Categories
Base Metals Energy Junior Mining

Cortadera North Flank Delivers High Grade Extensions – 82m at 1.0% CuEq & 168m at 1.0% CuEq

Hot Chili Limited (ASX: HCH) (OTCQB: HHLKF) (“Hot Chili” or “Company”) is pleased to announce that recent drill results from its Cortadera copper-gold discovery in Chile continue to add significant resource growth from extensional drilling, as the Company’s Costa Fuego coastal copper development draws ever-closer toward Tier-1 status.
Highlights

  • Hot Chili has recorded further strong extensional results from the Cortadera, demonstrating continued expansion of high grade resources (+1% CuEq) across the northern flank (North Flank) of the main porphyry (Cuerpo 3)
  • CRP0124D returned a broad intersection of 362m grading 0.6% CuEq (0.5% copper (Cu), 0.2g/t gold (Au)) from 480m depth down-hole, including 82m grading 1.0% CuEq (0.7% Cu, 0.3g/t Au) from 634m depth
  • Final assays from CRP0088D have significantly upgraded the initial result (reported to ASX 16th June, 2021) to 486m grading 0.6% CuEq (0.5% Cu, 0.2g/t Au) from 426m depth down-hole, including 168m grading 1.0% CuEq (0.8% Cu, 0.3g/t Au) from 682m depth
  • High Grade (+1% CuEq) mineralisation shows strong continuity across the North Flank over 400m of strike length with further extensions expected (assay results for CRP0134D pending)
  • Successful drill testing of additional open flanks at Cuerpo 2, results pending for five drill holes which have visually recorded wide intersections of strong porphyry mineralisation from surface
  • Three drill rigs in operation, 6,302m of assay results pending from 27 drill holes, assay turnaround currently 44 days

To access the announcement please click on the link below.

Download full announcement here

CRP00124D (702m depth down-hole) – 1.0% copper, 0.5g/t gold, 2.2g/t silver and 49 ppm molybdenum.  Early-stage porphyry, sericite-chlorite-albite alteration with 11% A-B vein abundance

Cortadera Copper Project

Cortadera’s maiden Mineral Resource positions Hot Chili with the largest copper Mineral Resource and one of the largest gold Mineral Resources for an ASX-listed emerging company. 

The Cortadera maiden Mineral Resource of 451Mt at 0.46% copper equivalent (CuEq) takes the total Mineral Resource estimate for Costa Fuego (Cortadera, Productora & El Fuego) to 724Mt at 0.48% CuEq for 2.9Mt copper, 2.7Moz gold, 9.9Moz Silver and 64kt molybdenum. Cortadera also contains a higher grade component of 104Mt at 0.74% CuEq, and this has strong potential to continue growing rapidly with further drilling.

View the Cortadera Project


  Tweet 
  Share   Forward 

Hot Chili Limited
Head Office (Perth)
First Floor, 768 Canning Highway,
Applecross, Western Australia 6153

P: 08 9315 9009
Categories
Junior Mining Precious Metals

Rover Metals Announces Cabin Gold Property Exploration Update, NWT, Canada

VANCOUVER, British Columbia, Sept. 09, 2021 (GLOBE NEWSWIRE) — Rover Metals Corp. (TSXV: ROVR) (OTCQB: ROVMF) (FRA:4X0) (“Rover” or the “Company”) is pleased to announce that the drilling component of its Phase 2 Exploration Program at its 100% owned Cabin Gold Project, Northwest Territories of Canada (60th parallel), is now complete. The Company drilled 31 NQ diamond drill holes across multiple near-surface targets along the Bugow Iron Formation. The Company has successfully intersected the targeted historic sulfidized zones, as well as some new conceptual targets. The Company plans to release the drill results zone by zone, once the assay results from the lab become available. The last part of the Phase 2 Exploration Program, a Ground IP Geophysics Study, is set to commence at the end of September 2021.

Ground IP Geophysics Study

The Company ran a ground IP test at the end of August and the results have come back favorable both in terms of: (a) identifying sulfidized versus non-sulfidized areas of the Bugow Iron Formation; and also (b) in terms of returning highly sulfidized areas versus lower sulfidized areas. High-grade gold at the Cabin Gold project is associated with highly sulfidized zones of the hosted iron formation. The favorable test results have led to the Company planning a large IP survey, including all of the known gold bearing zones on the project, in addition to some new anomaly targets. A link to the plan view of the IP survey can be found here:

https://www.rovermetals.com/landingpages/cabingold2021-nr-9-9-2021.html

The zones targeted for IP work includes the Arrow Zone that reported 32 meters of 13.6 g/t Au in Q4-2021. A successful IP program at the project will assist the Company in delineating deeper drill targets for a Phase 3 Drill Program in Q1 of 2022.

Regional LiDAR and Airborne Geophysics Work

The Company is also pleased to report that it has now completed a regional LiDAR imaging study as well as a regional airborne magnetic survey. The LiDAR and airborne magnetic campaigns have opened up other iron formations in the region for future exploration, including at the Slemon Gold project. The results of these campaigns will also help the Company in the planning of its Phase 3 Drill Program in Q1 of 2022. Results from the regional LiDAR and airborne magnetic campaigns will be made available in the coming weeks.

Judson Culter, CEO at Rover Metals, states “We are very fortunate to have been able to complete a multi-faceted exploration program at Cabin Gold this summer. The final leg of the exploration will commence at the end of the month, and will set the stage for deeper drilling of all defined gold bearing zones in Q1-2022. The goal of this program was to define at least one new additional zone open at depth. We believe we have accomplished this goal, and the results will be made available in the coming weeks. As it stands, the Arrow Zone discovery that we made in Q4-2020 remains open at depth, and that will be our first drill target for Q1-2022.”

Technical information in this news release has been approved by Raul Sanabria, M.Sc., P.Geo., Technical Advisor and shareholder of Rover Metals Corp. and a Qualified Person for the purposes of National Instrument 43-101.

About Rover Metals

Rover is a precious metals exploration company specialized in North American precious metal resources, that is currently advancing the gold potential of its existing projects in the Northwest Territories of Canada (60th parallel). The Company commenced Phase 2 Exploration at its Cabin Gold Project in the summer of 2021.

You can follow Rover on its social media channels:
Twitter: https://twitter.com/rovermetals
LinkedIn: https://www.linkedin.com/company/rover-metals/
Facebook: https://www.facebook.com/RoverMetals/
for daily company updates and industry news, and
YouTube: https://www.youtube.com/channel/UCJsHsfag1GFyp4aLW5Ye-YQ?view_as=subscriber
for corporate videos.
Website: https://www.rovermetals.com/

ON BEHALF OF THE BOARD OF DIRECTORS
“Judson Culter”
Chief Executive Officer and Director

For further information, please contact:
Email: info@rovermetals.com
Phone: +1 (778) 754-2617

Statement Regarding Forward-Looking Information

This news release contains statements that constitute “forward-looking statements.” Such forward-looking statements involve known and unknown risks, uncertainties and other factors that may cause Rover’s actual results, performance or achievements, or developments in the industry to differ materially from the anticipated results, performance or achievements expressed or implied by such forward-looking statements. Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by the words “expects,” “plans,” “anticipates,” “believes,” “intends,” “estimates,” “projects,” “potential” and similar expressions, or that events or conditions “will,” “would,” “may,” “could” or “should” occur. There can be no assurance that such statements be prove to be accurate. Actual results and future events could differ materially from those anticipated in such statements, and readers are cautioned not to place undue reliance on these forward-looking statements. Any factor could cause actual results to differ materially from Rover’s expectations. Rover undertakes no obligation to update these forward-looking statements in the event that management’s beliefs, estimates or opinions, or other factors, should change.

THE FORWARD-LOOKING INFORMATION CONTAINED IN THIS NEWS RELEASE REPRESENTS THE EXPECTATIONS OF THE COMPANY AS OF THE DATE OF THIS NEWS RELEASE AND, ACCORDINGLY, IS SUBJECT TO CHANGE AFTER SUCH DATE. READERS SHOULD NOT PLACE UNDUE IMPORTANCE ON FORWARD-LOOKING INFORMATION AND SHOULD NOT RELY UPON THIS INFORMATION AS OF ANY OTHER DATE. WHILE THE COMPANY MAY ELECT TO, IT DOES NOT UNDERTAKE TO UPDATE THIS INFORMATION AT ANY PARTICULAR TIME EXCEPT AS REQUIRED IN ACCORDANCE WITH APPLICABLE LAWS.

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OF THIS RELEASE.

Categories
Junior Mining Precious Metals

Lakewood Exploration Reports High Grade Surface Samples, Including 1540 g/t Silver and 6.88% Copper; and 1410 g/t Silver 5.41% Copper at Eliza Silver Project in Nevada

Table 1

Table 1.  Complete Sample Table
Table 1. Complete Sample Table
Table 1. Complete Sample Table

Figure 1

Figure 1. Area Map: Near Historic California mine.
Figure 1. Area Map: Near Historic California mine.
Figure 1. Area Map: Near Historic California mine.

Figure 2

Figure 2. Sample From Eliza Property ERZ 008
Figure 2. Sample From Eliza Property ERZ 008
Figure 2. Sample From Eliza Property ERZ 008

Figure 3

Figure 3. Sample from Eliza Property ER 007
Figure 3. Sample from Eliza Property ER 007
Figure 3. Sample from Eliza Property ER 007

VANCOUVER, British Columbia, Sept. 09, 2021 (GLOBE NEWSWIRE) — Lakewood Exploration (CSE: LWD / OTC: LWDEF) (“Lakewood” or the “Company”) is pleased to report high grade surface samples from the Company’s recently acquired Eliza Silver project in Nevada.

A total of 11 samples were collected from the Eliza claim block in an area adjacent to the past-producing California Mine, from which a nearly 25,000 g/t silver sample was collected from surface in 1965, but never followed up.

Highlights from the sampling program include:

  • 1,540 grams per tonne (g/t) Silver (Ag), 6.88% copper (Cu), 4.57% lead (Pb), 7.38% zinc (Zn) ( See Figure 2.)
  • 1,410 g/t Ag, 0.23 g/t Au, 5.41% Cu, 9.05% Pb, 26% Zn (See Figure 3.)

“We are very pleased with these initial results from our first field program at the newly acquired Eliza Project, which has never before been explored using modern exploration technology or approaches,” stated President, Morgan Lekstrom. “To obtain excellent silver, copper, lead and zinc values from this initial sampling demonstrates the potential for significant mineralization across our property. We will use this information in addition to more detailed surface work, which is currently underway, to define drill targets later this year.”

Qualified Person

Technical aspects of this press release have been reviewed and approved under the supervision of Philip Mulholland, P.Geo. Mr. Mulholland is a Qualified Person (QP) under National Instrument 43-101 Standards of Disclosure for Mineral Projects.

About Lakewood Exploration Inc.

Lakewood Exploration Inc. is a junior resource company advancing the past-producing Silver Strand Mine in the Coeur d’Alene Mining District in Idaho, USA, both the Eliza Silver Project and the Silverton Silver Mine in one of the world’s most prolific mining jurisdictions in Nevada and the Lacy Gold Project in British Columbia, Canada. The Company is rapidly advancing towards an initial drill program at Silver Strand with the aim of defining a large silver resource within a belt that has produced more than 1.2 billion ounces of silver to-date. Geologic studies indicate that the Silver Strand Mine is hosted by the Revett formation, suggesting the potential for significant down dip extensions as demonstrated by other major mines in the district. Previous operators were solely interested in developing the known shallow mineralization, with the mine’s lowest level extending only 90 meters below surface. Lakewood strives to become a multi-mine silver producer.

*Mineralization hosted on adjacent and/or nearby properties is not necessarily indicative of mineralization hosted on the Company’s property.

On Behalf of the Board of Lakewood Exploration Inc.

Morgan Lekstrom, President

Corporate Office: 551 Howe Street, Vancouver, British Columbia V6C 2C2, Canada
Contact: Kristina Pillon, President, High Tide Consulting Corp.
604.908.1695 / investors@silverhammermining.com

The CSE does not accept responsibility for the adequacy or accuracy of this release.

The Canadian Securities Exchange has not in any way passed upon the merits of the Proposed Transaction and has neither approved nor disapproved the contents of this press release.

Photos accompanying this announcement are available at:

https://www.globenewswire.com/NewsRoom/AttachmentNg/e451ffbe-ab35-4f7f-9085-3a08fc2071a4
https://www.globenewswire.com/NewsRoom/AttachmentNg/920dac62-ddf8-419c-ade2-73985b56de17
https://www.globenewswire.com/NewsRoom/AttachmentNg/57bdd380-2466-4b4d-85e3-c98734d72e46
https://www.globenewswire.com/NewsRoom/AttachmentNg/3b751c60-b7f4-48bd-8d94-7beac1887592
Categories
Base Metals Junior Mining Precious Metals Project Generators

Vox Royalty | Construction Contract Awarded for Mt Ida Gold Project

TORONTO, Sept. 9, 2021 /CNW/ – Vox Royalty Corp. (TSXV: VOX) (OTCQX: VOXCF) (“Vox” or the “Company“), a high growth precious metals focused royalty company, is pleased to share a recent construction update from its royalty operating partners Aurenne Group Pty Ltd (“Aurenne“) and engineering firm GR Engineering Services Ltd (ASX: GRE) (“GR Engineering“), announced by GR Engineering on September 3, 2021.

Vox Royalty Logo (CNW Group/Vox Royalty Corp.)
Vox Royalty Logo (CNW Group/Vox Royalty Corp.)

Riaan Esterhuizen, Executive Vice President – Australia stated, “The construction contract award milestone for Mt Ida demonstrates Vox’s ability to identify and acquire royalties that are on the cusp of construction. Including Mt Ida, Vox management expects Vox will hold ten producing royalty assets by the end of 2023(1). We are excited to share further development milestones with Vox shareholders over the coming quarters.”

Mt Ida (Feasibility) – A$73M Construction Contract Awarded

  • Vox holds a 1.5% net smelter return royalty subsequent to the first 10,000 ounces of cumulative gold production over part of the Mt Ida project;
  • On September 3, 2021, GR Engineering announced that:
  • Vox acquired the Mt Ida royalty from hearing aid technology company Nuheara Limited (ASX: NUH) in May 2020 for US$200,000; and
  • Aurenne acquired Alt Resources Limited (“Alt Resources“) in Q4 2020 for A$40M and as a result assumed operatorship of the Mt Ida project.

Mt Ida Project Overview(2)

  • On July 10, 2020 Alt Resources released a pre-feasibility study on the Mt Ida project which outlined the following:
  • Vox’s royalty covers the Tim’s Find, Boudie Rat, Forrest Belle, Boudie West, Belvidere, Quinn’s Hills, Matisse and Spotted Dog deposits, covering a total resource base2 of approximately 1.64Mt @ 2.28g/t for 120,000 royalty-attributable ounces based on the 3 April 2020 Mineral Resource Estimate of the Mt Ida project and Vox management’s analysis and expectations.
  • Vox management expects first production at Mt Ida in 2023.

Qualified Person

Timothy J. Strong, MIMMM, of Kangari Consulting LLC and a “Qualified Person” under National Instrument 43-101 – Standards of Disclosure for Mineral Projects, has reviewed and approved the scientific and technical disclosure contained in this press release.

About Vox

Vox is a high growth precious metals royalty and streaming company with a portfolio of over 50 royalties and streams spanning eight jurisdictions. The Company was established in 2014 and has since built unique intellectual property, a technically focused transactional team and a global sourcing network which has allowed Vox to become the fastest growing company in the royalty sector. Since the beginning of 2019, Vox has announced over 20 separate transactions to acquire over 45 royalties.

Further information on Vox can be found at www.voxroyalty.com.

Cautionary Note Regarding Forward Looking Information

This news release contains certain forward-looking statements. Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance (often, but not always, using words or phrases such as “expects” or “does not expect”, “is expected”, “anticipates” or “does not anticipate” “plans”, “estimates” or “intends” or stating that certain actions, events or results ” may”, “could”, “would”, “might” or “will” be taken, occur or be achieved) are not statements of historical fact and may be “forward-looking statements”.

The forward-looking statements and information in this press release include, but are not limited to, summaries of operator updates provided by management and the potential impact on the Company of such operator updates, statements regarding expectations for the timing of commencement of resource production from various mining projects, expectations regarding the size, quality and exploitability of the resources at various mining projects, future operations and work programs of Vox’s mining operator partners, the receipt of future royalty payments derived from various royalty assets of Vox, anticipated future cash flows and future financial reporting by Vox and requirements for regulatory approvals.

Forward-looking statements and information are based on forecasts of future results, estimates of amounts not yet determinable and assumptions that, while believed by management to be reasonable, are inherently subject to significant business, economic and competitive uncertainties and contingencies. Forward-looking statements and information are subject to various known and unknown risks and uncertainties, many of which are beyond the ability of Vox to control or predict, that may cause Vox’s actual results, performance or achievements to be materially different from those expressed or implied thereby, and are developed based on assumptions about such risks, uncertainties and other factors set out herein, including but not limited to: the requirement for regulatory approvals and third party consents, the impact of general business and economic conditions, the absence of control over the mining operations from which Vox will receive royalties, including risks related to international operations, government relations and environmental regulation, the inherent risks involved in the exploration and development of mineral properties; the uncertainties involved in interpreting exploration data; the potential for delays in exploration or development activities; the geology, grade and continuity of mineral deposits; the impact of the COVID-19 pandemic; the possibility that future exploration, development or mining results will not be consistent with Vox’s expectations; accidents, equipment breakdowns, title matters, labor disputes or other unanticipated difficulties or interruptions in operations; fluctuating metal prices; unanticipated costs and expenses; uncertainties relating to the availability and costs of financing needed in the future; the inherent uncertainty of production and cost estimates and the potential for unexpected costs and expenses, commodity price fluctuations; currency fluctuations; regulatory restrictions, including environmental regulatory restrictions; liability, competition, loss of key employees and other related risks and uncertainties.

Vox has assumed that the material factors referred to in the previous paragraph will not cause such forward looking statements and information to differ materially from actual results or events. However, the list of these factors is not exhaustive and is subject to change and there can be no assurance that such assumptions will reflect the actual outcome of such items or factors. The forward-looking information contained in this press release represents the expectations of Vox as of the date of this press release and, accordingly, is subject to change after such date. Readers should not place undue importance on forward looking information and should not rely upon this information as of any other date. While Vox may elect to, it does not undertake to update this information at any particular time except as required in accordance with applicable laws.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Technical and Third-Party Information

Except where otherwise stated, the disclosure in this press release is based on information publicly disclosed by project operators based on the information/data available in the public domain as at the date hereof and none of this information has been independently verified by Vox. Specifically, as a royalty investor, Vox has limited, if any, access to the royalty operations. Although Vox does not have any knowledge that such information may not be accurate, there can be no assurance that such information from the project operators is complete or accurate. Some information publicly reported by the project operators may relate to a larger property than the area covered by Vox’s royalty interests. Vox’s royalty interests often cover less than 100% and sometimes only a portion of the publicly reported mineral reserves, mineral resources and production of a property.

References & Notes:
(1)Vox has five producing assets as of the date of this release (Segilola, Higginsville, Koolyanobbing, Brauna and Janet Ivy), and based on third-party development and construction announcements and Vox management expectations, Vox anticipates that each of its Bulong, Otto Bore, Pitombeiras, Mt Ida and Brits royalties will also be in production by the end of 2023. See slide 14 of Vox’s corporate presentation.
(2)The 3 April 2020 Mineral Resource Estimate of the Mt Ida Project, as reported in the Alt Resources Target Statement dated 17 July 2020 (link below), is the responsibility of Mr. Stephen Hyland, a Competent Person and Fellow of the AusIMM and a Qualified Person as defined by NI 43-101 guidelines, Principal Consultant Geologist with Hyland Geological and Mining Consultants (HGMC), who is a fellow of the Australian Institute of Mining and Metallurgy, contracted by Alt Resources Limited. This mineral resource estimate is compliant with the Joint Ore Reserves Committee (JORC) Code, 2012 Edition.
a. https://www.asx.com.au/asxpdf/20200717/pdf/44kmdtpsd45wjw.pdf

SOURCE Vox Royalty Corp.

Cision
Cision

View original content to download multimedia: http://www.newswire.ca/en/releases/archive/September2021/09/c2224.html

Categories
Junior Mining Precious Metals

Accelerated Near-Mine Exploration Program Underway at Novo’s Nullagine Gold Project

HIGHLIGHTS
 

  • Novo’s board of directors has approved an additional A$2.5M exploration budget to accelerate drilling of high-priority near-mine targets in the Mosquito Creek Basin which hosts the Nullagine gold project (the “ NGP ”) and the Golden Eagle processing facility.
  • A program of over 25,000 metres of reverse circulation (“ RC ”) drilling is in progress across several priority basement targets.
  • Novo’s exploration team has recently identified high priority drill targets including the Parnell-Vulture prospect. Significant results have been returned from mapping, rock chip and soil sampling programs, including a very large 1.5 km long, up to 500 m wide zone dominated by soil samples grading 100 ppb Au or better. These results are not necessarily representative of mineralization at the site.
  • The near-mine geology team has been expanded to accelerate near-mine exploration.
  • In addition, historical data from previous targets and mined open pits across the Mosquito Creek Basin is being re-analysed to determine further targets for potential feed for the Golden Eagle processing facility.
     

VANCOUVER, British Columbia, Sept. 08, 2021 (GLOBE NEWSWIRE) — Novo Resources Corp. “Novo” or the “Company” ) (TSX: NVO, NVO.WT & NVO.WT.A) (OTCQX: NSRPF) is pleased to provide an update on near-mine exploration programs focussing on exploration opportunities at its highly prospective 100% controlled NGP.

Near-Mine Exploration

Novo’s aggressive 2021 exploration continues with Novo’s board of directors approving additional funding of up to A$2.5M to support near-mine exploration. This is in addition to the A$12 million approved in June 2021 for exploration across Novo’s tenements in 2021 ( refer to the Company’s news release dated June 3, 2021 ). The goal of this program is to accelerate the delineation of targets in the Mosquito Creek Basin that have the potential to provide additional oxide mill feed to the NGP’s Golden Eagle processing facility .

Planned RC drilling of at least 25,000 m across multiple priority basement targets has commenced and is scheduled to be completed prior to year-end. Over 20 high priority orogenic gold drill targets ( Figure 1 ) have been identified within trucking distance of the Golden Eagle processing facility. Priority targets include Genne and Parnell-Vulture, both located on granted mining leases.

At the Parnell prospect (M46/527), a series of robust, coherent gold anomalies were recently returned from soil sampling, confirming targets highlighted during the June mapping program ( Figure 2 ). Of particular note is a very large 1.5 km long, up to 500 m wide zone dominated by soil samples grading 100 ppb Au or better and peaking at 7.8 g/t Au. Significant rock chip samples up to 14.6 g/t Au were also returned from Parnell-Vulture, again highlighting the presence of high-grade gold targets in this region. Although these results are not necessarily representative of mineralization at the site, they further confirm prospectivity of this area and drill planning for both prospects is currently underway as part of the current near-mine exploration program.

Figure 1 is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/2e3d54f5-bdfe-44c2-b9c0-7e0685a12a8a

Figure 2 is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/99127b4e-3d90-4272-93ac-eca62785fb38

As part of the current near-mine exploration program, historical data from previous targets and mined open pits across the Mosquito Creek Basin is being re-analysed. With Novo’s extensive knowledge of the Mosquito Creek Basin, further targets for potential mill feed for the Golden Eagle processing facility are being assessed. This work may result in further areas for priority drill testing.

Talga Talga Drilling and Bulk Sampling

Novo recently completed a maiden 1,830 m, 34-hole RC drill program at its 100%-controlled Talga Talga gold project ( Figure 3 ) approximately 110 km north of the NGP and adjacent to the road that extends southward to the Golden Eagle processing facility. This property hosts a series of orogenic lode deposits hosted by greenstone that is part of the plus 3.0-billion-year-old basement rock of the Pilbara. Dips of the lodes are reasonably shallow and follow topography, making them well suited for open cast excavation. Assays results from the drilling program are expected in October 2021.

Figure 3 is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/fe415d91-d9f2-49ca-9af8-bd4aba7f758d

Talga Talga has the potential to be brought into the NGP as a satellite deposit. Part of the Company’s strategy is to trial bulk samples of mineralized material from Talga Talga through its mechanical sorter. In preparation for these trials, five, approximately 5-tonne bulk samples have been excavated from various lodes across the project and have been delivered to Golden Eagle to be included in the mechanical test work program to commence in October 2021.

Mechanical Sorting Trial Samples

In preparation for mechanical sorting trials that begin in October 2021, bulk samples stored at Karratha and Egina from previous sampling programs have been delivered to Golden Eagle. Karratha test material includes unprocessed bulk samples collected in 2018. Egina bulk sample material includes some 60 tonnes of gold-bearing gravels collected from large scale bulk sampling pits along the test swale on M46/560, the focus of exploration work in 2019. Novo expects to have results from testing on these samples and others including those from Talga Talga by the end of 2021.

Analytic Protocols

All soils and rock chips from Parnell and Vulture were submitted to Intertek Laboratories in Perth, Australia. Rock chips were assayed for FA gold (FA50/OE04) and 4-Acid Digest ME (4A/MS48). Soils will be assayed for Aqua Regia gold and ME (AR25/MS33).

There were no limitations to the verification process and all relevant data was verified by a qualified person as defined in National Instrument 43-101 Standards of Disclosure for Mineral Projects (“ NI 43-101 ”) by reviewing analytical procedures undertaken by the laboratory. Dr. Quinton Hennigh (P.Geo.) is the qualified person responsible for, and having reviewed and approved, the technical information contained in this news release. Dr. Hennigh is a director of Novo and its Non-Executive Co-Chairman.

2021 Precious Metals Summit Beaver Creek

Novo’s Non-Executive Co-Chairman, Dr. Quinton Hennigh, will present at the Precious Metals Summit on Thursday September 9 th , 2021 from 8:30 am-8:45 am Mountain Time.

Webcast Link: https://wsw.com/webcast/preciousmetals3/nvo.v/

About Novo

Novo is commissioning its flagship Beatons Creek gold project while exploring and developing its prospective land package covering approximately 14,000 square kilometres in the Pilbara region of Western Australia. In addition to the Company’s primary focus, Novo seeks to leverage its internal geological expertise to deliver value-accretive opportunities to its shareholders. For more information, please contact Leo Karabelas at (416) 543-3120 or e-mail leo@novoresources.com .

On Behalf of the Board of Directors,

Novo Resources Corp.

“ Quinton Hennigh 

Quinton Hennigh

Non-Executive Co-Chairman

Forward-looking information

Some statements in this news release contain forward-looking information (within the meaning of Canadian securities legislation) including, without limitation, planned exploration activities, determination of further targets for potential mill feed for the Golden Eagle processing facility, and the expected timing of receipt of assay and mechanical testing results. These statements address future events and conditions and, as such, involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements to be materially different from any future results, performance or achievements expressed or implied by the statements. Such factors include, without limitation, customary risks of the resource industry and the risk factors identified in Novo’s annual information form for the 11-month fiscal year ended December 31, 2020, which is available under Novo’s profile on SEDAR at www.sedar.com. Forward-looking statements speak only as of the date those statements are made. Except as required by applicable law, Novo assumes no obligation to update or to publicly announce the results of any change to any forward-looking statement contained or incorporated by reference herein to reflect actual results, future events or developments, changes in assumptions or changes in other factors affecting the forward-looking statements. If Novo updates any forward-looking statement(s), no inference should be drawn that the Company will make additional updates with respect to those or other forward-looking statements.

Primary Logo
Categories
Base Metals Energy Junior Mining Precious Metals

Eloro Intersects 234.19g Ag eq/t over 53.20m in the Mineralized Envelope of the Santa Barbara Breccia Pipe at Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia

Eloro Resources Ltd.Tue, September 7, 2021, 7:00 AMIn this article:

My WatchlistMy WatchlistView my watchlists

Table 1

Significant Diamond Drilling Results, Iska Iska, as at September 5, 2021
Significant Diamond Drilling Results, Iska Iska, as at September 5, 2021
Significant Diamond Drilling Results, Iska Iska, as at September 5, 2021

Figure 1

Geology of the Iska Iska Caldera Complex showing locations of Major Breccia Pipe targets including the magnetic anomaly northwest of the Santa Barbara Breccia Pipe and diamond drill holes completed and in progress.
Geology of the Iska Iska Caldera Complex showing locations of Major Breccia Pipe targets including the magnetic anomaly northwest of the Santa Barbara Breccia Pipe and diamond drill holes completed and in progress.
https://s.yimg.com/rq/darla/4-9-0/html/r-sf-flx.html
Geology of the Iska Iska Caldera Complex showing locations of Major Breccia Pipe targets including the magnetic anomaly northwest of the Santa Barbara Breccia Pipe and diamond drill holes completed and in progress.

Figure 2

North-South Geological Cross Section, Santa Barbara Breccia Pipe showing Major Extension in Holes DSB-12 and DSB-13
North-South Geological Cross Section, Santa Barbara Breccia Pipe showing Major Extension in Holes DSB-12 and DSB-13
North-South Geological Cross Section, Santa Barbara Breccia Pipe showing Major Extension in Holes DSB-12 and DSB-13

Figure 3a: Picture of Diamond Drill Core Samples from Hole DSB-12

Hole DSB-12 496.27m to 503.44m. Deformed moderately alunitized dacite locally interbedded with minor sandstone, showing flow banding and cut by intrusive breccia composed of dacite clasts cemented with tourmaline matrix (partially replaced by sulphides as pyrite, sphalerite and, silver sulphosalts). There are two vein breccias (20/30 cm in width) along with pyrite, sphalerite, and alunite-bearing cross-cutting veinlets and disseminated pyrite (3%).
Hole DSB-12 496.27m to 503.44m. Deformed moderately alunitized dacite locally interbedded with minor sandstone, showing flow banding and cut by intrusive breccia composed of dacite clasts cemented with tourmaline matrix (partially replaced by sulphides as pyrite, sphalerite and, silver sulphosalts). There are two vein breccias (20/30 cm in width) along with pyrite, sphalerite, and alunite-bearing cross-cutting veinlets and disseminated pyrite (3%).
Hole DSB-12 496.27m to 503.44m. Deformed moderately alunitized dacite locally interbedded with minor sandstone, showing flow banding and cut by intrusive breccia composed of dacite clasts cemented with tourmaline matrix (partially replaced by sulphides as pyrite, sphalerite and, silver sulphosalts). There are two vein breccias (20/30 cm in width) along with pyrite, sphalerite, and alunite-bearing cross-cutting veinlets and disseminated pyrite (3%).

Figure 3b: Picture of Diamond Drill Core Samples from Hole DSB-12

Hole DSB-12 664.64m to 671.63m. Deformed intrusion breccia locally intercalated with aphanitic dacite. Breccia is polymictic, clast-supported with subangular to subrounded clasts of fine-grained dacite in a milled granodiorite matrix, partially replaced by tourmaline. Mineralization is principally as three vein breccias consisting of pyrite, chalcopyrite, alunite and quartz. Locally there are sulphide veinlets (3-5 per m) and disseminated pyrite (3%).
Hole DSB-12 664.64m to 671.63m. Deformed intrusion breccia locally intercalated with aphanitic dacite. Breccia is polymictic, clast-supported with subangular to subrounded clasts of fine-grained dacite in a milled granodiorite matrix, partially replaced by tourmaline. Mineralization is principally as three vein breccias consisting of pyrite, chalcopyrite, alunite and quartz. Locally there are sulphide veinlets (3-5 per m) and disseminated pyrite (3%).
Hole DSB-12 664.64m to 671.63m. Deformed intrusion breccia locally intercalated with aphanitic dacite. Breccia is polymictic, clast-supported with subangular to subrounded clasts of fine-grained dacite in a milled granodiorite matrix, partially replaced by tourmaline. Mineralization is principally as three vein breccias consisting of pyrite, chalcopyrite, alunite and quartz. Locally there are sulphide veinlets (3-5 per m) and disseminated pyrite (3%).
  • Step out drilling northwest of Santa Barbara Breccia Pipe demonstrates room for expansion of the mineralized strike length of the breccia pipe and its surrounding mineralized envelope to over 1.2km
  • Definition drilling in progress to define a maiden NI 43-101 compliant mineral resource within a target block measuring 1,200m along strike, 500m wide and extending to a depth of up to 600m in Santa Barbara Breccia Pipe and its surrounding mineralized envelope

TORONTO, Sept. 07, 2021 (GLOBE NEWSWIRE) — Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF FSE: P2QM) (“Eloro”, or the “Company”) is pleased to provide an update on its Iska Iska silver-tin polymetallic project in the Potosi Department, southern Bolivia. To date, the Company has completed 58 diamond drill holes totalling 26,982 metres (m) to test major target areas at Iska Iska. This press release reports drilling results from four (4) additional holes which tested the mineralized envelope of the Santa Barbara Breccia Pipe (“SBBP”) (Holes DDHK-19 and DHK-20) and the central-southern part of the Central Breccia Pipe (“CBP”) (Holes DCN-04 and DCS-02). To date, every drill hole that has been assayed has returned multiple reportable mineralized intercepts. Currently three drill rigs are in operation at Iska Iska. Two surface drill rigs are completing drilling at SBBP in order to outline an initial National Instrument 43-101 (“NI-43-101”) compliant resource. A third drill, an underground rig, situated in the west end of the Santa Barbara Adit, is testing the eastern part of SBBP and its mineralized envelope. Figure 1 is a geological plan map showing locations of drill holes and an updated geological interpretation. This map depicts a recently identified robust magnetic anomaly to the northwest of the SBBP where drilling is in progress (see press release June 7, 2021, for an overview of the magnetic results). Figure 2 is a north-south section showing the major potential extension of the SBBP mineralized system. Table 1 provides significant drilling results with definitions of chemical symbols and Table 2 lists holes completed with assays pending as well as holes in progress in the three major target areas. Highlights are as follows:

Highlights:

  • Hole DHK-20, drilled from the west end of the Huayra Kasa underground workings at -50 degrees on section with hole DHK-18, which intersected 129.65 g Ag eq/t over 300.75m (see press release dated July 28, 2021), returned 234.19 g Ag eq/t (70.5 g Ag/t, 2.31% Zn, 2.74% Pb and 0.04% Sn) over 53.20m from 139.35m to 192.55m including a higher grade portion of 931.73 g Ag eq/t (367.29 g Ag/t, 5.64% Zn, 13.67% Pb and 0.10% Sn) over 9.26m. Multiple additional significant mineralized intervals occur above and below this intercept. Mineralization occurs within the mineralized envelope east of SBBP in all host rock types.
  • Hole DHK-19, drilled to the southeast at -45 degrees from the west end of the Huayra Kasa underground workings, intersected 108.24 g Ag eq/t (3.14g Ag/t, 0.24 g Au/t, 2.02% Zn and 0.58% Pb) over 48.2m from 46.95m to 95.15m in altered dacite in the mineralized envelope of the SBBP. This includes a higher-grade interval grading 180.76 g Ag eq/t (4.46 g Ag/t, 0.35 g Au/t, 3.58% Zn and 1.04% Pb) over 15.02m. Multiple additional significant mineralized intervals occur above and below this intercept.
  • Hole DCN-04 was drilled at -80 degrees to the north from the northern radial platform of the CBP. This hole intersected seventeen (17) mineralized intersections, principally Sn-Ag-bearing, over its 851.4m length. Best results include 71.54 g Ag eq/t (32.58 g Ag/t and 0.10% Sn) over 97.10m from 134.40 to 231.5m; 101.52 g Ag eq/t (28.74 g Ag/t and .19% Sn) over 62.01m from 281.40m to 343.41m; 134.33 g Ag eq/t (70.42 g Ag/t and 0.16% Sn) over 22.59m from 417.05m to 439.64m; and 236.96 g Ag eq/t (92.21 g Ag/t and 0.25% Sn) over 17.45m from 659.55m to 677.00.m
  • Hole DCS-02 was drilled southeast at -60 degrees from the south radial platform of the CBP. This hole, which was drilled to 800.5m, intersected nine (9) reportable Ag-Zn-Pb-Sn mineralized intervals. Best results include 79.53 g Ag eq/t (including 0.21% Sn) over 19.42m, 101.01 g Ag eq/t (32.75 g Ag/t, 0.76% Zn, 0.75% Pb) over 10.47 and 130.95g Ag eq/t (34.14 g Ag/t, 0.10 g Au/t, 1.35% Zn and 0.56 % Pb over 7.40m. Mineralization in the southern part of the CBP is notable for containing significant Zn and Pb as well as Ag and Sn, a metal assemblage more comparable to SBBP and Porco. The northern part of the CBP is dominantly Sn-Ag suggesting a deeper origin for this part of the breccia pipe.

Major Potential Extension to Santa Barbara Breccia Pipe

Data from a ground magnetics survey conducted by Eloro (see press release of June 7, 2021) outlined a prominent area of anomalously low magnetic variability northwest of the SBBP, as shown in Figure 1, likely reflecting strong hydrothermal alteration. Subsequent 3D inversion modelling confirmed that this area warranted drill testing as this pattern is comparable to the SBBP and CBP, both marked by similar magnetic anomalies. Recently completed holes DSB-12 drilled southeast at -40 degrees and DSB-13 on section at -65 degrees intersected strongly altered dacite and breccia with widespread mineralization. As depicted in Figure 2, a north-south section, these holes substantially increase the potential strike length of the SBBP and surrounding mineralized envelope to more than 1.2km. Figure 3 shows pictures of representative boxes of mineralized drill core. Sulphide minerals identified include pyrite, galena, sphalerite and chalcopyrite accompanied by cassiterite. Assays are pending but visually the style of mineralization is similar to what has been intersected within drill holes in the mineralized envelope of the SBBP.

Tom Larsen, CEO of Eloro commented: “The Company is pleased to report that the Santa Barbara Breccia Pipe and its surrounding mineralized envelope is in fact much larger than initially envisioned. Our drilling campaign is now focused within this extensive area in order to define an inaugural NI 43-101 compliant mineral resource which we expect to have completed in Q1 2022. In addition, I am pleased to announce that, as a result of the continuing sampling backlog delays at the ALS Laboratory in Lima due to Covid-19 induced issues, the Company has recently commissioned Alfred H Knight (“AHK”) Laboratories of Great Britain along with ALS Laboratories to help alleviate this backlog. AHK is highly recognized, having a global network of accredited laboratories with operations in over 35 countries. They have recently opened facilities in Bolivia, due to the high demand taking place from mining companies in the region. This is a significant development which will improve the reporting of drilling results at Iska Iska going forward.”

Dr. Bill Pearson, P.Geo., Eloro’s Executive Vice President Exploration, commented: “The very encouraging mineralized intersections in the drill holes testing the magnetic anomaly northwest of the SBBP has opened up the potential for a major extension to this target resource area. The strike length of SBBP and its envelope which trends approximately north-northwest is now more than 1.2km and remains open in all directions. The present target area for mineral resource definition is approximately 1.2km along strike, 500m wide and extends to a depth of at least 600m. Drill holes in the CBP continue to return encouraging values but further drilling on this and the Porco target will be deferred until after drilling in the SBBP area is completed. The downhole IP/Res survey at the SBBP is moving along well and will provide important information to better confirm continuity of mineralization between drill holes especially higher-grade zones with greater sulphide content.”

Dr. Osvaldo Arce, P.Geo., General Manager of Eloro’s Bolivian subsidiary Minera Tupiza S.R.L., said: “Interpretation of Aster/Landsat satellite imagery and later, the magnetic survey in the northwestern sector of the SBBP, has outlined a substantial anomalous zone that likely reflects widespread hydrothermal alteration. The first diamond drillholes DSB-12 and DSB-13 holes have intercepted a number of well mineralized intervals in which measurement with the XRF gun confirm Ag, Sn, Pb, Zn and tungsten (W). This mineralization is hosted in dacitic volcanic domes which are cut by local sections of well-mineralized breccias with predominantly dacitic clasts surrounded by a tourmaline matrix that is replaced by sulphides and cassiterite. This discovery extends the SBBP and associated mineralized envelope along strike as much as 50% from its original size. The SBBP has characteristics of a large kilometre-scale and continuous near-surface mineralized body of enriched telescoped polymetallic mineralization.”

Dr. Quinton Hennigh, P.Geo., Senior Technical Advisor to Eloro, commented: “Once again, all recently assayed drill holes returned multiple long mineralized intervals at Iska Iska. The limits of the system keep expanding, the magnetic anomaly to the northwest of the SBBP being the most recent addition. Here, recently completed holes DSB-12 and DSB-13 display very promising long intervals of mineralization with an appearance similar to holes drilled closer to the SBBP. While the 1,200 x 500 x 600 m volume currently being targeted for a maiden resource is impressive, it is important to keep in mind that this is still just a subset of the much larger Iska Iska system that extends over a kilometre further south to the Porco breccia pipe along the southern margin of the caldera complex where Eloro recently drilled some visibly mineralized holes. In short, this major discovery is still in its early days.”

Table 1: Significant Diamond Drilling Results, Iska Iska, as at September 7, 2021
https://www.globenewswire.com/NewsRoom/AttachmentNg/8db46095-749d-404a-b905-8c288034ffc3

Note: True width of the mineralization is not known at the present time, but based on the current understanding of the relationship between drill orientation/inclination and the mineralization within the breccia pipes and the host rocks such as sandstones and dacites. It is estimated that true width ranges between 70% and 90% of the down hole interval length but this will be confirmed by further drilling. Percentage metal contents are shown for each element.

Chemical symbols: Ag= silver, Au = gold, Zn = zinc, Pb = lead, Cu = copper, Sn = tin, Bi = bismuth, Cd = cadmium and g Ag eq/t = grams silver equivalent per tonne. Quantities are given in percent (%) for Zn, Pb Cu, Sn, Bi and Cd and in grams per tonne (g/t) for Ag, Au and Ag eq.

Metal prices and conversion factors used for calculation of g Ag eq/t (grams Ag per grams x metal ratio) are as follows:

ElementPrice (per kg)Ratio to Ag
Ag$875.001.00000
Sn$28.000.03200
Zn$2.800.00320
Pb$2.100.00240
Au$57,40065.6000
Cu$8.800.01006
Bi$12.760.01458
In$305.000.34857
Cd$5.500.00629

In calculating the intersections reported in this press release a sample cutoff of 30 g Ag eq/t was used with generally a maximum dilution of 3 continuous samples below cutoff included within a mineralized section unless more dilution is justified geologically.

The equivalent grade calculations are based on the stated metal prices and are provided for comparative purposes only, due to the polymetallic nature of the deposit. Preliminary metallurgical tests are in progress to establish levels of recovery for each element reported but currently the potential recovery for each element has not yet been established. While there is no assurance that all or any of the reported concentrations of metals will be recoverable, Bolivia has a long history of successfully mining and processing similar polymetallic deposits which is well documented in the landmark volume “Yacimientos Metaliferos de Bolivia” by Dr. Osvaldo R. Arce Burgoa, P.Geo.

Table 2: Summary of Diamond Drill Holes Completed with Assays Pending and Drill Holes in Progress at Iska Iska from press release of September 7, 2021.

Hole No.TypeCollar
Easting
Collar
Northing
ElevAzimuthAngleHole Length
m
Surface Drilling Northwest Extension Santa Barbara
DSB-12205072.77656867.54165.0225-40806.2
DSB-13205072.77656867.54165.0225-60696.5
Subtotal1502.7
Underground Drilling Huayra Kasa – Santa Barbara Area
DHK-21UG205418.57656360.04151.9235-70512.9
DHK-22UG205418.57656360.04151.9210-60600.0
DHK-23UG205418.57656360.04151.9270-50598.0
Subtotal1710.9
Underground Drilling Santa Barbara Adit
DSBU-1UG205285.27656074.84165.090-10260.5
Subtotal260.5
DSBU-2UG205285.27656074.84165.0270-20In progress
Central Breccia Pipe – Surface Radial Drill Program – North Setup
DCN-05S204902.07655860.04420.090-60524.3
DCN-06S204902.07655860.04420.0180-80626.4
DCN-07S204902.07655860.04420.0270-60680.4
Subtotal1831.1
Central Breccia Pipe – Surface Radial Drill Program – South Setup
DCS-03S204852.17655612.34429.7225-60443.5
DCS-04S204852.17655612.34429.7180-60644.4
Subtotal1087.9
Porco Central – Surface Radial Drill Program
DPC-01S205457.27655110.94175.0270-60767.5
DPC-02S205457.27655110.94175.0225-60908.2
DPC-03S205457.27655110.94175.0135-60524.5
DPC-04S205457.27655110.94175.00-60371.4
DPC-05S205457.27655110.94175.090-60407.5
DPC-06S205457.27655110.94175.0243-60716.4
Subtotal2,571.6
TOTAL10,088.6

S = Surface UG=Underground; collar coordinates in metres; azimuth and dip in degrees

Total drilling completed since the start of the program on September 13, 2020 is 26,982m in 58 holes (19 underground holes and 39 surface holes) with one underground in progress. One surface rig is being moving to a new hole location northwest of SBBP. The second surface drill rig is being exchanged for a more powerful machine which will arrive on site soon and commence drilling in the SBBP area.

Qualified Person

Dr. Osvaldo Arce, P. Geo., General Manager of Minera Tupiza S.R.L., and a Qualified Person in the context of National Instrument 43-101 (“NI 43-101”), has reviewed and approved the technical content of this news release. Dr. Bill Pearson, P.Geo., Executive Vice President Exploration Eloro, and who has more than 45 years of worldwide mining exploration experience including extensive work in South America, manages the overall technical program working closely with Dr. Arce. Dr. Quinton Hennigh, P.Geo., Senior Technical Advisor to Eloro and Independent Technical Advisor, Mr. Charley Murahwi P. Geo., FAusIMM of Micon International Limited are regularly consulted on technical aspects of the project.

Drill samples are prepared in ALS Bolivia Ltda’s preparation facility in Oruro, Bolivia with pulps sent to the main ALS Global laboratory in Lima for analysis. As announced in the February 26, 2021 press release, Eloro has changed the assay protocol to utilize X-ray fluorescence (XRF) to more accurately analyze higher tin. Tin in the CBP is suspected to occur as cassiterite which is insoluble in acid digestion, and therefore not suited for wet chemical techniques. In addition, other assay protocols have been changed to provide for a more accurate measurement of the wide-ranging suite of polymetallic metals at Iska Iska. Eloro employs an industry standard QA/QC program with standards, blanks and duplicates inserted into each batch of samples analyzed with selected check samples sent to a separate accredited laboratory.

Unfortunately, the ALS Global laboratory in Lima where the Iska Iska samples are being analyzed has had major delays in turnaround time due to the impact of the COVID-19 lockdown of Lima by the Peruvian government. This has restricted availability of critical supplies necessary to carry out analytical work. As a result, there will be delays in reporting of assay results.

Recently, AHK Laboratories, who manage a global network of laboratories have setup operations in Bolivia with the establishment of a preparation laboratory in Oruro. AHK has a strong base of accredited laboratories in South America including Peru, Chile, Brazil and Argentina. Eloro will be contracting AHK to provide analytical services in order to help reduce the sample backlog. A series of check samples are currently being analyzed by AHK as a QA/QC check.

About Iska Iska

Iska Iska silver-tin polymetallic project is a road accessible, royalty-free property, wholly-controlled by the Title Holder, Empresa Minera Villegas S.R.L. and is located 48 km north of Tupiza city, in the Sud Chichas Province of the Department of Potosi in southern Bolivia. Eloro has an option to earn a 99% interest in Iska Iska.

Iska Iska is a major silver-tin polymetallic porphyry-epithermal complex associated with a Miocene possibly collapsed/resurgent caldera, emplaced on Ordovician age rocks with major breccia pipes, dacitic domes and hydrothermal breccias. The caldera is 1.6km by 1.8km in dimension with a vertical extent of at least 1km. Mineralization age is similar to Cerro Rico de Potosí and other major deposits such as San Vicente, Chorolque, Tasna and Tatasi located in the same geological trend.

Eloro began underground diamond drilling from the Huayra Kasa underground workings at Iska Iska on September 13, 2020. On November 18, 2020 Eloro announced the discovery of a significant breccia pipe with extensive silver polymetallic mineralization just east of the Huayra Kasa underground workings and a high-grade gold-bismuth zone in the underground workings. On November 24, 2020, Eloro announced the discovery of the SBBP approximately 150m southwest of the Huayra Kasa underground workings.

Subsequently, on January 26, 2021, Eloro announced significant results from the first drilling at the SBBP including the discovery hole DHK-15 which returned 129.60 g Ag eq/t over 257.5m (29.53g Ag/t, 0.078g Au/t, 1.45%Zn, 0.59%Pb, 0.080%Cu, 0.056%Sn, 0.0022%In and 0.0064% Bi from 0.0m to 257.5m. Subsequent drilling has confirmed significant values of Ag-Sn polymetallic mineralization in the SBBP and the adjacent CBP. The SBBP thus far extends 800m along strike by 400+m wide and extends to at least 700m depth. CBP extends for 700m along strike by 400+m wide and extends to at least 900m deep.

A substantive mineralized envelope which is open along strike and down-dip extends around the breccia pipes. Continuous channel sampling of the Santa Barbara Adit located to the east of SBBP returned 442 g Ag eq/t (164.96 g Ag/t, 0.46%Sn, 3.46% Pb and 0.14% Cu) over 166m including 1,092 g Ag eq/t (446 g Ag/t, 9.03% Pb and 1.16% Sn) over 56.19m. The west end of the adit intersects the end of the SBBP.

On May 4, 2021, Eloro released results from the first drill hole on the CBP. Hole DCN-01 intersected multiple mineralized intercepts including 196.09 g Ag eq/t (150.25 g Ag/t, 0.10% Sn and 0.05 g Au/t) over 56.2m and containing 342.98 g Ag eq/t (274.0 g Ag/t, 0.16% Sn and 0.16 g Au/t) over 27.53m.

On May 26, 2021 Eloro released results from Hole DSB-07 drilled at -60 degrees to a depth of 683.4m to the southeast from the radial drill platform on SBBP which intersected multiple mineralized intercepts including:

  • 122.66 grams silver equivalent/tonne (“g Ag eq/t”) (35.05 g Ag/t, 0.72% Zn, 0.61% Pb, 0.11% Sn and 0.06 g Au/t) over 123.61m from 236.60m to 360.21m including 205.74 g Ag eq/t (92.30 g Ag/t, 0.57% Zn, 0.85% Pb, 0.18% Sn and 0.07 g Au/t) over 32.32m, from 317.21m to 349.53m.
  • 105.41 g Ag eq/t (8.55 g Ag/t, 1.01% Zn, 0.48% Pb, 0.06% Sn and 0.38 g Au/t) over 173.58m from 449.87m to 623.45m including 199.77 g Ag eq/t (21.90 g Ag/t, 1.18% Zn, 0.93% Pb 0.12% Sn and 0.94 g Au/t) over 39.08m, from 551.19m to 590.27m.
  • 146.19 g Ag eq/t (1.70 g Ag/t, 0.00% Zn, 0.01% Pb, 0.42% Sn and 0.02 g Au/t) over 10.20m from 171.60m to 181.80m in the oxide zone indicating potential for significant Sn mineralization in this strongly leached nearer surface zone.
  • In aggregate, 64% of this 683.4m long hole returned reportable mineralized intervals.

Eloro reported additional multiple holes with significant silver-tin polymetallic Intercepts in the SBBP and CBP on July 6, 2021 including:

  • Hole DSB-08, testing the northeast quadrant of the SBBP, encountered eighteen reportable mineralized intercepts beginning near surface to its terminus at 614.4 m. The longest intercept was 69.89 g Ag eq/t over 252.89m from 355.12 to 608.02m including several higher-grade sections of 196.60 g Ag eq/t including 131.13 g Ag/t over 14.52m, 134.62 g Ag eq/t including 93.25 g Ag/t over 21.08m and 145.35 g Ag eq/t including 2.38% Zn over 10.11m.
  • Hole DSB-10, testing the southwest quadrant of the SBBP and northern part of the CBP, encountered twenty-nine reportable mineralized intercepts beginning near surface to its terminus at 1,019.4m. Tin was notably elevated in many intervals suggesting proximity to a mineralizing intrusive source in this area. Notable intercepts include 114.96 Ag eq/t including 0.325% tin (Sn) over 56.2m from 322.18m to 378.30m including a higher-grade section of 187.98 g Ag eq/t including 0.535% Sn over 28.86m80.71 g Ag eq/t including 0.213% Sn over 74.39m from 474.86 to 549.25m and 118.69 g Ag eq/t over 10.77m from 829.97 to 840.74m.

On July 28, 2021 Eloro reported results from hole DHK-18, drilled due south at -10 degrees from the west drill bay in the Huayra Kasa underground workings to test the mineralized envelope of the SBBP. This hole intersected 129.65 g Ag eq/t (18.38 g Ag/t, 2.14% Zn, 0.67%Pb, and 0.047% Sn) over 300.75m from 65.14m to 365.91m including higher grade intervals of 215.54 g Ag eq/t over 72.76m, 163.35 g Ag eq/t over 31.83m and 224.48 g Ag eq/t over 19.39m. This hole intersected significant mineralization approximately 230m below the eastern part of the Santa Barbara adit from which continuous channel sampling previously reported returned 442 g Ag eq/t over 166m (see press release April 13, 2021). 82% of this 446.5m long hole contained reportable intervals.

A detailed ground magnetic survey of the Iska Iska property reported on June 6, 2021 confirmed the extent of the Iska Iska Caldera as determined from geological mapping and satellite interpretation including Aster data. The SBBP and CBP, both of which have been confirmed by drill-testing, are marked by prominent low anomalies reflecting strong alteration. The magnetic data suggests that the Central and Porco Breccia Pipes likely merge at depth. In addition there is a prominent area of low intensity magnetics northwest of the SBBP which is reported on in this press release.

Geological mapping and satellite interpretation identified a third major breccia pipe target Porco (South) that is approximately 600m in diameter (South) located southeast of CBP in the southern part of the Iska Iska caldera complex. The Porco (South) Breccia Pipe target has a similar magnetic signature to the Santa Barbara and Central Breccia Pipes, further confirming the likelihood of it being a major breccia pipe. This target is currently being drill tested. Previous channel sampling in the Porco adit located adjacent the target area 200m to the southeast returned 50m grading 519.35 g Ag eq/t including 236.13 g Ag/t, 1.89 g Au/t, 0.87% Cu, 0.22% Bi and >0.05% Sn over an average sample width of 2.49m.

Currently three diamond drill rigs are active at Iska Iska, two surface rigs and one underground drill. Planned drilling for 2021 is 51,000m with the aim of outlining an initial inferred NI 43-101 compliant mineral resource by Q1 2022. A downhole induced polarization/resistivity (IP/Res) survey is in progress to further define drill targets and aid resource definition drilling. Preliminary metallurgical tests are also in progress. An updated NI 43-101 Technical Report is being prepared by independent consultant Micon International Ltd.

About Eloro Resources Ltd.

Eloro is an exploration and mine development company with a portfolio of gold and base-metal properties in Bolivia, Peru and Quebec. Eloro has an option to acquire a 99% interest in the highly prospective Iska Iska Property, which can be classified as a polymetallic epithermal-porphyry complex, a significant mineral deposit type in the Potosi Department, in southern Bolivia. Eloro commissioned a NI 43-101 Technical Report on Iska Iska, which was completed by Micon International Limited and is available on Eloro’s website and under its filings on SEDAR. Iska Iska is a road-accessible, royalty-free property. Eloro also owns an 82% interest in the La Victoria Gold/Silver Project, located in the North-Central Mineral Belt of Peru some 50 km south of Barrick’s Lagunas Norte Gold Mine and Pan American Silver’s La Arena Gold Mine. La Victoria consists of eight mining concessions and eight mining claims encompassing approximately 89 square kilometres. La Victoria has good infrastructure with access to road, water and electricity and is located at an altitude that ranges from 3,150 m to 4,400 m above sea level.

For further information please contact either Thomas G. Larsen, Chairman and CEO or Jorge Estepa, Vice-President at (416) 868-9168.

Information in this news release may contain forward-looking information. Statements containing forward looking information express, as at the date of this news release, the Company’s plans, estimates, forecasts, projections, expectations, or beliefs as to future events or results and are believed to be reasonable based on information currently available to the Company. There can be no assurance that forward-looking statements will prove to be accurate. Actual results and future events could differ materially from those anticipated in such statements. Readers should not place undue reliance on forward-looking information.

Neither the TSXV nor its Regulation Services Provider (as that term is defined in the policies of the TSXV) accepts responsibility for the adequacy or accuracy of this release.

Figure 1: Geology of the Iska Iska Caldera Complex showing locations of Major Breccia Pipe targets including the magnetic anomaly northwest of the Santa Barbara Breccia Pipe and diamond drill holes completed and in progress.
https://www.globenewswire.com/NewsRoom/AttachmentNg/3561dc8a-fb45-4df0-81a6-a47ca615fd1f

Figure 2: North-South Geological Cross Section, Santa Barbara Breccia Pipe showing Major Extension in Holes DSB-12 and DSB-13
https://www.globenewswire.com/NewsRoom/AttachmentNg/95f6e3a0-5731-4a32-b503-d6a1bc26858d

Figure 3: Pictures of Diamond Drill Core Samples from Hole DSB-12

Hole DSB-12 496.27m to 503.44m. Deformed moderately alunitized dacite locally interbedded with minor sandstone, showing flow banding and cut by intrusive breccia composed of dacite clasts cemented with tourmaline matrix (partially replaced by sulphides as pyrite, sphalerite and, silver sulphosalts). There are two vein breccias (20/30 cm in width) along with pyrite, sphalerite, and alunite-bearing cross-cutting veinlets and disseminated pyrite (3%).
https://www.globenewswire.com/NewsRoom/AttachmentNg/efe4f19e-c81d-4e5f-a197-ea16c95cb6c2

Hole DSB-12 664.64m to 671.63m. Deformed intrusion breccia locally intercalated with aphanitic dacite. Breccia is polymictic, clast-supported with subangular to subrounded clasts of fine-grained dacite in a milled granodiorite matrix, partially replaced by tourmaline. Mineralization is principally as three vein breccias consisting of pyrite, chalcopyrite, alunite and quartz. Locally there are sulphide veinlets (3-5 per m) and disseminated pyrite (3%).
https://www.globenewswire.com/NewsRoom/AttachmentNg/d2563ee0-770c-4c19-9734-786c8ed54677

Categories
Breaking Junior Mining Precious Metals

Lion One Adds Numerous High-Grade Intercepts near Surface and Expands Deep Feeder Zone 500, Tuvatu, Fiji

North Vancouver, British Columbia–(Newsfile Corp. – September 7, 2021) – Lion One Metals Limited (TSXV: LIO) (OTCQX: LOMLF) (ASX: LLO) (“Lion One” or the “Company”) is pleased to announce further high grade intercepts from ongoing deep extensional step-out drilling and near-surface infill drilling from the Company’s 100% owned Tuvatu gold project in Fiji.

Highlights include:

10.24 g/t Au over 8.48m from downhole depth of 111.20m from TUDDH539 (near surface infill)
-incl. 33.26 g/t Au over 2.44m from 111.20m, and 13.49 g/t Au over 3.30m from 115.40m

24.92 g/t Au over 3.70m from downhole depth of 415.70m from TUG135 (Deep Feeder Zone 500)
-incl. 83.63 g/t Au over 0.30m from 415.70m, and 159.30 g/t Au over 0.30m from 417.20m

Sergio Cattalani, Lion One’s Senior Vice President Exploration, commented, “High grade mineralization in Deep Feeder Zone 500 has now been demonstrated to extend over an area approximately 150m along strike and 250m vertically, completely outside the existing resource model. We have planned additional drilling to test the lateral extent of this zone and infill the shallowest part of this zone with the base of the existing resource.”

Deep Feeder Zone 500
These most recent intercepts are believed to be the continuation of the interpreted deep feeder structure that encountered 55.43 g/t Au over 12.70m in TUDDH500 (see July 24, 2020 News Release) and 55.44 g/t Au over 2.30m in TUDDH533. Multiple new high-grade gold intercepts have been encountered in underground hole TUG135 drilled from the Tuvatu decline, as well as in hole TUDDH533W1, a wedge hole to TUDDH533 reported previously (see July 26, 2021 News Release). These include 24.92 g/t Au over 3.70m (including 159.30 g/t over 0.30m) from a downhole depth of 415.70m, 2.89 g/t Au over 2.50m from a downhole depth of 508.10m in hole TUG135, and 3.34 g/t Au over 1.80m from a downhole depth of 613.90m in hole TUDDH533W1. This same gold-bearing structure has now been intersected by multiple holes, including TUDDH500, 500W1, 500W2, TUDDH533, 533W1, TUDDH528, TUDDH517, 517W1, TUDDH514, 514W1, and TUG135 (see Figure 1). These additional deep intercepts significantly increase our degree of confidence that the Tuvatu orebody extends to considerable depth, and that it remains fully open, laterally and at depth. It is clear that the current Tuvatu resource represents but a fraction of a much larger and considerably more extensive, high-grade Au deposit for which additional drilling is warranted to further define its true extent.



Figure 1: Longitudinal Section of the UR4 Lode Showing Block Model and 2020 and selected 2021 Drill Intercepts. The grid is 100m, the bright yellow is indicated and the darker yellow is inferred. Intercepts are expressed as g/t Au over downhole width in meters.

To view an enhanced version of Figure 1, please visit:
https://orders.newsfilecorp.com/files/2178/95575_801e4781548369e8_001full.jpg

Resource Infill/Definition Drilling
In addition to expanding the high-grade feeder zone underlying the UR4 lode, several bonanza-grade intercepts have also been returned from the ongoing near-surface infill/definition drill program which will add significantly to the resource earmarked for early production. The aim of this drill program was to infill areas of low data density within parts of the resource currently categorized as Inferred. A complete set of results for all previously unreported drill holes is included as Appendix 1.

The Company is currently undertaking three tiers of drilling: 1) shallow resource infill drilling from surface and underground, 2) deep exploration drilling looking for lode extensions under the Tuvatu resource and 3) other target areas within the Navilawa caldera such as Banana Creek, 3.5 km NE of Tuvatu where drilling is underway.

Highlights from shallow infill/definition drilling include:
TUG 135: 7.53 g/t Au over 5.80m from 28.60m, incl. 13.64 g/t Au over 2.60m
TUDDH 540: 97.40 g/t Au over 1.30m from 103.90m, incl. 210.29 g/t Au over 0.60m
TUDDH 539: 10.24 g/t Au over 8.48m from 111.20m,
incl. 33.26 g/t Au over 2.44m, and 13.49 g/t Au over 3.30m
TUDDH 534: 5.52 g/t Au over 3.71m from 123.23m,
incl. 15.59g/t Au over 0.34m and 18.4 g/t Au over 0.47m
TUDDH 537: 12.23 g/t Au over 1.33m from 134.15m,
incl. 30.50 g/t Au over 0.35m, and 16.07 g/t Au over 0.35m
TUDDH 537: 6.52 g/t Au over 3.51m from 138.93m, incl. 19.46 g/t Au over 0.38m
TUDDH 538: 103.5g/t Au over 0.28m from 177.78m in TUDDH538
Note: true width of intersections have yet to be accurately determined for these numerous lodes reported in this release.

Table 1: Drilling Intervals Reported (intervals greater than 3.0 g/t Au cutoff are bolded)

Drill HoleFrom (m)To (m)Interval (m)Au (g/t)
TUDDH53312.4513.651.2010.45
incl13.0013.300.3036.69
15.3515.650.302.18
17.5017.800.302.91
20.3023.803.502.72
incl20.6020.900.309.23
25.8526.150.300.89
27.4028.000.601.04
28.5728.950.380.54
30.0031.801.801.41
36.0039.003.003.47
incl37.6038.200.6010.06
162.20162.500.301.19
266.80267.400.60437.13
306.35307.351.001.20
309.35310.801.4516.14
incl310.15310.800.6531.93
335.24335.640.4012.84
370.89371.230.340.56
385.60386.000.401.10
390.79391.090.301.47
437.84438.260.420.95
439.30439.600.300.58
453.15453.600.450.67
459.25459.800.553.73
464.10464.910.811.82
487.40488.330.930.92
539.45540.300.851.33
550.06550.430.370.76
551.20551.500.300.61
575.70578.002.3055.44
incl576.68578.001.3296.13
incl577.60578.000.40221.60
TUDDH533w1536.30540.864.561.50
546.94549.442.501.85
612.10613.901.803.34
614.50614.800.300.56
TUDDH53466.6967.080.390.67
71.4071.720.324.03
90.9594.193.242.95
incl90.9591.420.477.72
and93.8094.190.3914.76
100.57100.840.270.66
120.49121.100.611.97
123.23126.943.715.52
incl124.66125.000.3415.59
and125.47125.940.4718.44
TUDDH53783.5683.900.341.91
126.57127.360.793.99
128.50129.781.284.04
134.15135.481.3312.23
incl134.15134.500.3530.50
and135.17135.480.3116.07
138.93142.443.516.52
incl142.06142.440.3819.46
144.62146.391.773.50
incl145.31145.530.2214.13
TUDDH538143.81144.240.430.68
177.78178.040.26103.50
TUDDH53986.2788.282.014.26
102.82103.140.3210.78
111.20119.688.4810.24
incl111.20113.642.4433.26
and115.40118.703.3013.49
121.65122.310.6626.55
TUDDH54097.9598.250.3079.65
103.90105.201.3097.40
incl103.90104.500.60210.29
which incl103.90104.200.3041.58
and104.20104.500.30379.00
109.20110.201.001.12
TUG1354.604.900.301.12
28.6034.405.807.53
incl29.4032.002.6013.64
66.1067.000.902.37
95.4095.700.300.69
105.10105.400.300.69
106.60107.200.6020.70
incl106.90107.200.3040.55
108.90110.701.801.37
178.20178.500.300.53
260.50261.300.801.83
263.10263.700.601.18
265.00265.300.301.84
276.40280.404.003.59
284.30285.601.301.49
288.40288.700.302.77
294.90295.200.301.26
299.55299.850.302.02
346.70350.103.403.61
374.60374.900.300.96
415.70419.403.7024.92
incl415.70416.000.3083.63
and417.20417.500.30159.30
and418.10418.400.3017.68
508.10510.602.502.89
incl508.10508.800.708.93
511.50511.900.400.56

Table 2: Survey details of diamond drill holes referenced in this release (Fiji Map Grid)

Hole NocoordinatesRLfinal depthdipazimuth
NEm(TN)
TUDDH53339207951876351209.4818.7-60130
TUDDH533W139207951876351209.4773.8-60130
TUDDH5343920736.011876267225.83179.4-7016
TUDDH5373920735.171876267225.98206.5-8011
TUDDH53839207351876267225.98239.60-8380
TUDDH53939207311876300228.00186.20-720
TUDDH54039207311876300228.00168.20-600
TUG13539207611876454139.28underway-64.00131

Drilling and Assay Processes and Procedures
The Company is utilizing its own diamond drill rig, using PQ, HQ and ultimately NQ sized drill core rods. Drill core is logged by Company geologists and then is sawn in half and sampled by Lion One staff.

Samples are analyzed at the Company’s own geochemical laboratory in Fiji, whilst pulp duplicates of samples with results >0.5g/t Au are sent to ALS Global Laboratories in Australia for check assay determinations. Samples for assays reported here will be sent to ALS Global Laboratories for check assays shortly. All samples are pulverized to 80% passing through 75 microns. Gold analysis is carried out using fire assay with an AA finish. Samples that have returned grades greater than 10g/t Au are then re-analyzed by gravimetric method. Lion One’s laboratory can also assay for a range of 71 other elements through Inductively Coupled Plasma Optical Emission Spectrometry (ICP-OES), but currently focuses on a suite of 9 important pathfinder elements. All duplicate anomalous samples sent to ALS Townsville, Queensland, Australia are analyzed by the same methods (Au-AA26, and also Au-GRA22 where applicable). ALS also analyze for 33 pathfinder elements by HF-HNO3-HClO4 acid digestion, HCl leach and ICP-AES. (method ME-ICP61).

Qualified Person
The scientific and technical content of this news release has been reviewed, prepared, and approved by Mr. Sergio Cattalani, P. Geo, who is a qualified person pursuant to National Instrument 43-101 – Standards of disclosure for Mineral Projects (“NI-43-101).

About Tuvatu
The Tuvatu gold deposit is located on the island of Viti Levu in the South Pacific island nation of Fiji. The mineral resource for Tuvatu as disclosed in the technical report “Tuvatu Gold Project PEA”, dated June 1, 2015, and prepared by Mining Associates Pty Ltd of Brisbane Qld, comprises 1,120,000 tonnes indicated at 8.17 g/t Au (294,000 oz. Au) and 1,300,000 tonnes inferred at 10.60 g/t Au (445,000 oz. Au) at a cut-off grade of 3 g/t Au. The technical report is available on the Lion One website at www.liononemetals.com and on the SEDAR website at www.sedar.com.

About Lion One Metals Limited
Lion One’s flagship asset is 100% owned, fully permitted high grade Tuvatu Alkaline Gold Project, located on the island of Viti Levu in Fiji. Lion One envisions a low-cost high-grade underground gold mining operation at Tuvatu coupled with exciting exploration upside inside its tenements covering the entire Navilawa Caldera, an underexplored yet highly prospective 7km diameter alkaline gold system. Lion One’s CEO Walter Berukoff leads an experienced team of explorers and mine builders and has owned or operated over 20 mines in 7 countries. As the founder and former CEO of Miramar Mines, Northern Orion, and La Mancha Resources, Walter is credited with building over $3 billion of value for shareholders.

On behalf of the Board of Directors of
Lion One Metals Limited
Walter Berukoff
Chairman and CEO

For further information
Contact Investor Relations
Toll Free (North America) Tel: 1-855-805-1250
Email: info@liononemetals.com
Website: www.liononemetals.com

Neither the TSX Venture Exchange nor its Regulation Service Provider

accepts responsibility for the adequacy or accuracy of this release.

This press release may contain statements that may be deemed to be “forward-looking statements” within the meaning of applicable Canadian securities legislation. All statements, other than statements of historical fact, included herein are forward looking information. Generally, forward-looking information may be identified by the use of forward-looking terminology such as “plans”, “expects” or “does not expect”, “proposed”, “is expected”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates” or “does not anticipate”, or “believes”, or variations of such words and phrases, or by the use of words or phrases which state that certain actions, events or results may, could, would, or might occur or be achieved. This forward-looking information reflects Lion One Metals Limited’s current beliefs and is based on information currently available to Lion One Metals Limited and on assumptions Lion One Metals Limited believes are reasonable. These assumptions include, but are not limited to, the actual results of exploration projects being equivalent to or better than estimated results in technical reports, assessment reports, and other geological reports or prior exploration results. Forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of Lion One Metals Limited or its subsidiaries to be materially different from those expressed or implied by such forward-looking information. Such risks and other factors may include, but are not limited to: the stage development of Lion One Metals Limited, general business, economic, competitive, political and social uncertainties; the actual results of current research and development or operational activities; competition; uncertainty as to patent applications and intellectual property rights; product liability and lack of insurance; delay or failure to receive board or regulatory approvals; changes in legislation, including environmental legislation, affecting mining, timing and availability of external financing on acceptable terms; not realizing on the potential benefits of technology; conclusions of economic evaluations; and lack of qualified, skilled labour or loss of key individuals. Although Lion One Metals Limited has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. Accordingly, readers should not place undue reliance on forward-looking information. Lion One Metals Limited does not undertake to update any forward-looking information, except in accordance with applicable securities laws.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/95575

Categories
Base Metals Breaking Energy Junior Mining

Nevada Copper Announces Effective Date of Share Consolidation

YERINGTON, Nev., Sept. 03, 2021 (GLOBE NEWSWIRE) — Nevada Copper Corp. (TSX: NCU) (OTC: NEVDF) (“Nevada Copper” or the “Company”) announces implementation of the 10:1 consolidation (the “Share Consolidation”) of the Company’s common shares (“Common Shares”), which was previously approved by the Company’s shareholders at the Company’s annual and special meeting of shareholders held on June 30, 2021 (the “Meeting”). The Toronto Stock Exchange (the “TSX”) has conditionally approved the Share Consolidation, subject to the filing of certain customary documents. The Share Consolidation will become effective on September 17, 2021 and the Common Shares are expected to commence trading on the TSX on a post-consolidation basis on or about September 21, 2021.

Following the Share Consolidation, the number of outstanding Common Shares will be reduced from approximately 1,850,635,602 outstanding Common Shares to approximately 185,063,560 outstanding Common Shares. The Common Shares will continue to be listed on the TSX under the symbol “NCU”. Following the Share Consolidation, the new CUSIP number for the Common Shares will be 64128F703 and the new ISIN for the Common Shares will be CA64128F7039.

No fractional Common Shares will be issued as a result of the Share Consolidation. Any fractional interest in Common Shares that would otherwise result from the Share Consolidation will be rounded up to the next whole Common Share, if the fractional interest is equal to or greater than one-half of a Common Share, and rounded down to the next whole Common Share if the fractional interest is less than one-half of a Common Share. In all other respects, the post-consolidation Common Shares will have the same attributes as the pre-consolidation Common Shares.

Common Share purchase warrants issued by the Company in connection with the Company’s July 2020 public offering of units (the “July Warrants”) and the Company’s January 2021 public offering of units (the “January Warrants”), respectively, are listed for trading on the TSX. As a result of the Share Consolidation (i) the July Warrants will be adjusted in accordance with the terms of the warrant indenture dated July 28, 2020 such that ten July Warrants will now be exercisable for one post-consolidation Common Share following the payment of an adjusted exercise price of C$2.00, and (ii) the January Warrants will be adjusted in accordance with the terms of the warrant indenture dated January 29, 2021 such that ten January Warrants will now be exercisable for one post-consolidation Common Share following the payment of an adjusted exercise price of C$2.20.

The Company’s transfer agent, Computershare Investor Services Inc. (“Computershare”), will act as the exchange agent for the Share Consolidation. Letters of transmittal were mailed to registered shareholders in connection with the Meeting and a copy is available on www.sedar.com. Registered shareholders are requested to submit their share certificates, or DRS advices, as applicable, together with their completed letters of transmittal, to Computershare. Until surrendered, each share certificate (or DRS advice) representing pre-consolidation Common Shares will be deemed to represent the number of whole post-consolidation Common Shares to which the shareholder is entitled as a result of the Share Consolidation.

Beneficial shareholders who hold their Common Shares through intermediaries (securities brokers, dealers, banks, financial institutions, etc.) and who have questions regarding how the Share Consolidation will be processed should contact their intermediaries.

About Nevada Copper
Nevada Copper (TSX: NCU) is a copper producer and owner of the Pumpkin Hollow copper project. Located in Nevada, USA, Pumpkin Hollow has substantial reserves and resources including copper, gold and silver. Its two fully permitted projects include the high-grade underground mine and processing facility, which is now in the production stage, and a large-scale open pit project, which is advancing towards feasibility status.

NEVADA COPPER CORP.
www.nevadacopper.com
Mike Brown, Interim President and CEO

For further information contact:
Rich Matthews, Investor Relations
Integrous Communications
rmatthews@integcom.us
+1 604 757 7179

Cautionary Language

This news release includes certain statements and information that constitute forward-looking information within the meaning of applicable Canadian securities laws. All statements in this news release, other than statements of historical facts are forward-looking statements. Such forward-looking statements and forward-looking information specifically include, but are not limited to, statements that relate to the timing and completion of the Share Consolidation.

Forward-looking statements and information include statements regarding the expectations and beliefs of management. Often, but not always, forward-looking statements and forward-looking information can be identified by the use of words such as “plans”, “expects”, “potential”, “is expected”, “anticipated”, “is targeted”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates”, or “believes” or the negatives thereof or variations of such words and phrases or statements that certain actions, events or results “may”, “could”, “would”, “might” or “will” be taken, occur or be achieved. Forward-looking statements or information should not be read as guarantees of future performance and results. They are subject to known and unknown risks, uncertainties and other factors which may cause the actual results and events to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements or information.

Such risks and uncertainties include, without limitation, those relating to: the ability of the Company to complete the ramp-up of its underground mine (the “Underground Mine”) within the expected cost estimates and timeframe; requirements for additional capital and no assurance can be given regarding the availability thereof; the impact of the COVID-19 pandemic on the business and operations of the Company; the state of financial markets; history of losses; dilution; adverse events relating to milling operations, construction, development and ramp-up, including the ability of the Company to address underground development and process plant issues; failure to obtain extensions under and amendments to the Company’s amended and restated senior credit facility with KfW IPEX-Bank; ground conditions; cost overruns relating to development, construction and ramp-up of the Underground Mine; loss of material properties; interest rates increase; global economy; limited history of production; future metals price fluctuations; speculative nature of exploration activities; periodic interruptions to exploration, development and mining activities; environmental hazards and liability; industrial accidents; failure of processing and mining equipment to perform as expected; labor disputes; supply problems; uncertainty of production and cost estimates; the interpretation of drill results and the estimation of mineral resources and reserves; changes in project parameters as plans continue to be refined; possible variations in ore reserves, grade of mineralization or recovery rates from management’s expectations and the difference may be material; legal and regulatory proceedings and community actions; accidents; title matters; regulatory approvals and restrictions; increased costs and physical risks relating to climate change, including extreme weather events, and new or revised regulations relating to climate change; permitting and licensing; volatility of the market price of the Company’s securities; insurance; competition; hedging activities; currency fluctuations; loss of key employees; other risks of the mining industry as well as those risks discussed in the Company’s Management’s Discussion and Analysis in respect of the year ended December 31, 2020 and in the section entitled “Risk Factors” in the Company’s Annual Information Form dated March 18, 2021. Should one or more of these risks or uncertainties materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those described in forward-looking statements and information. The forward-looking information and statements are stated as of the date hereof. Nevada Copper disclaims any intent or obligation to update forward-looking statements or information except as required by law. Readers are referred to the additional information regarding Nevada Copper’s business contained in Nevada Copper’s reports filed with the securities regulatory authorities in Canada. Although the Company has attempted to identify important factors that could cause actual actions, events, or results to differ materially from those described in forward-looking statements, there may be other factors that could cause actions, events or results not to be as anticipated, estimated or intended. For more information on Nevada Copper and the risks and challenges of its business, investors should review Nevada Copper’s filings that are available at www.sedar.com.

Nevada Copper provides no assurance that forward-looking statements and information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements or information. Accordingly, readers should not place undue reliance on forward-looking statements or information.

Categories
Base Metals Energy Junior Mining Project Generators Uncategorized

Azincourt Energy Completes Radioactive Survey – Updates Plans for thr East Preston Uranium Project

Figure 1: Target corridors at the East Preston Uranium Project, Western Athabasca Basin Saskatchewan

Figure 1: Target corridors at the East Preston Uranium Project, Western Athabasca Basin Saskatchewan
Figure 1: Target corridors at the East Preston Uranium Project, Western Athabasca Basin Saskatchewan
Figure 1: Target corridors at the East Preston Uranium Project, Western Athabasca Basin Saskatchewan

Figure 2: 2021 Drill Target areas at the East Preston Uranium Project

Figure 2: 2021 Drill Target areas at the East Preston Uranium Project
Figure 2: 2021 Drill Target areas at the East Preston Uranium Project
Figure 2: 2021 Drill Target areas at the East Preston Uranium Project

Figure 3: 2021 Radiometric survey coverage at East Preston Uranium Project

Figure 3: 2021 Radiometric survey coverage at East Preston Uranium Project
Figure 3: 2021 Radiometric survey coverage at East Preston Uranium Project
Figure 3: 2021 Radiometric survey coverage at East Preston Uranium Project

Figure 4: Project Location – Western Athabasca Basin, Saskatchewan, Canada

Figure 4: Project Location – Western Athabasca Basin, Saskatchewan, Canada
Figure 4: Project Location – Western Athabasca Basin, Saskatchewan, Canada
Figure 4: Project Location – Western Athabasca Basin, Saskatchewan, Canada

VANCOUVER, British Columbia, Sept. 07, 2021 (GLOBE NEWSWIRE) — AZINCOURT ENERGY CORP. (“Azincourt” or the “Company”) (TSX.V: AAZ, OTC: AZURF), is pleased to report the completion of the airborne radiometric survey and provide an update on preparations for the upcoming 2021-2022 drill program at the East Preston uranium project, located in the western Athabasca Basin, Saskatchewan, Canada.

The primary target area for the 2021-2022 program continues to be the conductive corridor from the A-Zone through to the G-Zone (Figures 1 and 2). The selection of this trend is based on a compilation of results from the 2018 through 2020 ground-based EM and gravity surveys, property wide VTEM and magnetic surveys, and the 2019 through 2021 drill programs. The 2020 HLEM survey completed in December indicates multiple prospective conductors and structural complexity along the eastern edge of this corridor.

Airborne Radiometric Survey Complete

Terralogic Exploration Inc. was contracted to facilitate an airborne radiometric survey over the previously unsurveyed southern portion of the property and conduct field investigations of resulting anomalies. Special Project Inc. (SPI) of Calgary, Alberta conducted the survey using a fixed wing aircraft to complete the airborne radiometric survey, which consisted of 2,514 km of survey lines flown at a low minimum altitude and 50 m line spacing to ensure good data collection and a high survey resolution. The survey commenced on August 4th and was completed by August 14th. Preliminary results have been received (Figure 3) and ground-based follow-up of identified anomalies is currently underway.

An airborne radiometric survey uses a gamma ray scintillometer mounted on an airborne platform to measure and map the natural radiation emitted by the rocks and soil the aircraft is flying over. Gamma radiation occurs from the natural decay of elements such as uranium, thorium, and potassium. Locations that have a higher radiation signature (anomalies) than the normal values for the surrounding area (background) would then be examined by crews on the ground for the potential presence of radioactive bedrock if there is not much glacial till cover, or boulders in the till that could be traced back to a source. Many uranium deposits in the Athabasca Basin, including the nearby Triple-R deposit, have been found by following trails of radioactive boulders in the glacial till back to their source.

“The radiometric survey coverage has further highlighted the G-zone and the Q-zone to the east, reinforcing our decision to focus on these conductive packages at this stage of the project. I’m eager to see what boots on the ground may yet show based on these results,” said VP, Exploration, Trevor Perkins.

Updated Exploration Plans

The planned early fall diamond drilling program to complete approximately 1,000 meters of drilling remaining from the shortened winter 2021 program has been rescheduled after consultation with local communities and contractors. As a result, this meterage will be used to further expand the upcoming extensive winter drill program. This program will now consist of approximately 7,000 meters in 30-35 drill holes. Preparations are set to begin in early December. Target selection is ongoing and will be refined based on the ground-based follow-up of anomalies identified from the recently completed airborne survey.

“We don’t want our activities to negatively impact traditional activities by members of the local communities in the area at this critical time of year. There are number of concerns, including the impact of this summer’s heightened fire conditions on the environment,” said VP Exploration, Trevor Perkins. “In consideration of this, we made the decision in consultation with the community to push the scheduled 1000 meters out 90 days into an expanded winter program, which is due to commence in December. We are looking forward to the upcoming drill campaign,” continued Mr. Perkins.

“The radiometric survey has successfully increased our potential target inventory at East Preston,” said Alex Klenman, President and CEO. “In addition, in a matter of weeks we’ll be starting the largest drill campaign yet at East Preston. We are heading towards discovery, with all previous work programs contributing critical data and creating what is now a very compelling exploration case. With renewed life in the sector, our timing appears to be really good. The next couple of years could be very exciting for both the Company and our shareholders,” continued Mr. Klenman.

Permits and funding are in place to complete all the planned work through the winter of 2022, and consultations and information sessions with local communities will continue throughout.

Figure 1: Target corridors at the East Preston Uranium Project, Western Athabasca Basin Saskatchewan

https://www.globenewswire.com/NewsRoom/AttachmentNg/678db516-1e2e-47ae-acb5-6ee4fe64e309

Figure 2: 2021 Drill Target areas at the East Preston Uranium Project

https://www.globenewswire.com/NewsRoom/AttachmentNg/89b870d5-adf9-4a4c-8539-826dc2b170ca

Figure 3: 2021 Radiometric survey coverage at East Preston Uranium Project.

https://www.globenewswire.com/NewsRoom/AttachmentNg/ca66b2fa-0f19-455c-88b4-656a301bbfb5

Figure 4: Project Location – Western Athabasca Basin, Saskatchewan, Canada

https://www.globenewswire.com/NewsRoom/AttachmentNg/0da59997-2297-475f-a4b6-a152359fa6f6

About East Preston

Azincourt controls a majority 70% interest in the 25,000+ hectare East Preston project as part of a joint venture agreement with Skyharbour Resources (TSX.V: SYH), and Dixie Gold. Three prospective conductive, low magnetic signature corridors have been discovered on the property. The three distinct corridors have a total strike length of over 25 km, each with multiple EM conductor trends identified. Ground prospecting and sampling work completed to date has identified outcrop, soil, biogeochemical and radon anomalies, which are key pathfinder elements for unconformity uranium deposit discovery.

The East Preston Project has multiple long linear conductors with flexural changes in orientation and offset breaks in the vicinity of interpreted fault lineaments – classic targets for basement-hosted unconformity uranium deposits. These are not just simple basement conductors; they are clearly upgraded/enhanced prospectivity targets because of the structural complexity.

The targets are basement-hosted unconformity related uranium deposits similar to NexGen’s Arrow deposit and Cameco’s Eagle Point mine. East Preston is near the southern edge of the western Athabasca Basin, where targets are in a near surface environment without Athabasca sandstone cover – therefore they are relatively shallow targets but can have great depth extent when discovered. The project ground is located along a parallel conductive trend between the PLS-Arrow trend and Cameco’s Centennial deposit (Virgin River-Dufferin Lake trend).

Qualified Person

The technical information in this news release has been prepared in accordance with the Canadian regulatory requirements set out in National Instrument 43-101 and reviewed on behalf of the company by C. Trevor Perkins, P.Geo., Vice President, Exploration of Azincourt Energy, and a Qualified Person as defined by National Instrument 43-101.

About Azincourt Energy Corp.

Azincourt Energy is a Canadian-based resource company specializing in the strategic acquisition, exploration, and development of alternative energy/fuel projects, including uranium, lithium, and other critical clean energy elements. The Company is currently active at its majority controlled joint venture East Preston uranium project in the Athabasca Basin, Saskatchewan, Canada, and the Escalera Group uranium-lithium project located on the Picotani Plateau in southeastern Peru.

ON BEHALF OF THE BOARD OF AZINCOURT ENERGY CORP.

“Alex Klenman”
Alex Klenman, President & CEO

Neither the TSX Venture Exchange nor its regulation services provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

This press release includes “forward-looking statements”, including forecasts, estimates, expectations and objectives for future operations that are subject to a number of assumptions, risks and uncertainties, many of which are beyond the control of Azincourt. Investors are cautioned that any such statements are not guarantees of future performance and that actual results or developments may differ materially from those projected in the forward-looking statements. Such forward-looking information represents management’s best judgment based on information currently available. No forward-looking statement can be guaranteed, and actual future results may vary materially.

For further information please contact:

Alex Klenman, President & CEO
Tel: 604-638-8063
info@azincourtenergy.com

Azincourt Energy Corp.
1430 – 800 West Pender Street
Vancouver, BC V6C 2V6
www.azincourtenergy.com

Categories
Energy Junior Mining Precious Metals

Magna Gold Announces Grant of Stock Options

TORONTO, Sept. 3, 2021 /PRNewswire/ – Magna Gold Corp. (TSXV: MGR) (OTCQB: MGLQF) (“Magna” or the “Company”) announced today that, pursuant to the Company’s stock option plan, it has granted a total of 1,000,000 stock options to officers and employees of the Company. Each option is exercisable at CAD $0.90 per common share of the Company until September 3, 2026 with the stock options vesting immediately. The closing price of the Company’s common shares on September 2, 2021, the date prior to the grant of the stock options, was CAD $0.94 per share.

Magna Gold Corp (CNW Group/Magna Gold Corp.)
Magna Gold Corp (CNW Group/Magna Gold Corp.)

About Magna Gold Corp
Magna is a Mexico focused gold/silver production company focused on acquiring, exploring, developing and operating quality precious metals properties in Mexico. It is committed to advancing its 100% owned flagship San Francisco Mine and other highly prospective mineral properties located in Sonora and in Chihuahua. The primary strength of the Company is the team of highly experienced mining professionals with a proven track record of developing properties in Mexico from discovery to production. Magna employs community members and services in its operations.

ON BEHALF OF THE BOARD OF DIRECTORShttps://s.yimg.com/rq/darla/4-9-0/html/r-sf-flx.html

Arturo Bonillas

President and CEO

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Cautionary Statements

This News Release includes certain “forward-looking statements” which are not comprised of historical facts. Forward-looking statements include estimates and statements that describe the Company’s future plans, objectives or goals, including words to the effect that the Company or management expects a stated condition or result to occur. Forward-looking statements may be identified by such terms as “believes”, “anticipates”, “expects”, “estimates”, “may”, “could”, “would”, “will”, or “plan”. Since forward-looking statements are based on assumptions and address future events and conditions, by their very nature they involve inherent risks and uncertainties. Although these statements are based on information currently available to the Company, the Company provides no assurance that actual results will meet management’s expectations. Risks, uncertainties and other factors involved with forward-looking information could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. Forward-looking information in this news release includes, but is not limited to, the Company’s objectives, goals or future plans. Factors that could cause actual results to differ materially from such forward-looking information include, but are not limited to failure to identify mineral resources, failure to convert estimated mineral resources to reserves, the inability to complete a feasibility study which recommends a production decision, the preliminary nature of metallurgical test results, delays in obtaining or failures to obtain required governmental, environmental or other project approvals, political risks, uncertainties relating to the availability and costs of financing needed in the future, changes in equity markets, inflation, changes in exchange rates, fluctuations in commodity prices, delays in the development of projects, capital, operating and reclamation costs varying significantly from estimates and the other risks involved in the mineral exploration and development industry, risks related to the effects of COVID-19 on the Company; and those risks set out in the Company’s public documents filed on SEDAR. Although the Company believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. The Company disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by law.