copper grade cut-off.Six diamond drillholes were drilled in this zone are part of the first phase of drilling with the intent of evaluating the continuation of bornite-chalcopyrite mineralization down dip. The drilling was very successful in not only confirming the continuation of the high grade bornite-chalcopyrite mineralization but also extending mineralization well below the current block model as well as encountering significant molybdenite mineralization A technical hole (CRM21-018) was drilled subparallel to the mineralization to evaluate the geological concept of a southern W-E striking fault which post-dates and offsets mineralization.

Table 3 – Zone 2000S mineral resources1

CategoryTonnes (000’s)Cu (%)Acid soluble Cu (%)Sulphide Cu (%)Au (g/t)Ag (g/t)
Measure & IndicatedOxide410,8780.640.490.140.233.15
Inferred Oxide266,8940.570.340.240.142.66
Measure & IndicatedSulfide740,0000.700.070.630.173.28
Inferred Sulfide636,0000.730.050.680.183.50

1Mineral resource prepared by Dr. Gilles Arseneau, P.Geo., reported in JDS Energy and Mining Inc 2017 Ni 43-101 [1] JDS Energy and Mining. Feb 9, 2017. NI 43-101 Preliminary Economic Assessment Technical Report on the Carmacks Project, Yukon, Canada., with updated resource for Zones 2000S, 12 and 13 as reported in April 9, 2018 by Copper North Mining.

Figure 3 – Long section of 2000S

Zone 13

Three diamond drill holes were completed in Zone 13 with the intent of evaluating the northern continuity of sulfide mineralization, along strike and to infill an open area of the block model. Within 1000m of Zone 1, Zone 13 has the potential to add both oxide and sulfide resources to an updated mine plan. The sulfide portion remains open along strike and at depth. All assay results from Zone 13 are pending.

COVID-19 Protocols

Granite Creek has worked closely with the Yukon government to develop a COVID-19 safety plan that enables the Company to implement an effective work plan while maintaining the highest degree of safety of our workers and surrounding communities. The Company strictly adheres to mandates put in place by health authorities at the Federal and Territorial government level and hold the health and safety of our workers, and the citizens of the communities in which work in the highest regard.

[1] JDS Energy and Mining. Feb 9, 2017. NI 43-101 Preliminary Economic Assessment Technical Report on the Carmacks Project, Yukon, Canada. Contained metal based on 23.76 million tonnes of NI 43-101 compliant resources in the Measured and Indicated categories grading 0.85% Cu, 0.31 g/t Au, 3.14 g/t Ag.

[2] Arseneau Consulting Services, 2016 Independent Technical Report on the Carmacks Copper Project, Yukon, Canada.

About Granite Creek Copper

Granite Creek, a member of the Metallic Group of Companies, is a Canadian exploration company focused on the 176 square kilometer Carmacks project in the Minto copper district of Canada’s Yukon Territory. The project is on trend with the high-grade Minto copper-gold mine, operated by Minto Explorations Ltd, to the north and features excellent access to infrastructure with the nearby paved Yukon Highway 2, along with grid power within 12 km. More information about Granite Creek Copper can be viewed on the Company’s website at www.gcxcopper.com.

FOR FURTHER INFORMATION PLEASE CONTACT:

Timothy Johnson, President & CEO
Telephone: 1 (604) 235-1982
Toll Free: 1 (888) 361-3494
E-mail: info@gcxcopper.com
Website: www.gcxcopper.com

Qualified Person

Ms. Debbie James, P.Geo., a qualified person for the purposes of National Instrument 43-101, has reviewed and approved the technical disclosure contained in this news release.

Quality Control and Quality Assurance

Quality assurance and quality control procedures include the systematic insertion of duplicate, blank and standard samples, making up 12% of the sample stream. Drill core samples were sawn in half, labelled, placed in sealed bags and shipped directly to the Bureau Veritas preparation laboratory in Whitehorse. All geochemical analyses were performed by Bureau Veritas in Vancouver. Copper and silver analysis was performed by four-acid digestion with an ICP-ES finish. Non-sulphide copper was determined through a sulphuric acid leach with an AAS finish. Gold was analyzed by igniting a 15 g sample followed by an aqua regia digestion with an ICP-MS finish.

Forward-Looking Statements

This news release includes certain statements that may be deemed “forward-looking statements”. All statements in this release, other than statements of historical facts including, without limitation, statements regarding potential mineralization, historic production, estimation of mineral resources, the realization of mineral resource estimates, interpretation of prior exploration and potential exploration results, the timing and success of exploration activities generally, the timing and results of future resource estimates, permitting time lines, metal prices and currency exchange rates, availability of capital, government regulation of exploration operations, environmental risks, reclamation, title, and future plans and objectives of the company are forward-looking statements that involve various risks and uncertainties. Although Granite Creek Copper believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in the forward-looking statements. Forward-looking statements are based on a number of material factors and assumptions. Factors that could cause actual results to differ materially from those in forward-looking statements include failure to obtain necessary approvals, unsuccessful exploration results, changes in project parameters as plans continue to be refined, results of future resource estimates, future metal prices, availability of capital and financing on acceptable terms, general economic, market or business conditions, risks associated with regulatory changes, defects in title, availability of personnel, materials and equipment on a timely basis, accidents or equipment breakdowns, uninsured risks, delays in receiving government approvals, unanticipated environmental impacts on operations and costs to remedy same, and other exploration or other risks detailed herein and from time to time in the filings made by the companies with securities regulators. Readers are cautioned that mineral resources that are not mineral reserves do not have demonstrated economic viability. Mineral exploration and development of mines is an inherently risky business. Accordingly, the actual events may differ materially from those projected in the forward-looking statements. For more information on Granite Creek Copper and the risks and challenges of their businesses, investors should review their annual filings that are available at www.sedar.com.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

SOURCE: Granite Creek Copper Ltd.

Categories
Base Metals Energy Granite Creek Copper Junior Mining

Granite Creek Copper Completes IP Survey and Launches Phase 2 of Expanded Drill Program at Carmacks Copper-Gold Project in Yukon, Canada

July 14, 2021

Vancouver, B.C., Granite Creek Copper Ltd. (TSX.V: GCX | OTCQB: GCXXF) (“Granite Creek” or the “Company”) is pleased to announce that Simcoe Geophysics has completed a 20.8 line kilometer (“km”) induced polarization (IP) survey on the Company’s Carmacks North target area. Preliminary results from the survey have identified several near surface chargeability anomalies that have been prioritized as trenching and reverse circulation (“RC”) drill targets for Phase 2 of the 2021 season. 

Granite Creek further announces the completion of Phase 1 of its 2021 drilling program, which consisted of 19 holes totalling 6355 meters of diamond drilling on Zones 1, 2000S and 13 of the Carmacks deposit. The first tranche of assays from Phase 1 are expected very soon and will be released in batches as received and reviewed by the Company. With this initial stage of drilling completed, Vision Quest Exploration, based in Whitehorse, Yukon, has mobilized a reverse circulation (“RC”) drill rig to the property and commenced Phase 2 drilling which is expected to consist of approximately 3000 meters. 

Given the early start to the 2021 field season and encouraging early indications of success, Granite Creek has made the decision to expand the previously defined 10,000-meter program by adding a third phase which is expected to add an additional 2700 meters of diamond drilling to the overall program. Launch date for Phase 3 is tentatively targeted for early September, with potential to bring that forward to late August. The Company will provide further guidance in this regard in the ensuing weeks.

Granite Creek President & CEO, Tim Johnson, commented, “We are extraordinarily pleased with the progress we have made to date in advancing the Carmacks project. It is a testament to the strength and dedication of our team that we have been able to maintain a very aggressive pace as we move towards an updated 43-101 resource estimate and subsequent economic assessment. This drill campaign has been a showcase of professionalism from our site teams and contractors, and we are very much looking forward to carrying that momentum ahead through Phase 2 and the newly announced Phase 3. In total, we are now expecting to complete over 13,000 meters of drilling, data from which will be incorporated into the new resource update being targeted for Q4.”

Carmacks North Target Area

The Carmacks North Target area is comprised of Zones A-D, as well as additional targets currently being developed. Prior to the Granite Creek’s inaugural drill program completed last fall (see news release dated Feb 11, 2021), little work had been completed on the area since 1980. Historical high-grade copper intercepts of up to 2.52% Cu, 1.64 g/t Au, 12.84 g/t Ag over 19.81 meters were successfully followed up with intercepts of 4.31% Cu, 3.41 g/t Au, 23.78 Ag over 4.36 meters and 0.97% Cu, 0.32 g/t Au, 2.84 g/t Ag over 25 meters. Recognizing the discovery potential in the target area the Company is pleased to deploy modern, advanced exploration tools such as the Alpha Induced Polarization survey employed by Simcoe Geophysics. Capable of measuring the chargeability and resistivity of the rock up to 1000m below the surface these types of surveys greatly improves the chance of success with drilling. The use of a rapidly deployable drill rig such as the RC rig being supplied by Vision Quest along with excavator trenching allows for testing of multiple high priority targets during a single field season. 

OTCQB Metals and Mining Virtual Conference 

Granite Creek Copper will be presenting at the upcoming Green Energy and Precious Metals Investor Conference hosted by OTC Markets on July 29 at 1:30pm ET. President & CEO, Tim Johnson, will provide a comprehensive overview of the Company, including an update on 2021 exploration activities to date and upcoming newsflow. To register, click here

COVID-19 Protocols

Granite Creek has worked closely with the Yukon government to develop a COVID-19 safety plan that enables the Company to implement an effective work plan while maintaining the highest degree of safety of our workers and surrounding communities. The Company strictly adheres to mandates put in place by health authorities at the Federal and Territorial government level and holds the health and safety of our workers, and the citizens of the communities in which we work, in the highest regard. 

Figure 1: Oblique view of the UBC 2D DCIP inversion sections of the chargeability from 20.8 km of IP collected by Simcoe Geophysics over Carmacks North

Figure 2: 2D IP chargeability model of Line 3

About Granite Creek Copper

Granite Creek, a member of the Metallic Group of Companies, is a Canadian exploration company focused on the 176 square kilometer Carmacks project in the Minto copper district of Canada’s Yukon Territory. The project is on trend with the high-grade Minto copper-gold mine, operated by Minto Explorations Ltd, to the north and features excellent access to infrastructure with the nearby paved Yukon Highway 2, along with grid power within 12 km. More information about Granite Creek Copper can be viewed on the Company’s website at www.gcxcopper.com.

FOR FURTHER INFORMATION PLEASE CONTACT:

Timothy Johnson, President & CEO
Telephone:         1 (604) 235-1982
Toll Free:             1 (888) 361-3494
E-mail:       info@gcxcopper.com
Website:    www.gcxcopper.com
Metallic Group:  www.metallicgroup.ca   

Qualified Person

Ms. Debbie James, P.Geo., a qualified person for the purposes of National Instrument 43-101, has reviewed and approved the technical disclosure contained in this news release.

Forward-Looking Statements
This news release includes certain statements that may be deemed “forward-looking statements”. All statements in this release, other than statements of historical facts including, without limitation, statements regarding potential mineralization, historic production, estimation of mineral resources, the realization of mineral resource estimates, interpretation of prior exploration and potential exploration results, the timing and success of exploration activities generally, the timing and results of future resource estimates, permitting time lines, metal prices and currency exchange rates, availability of capital, government regulation of exploration operations, environmental risks, reclamation, title, and future plans and objectives of the company are forward-looking statements that involve various risks and uncertainties. Although Granite Creek Copper believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in the forward-looking statements. Forward-looking statements are based on a number of material factors and assumptions. Factors that could cause actual results to differ materially from those in forward-looking statements include failure to obtain necessary approvals, unsuccessful exploration results, changes in project parameters as plans continue to be refined, results of future resource esti-mates, future metal prices, availability of capital and financing on acceptable terms, general economic, market or business conditions, risks associated with regulatory changes, defects in title, availability of personnel, materials and equipment on a timely basis, accidents or equipment breakdowns, uninsured risks, delays in receiving government approvals, unanticipated environmental impacts on operations and costs to remedy same, and other exploration or other risks detailed herein and from time to time in the filings made by the companies with securities regulators. Readers are cautioned that mineral resources that are not mineral reserves do not have demonstrated economic viability. Mineral exploration and development of mines is an inherently risky business. Accordingly, the actual events may differ materially from those projected in the forward-looking statements. For more infor-mation on Granite Creek Copper and the risks and challenges of their businesses, investors should review their annual filings that are available at www.sedar.com.


Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Categories
Base Metals Energy Exclusive Interviews Junior Mining

GRANITE CREEK COPPER | Our Deposits Contain Oxide and Sulphide Cu


Transcript

Proven and Probable

https://youtu.be/zX9l_VVa8wg

ABOUT GRANITE CREEK COPPER
Granite Creek Copper is a Canadian junior mining, exploration company focused on the advancement of its 100%-owned Stu Copper-Gold project located in the Yukon’s Minto Copper District. This 115-square-kilometer property is between, and on trend with, Pembridge Resources’ high-grade Minto Copper-Gold Mine and, to the south, the Carmacks Copper-Gold-Silver project held by Copper North of which Granite Creek holds a 30% interest. The Stu project has excellent access to infrastructure with the nearby paved Yukon Highway 2, along with grid power within 12 km.

Granite Creek Copper: (TSX.V: GCX | OTC: GCXXF)
Website: https://www.gcxcopper.com/
Corporate Presentation: https://bit.ly/3gL3H8j
Granite Creek Copper
Suite 904-409 Granville Street
Vancouver, BC Canada V6C 1T2
Phone : 604-235-1982
TF: 888-361-3494
Email: info@gcxcopper.com

Website| www.provenandprobable.com
Call me directly at 855.505.1900 or email: Maurice@MilesFranklin.com
Precious Metals FAQ – https://www.milesfranklin.com/faq-maurice/

Proven and Probable
Where we deliver Mining Insights & Bullion Sales. I’m a licensed broker for Miles Franklin Precious Metals Investments (https://www.milesfranklin.com/contact/) Where we provide unlimited options to expand your precious metals portfolio, from physical delivery, offshore depositories, and precious metals IRA’s. Call me directly at (855) 505-1900 or you may email maurice@milesfranklin.com.

Proven and Probable provides insights on mining companies, junior miners, gold mining stocks, uranium, silver, platinum, zinc & copper mining stocks, silver and gold bullion in Canada, the US, Australia, and beyond.