Categories
Base Metals Collective Mining Energy Junior Mining Precious Metals

Collective Mining Step-Out Drilling Confirms a Significant Southern Zone of Near Surface High-Grade Mineralization Including 32 Metres at 10.48 g/t Gold Equivalent

Drill hole APC-29 intercepted the highest grade near-surface copper-silver-gold mineralization encountered to date at the Main Breccia system at the Apollo target (“Apollo”) yielding 32 metres @ 10.48 g/t gold equivalent from 80 metres vertical. This hole was designed to test directly below where the Main Breccia system daylights at surface in the southern part of the system and to follow up on recently announced results for hole APC-22, which intersected 47.25 metres @ 5.45 g/t gold equivalent (see press release dated January 11, 2023). Further down-hole in APC-29, a broad zone of mineralization was encountered averaging 214.4 metres @ 1.04 g/t gold equivalent. APC-29 had to be abandoned short of target depth due to a fault while still in mineralization with the final 0.5 metre sample assaying 1.72 g/t gold, 39 g/t silver and 0.1% copper.

Drill hole APC-25 was designed as a step out hole along strike of the near surface high-grade zone of mineralization and intersected 106.85 metres @ 2.31 g/t gold equivalent starting at 65 metres vertical below surface. As a result, APC-25 has confirmed a shallow, westward expansion to the Main Breccia system and an apparent thickening to the high-grade near surface mineralized zone as the system is traced to the west.

Hole APC-26 was drilled to the northeast from Pad 4 and confirmed continuity of mineralization in that direction returning 136.9 metres @ 1.51 g/t gold equivalent contained within 311.2 metres at 1.04 g/t gold.

The phase II drilling program is underway with three rigs currently operating focused on testing near surface mineralization and expanding the dimensions of the Main Breccia system. Assay results are expected in the near term for the final three holes of the 2022 program, including westwards step-out hole APC-28, which cut more than 600 metres of continuous mineralization. Additionally, the first hole of the Phase II program is now complete, and core has been dispatched to the lab for assaying.

Ari Sussman, Executive Chairman commented: “Not only is the Main Breccia system at Apollo a large, bulk tonnage deposit but it now appears to host an outcropping and shallow zone of high-grade mineralization, which clearly enhances the value of this exciting discovery. Based on surface sampling, the system appears to daylight over an area measuring approximately 150 metres in diameter and remains open for expansion. The Main Breccia system is truly evolving into a brand-new world-class discovery right in the heart of a prolific mining camp with continuous precious metal production dating back more than 500 years.”

TORONTO, Jan. 31, 2023 /CNW/ – Collective Mining Ltd. (TSXV: CNL) (OTCQX: CNLMF) (“Collective” or the “Company”) is pleased to announce assay results from a further three holes drilled into the Main Breccia discovery at the Apollo target (“Apollo”), which is part of the Guayabales project located in Caldas, Colombia. The Main Breccia discovery is a high-grade, bulk tonnage copper-silver-gold porphyry-related system, which owes its excellent metal endowment to multiple phases of mineralization which includes older copper-silver-gold porphyry mineralization and younger, overprinting, precious metal rich sheeted carbonate base metal vein systems.

Details (See Table 1 and Figures 1–6)

Assay results for twenty-eight diamond drill holes have now been announced at Apollo with results for additional holes expected in the near term. This press release announces results of three diamond drill holes with results summarized below.

APC-25 was drilled to the northwest from Pad 3 to a maximum depth of 215.80 metres and intersected a shallow, western extension to the Main Breccia discovery averaging:

  • 106.85 metres @ 2.31 g/t gold equivalent consisting of 0.81 g/t Au, 30 g/t Ag, 0.62% Cu and 30 ppm Mo beginning at 73 metres downhole (65 metres vertical).

The mineralized angular breccia of this intercept contains a sulphide matrix which includes 1.5% to 2.5% chalcopyrite and between 1% and 3% pyrite plus pyrrhotite. The breccia has been overprinted by a zone of carbonate and base metal (sphalerite and galena) veins, which host higher gold grades and returned an interval of 14 metres grading 3.65 g/t gold equivalent. APC-25 is the westernmost hole drilled into the Main Breccia discovery and demonstrates that the mineralization is open and is thickening in this direction. Drill holes have been designed to continue to step-out to the west to expand upon this high grade and near surface mineralization.

APC-26 was drilled northeast from pad 4 and confirms continuity within the Northern Extension Zone of the Main Breccia system, as previously defined in holes APC-17 and APC-22. The hole was drilled to a maximum downhole length of 813.7 metres and intercepted:

  • 311.2 metres @ 1.04 g/t gold equivalent consisting of 0.74 g/t Au, 16 g/t Ag, 0.05% Cu and 10 ppm Mo from 415 metres down hole.

Gold and silver mineralization relates to sulphides hosted within the angular breccia matrix including pyrite (1%-3%), pyrrhotite (1%-2%) and chalcopyrite (0.5%-1%). A higher-grade sub-zone was encountered within the mineralized intercept averaging 136.9 metres at 1.51 g/t gold equivalent and is characterized by an increase in overprinting low and intermediate sulphidation, carbonate base metal (“CBM”) vein material including visible sphalerite and galena.

APC-29 was drilled to the north-northeast from Pad 3 to a maximum depth of 644.8 metres and intercepted three mineralized zones before the hole was abandoned short of target depth due to a complicated fault structure. The two shallow zones within this hole are located directly beneath mineralized surface outcrops with the initial 32.0 metre intercept of mineralization beginning at 111.3 metres downhole (80 metres vertical), and the second 8.65 metre mineralized zone starting at 194.8 metres downhole (143 metres vertical). These high-grade gold, silver, and copper shallow zones of mineralization are hosted within a matrix of angular quartz diorite breccia with the sulphide component consisting of chalcopyrite (0.5%-2%), pyrite (0.5%-2%) and pyrrhotite (0.5-1%). Finally, the third zone, which starts at 343.8 metres downhole (318 metres vertical) intersected more 301 metres of continuous mineralization including a higher-grade subzone over 214.4 metres. The sulphide mineralization within the breccia matrix of this intercept contained pyrrhotite (0.5%-2.5%), pyrite (1%-3%) and multiple zones of sheeted CBM vein material, which are predominantly sphalerite rich with minor galena. The following intercepts are summarized from APC-29:

  • 32.00 metres @ 10.48 g/t gold equivalent consisting of 9.23 g/t Au, 60 g/t Ag, 0.44% Cu and 30 ppm Mo from 89.25 metres downhole (80 metres vertical depth).
  • 8.65 metres @ 2.26 g/t gold equivalent consisting of 0.57 g/t Au, 82 g/t Ag, 0.27% Cu and 10 ppm Mo from 194.80 metres downhole (143 metres vertical depth).
  • 214.40 metres @ 1.04 gold equivalent consisting of 0.77 g/t Au, 14 g/t Ag, 0.05% Cu and 10 ppm Mo from 343.80 metres downhole (318 metres vertical depth), which includes 98.20 metres @ 1.26 g/t gold equivalent.

The Company’s Phase II, 2023 program is well underway with two rigs focused on drilling near surface, high grade mineralization below mineralized outcrops in the southern and central areas of the Main Breccia system while simultaneously targeting expansion to the overall dimensions of the system to the west, northwest, north and northeast. Furthermore, a new drill pad (pad 8) has been constructed 150 south of the southernmost modelled boundary of the Main Breccia system at Apollo and reconnaissance drilling is underway to test a recently discovered porphyry target.

The Apollo target area, as defined to date by surface mapping, rock sampling and copper and molybdenum soil geochemistry, covers a 1,000 metres X 1,200 metres area. The Apollo target area hosts the Company’s Main Breccia discovery and multiple additional untested breccia, porphyry and vein targets. The overall Apollo target area also remains open for further expansion.

Table 1: Apollo Target Assays Results for Holes APC-25, APC-26 and APC-29

HoleIDFrom
(m)
To
 (m)
Intercept
(m)
Au
(g/t)
Ag
(g/t)
Cu
%
Mo
%
AuEq(g/t) *CuEq(%) *
APC-2573.00179.85106.850.81300.620.0032.311.26
Incl.111.00125.0014.002.00350.750.0053.652.00
APC-26415.00726.20311.200.74160.050.0011.04
incl.415.00551.90136.901.14200.060.0011.51
APC-29111.30143.3032.009.23600.440.00310.48
and194.80203.458.650.57820.270.0012.26
and343.80644.80301.000.63140.050.0010.90
Incl.343.80558.20214.400.77140.050.0011.04
Incl.460.00558.2098.201.26150.040.0011.51
* AuEq (g/t) is calculated as follows: (Au (g/t) x 0.95) + (Ag g/t x 0.016 x 0.95) + (Cu (%) x 1.83 x 0.95)+ (Mo (%)*9.14 x 0.95) and CuEq (%) is calculated as follows:  (Cu (%) x 0.95) + (Au (g/t) x 0.51 x 0.95) + (Ag (g/t) x 0.01 x 0.95)+ (Mo(%)x 3.75 x 0.95) utilizing metal prices of Cu – US$4.00/lb, Ag – $24/oz Mo US$20.00/lb and Au – US$1,500/oz and recovery rates of 95% for Au, Ag, Mo and Cu. Recovery rate assumptions are speculative as no metallurgical work has been completed to date.
** A 0.2 g/t AuEq cut-off grade was employed with no more than 15% internal dilution. True widths are unknown, and grades are uncut.
Figure 1: Plan View of the Main Breccia System at Apollo Highlighting Drill Holes APC-25, APC-26 and APC-29 (CNW Group/Collective Mining Ltd.)
Figure 1: Plan View of the Main Breccia System at Apollo Highlighting Drill Holes APC-25, APC-26 and APC-29 (CNW Group/Collective Mining Ltd.)
Figure 2: Up Close View of Drill Holes Intersecting the Shallow, High-Grade Southern Zone Within the Main Breccia System at Apollo (CNW Group/Collective Mining Ltd.)
Figure 2: Up Close View of Drill Holes Intersecting the Shallow, High-Grade Southern Zone Within the Main Breccia System at Apollo (CNW Group/Collective Mining Ltd.)
Figure 3: Plan View of the Guayabales Project Highlighting the Apollo Target (CNW Group/Collective Mining Ltd.)
Figure 3: Plan View of the Guayabales Project Highlighting the Apollo Target (CNW Group/Collective Mining Ltd.)
Figure 4: Core Photo Highlights from Drill Hole APC-25 (CNW Group/Collective Mining Ltd.)
Figure 4: Core Photo Highlights from Drill Hole APC-25 (CNW Group/Collective Mining Ltd.)
Figure 5: Core Photo Highlights from Drill Hole APC-26 (CNW Group/Collective Mining Ltd.)
Figure 5: Core Photo Highlights from Drill Hole APC-26 (CNW Group/Collective Mining Ltd.)
Figure 6: Core Photo Highlights from Drill Hole APC-29 (CNW Group/Collective Mining Ltd.)
Figure 6: Core Photo Highlights from Drill Hole APC-29 (CNW Group/Collective Mining Ltd.)

About Collective Mining Ltd.

To see our latest corporate presentation and related information, please visit www.collectivemining.com

Founded by the team that developed and sold Continental Gold Inc. to Zijin Mining for approximately $2 billion in enterprise value, Collective Mining is a copper, silver and gold exploration company based in Canada, with projects in Caldas, Colombia. The Company has options to acquire 100% interests in two projects located directly within an established mining camp with ten fully permitted and operating mines.

The Company’s flagship project, Guayabales, is anchored by the Apollo target, which hosts the large-scale, bulk-tonnage and high-grade copper, silver and gold Main Breccia discovery. The Company’s near-term objective is to continue with expansion drilling of the Main Breccia discovery while increasing confidence in the highest-grade portions of the system.

Management, insiders and close family and friends own nearly 35% of the outstanding shares of the Company and as a result, are fully aligned with shareholders. The Company is listed on the TSXV under the trading symbol “CNL” and on the OTCQX under the trading symbol “CNLMF”.

Qualified Person (QP) and NI43-101 Disclosure

David J Reading is the designated Qualified Person for this news release within the meaning of National Instrument 43-101 (“NI 43-101”) and has reviewed and verified that the technical information contained herein is accurate and approves of the written disclosure of same. Mr. Reading has an MSc in Economic Geology and is a Fellow of the Institute of Materials, Minerals and Mining and of the Society of Economic Geology (SEG).

Technical Information

Rock and core samples have been prepared and analyzed at SGS laboratory facilities in Medellin, Colombia and Lima, Peru. Blanks, duplicates, and certified reference standards are inserted into the sample stream to monitor laboratory performance. Crush rejects and pulps are kept and stored in a secured storage facility for future assay verification. No capping has been applied to sample composites. The Company utilizes a rigorous, industry-standard QA/QC program.

Information Contact:

Follow Executive Chairman Ari Sussman (@Ariski) and Collective Mining (@CollectiveMini1) on Twitter

FORWARD-LOOKING STATEMENTS

This news release contains certain forward-looking statements, including, but not limited to, statements about the drill programs, including timing of results, and Collective’s future and intentions. Wherever possible, words such as “may”, “will”, “should”, “could”, “expect”, “plan”, “intend”, “anticipate”, “believe”, “estimate”, “predict” or “potential” or the negative or other variations of these words, or similar words or phrases, have been used to identify these forward-looking statements. These statements reflect management’s current beliefs and are based on information currently available to management as at the date hereof.

Forward-looking statements involve significant risk, uncertainties, and assumptions. Many factors could cause actual results, performance, or achievements to differ materially from the results discussed or implied in the forward-looking statements. These factors should be considered carefully, and readers should not place undue reliance on the forward-looking statements. Although the forward-looking statements contained in this news release are based upon what management believes to be reasonable assumptions, Collective cannot assure readers that actual results will be consistent with these forward-looking statements. These forward-looking statements are made as of the date of this news release, and Collective assumes no obligation to update or revise them to reflect new events or circumstances, except as required by law.

Neither the TSXV nor its Regulation Services Provider (as that term is defined in the policies of the TSXV) accepts responsibility for the adequacy or accuracy of this news release.

SOURCE Collective Mining Ltd.

Categories
Gold Shore Resources Junior Mining Precious Metals

Goldshore Announces Private Placement of up to $1 Million

Vancouver, British Columbia–(Newsfile Corp. – December 23, 2022) – Goldshore Resources Inc. (TSXV: GSHR) (OTCQB: GSHRF) (FSE: 8X00) (“Goldshore” or the “Company“) is pleased to announce a non-brokered private placement of up to 4,000,000 units (each, a “Unit”) at a price of $0.25 per Unit for gross proceeds of up to $1,000,000 (the “Financing”). Each Unit issued in connection with the Financing is comprised of one common share of the Company (each, a “Common Share”) and one-half common share purchase warrant (each whole warrant, a “Warrant”). Each Warrant shall entitle the holder thereof to purchase one Common Share at an exercise price of $0.40 at any time up to 24 months from the closing of the Offering.

The Company intends to use the proceeds raised from the Financing for future exploration work on its Moss Lake gold deposit in Northwest Ontario, Canada and for general working capital purposes.

The securities issued pursuant to the Financing will be subject to a four-month and one day hold period under applicable securities laws in Canada. Closing of the Financing is subject to approval by the TSX Venture Exchange.

This press release is not an offer to sell or the solicitation of an offer to buy the securities in the United States or in any jurisdiction in which such offer, solicitation or sale would be unlawful prior to qualification or registration under the securities laws of such jurisdiction. The securities being offered have not been, nor will they be, registered under the United States Securities Act of 1933, as amended (the “U.S. Securities Act“) or any U.S. state securities laws, and such securities may not be offered or sold within the United States or to, or for the account or benefit of, U.S. persons absent registration or an applicable exemption from registration requirements of the U.S. Securities Act and applicable U.S. state securities laws.

About Goldshore

Goldshore is an emerging junior gold development company, and owns the Moss Lake Gold Project located in Ontario. Wesdome Gold Mines Ltd. is currently a large shareholder of Goldshore with an approximate 23% equity position in the Company. Well-financed and supported by an industry-leading management group, board of directors and advisory board, Goldshore is positioned to advance the Moss Lake Gold Project through the next stages of exploration and development.

For More Information – Please Contact:

Brett A. Richards
President, Chief Executive Officer and Director
Goldshore Resources Inc.

P. +1 604 288 4416 M. +1 905 449 1500
E. brichards@goldshoreresources.com
W. www.goldshoreresources.com

Facebook: GoldShoreRes | Twitter: GoldShoreRes | LinkedIn: goldshoreres

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Cautionary Note Regarding Forward-Looking Statements

This news release contains “forward-looking information” within the meaning of applicable Canadian securities legislation. “Forward-looking information” includes, but is not limited to, statements with respect to the activities, events or developments that the Company expects or anticipates will or may occur in the future, including the expectation that the Offering will close in the timeframe and on the terms as anticipated by management. Generally, but not always, forward-looking information and statements can be identified by the use of words such as “plans”, “expects”, “is expected”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates”, or “believes” or the negative connotation thereof or variations of such words and phrases or state that certain actions, events or results “may”, “could”, “would”, “might” or “will be taken”, “occur” or “be achieved” or the negative connation thereof. These forward‐looking statements or information relate to, among other things: closing of the Financing and the timing thereof; receipt of approvals required to close the Financing; and the intended use of proceeds from the Financing.

Such forward-looking information and statements are based on numerous assumptions, including among others, that the Company will complete Offering in the timeframe and on the terms as anticipated by management. Although the assumptions made by the Company in providing forward-looking information or making forward-looking statements are considered reasonable by management at the time, there can be no assurance that such assumptions will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements.

Important factors that could cause actual results to differ materially from the Company’s plans or expectations include risks relating to the failure to complete the Offering in the timeframe and on the terms as anticipated by management, market conditions and timeliness regulatory approvals. Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in the forward-looking information or implied by forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking information and statements will prove to be accurate, as actual results and future events could differ materially from those anticipated, estimated or intended. Accordingly, readers should not place undue reliance on forward-looking statements or information.

NOT FOR DISTRIBUTION TO U.S. NEWSWIRE SERVICES OR DISSEMINATION IN THE UNITED STATES

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/149314

Categories
Junior Mining Labrador Gold Precious Metals

Labrador Gold Raises $3.88 Million From Exercise of Share Purchase Warrants

Labrador Gold, Proven and Probable

TORONTO, June 29, 2022 (GLOBE NEWSWIRE) — Labrador Gold Corp. (TSX.V:LAB | OTCQX:NKOSF | FNR: 2N6) (“LabGold” or the “Company”) is pleased to announce that it has raised $3,885,285.90 from the recent exercise of share purchase warrants (the “warrants”) with a strike price of $0.175 and $0.30. The warrant exercise increases the Company’s cash position to $26.5 million. Management and directors of Labrador Gold were among those exercising warrants.

“The funds brought in by the exercise of the warrants adds to an already robust treasury and allows us to continue our ongoing exploration of the 12km strike length of the Appleton Fault Zone at our 100% owned Kingsway Project,” said Roger Moss, President and CEO. “The hard work of the LabGold team over the past two years has resulted in the generation and successful drilling of four out of four gold targets. This demonstrates both the ability of our people on the ground as well as the prospectivity of the Kingsway project, and the Appleton Fault Zone in particular. We look forward to another exciting summer of discovery as we prove up more targets in the pipeline and get them ready for drilling.”

Exploration Update

Drilling continues at Kingsway with four drill rigs. Two rigs are working at Big Vein, one testing the down plunge extension of the high-grade HTC Zone below 250m, and the other testing the southwest extension of the Big Vein Zone. A third rig continues to test the Golden Glove target while the fourth rig tests the CSAMT target approximately eight kilometres northeast of Big Vein. The CSAMT target was generated from geophysical (controlled source audio magnetotellurics, magnetics and VLF-EM) and geochemical (gold in soil, rock and till) anomalies and is in an area of structural complexity. Both the Golden Glove and CSAMT targets occur on the east side of the Appleton Fault Zone. Approximately 44% of the 100,000 metre planned program has been completed to date.

Qualified Person

Roger Moss, PhD., P.Geo., President and CEO of LabGold, a Qualified Person in accordance with Canadian regulatory requirements as set out in NI 43-101, has read and approved the scientific and technical information that forms the basis for the disclosure contained in this release.

The Company gratefully acknowledges the Newfoundland and Labrador Ministry of Natural Resources’ Junior Exploration Assistance (JEA) Program for its financial support for exploration of the Kingsway property.

About Labrador Gold
Labrador Gold is a Canadian based mineral exploration company focused on the acquisition and exploration of prospective gold projects in Eastern Canada.

In early 2020, Labrador Gold acquired the option to earn a 100% interest in the Kingsway project in the Gander area of Newfoundland. The three licenses comprising the Kingsway project cover approximately 12km of the Appleton Fault Zone which is associated with gold occurrences in the region, including those of New Found Gold immediately to the south of Kingsway. Infrastructure in the area is excellent located just 18km from the town of Gander with road access to the project, nearby electricity and abundant local water. LabGold is drilling a projected 50,000 metres targeting high-grade epizonal gold mineralization along the Appleton Fault Zone following encouraging early results. The Company has approximately $26.5 million in working capital and is well funded to carry out the planned program.

The Hopedale property covers much of the Florence Lake greenstone belts that stretches over 60 km. The belt is typical of greenstone belts around the world but has been underexplored by comparison. Work to date by Labrador Gold show gold anomalies in rocks, soils and lake sediments over a 3 kilometre section of the northern portion of the Florence Lake greenstone belt in the vicinity of the known Thurber Dog gold showing where grab samples assayed up to 7.8g/t gold. In addition, anomalous gold in soil and lake sediment samples occur over approximately 40 km along the southern section of the greenstone belt (see news release dated January 25th 2018 for more details). Labrador Gold now controls approximately 40km strike length of the Florence Lake Greenstone Belt.

The Company has 168,889,979 common shares issued and outstanding and trades on the TSX Venture Exchange under the symbol LAB.

For more information please contact:

Roger Moss, President and CEO      Tel: 416-704-8291

Or visit our website at: www.labradorgold.com

Twitter @LabGoldCorp

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Forward-Looking Statements: This news release contains forward-looking statements that involve risks and uncertainties, which may cause actual results to differ materially from the statements made. When used in this document, the words “may”, “would”, “could”, “will”, “intend”, “plan”, “anticipate”, “believe”, “estimate”, “expect” and similar expressions are intended to identify forward-looking statements. Such statements reflect our current views with respect to future events and are subject to risks and uncertainties. Many factors could cause our actual results to differ materially from the statements made, including those factors discussed in filings made by us with the Canadian securities regulatory authorities. Should one or more of these risks and uncertainties, such as actual results of current exploration programs, the general risks associated with the mining industry, the price of gold and other metals, currency and interest rate fluctuations, increased competition and general economic and market factors, occur or should assumptions underlying the forward looking statements prove incorrect, actual results may vary materially from those described herein as intended, planned, anticipated, or expected. We do not intend and do not assume any obligation to update these forward-looking statements, except as required by law. Shareholders are cautioned not to put undue reliance on such forward-looking statements.

Categories
Base Metals Energy Junior Mining Noram Lithium

Noram Receives Results for CVZ-75 & 76: High-Grade Intercepts of 150 Ft (45.7 M) Averaging 962 PPM, & 100 Ft (30.5 M) Averaging 1163 PPM Respectively

VANCOUVER, BC / ACCESSWIRE / June 2, 2022 / Sandy MacDougall, CEO of Noram Lithium Corp. (“Noram” or the “Company“) (TSXV:NRM)(OTCQB:NRVTF)(Frankfurt:N7R) is pleased to announce the successful completion of CVZ-75 (PH-01) and CVZ-76 (PH-02) and release of the final assay results. The Company completed core hole CVZ-75 at a depth of 326 feet (99.4 m). Sampling for assays began at 46 ft (14.0 m) and continued to the bottom of the hole, an interval thickness of 150 ft (45.7 m) was intersected from 46 ft (14.0 m) to 196 ft (59.7 m). The hole ended in mineralization and the weighted average lithium values present are summarized below. The Company completed core hole CVZ-76 at a depth of 338 feet (103.0 m). Sampling for assays began at 26 ft (7.9 m) and continued to the bottom of the hole, an interval thickness of 100 ft (30.5 m) was intersected from 26 ft (7.9 m) to 126 ft (38.4 m). The hole ended in mineralization and the weighted average lithium values present are summarized below.

Noram Ventures Inc., Thursday, June 2, 2022, Press release picture
Noram Ventures Inc., Thursday, June 2, 2022, Press release picture
Noram Ventures Inc., Thursday, June 2, 2022, Press release picture
Noram Ventures Inc., Thursday, June 2, 2022, Press release picture

Figure 1 – Location of all past drill holes (Phase I to Phase V) previously completed in addition to the 12 proposed holes for Phase V1. Phase VI holes are indicated in purple.

Noram Ventures Inc., Thursday, June 2, 2022, Press release picture
Noram Ventures Inc., Thursday, June 2, 2022, Press release picture

Figure 2 – Comparative stratigraphy and assay results for drill holes CVZ-76 and CVZ-75 as compared to CVZ-63 which was drilled as part of a prior program. The histogram on the sides of the holes are the composited lithium grades in ppm Li. The cross section has a 4X vertical exaggeration.

“Holes CVZ-75 and CVZ-76 were located near the northeast end of the Phase V and Phase VI drilling. This is an area where the sediments are thinner since we are getting close to the basin margin. However, the lithium grades continue to be high. These holes are expected to continue to upgrade portions of the Zeus resource from inferred to indicated in Noram’s upcoming PFS.” comments Brad Peek, VP of Exploration and geologist on all six phases of Noram’s Clayton Valley exploration drilling.

Hole IDSample No.From (ft)To (ft)From (m)To (m)Li (ppm)
CVZ-751748394465614.017.11690
CVZ-751748395566617.120.1890
CVZ-751748396667620.123.2840
CVZ-751748397768623.226.2910
CVZ-751748398869626.229.31420
CVZ-7517483999610629.332.31160
CVZ-75174840010611632.335.41010
CVZ-75174840111612635.438.4900
CVZ-75174840212613638.441.5870
CVZ-75174840413614641.544.5850
CVZ-75174840514615644.547.5820
CVZ-75174840615616647.550.6810
CVZ-75174840716617650.653.6620
CVZ-75174840817618653.656.7510
CVZ-75174840918619656.759.71130
CVZ-75174841019620659.762.8800
CVZ-75174841120621662.865.8560
CVZ-75174841221622665.868.9650
CVZ-75174841322623668.971.9680
CVZ-75174841423624671.975.0510
CVZ-75174841524625675.078.0650
CVZ-75174841625626678.081.1570
CVZ-75174841726627681.184.1770
CVZ-75174841827628684.187.2570
CVZ-75174841928629687.290.2510
CVZ-75174842029630690.293.3770
CVZ-75174842130631693.396.3470
CVZ-75174842231632696.399.4600

Table 1 – Sample results from CVZ-75 from 46 ft (14.0 m) to depth of 326 ft (99.4 m).

Hole IDSample No.From (ft)To (ft)From (m)To (m)Li (ppm)
CVZ-76174842626367.911.01320
CVZ-761748427364611.014.01620
CVZ-761748428465614.017.11620
CVZ-761748429566617.120.1970
CVZ-761748430667620.123.2830
CVZ-761748431768623.226.2910
CVZ-761748432869626.229.31460
CVZ-7617484339610629.332.31070
CVZ-76174843410611632.335.4930
CVZ-76174843511612635.438.4900
CVZ-76174843612613638.441.5780
CVZ-76174843713614641.544.5710
CVZ-76174843814615644.547.5670
CVZ-76174843915616847.551.2720
CVZ-76No Sample16817851.254.3
CVZ-76174844017818854.357.3460
CVZ-76174844118819857.360.4840
CVZ-76174844219820860.463.4700
CVZ-76174844320821863.466.4740
CVZ-76174844421822866.469.5720
CVZ-76174844522823869.572.5710
CVZ-76174844623824872.575.6520
CVZ-76174844724825875.678.6680
CVZ-76174844825826878.681.7640
CVZ-76174844926827881.784.7640
CVZ-76174845027828884.787.8590
CVZ-76174845128829887.890.8590
CVZ-76174845229830890.893.9449
CVZ-76174845330831893.996.9610
CVZ-76174845431832896.9100.0560
CVZ-761748455328338100.0103.0470

Table 2 – Sample results from CVZ-76 from 26 ft (7.9 m) to depth of 338 ft (103.0 m).

All samples were analyzed by the ALS laboratory in Reno, Nevada. QA/QC samples were included in the sample batch and returned values that were within their expected ranges.

The technical information contained in this news release has been reviewed and approved by Brad Peek., M.Sc., CPG, who is a Qualified Person with respect to Noram’s Clayton Valley Lithium Project as defined under National Instrument 43-101.

About Noram Lithium Corp.

Noram Lithium Corp. (TSXV:NRM | OTCQB:NRVTF | Frankfurt:N7R) is a well-financed Canadian based advanced Lithium development stage company with less than 90 million shares issued and a fully funded treasury. Noram is aggressively advancing its Zeus Lithium Project in Nevada from the development-stage level through the completion of a Pre-Feasibility Study in 2022.

The Company’s flagship asset is the Zeus Lithium Project (“Zeus”), located in Clayton Valley, Nevada. The Zeus Project contains a current 43-101 measured and indicated resource estimate* of 363 million tonnes grading 923 ppm lithium, and an inferred resource of 827 million tonnes grading 884 ppm lithium utilizing a 400 ppm Li cut-off. In December 2021, a robust PEA** indicated an After-Tax NPV(8) of US$1.3 Billion and IRR of 31% using US$9,500/tonne Lithium Carbonate Equivalent (LCE). Using the LCE long term forecast of US$14,000/tonne, the PEA indicates an NPV (8%) of approximately US$2.6 Billion and an IRR of 52% at US$14,000/tonne LCE.

Please visit our web site for further information: www.noramlithiumcorp.com.

ON BEHALF OF THE BOARD OF DIRECTORS

Sandy MacDougall
Chief Executive Officer and Director
C: 778.999.2159

For additional information please contact:

Peter A. Ball
President and Chief Operating Officer
peter@noramlithiumcorp.com
C: 778.344.4653

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. This news release may contain forward-looking information which is not comprised of historical facts. Forward-looking information involves risks, uncertainties and other factors that could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. Forward-looking information in this news release includes statements regarding, among other things, the completion transactions completed in the Agreement. Factors that could cause actual results to differ materially from such forward-looking information include, but are not limited to, regulatory approval processes. Although Noram believes that the assumptions used in preparing the forward-looking information in this news release are reasonable, including that all necessary regulatory approvals will be obtained in a timely manner, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. Noram disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by applicable securities laws. *Updated Lithium Mineral Resource Estimate, Zeus Project, Clayton Valley, Esmeralda County, Nevada, USA (August 2021) **Preliminary Economic Assessment Zeus Project, ABH Engineering (December 2021).

SOURCE: Noram Ventures Inc.



View source version on accesswire.com:
https://www.accesswire.com/703581/Noram-Receives-Results-for-CVZ-75-76-High-Grade-Intercepts-of-150-Ft-457-M-Averaging-962-PPM-100-Ft-305-M-Averaging-1163-PPM-Respectively

Categories
Precious Metals

Gold Needs to “Glow Up”


Click here

As of August 24, gold bullion1 has gained 27.13% YTD and 39.74% YOY. Gold mining equities (SGDM)2 are up 38.85% YTD and 61.54% YOY. This compares to 7.55% YTD and 11.96% YOY returns for the S&P 500 TR Index.3  Silver has posted outsized gains, climbing 49.03% YTD and 50.00% YOY.

Delivered to You

855.505.1900 | Maurice@MilesFranklin.com

Click Here