Categories
Base Metals Energy Exclusive Interviews Junior Mining Precious Metals Rover Metals

Rover Metals – New Flagship, Critical Minerals, Brownfields

Joining us for a conversation is Judson Culter the CEO of Rover Metals to discuss the company’s newest project acquisition, the Indian Mountain Lake Project, representing approximately 30,000 acres of greenstone belt, that will offer shareholders exposure to critical minerals – Zinc, Lead, Silver, and Copper.

0:00 Introduction
0:35 Rover Metals Company Overview
1:00 Indian Mountain Lake – Critical Minerals Project (Brownfields)
3:13 (3%) Blue Sky Potential
4:07 New Flagship – Zinc, Lead, Silver, Copper
5:43 Genetic Model
7:46 Infrastructure
10:18 Goals this year on the Indian Mountain Lake Project
11:42 Exploration Work – Twin and or Step Out Drilling
12:57 News flow for the 2022
14:55 Capital Structure
15:23 Message for Shareholders
17:06 What did I forget to ask

Rover Metals has an option to own a 90% interest in the Indian Mountain Lake Volcanic Massive Sulphide project, NT, Canada. The Indian Mountain Lake Project is the Company’s first district scale land package, representing approximately 30,000 acres of greenstone belt. The project has a historical Zinc-Copper-Lead-Silver geological resource. The Indian Mountain Lake VMS Project has had exploration dating back to the 1940s and has a historical resource spread across four zones on the project. The BB Zone and Kennedy Lake Zone have a combined historic resource of 1,400,000 tons grading 10% combined zinc and lead with 3.5 OPT (ounces per ton) of silver. Approximately 900 metres west of the BB Zone, the Kennedy Lake West Zone has a historic resource of 610,000 tons grading 1.15% copper. About 8 km southeast of the BB Zone, the Susu Lake Zone, has a historical resource consisting of 142,500 tons grading 0.95% copper*.

The property is located approximately 195 km east-northeast of Yellowknife, NT, off the eastern arm of Great Slave Lake. Seasonal access relies upon fixed or rotor wing support. A right of way was cleared to the project from Thompson Landing in the 1970’s. If this right of way were to be brushed out it would provide barge access at Thompson Landing, from Yellowknife, with ground transportation, considerably lowering any logistical costs. Future Government of Canada federally funded hydro-energy infrastructure could come close to the project if the Taltson Hydro Dam expansion proceeds through the eastern arm of Great Slave Lake into Yellowknife. At the southwest-end of Great Slave Lake, Osisko Metals is gearing up to reopen the Pine Point Zinc-Lead Mine. At nearby Hay River, NT, there is a rail line to the Teck Resources Zinc Refinery in Trail, BC.

*These resources are historic in nature. Further drilling is needed to bring them up to CIM Definition Standards. The historic data has not been verified by Rover. The historic information is provided in the 2103 Assessment Report for Indian Mountain Lake which is in public record with the Government of the Northwest Territories. Technical information has been approved by Gary Vivian, M.Sc., P.Geo., QP for the purposes of NI 43-101.

The Company’s management believes that the Indian Mountain Lake VMS Project has the potential to be a Tier 1 Zinc and Copper project. The historical resource represents only 3% of the total land package. The blue sky on the remaining 97% of the greenstone belt is: (1) for additional zinc resources and (2) a significant new copper discovery. Historical workings also document the presence of copper-gold skarn systems. The historic zones are open along strike and below a vertical depth of 150 meters.

In Canada, Zinc and Copper are on the Federal Government’s Critical Minerals List, and part of the Canadian Government’s Critical Minerals Strategy. As a result, the project qualifies for the 30% critical mineral flow-through investor tax credit. Zinc-Copper-Lead-Silver are also on the U.S. Critical Minerals List.

Metals trades under the symbol “ROVR” on the TSXV. Rover also obtained a public co-listing of its securities on the OTCQB on January 17, 2019 (OTCQB: ROVMF), and on the Frankfurt Stock Exchange on February 1, 2021 (FRA: 4XO).

On August 9, 2018, Rover Metals acquired a 100% interest in the Cabin Lake Property completing its area play for the Cabin Lake Group of Gold Projects. The Cabin Lake Group of Gold Projects are located 110 km northwest of Yellowknife and 20 km southeast of Fortune Minerals’ NICO Project and close to the new Tlicho All Season Road. The properties hosts high-grade gold in iron formation in archean metasedimentary.

On September 9, 2016, Rover Metals Optioned up to a 100% interest in the Up Town Gold Property. The Up Town Gold Property is a high grade Archean lode gold prospect adjoining the Giant Mine in Yellowknife, Northwest Territories. The Property consists of 6 claims covering 3,227 hectares and borders the west side of the Giant Mine leases. The Property centre is approximately 6 km north from downtown Yellowknife, and adjoins Gold Terra’s Northbelt claims.

Website: https://rovermetals.com/index.html
Corporate Presentation: https://rovermetals.com/pitchdeck/ROVR-presentation.pdf

Fact Sheet: https://rovermetals.com/s/Rover_FactSheet_v07-letter_web.pdf

Website | https://www.provenandprobable.com

Contact: Contact@provenandprobable.com

PRECIOUS METALS:
Call me directly at 855.505.1900 or email: Maurice@MilesFranklin.com
Precious Metals FAQhttps://www.milesfranklin.com/faq-maurice/

Proven and Probable
Where we deliver Mining Insights & Bullion Sales. I’m a licensed broker for Miles Franklin Precious Metals Investments, where we provide unlimited options to expand your precious metals portfolio, from physical delivery, offshore depositories, and precious metals IRA’s. Call me directly at (855) 505-1900 or you may email maurice@milesfranklin.com.

Proven and Probable provides insights on mining companies, junior miners, gold mining stocks, uranium, silver, platinum, zinc & copper mining stocks, silver and gold bullion in Canada, the US, Australia, and beyond.

Categories
Base Metals

Two charts show copper price drop may have been overdone

Original Source: https://www.mining.com/two-charts-show-copper-price-drop-may-have-been-overdone/

Two charts show copper price slump may have been overdone

Altonorte anodes port of Antofagasta, Chile. Image from Glencore.

Copper is on track for its worst monthly run of losses since 2015, with another steep decline so far in August. Although off its recent lows, large-scale speculators in the copper market like hedge funds have held net short positions – bets on falling prices – for six weeks running.

A global energy crisis centred in Europe, a slump in China – particularly the crucial property and construction sector – inflation and fears of a recession in the US and a surging dollar have been assigned blame for all the gloom in the copper market at the moment. 

Copper’s short term woes frequently butt up against its longer term tailwinds, thanks to its central role in the green energy transition, making accurate forecasting difficult if not impossible. 

Bewarehouses 

In particular, tracking Goldman Sachs’ trajectory on the copper market has been something of a white knuckle ride. 

In February the investment bank predicted a “scarcity episode” by the end of the 2022 as global stocks fell to dangerously low levels

In April, Goldman forecast copper reaching an all-time high before the end of 2022 because the market was “sleepwalking towards a stock-out.” 

In July, with the price falling to a 20-month low, the firm’s analyst conceded that their great expectations for copper in the short term will have to be postponed

But Goldman’s main argument of the dangers of a “scarcity episode” or a “stock-out” remains well supported.     

Days left 

WHEN THE CHINESE GOVERNMENT STARTS BUYING COPPER ON THE OPEN MARKET IT’S USUALLY READ AS A SIGN OF PRICES BOTTOMING

Wall Street natural resource investment house Goehring & Rozencwajg Associates in their Q2 update released last week exhibits a five year chart of global copper warehouse inventories.  

Goehring & Rozencwajg points out that after bottoming at 165,000 tonnes at the end of 2021, stockpiles rebounded to 300,000 by mid-May, but have since pulled back to 240,000 tonnes: 

“When adjusted for days of consumption, inventories are almost as low as they were back in 2005, just before copper prices more than doubled. In 2005, copper exchange inventories covered consumption by only two days. 

“By the end of 2021, inventories had fallen to only 2.5 days of consumption, and at 240,000 tonnes today, inventories cover consumption by only 3.5 days – still an extremely low number.” 

Two charts show copper price slump may have been overdone

Shipping news

As for concerns about the appetite of China – responsible for some 55% of the world’s copper consumption – the bellwether metal is the one commodity that is showing positive import growth this year. 

China’s unwrought copper imports are up nearly 6% while concentrate shipments are around 7% higher so far this year, encouraged by the fall in price, according to Capital Economics, a London-based research firm. In contrast, cargoes of iron ore, for which China is significantly more reliant on imports than copper, are down 3.5%.  

Despite robust imports, physical stocks of copper across the country are at year lows, according to Shanghai Metals Market, dropping to 61,300 tonnes as of Friday.

That is down more than 60% from total inventories of more than 150,000 recorded this time in 2021. SMM also said rumours about strategic stockpiling of copper by China’s state reserves bureau remain “unconfirmed”. When the Chinese government starts buying copper on the open market it’s usually read as a sign of prices bottoming.

Two charts show copper price slump may have been overdone

Prop up property

Beijing is ramping up measures to prop up the housing market. In July plans for a $44 billion fund backed by the central bank to rescue beleaguered developers came to light.  

Over the weekend PBOC slashed its key interest rate by 1.5%, matching its biggest cut on record. Local governments have also started to lend to developers to continue construction of uncompleted homes as buyers threaten non-payment unless their paid-for homes are ready to move in.       

As Goldman Sachs pointed out in an October 2021 report, while construction and its associated sectors account for 40% of China’s copper demand, construction itself accounts for 20% and over 90% of that demand comes from completions, not from new starts.

Lower longer

Goldman has hacked its original forecasts and now sees copper averaging only 7,400 a tonne in Q4 2022, down from over $10,000 before. 

Goldman joins other sceptics, including Capital Economics ($7,250), JP Morgan ($6,500) and Standard Chartered ($7,850) who see prices going lower from today’s level according to data compiled by FocusEconomics

Thirteen out of 35 analysts cut their forecast for the copper market in the Barcelona-based researcher’s August survey. The consensus forecast for full year 2023 is $8,400, a rather uninspiring 5% upside from the price in New York early Tuesday. 

Goldman’s longer term outlook based on a “clear structural bull story” is $15,000 by 2025.

Better late than never.

Categories
Base Metals Energy Granite Creek Copper Junior Mining Metallic Group Precious Metals

Granite Creek Copper Acquires Copper-Nickel-PGM Project in British Columbia, Canada

Granite Creek Copper, Proven and Probable

VANCOUVER, BC / ACCESSWIRE / August 24, 2022 / Granite Creek Copper Ltd. (TSXV:GCX | OTCQB:GCXXF) (“Granite Creek” or the “Company“) is pleased to announce the acquisition of the Star Cu-Ni-Platinum Group Metal (“PGM”) project, located in the Omineca mineral belt of northern British Columbia.

Granite Creek will secure a 100% interest in the Star project, with no underlying royalty or further obligation, for a total consideration of $10,000 CDN and the issuance of 500,000 common shares of the Company to the estate of Ursula Mowat. The issued shares will have a hold period of 4 months plus one day from the date of issuance. The Company anticipates closing the transaction on or about the August 30, 2022, subject to TSX Venture approval.

Tim Johnson, CEO of Granite Creek Copper, stated, “I was saddened to hear of the passing of Ursula Mowat who had been a pioneer in prospecting for platinum group metals and associated nickel and copper mineralisation in the Omineca region of British Columbia. As one of the first geologists to recognize the potential for the native iron-nickel alloy awaruite to be a significant source of low-cost nickel in the Omineca area, she will be remembered for her ground-breaking work in the industry. To be able to acquire the Star project claims and continue the development work to unlock the potential that Ursula obviously saw is an honour. We look forward to completing our initial work on the claims and relaying to investors the potential for both precious and battery metals on the project.”

“Although Granite Creek’s primary focus remains our flagship Carmacks Copper-Gold-Silver project with the pending updated preliminary economic assessment expected in Q4 2022, the Star project increases our exposure to critical minerals at a time when the Canadian government is incentivizing exploration of listed critical commodities in Canada, as part of a broader push to secure supplies of the minerals in North America for national security and to support the development of carbon free energy sources.”

About the Star Project

The Star project is located 190 kilometers northeast of Smithers, BC and is within 5 kilometers of the Omineca Resource Road and powerline that served the Kemess Mine. The 2500-hectare project is underlain by ultramafic rocks that are prospective for copper, nickel, cobalt, PGMs and gold. Previous work identified multiple showings consisting of copper and nickel sulphide mineralisation with accompanying PGM and gold values. The showings are identified within six distinct zones spread over a 12-kilometer strike length including Queen Zone, GL Zone, HB Zone, HC Zone, Libra Zone, and Ridge Zone (see accompanying Figure 1 for Zone locations as well as additional areas identified for follow up).

Highlights of some of the best mineralised copper and nickel sulfide bearing rock sampled by Ms. Mowat from the various are identified below:

  • 1.18% Cu, 0.17 g/t Au, 0.11 g/t Pd from the Queen Zone
  • 0.78% Cu, 0.25% Ni, 833 ppm Co and 0.27% Cu from the GL Zone.
  • 0.09 % Cu, 1.32 g/t Pt and 1.82 g/t Pd from the HB Zone.
  • 0.87% Cu, 0.18 % Ni, 0.12 g/t Au, 0.41 g/t Pt and 0.83 g/t Pd from the HC Zone.
  • 0.31% Cu Cu from Libra Zone
  • 0.30% Cu, 0.28 g/t Pt, 0.25 g/t Pd from the Ridge Zone.
Granite Creek Copper Ltd., Wednesday, August 24, 2022, Press release picture
Figure 1 Claim Block and Zone Location

Qualified Persons

Ms. Debbie James, P.Geo., a qualified person for the purposes of National Instrument 43-101, has reviewed and approved the technical in this news release. Ms. James is a Senior Geologist with TruePoint Exploration and a Project Manager for Granite Creek Copper.

About Granite Creek Copper

Granite Creek, a member of the Metallic Group of Companies, is a Canadian exploration company focused on the 176-square-kilometer Carmacks project in the Minto copper district of Canada’s Yukon Territory. The project is on trend with the high-grade Minto copper-gold mine, operated by Minto Metals Corp., to the north, and features excellent access to infrastructure with the nearby paved Yukon Highway 2, along with grid power within 12 km. The project is located within the Traditional Territory of Little Salmon/Carmacks First Nation. More information about Granite Creek Copper can be viewed on the Company’s website at www.gcxcopper.com.

FOR FURTHER INFORMATION PLEASE CONTACT:

Timothy Johnson, President & CEO

Telephone: 1 (604) 235-1982

Toll-Free: 1 (888) 361-3494

E-mail: info@gcxcopper.com

Website: www.gcxcopper.com

Metallic Group: www.metallicgroup.ca

Twitter: @yukoncopper

Forward-Looking Statements

This news release includes certain statements that may be deemed “forward-looking statements”. All statements in this release, other than statements of historical facts including, without limitation, statements regarding potential mineralization, historic production, estimation of mineral resources, the realization of mineral resource estimates, interpretation of prior exploration and potential exploration results, the timing and success of exploration activities generally, the timing and results of future resource estimates, permitting time lines, metal prices and currency exchange rates, availability of capital, government regulation of exploration operations, environmental risks, reclamation, title, and future plans and objectives of the company are forward-looking statements that involve various risks and uncertainties. Although Granite Creek Copper believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in the forward-looking statements. Forward-looking statements are based on a number of material factors and assumptions. Factors that could cause actual results to differ materially from those in forward-looking statements include failure to obtain necessary approvals, unsuccessful exploration results, changes in project parameters as plans continue to be refined, results of future resource estimates, future metal prices, availability of capital and financing on acceptable terms, general economic, market or business conditions, risks associated with regulatory changes, defects in title, availability of personnel, materials and equipment on a timely basis, accidents or equipment breakdowns, uninsured risks, delays in receiving government approvals, unanticipated environmental impacts on operations and costs to remedy same, and other exploration or other risks detailed herein and from time to time in the filings made by the companies with securities regulators. Readers are cautioned that mineral resources that are not mineral reserves do not have demonstrated economic viability. Mineral exploration and development of mines is an inherently risky business. Accordingly, the actual events may differ materially from those projected in the forward-looking statements. For more information on Granite Creek Copper and the risks and challenges of their businesses, investors should review their annual filings that are available at www.sedar.com.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

SOURCE: Granite Creek Copper Ltd.



View source version on accesswire.com:
https://www.accesswire.com/713412/Granite-Creek-Copper-Acquires-Copper-Nickel-PGM-Project-in-British-Columbia-Canada

Categories
Base Metals Collective Mining Energy Junior Mining Precious Metals

Collective Mining Commences a Phase II Drill Program at the Olympus Target

Collective Mining Ltd.
Collective Mining Ltd.

Figure 1

Plan View of the Guayabales Project Highlighting the Olympus Target
Plan View of the Guayabales Project Highlighting the Olympus Target

Figure 2

Plan View of the Olympus Target Outlining the Phase II Drilling Location (red circle) and Highlighting Previously Announced Drilling and Channel Sampling Assay Results
Plan View of the Olympus Target Outlining the Phase II Drilling Location (red circle) and Highlighting Previously Announced Drilling and Channel Sampling Assay Results

Figure 3

Photo of the Underground Drill Chamber and Rig
Photo of the Underground Drill Chamber and Rig

TORONTO, Aug. 17, 2022 (GLOBE NEWSWIRE) — Collective Mining Ltd. (TSXV: CNL) (OTCQX: CNLMF) (“Collective” or the “Company”) is pleased to announce that drilling has recommenced at the Olympus target (“Olympus”), one of eight newly generated porphyry related targets at the Guayabales project, located in Caldas, Colombia. The phase II drill program, which will be executed exclusively from underground chambers, will follow up on the Phase I program which yielded an important grassroots discovery for the Company highlighted by hole OLCC-3 which averaged 301.9 metres @ 1.11 g/t AuEq (see press release dated March 15, 2022). There are currently four rigs operating at the project as part of the Company’s fully financed minimum 20,000 metre drill program for 2022 with one rig drilling at Olympus and three rigs following up on the recent significant discovery at the Apollo target highlighted by hole APC-2 which averaged 207.15 metres @ 2.68 g/t AuEq (see press release dated August 10, 2022).

Highlights (See Figures 1-3)

  • Olympus is a large-scale target area measuring up to 1,400 metres north-south by 900 metres east-west and hosts over 50 ancestral mines with over 25 veins mapped from available exposures. The Phase I drill program was focused on the northern portion of this target area and intersected multiple broad zones of mineralization beginning near surface highlighted by:
    • 301.9 metres @ 1.11 g/t AuEq (OLCC-3) and
    • 216.7 metres @ 1.08 g/t AuEq (OLCC-4) (see press release dated May 9, 2022)
  • The phase II drill program, which is now underway, will step out up to 500 metres along strike to the southwest from drill hole OLCC-3 into an area where most of the historical and current ancestral mines are located. It is within this southwest area that the Company has reported multiple high-grade chip channel samples taken from underground working faces with grades as high as 485 g/t gold and 2,359 g/t silver (see press releases dated December 1, 2021, and July 19, 2022). Additionally, systematic channel sampling from a crosscut developed within an ancestral mine orthogonal to the strike of the main mineralized system yielded the following assay result:
    • 182.45 metres @ 1.15 g/t gold equivalent (true horizontal width) (see press release dated July 19, 2022)
  • The phase II underground drill program is expected to ramp up in scale for the balance of the year as new drill chambers are constructed and additional rigs are added.
  • Even though the target is at an early stage of exploration, the Company believes that the decision to construct chambers and drill from underground for its phase II program is an innovative approach to work with the ancestral miners operating at the Olympus target for the following reasons:
    • Working underground with the ancestral miners will increase cooperation amongst the stakeholders resulting in ever increasing trust and transparency.
    • The Company will promote the best health and safety practices and mine-planning and in return the Company gains an understanding of the challenges the ancestral miners face and underground access to new working faces and veins as they are discovered.
    • Drilling from underground will eliminate the challenges associated with lack of drilling angles from surface due to the steep topography resulting in an accelerated timeline to evaluate and advance the Olympus target.
  • Mineralization at Olympus is characterized by high-grade, late-stage carbonate base metal (“CBM”) sheeted veins impregnating either porphyry diorite host rock or schist host rock, with the former offering potential to produce a bulk tonnage mineralized systems and the latter offering potential to produce high-grade vein systems.

    “We are excited to have initiated the phase II drill program at Olympus as we are now targeting what the Company interprets to be the heart of the mineralized system,” commented Ari Sussman, Executive Chairman. “Olympus offers potential for both bulk tonnage and high-grade vein mineralization and we are looking forward to reporting assay results from the new program in due course.”

Figure 1: Plan View of the Guayabales Project Highlighting the Olympus Target

https://www.globenewswire.com/NewsRoom/AttachmentNg/6f9d5006-c691-4716-8b79-c825b54a903a

Figure 2: Plan View of the Olympus Target Outlining the Phase II Drilling Location (red circle) and Highlighting Previously Announced Drilling and Channel Sampling Assay Results

https://www.globenewswire.com/NewsRoom/AttachmentNg/a954ee6d-b120-4f2d-ba72-dc78d30a1fa8

Figure 3: Photo of the Underground Drill Chamber and Rig

https://www.globenewswire.com/NewsRoom/AttachmentNg/5d5f0535-e925-473c-bc0f-37a8f769b0ac

About Collective Mining Ltd.

Twitter: @CollectiveMini1
Instagram: CollectiveMining
LinkedIn: Collective Mining
Facebook: Collective Mining Colombia

To see our latest corporate presentation, please visit www.collectivemining.com

Collective Mining is an exploration and development company focused on identifying and exploring prospective mineral projects in South America. Founded by the team that developed and sold Continental Gold Inc. to Zijin Mining for approximately $2 billion in enterprise value, the mission of the Company is to repeat its past success in Colombia by making significant new mineral discoveries and advance the projects to production. Management, insiders and close family and friends own nearly 45% of the outstanding shares of the Company and as a result, are fully aligned with shareholders.

The Company currently holds an option to earn up to a 100% interest in two projects located in Colombia. As a result of an aggressive exploration program at both the Guayabales and San Antonio projects, a total of eleven major targets have been identified. The Company has made significant grassroot discoveries at both projects with near-surface discovery holes at the Guayabales project yielding 302 metres at 1.11 g/t AuEq at the Olympus target, 163 metres at 1.3 g/t AuEq at the Donut target and recently, at the Apollo target, 207.15 metres at 2.68 g/t AuEq. At the San Antonio project, the Company intersected, from surface, 710 metres at 0.53 AuEq. (See related press releases on our website for AuEq calculations)

Qualified Person (QP) and NI43-101 Disclosure

David J Reading is the designated Qualified Person for this news release within the meaning of National Instrument 43-101 (“NI 43-101”) and has reviewed and verified that the technical information contained herein is accurate and approves of the written disclosure of same. Mr. Reading has an MSc in Economic Geology and is a Fellow of the Institute of Materials, Minerals and Mining and of the Society of Economic Geology (SEG).

Technical Information

Rock and core samples have been prepared and analyzed at SGS laboratory facilities in Medellin, Colombia and Lima, Peru. Blanks, duplicates, and certified reference standards are inserted into the sample stream to monitor laboratory performance. Crush rejects and pulps are kept and stored in a secured storage facility for future assay verification. No capping has been applied to sample composites. The Company utilizes a rigorous, industry-standard QA/QC program.

Contact Information

Collective Mining Ltd.
Steve Gold, Vice President, Corporate Development and Investor Relations
Tel. (416) 648-4065

FORWARD-LOOKING STATEMENTS

This news release contains certain forward-looking statements, including, but not limited to, statements about the drill programs, including timing of results, and Collective’s future and intentions. Wherever possible, words such as “may”, “will”, “should”, “could”, “expect”, “plan”, “intend”, “anticipate”, “believe”, “estimate”, “predict” or “potential” or the negative or other variations of these words, or similar words or phrases, have been used to identify these forward-looking statements. These statements reflect management’s current beliefs and are based on information currently available to management as at the date hereof.

Forward-looking statements involve significant risk, uncertainties, and assumptions. Many factors could cause actual results, performance, or achievements to differ materially from the results discussed or implied in the forward-looking statements. These factors should be considered carefully, and readers should not place undue reliance on the forward-looking statements. Although the forward-looking statements contained in this news release are based upon what management believes to be reasonable assumptions, Collective cannot assure readers that actual results will be consistent with these forward-looking statements. These forward-looking statements are made as of the date of this news release, and Collective assumes no obligation to update or revise them to reflect new events or circumstances, except as required by law.

Neither the TSXV nor its Regulation Services Provider (as that term is defined in the policies of the TSXV) accepts responsibility for the adequacy or accuracy of this news release.

Categories
Base Metals Energy Junior Mining Precious Metals Rover Metals

Rover Metals Options Brownfields Critical Minerals Project At 60th Parallel, NT, Canada

Rover Metals Corp.
Rover Metals Corp.

VANCOUVER, British Columbia, Aug. 16, 2022 (GLOBE NEWSWIRE) — Rover Metals Corp. (TSXV: ROVR) (OTCQB: ROVMF) (FSE:4XO) (“Rover” or the “Company”) is pleased to announce that it has signed a letter of intent to option a 90% ownership interest in the Indian Mountain Lake Volcanic Massive Sulphide project, NT, Canada. The Indian Mountain Lake Project is the Company’s first district scale land package, representing approximately 30,000 acres of greenstone belt. The project has a historical Zinc-Lead-Silver-Copper geological resource.

Indian Mountain Lake VMS Project
The Indian Mountain Lake VMS Project has had exploration dating back to the 1940s and has a historical resource spread across four zones on the project. The BB Zone and Kennedy Lake Zone have a combined historic resource of 1,400,000 tons grading 10% combined zinc and lead with 3.5 OPT (ounces per ton) of silver*. Approximately 900 metres west of the BB Zone, the Kennedy Lake West Zone has a historic resource of 610,000 tons grading 1.15% copper*. About 8 km southeast of the BB Zone, the Susu Lake Zone, has a historical resource consisting of 142,500 tons grading 0.95% copper*.

The property is located approximately 195 km east-northeast of Yellowknife, NT, off the eastern arm of Great Slave Lake. Seasonal access relies upon fixed or rotor wing support. A right of way was cleared to the project from Thompson Landing in the 1970’s. If this right of way were to be brushed out it would provide barge access at Thompson Landing, from Yellowknife, with ground transportation, considerably lowering any logistical costs. Future Government of Canada federally funded hydro-energy infrastructure could come close to the project if the Taltson Hydro Dam expansion proceeds through the eastern arm of Great Slave Lake into Yellowknife. At the southwest-end of Great Slave Lake, Osisko Metals is gearing up to reopen the Pine Point Zinc-Lead Mine. At nearby Hay River, NT, there is a rail line to the Tech Resources Zinc Refinery in Trial, BC.

*These resources are historic in nature. Further drilling is needed to bring them up to CIM Definition Standards. The historic data has not been verified by Rover. The historic information is provided in the 2103 Assessment Report for Indian Mountain Lake which is in public record with the Government of the Northwest Territories.

Technical information has been approved by Gary Vivian, M.Sc., P.Geo., QP for the purposes of NI 43-101.

Judson Culter, CEO at Rover Metals, states, “We believe the Indian Mountain Lake VMS Project has the potential to be a Tier 1 Zinc and Copper project. The historical resource represents only 3% of the total land package. The blue sky on the remaining 97% of the greenstone belt is: (1) for additional zinc resources and; (2) a significant new copper discovery. Historical workings also document the presence of copper-gold skarn systems. The historic zones are open along strike and below a vertical depth of 150 meters.

In Canada, Zinc and Copper are on the Federal Government’s Critical Minerals List, and part of the Canadian Government’s Critical Minerals Strategy. As a result, the project qualifies for the 30% critical mineral flow-through investor tax credit.

Management of the Company also remain committed to the further development of its gold projects, and hope to be able to provide a news release about the Cabin Gold Project in the coming weeks.”

Map of Indian Mountain Lake Greenstone Belt

An updating release will be provided once the Company has executed its Definitive Option Agreement.

New Website
In connection with the Company expanding into critical minerals, the Company will be launching a new website in the coming days featuring the Indian Mountain Lake VMS Project. Investors are encouraged to visit our website to review the Company’s new investor materials, as the become available.

About Rover Metals
Rover is now both a critical minerals exploration company as well as a precious metals exploration company, specialized in North American (Canada and U.S.) mineral resource development. Five of the Company’s six resource projects are located near to the city of Yellowknife, 60th parallel, Canada.

You can follow Rover on its social media channels:
Twitter: https://twitter.com/rovermetals
LinkedIn: https://www.linkedin.com/company/rover-metals/
Facebook: https://www.facebook.com/RoverMetals/
for daily company updates and industry news, and
YouTube: https://www.youtube.com/channel/UCJsHsfag1GFyp4aLW5Ye-YQ?view_as=subscriber
for corporate videos.
Website: https://www.rovermetals.com/

ON BEHALF OF THE BOARD OF DIRECTORS
“Judson Culter”
Chief Executive Officer and Director

For further information, please contact:
Email: info@rovermetals.com
Phone: +1 (778) 754-2617

Statement Regarding Forward-Looking Information
This news release contains statements that constitute “forward-looking statements.” Such forward-looking statements involve known and unknown risks, uncertainties and other factors that may cause Rover’s actual results, performance or achievements, or developments in the industry to differ materially from the anticipated results, performance or achievements expressed or implied by such forward-looking statements. Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by the words “expects,” “plans,” “anticipates,” “believes,” “intends,” “estimates,” “projects,” “potential” and similar expressions, or that events or conditions “will,” “would,” “may,” “could” or “should” occur. There can be no assurance that such statements prove to be accurate. Actual results and future events could differ materially from those anticipated in such statements, and readers are cautioned not to place undue reliance on these forward-looking statements. Any factor could cause actual results to differ materially from Rover’s expectations. Rover undertakes no obligation to update these forward-looking statements in the event that management’s beliefs, estimates or opinions, or other factors, should change.

THE FORWARD-LOOKING INFORMATION CONTAINED IN THIS NEWS RELEASE REPRESENTS THE EXPECTATIONS OF THE COMPANY AS OF THE DATE OF THIS NEWS RELEASE AND, ACCORDINGLY, IS SUBJECT TO CHANGE AFTER SUCH DATE. READERS SHOULD NOT PLACE UNDUE IMPORTANCE ON FORWARD-LOOKING INFORMATION AND SHOULD NOT RELY UPON THIS INFORMATION AS OF ANY OTHER DATE. WHILE THE COMPANY MAY ELECT TO, IT DOES NOT UNDERTAKE TO UPDATE THIS INFORMATION AT ANY PARTICULAR TIME EXCEPT AS REQUIRED IN ACCORDANCE WITH APPLICABLE LAWS.

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OF THIS RELEASE.

Categories
Energy Junior Mining Precious Metals Silver Bullet Mines

Silver Bullet Mines Corp. Closes Financing

Burlington, Ontario–(Newsfile Corp. – August 15, 2022) – Silver Bullet Mines Corp. (TSXV: SBMI) (OTCQB: SBMCF) (‘SBMI’ or ‘the Company’) is very pleased to announce it has closed on its debt financing (the “Financing”), previously announced on August 11, 2022.

The Financing is with SBMI’s largest institutional shareholder (the “Lender”), pursuant to which SBMI has borrowed CDN$650,000 (six hundred and fifty thousand dollars) from the Lender for an 18-month term. The Financing provides for an 8% annual interest rate and a conversion feature, whereby upon conversion the loan may convert into 2,166,667 units (each, a “Unit”) at an effective price of $0.30 per Unit. This is at a premium to the current market price. Each Unit is comprised of one common share and one common share purchase warrant exercisable at $0.35 for a four-year term.

“Management and the board have been working on this for a while,” said SBMI’s CEO, A. John Carter. “We believe this to be very attractive for the lender and friendly to our shareholders.”

SBMI also reports that Sepro Mineral Systems Corp., who assisted in the design of parts of SBMI’s mill in Arizona, is currently onsite and is assisting the Company in fine-tuning various components of the mill. The ramp-up using lower grade material continues.

Silver coming off the shaker table; picture taken Aug 15/22

To view an enhanced version of this photo, please visit:
https://images.newsfilecorp.com/files/8464/133956_a8aaf062a470f82c_001full.jpg

For further information, please contact:

John Carter
Silver Bullet Mines Corp., CEO
cartera@sympatico.ca
+1 (905) 302-3843

Peter M. Clausi
Silver Bullet Mines Corp., VP Capital Markets
pclausi@brantcapital.ca
+1 (416) 890-1232

Cautionary and Forward-Looking Statements

This news release contains certain statements that constitute forward-looking statements as they relate to SBMI and its subsidiaries. Forward-looking statements are not historical facts but represent management’s current expectation of future events, and can be identified by words such as “believe”, “expects”, “will”, “intends”, “plans”, “projects”, “anticipates”, “estimates”, “continues” and similar expressions. Although management believes that the expectations represented in such forward-looking statements are reasonable, there can be no assurance that they will prove to be correct.

By their nature, forward-looking statements include assumptions, and are subject to inherent risks and uncertainties that could cause actual future results, conditions, actions or events to differ materially from those in the forward-looking statements. If and when forward-looking statements are set out in this new release, SBMI will also set out the material risk factors or assumptions used to develop the forward-looking statements. Except as expressly required by applicable securities laws, SBMI assumes no obligation to update or revise any forward-looking statements. The future outcomes that relate to forward-looking statements may be influenced by many factors, including but not limited to: the impact of SARS CoV-2 or any other global virus; reliance on key personnel; the thoroughness of its QA/QA procedures; the continuity of the global supply chain for materials for SBMI to use in the production and processing of ore; shareholder and regulatory approvals; activities and attitudes of communities local to the location of the SBMI’s properties; risks of future legal proceedings; income tax matters; fires, floods and other natural phenomena; the rate of inflation; availability and terms of financing; distribution of securities; commodities pricing; currency movements, especially as between the USD and CDN; effect of market interest rates on price of securities; and, potential dilution. SARS CoV-2 and other potential global viruses create risks that at this time are immeasurable and impossible to define.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/133956

Categories
Energy Junior Mining Precious Metals Silver Hammer

Silver Hammer Reports on Drilling Progress at the Silver Strand Project in Idaho

Silver Hammer Mining Corp
Silver Hammer Mining Corp

Figure 1

Planned Phase II Drilling at Silver Strand
Planned Phase II Drilling at Silver Strand

VANCOUVER, British Columbia, Aug. 15, 2022 (GLOBE NEWSWIRE) — Silver Hammer Mining Corp. (CSE: HAMR; OTCQB: HAMRF) (the “Company” or “Silver Hammer”) is pleased to announce that the first drillhole of an 11-hole Phase II diamond drill program (“Phase II Drill Program”) has been completed at its past-producing Silver Strand Project in Idaho.

The Phase II Drill Program, which is utilizing the Company’s established underground drilling station, is focused on expanding known silver-gold mineralization further down-dip, while also testing the potential for additional mineralized chutes (see Figure 1). The Company has generated priority targets based on a drone supported magnetic survey, Phase I drilling results, and the integration of historical drilling data acquired from previous operators of the Silver Strand Project (see Jan 26, 2022 news release).

“We are excited to return to our flagship project and move forward with our Phase II Drill Program at Silver Strand. We have drillholes designed to test up to three times as deep as our previous phase of drilling and a series of other holes that will test the system laterally with the aim of discovering parallel chutes to the southeast of the main mine trend,” stated President & CEO Morgan Lekstrom. “We believe the potential for making additional discoveries at Silver Strand is excellent and finding new high-grade zones of gold-silver mineralization would demonstrate the large-scale potential we think is possible here.”

NISS, the Company’s drilling contractor, has begun drilling and successfully finished the first hole. Approximately 1,100 meters of drilling is currently planned with ability to expand the program depending on core observations and initial assay results. Silver Hammer continues to use the Company’s underground drilling station to deliver much better ROI per metre drilled. The Phase II Drill Program is expected to last approximately seven weeks, with assay results to follow during Q4/2022.

Qualified Person

Technical aspects of this press release have been reviewed and approved by Philip Mulholland, a Certified Professional Geologist (CPG) with the American Institute of Professional Geologists, a contractor of the Company and the designated Qualified Person under National Instrument 43-101 Standards of Disclosure for Mineral Projects.

About Silver Hammer Mining Corp.

Silver Hammer Mining Corp. is a junior resource company advancing the flagship past-producing Silver Strand Mine in the Coeur d’Alene Mining District in Idaho, USA, as well both the Eliza Silver Project and the Silverton Silver Mine in one of the world’s most prolific mining jurisdictions in Nevada and the Lacy Gold Project in British Columbia, Canada. Silver Hammer’s primary focus is defining and developing silver deposits near past-producing mines that have not yet been adequately tested. The Company’s portfolio also provides exposure to copper and gold discoveries.

Disclaimer note: Mineralization hosted on adjacent and/or nearby properties is not necessarily indicative of mineralization hosted on the Company’s projects.

On Behalf of the Board of Silver Hammer Mining Corp.
Morgan Lekstrom, President and CEO
Corporate Office: 551 Howe Street, Vancouver, British Columbia V6C 2C2, Canada

For investor relations inquiries, contact:
Kristina Pillon, High Tide Consulting Corp.
E: investors@silverhammermining.com

For media inquiries, contact:
Adam Bello, Primoris Group Inc.
T: 416.489.0092
E: media@primorisgroup.com

Cautionary Note Regarding Forward-Looking Statements

This news release contains forward-looking statements or forward-looking information under applicable Canadian securities laws (hereinafter collectively referred to as “forward-looking statements”) concerning the Company’s plans for its properties and mineral projects, financial results, operations and other matters. Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance are not statements of fact and may be forward-looking statements. Such forward-looking statements made as of the date of this news release or as of the date of the effective date of information described in this news release, as applicable.

Further, these forward-looking statements reflect management’s current views and are based on certain expectations, estimates and assumptions which may prove to be incorrect. A number of risks and uncertainties could cause the Company’s actual results to differ materially from those expressed or implied by the forward-looking statements, including: (1) a downturn in general economic conditions in North America and internationally. (2) the inherent uncertainties and speculative nature associated with mineral exploration. (3) a decreased demand for precious metals, (4) any number of events or causes which may delay exploration and development of the property interests, such as environmental liabilities, weather, mechanical failures, safety concerns and labour problems, (5) the risk that the Company does not execute its business plan, (6) inability to finance operations and growth, (7) inability to obtain all necessary permitting and financing, and (8) other factors beyond the Company’s control. Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such information. Accordingly, readers should not place undue reliance on forward-looking statements contained in this news release or in certain of the other documents on file with Canadian securities regulatory authorities, which are available on the Company’s SEDAR profile at www.sedar.com. The Company and its directors, officers and employees each disclaim any obligation to update any forward-looking statements, whether as a result of new information, future events or results or otherwise, except as required by applicable law. Accordingly, readers should not place undue reliance on forward-looking statements due to the inherent uncertainty therein. All forward-looking statements are expressly qualified in their entirety by this cautionary statement.

The CSE has neither approved nor disapproved the contents of this news release. Neither the CSE nor its Regulation Services Provider (as that term is defined in the policies of the CSE) accepts responsibility for the adequacy or accuracy of this release.

A photo accompanying this announcement is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/6512acd0-9b0c-4bcb-8f8d-9425a2e84ea5

Categories
Base Metals Breaking Energy Junior Mining

Copper worth nearly half a billion dollars goes missing in China

A group of Chinese companies are investigating why a commodities storage site in northern China is holding only one third of the copper concentrate they were financing, according to people familiar with the situation.

Traders from more than a dozen mostly state-owned firms gathered in Qinhuangdao city this week after becoming aware of the missing material following concerns into the borrower’s finances, said the people, who asked not to be identified as they aren’t authorized to speak publicly.

The group has a total claim on 300,000 tons of concentrate worth about 5 billion yuan ($740 million), but there’s only 100,000 tons at the depot, the people said. That puts the dollar value of the missing material at about $490 million.

The copper discrepancy in Hebei province comes just months after a separate dispute, spanning several locations in southern China, over missing aluminum tied to $1 billion of lending. Scrutiny of commodities financing and warehouse operations in China is growing, especially as volatile global markets expose some of the more opaque funding arrangements to greater risk.

At the center of this latest case is Huludao Risun Trading Co., a medium-sized merchant that purchases between 800,000 and 1 million tons of imported copper concentrate a year for distribution to domestic Chinese smelters, said the people. The company typically relies on larger counterparties to finance the materials, and then repays the loans with interest and fees after finalizing the trade.

Nobody picked up several calls to the company’s main number, and there was no immediate reply to an email seeking comment.

Risky business

Commodities traders have faced a tougher environment this year as banks turn cautious in the wake of high-profile losses — especially in the nickel market — and huge price volatility exacerbated by Russia’s invasion of Ukraine. That’s encouraged alternative financing, in which smaller, privately-owned firms pledge their goods to large state-run traders to get funding for operations.

But that route is also exposed to risk as the growth model that’s sustained China’s economy for decades shows signs of strain. Some state-owned enterprises, including the country’s top steel mills, have asked units to cut back on operations — including third-party trading — to preserve cash and avoid liquidity crunches.

The impact on the spot concentrate market of the Qinhuangdao copper dispute could be limited, consultancy Mysteel said in a note on Wednesday. Chinese smelters who take material from this merchant should be able to use their existing inventory, while traders could re-route cargoes due to arrive at the Qinhuangdao site to other destinations, it said.

source: mining.com

Categories
Base Metals Energy Junior Mining Nevada Copper

Nevada Copper Provides Operation and Financing Update

Nevada Copper Corp.
Nevada Copper Corp.

YERINGTON, Nev., Aug. 05, 2022 (GLOBE NEWSWIRE) — Nevada Copper (TSX: NCU) (OTC: NEVDF) (FSE: ZYTA) (“Nevada Copper” or the “Company”) provides an update on its operations and financing initiatives and activities at its Pumpkin Hollow copper mine (the “Underground Mine”) located in Yerington, Nevada.

Operational Restart Planning

During July, management has advanced its Underground Mine restart plans, which focus on the acceleration of key capital items followed by the development of a significant stope ore inventory in advance of a mill restart and completion of production ramp-up. The development of restart plans has allowed the Company to advance financing discussions with its key stakeholders. The commencement of restart activities is contingent on the Company obtaining long-term financing, as discussed below.

The Company continues to work with its creditors and vendors to defer payments and maintain the operation in a temporary suspension status, with only limited operational activities being undertaken to protect the Company’s assets, to minimize cash burn until closing of a restart funding package.

Restart Financing

The Company is engaged in active and ongoing discussions with its key financing partners with respect to a substantial funding package for the restart and ramp-up of the Underground Mine (as an alternative to the smaller financing package referred to in the Company’s July 4, 2022 press release which is no longer being pursued in that form).https://embed.fireplace.yahoo.com/embed?ctrl=Monalixa&m_id=monalixa&m_mode=document&site=sports&os=android&pageContext=%257B%2522ctopid%2522%253A%25221542500%253B1577000%2522%252C%2522hashtag%2522%253A%25221542500%253B1577000%2522%252C%2522wiki_topics%2522%253A%2522Company%253BYerington%252C_Nevada%253BBankruptcy%253BDebate%253BUnderground_hard-rock_mining%2522%252C%2522lmsid%2522%253A%2522a0770000002m0AbAAI%2522%252C%2522revsp%2522%253A%2522globenewswire.com%2522%252C%2522lpstaid%2522%253A%2522618b261d-7539-34cc-9b63-9cf83c3f5fd6%2522%252C%2522pageContentType%2522%253A%2522story%2522%257D

The Company has expended the full amount of the previously disclosed US$20 million promissory note from Pala Investments Limited (“Pala”), the Company’s largest shareholder. Pala has indicated that it is prepared to provide additional financing of up to US$20 million through further promissory notes (US$4 million of which has already been advanced) while the Company continues discussions with its financing partners. The Company will continue to require interim financing until a restart funding package is secured and closed. As previously disclosed, pending completion of a financing package, the Company has not made payments due to certain creditors and vendors and is in default of its obligations under certain financing agreements and other contractual arrangements.

There can be no assurance that the Company will obtain additional interim financing or that the longer-term restart funding package will be agreed or completed on terms satisfactory to the Company and within the required timeframe, or at all. In the absence of securing such arrangements or alternative financing arrangements, the Company will not be able to continue carrying on business in the ordinary course and may need to pursue proceedings for creditor protection. The Company’s creditors may also seek to commence enforcement action, including realizing on their security over the Company’s assets.

About Nevada Copper

Nevada Copper (TSX: NCU) is a copper producer and owner of the Pumpkin Hollow copper project. Located in Nevada, USA, Pumpkin Hollow has substantial reserves and resources including copper, gold and silver. Its two fully permitted projects include the high-grade Underground Mine and processing facility, which is now in the production stage, and a large-scale open pit project, which is advancing towards feasibility status.

Randy Buffington
President & CEO

For additional information, please see the Company’s website at www.nevadacopper.com, or contact:

Tracey Thom Vice President, IR and Community Relations
tthom@nevadacopper.com
+1 775 391 9029

Cautionary Language on Forward Looking Statements
This news release contains “forward-looking information” and “forward-looking statements” within the meaning of applicable Canadian securities laws. All statements in this news release, other than statements of historical facts, are forward-looking statements. Such forward-looking information and forward-looking statements specifically include, but are not limited to, statements that relate to mine planning, financing requirements, discussions with financing partners, and creditor protection proceedings.

Forward-looking statements and information include statements regarding the expectations and beliefs of management. Often, but not always, forward-looking statements and forward-looking information can be identified by the use of words such as “plans”, “expects”, “potential”, “is expected”, “anticipated”, “is targeted”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates”, or “believes” or the negatives thereof or variations of such words and phrases or statements that certain actions, events or results “may”, “could”, “would”, “might” or “will” be taken, occur or be achieved. Forward-looking statements or information should not be read as guarantees of future performance and results. They are subject to known and unknown risks, uncertainties and other factors which may cause the actual results and events to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements or information.

Such risks and uncertainties include, without limitation, those relating to: requirements for additional capital and no assurance can be given regarding the availability thereof; the outcome of discussions with creditors and vendors; potential creditor protection proceedings; the ability of the Company to complete the ramp-up of the Underground Mine within the expected cost estimates and timeframe; the impact of COVID-19 on the business and operations of the Company; the state of financial markets; history of losses; dilution; adverse events relating to milling operations, construction, development and ramp-up, including the ability of the Company to address underground development and process plant issues; ground conditions; cost overruns relating to development, construction and ramp-up of the Underground Mine; loss of material properties; interest rates increase; global economy; limited history of production; future metals price fluctuations; speculative nature of exploration activities; periodic interruptions to exploration, development and mining activities; environmental hazards and liability; industrial accidents; failure of processing and mining equipment to perform as expected; labour disputes; supply problems; uncertainty of production and cost estimates; the interpretation of drill results and the estimation of mineral resources and reserves; changes in project parameters as plans continue to be refined; possible variations in ore reserves, grade of mineralization or recovery rates from management’s expectations and the difference may be material; legal and regulatory proceedings and community actions; accidents; title matters; regulatory approvals and restrictions; increased costs and physical risks relating to climate change, including extreme weather events, and new or revised regulations relating to climate change; permitting and licensing; dependence on management information systems and cyber security risks; volatility of the market price of the Company’s securities; insurance; competition; hedging activities; currency fluctuations; loss of key employees; other risks of the mining industry as well as those risks discussed in the Company’s Management’s Discussion and Analysis in respect of the year ended December 31, 2021 and the quarter ended March 31, 2022 and in the section entitled “Risk Factors” in the Company’s Annual Information Form dated March 31, 2022. The forward-looking statements and information contained in this press release are based upon assumptions management believes to be reasonable, including, without limitation: no adverse developments in respect of the property or operations at the project; no material changes to applicable laws; the ramp-up of operations at the Underground Mine in accordance with management’s plans and expectations; no worsening of the current COVID-19 related work restrictions; reduced impacts of COVID-19 going forward; the Company will be able to obtain sufficient additional funding to complete the ramp-up, no material adverse change to the price of copper from current levels; and the absence of any other factors that could cause actions, events or results to differ from those anticipated, estimated or intended.

The forward-looking information and statements are stated as of the date hereof. The Company disclaims any intent or obligation to update forward-looking statements or information except as required by law. Although the Company has attempted to identify important factors that could cause actual actions, events, or results to differ materially from those described in forward-looking information and statements, there may be other factors that could cause actions, events or results not to be as anticipated, estimated or intended. Specific reference is made to “Risk Factors” in the Company’s Management’s Discussion and Analysis in respect of the year ended December 31, 2021 and the quarter ended March 31, 2022 and “Risk Factors” in the Company’s Annual Information Form dated March 31, 2022, for a discussion of factors that may affect forward-looking statements and information. Should one or more of these risks or uncertainties materialize, should other risks or uncertainties materialize or should underlying assumptions prove incorrect, actual results and events may vary materially from those described in forward-looking statements and information. For more information on the Company and the risks and challenges of its business, investors should review the Company’s filings that are available at www.sedar.com.

The Company provides no assurance that forward-looking statements and information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements or information. Accordingly, readers should not place undue reliance on forward-looking statements or information.

Categories
Base Metals Energy Junior Mining Precious Metals

Bravo Intercepts Massive Sulphide Mineralization at its Luanga (PGM + Au + Ni) Project

Bravo Mining, Proven and Probable

11m* Zone of Massive and Brecciated Semi-Massive Nickel/Copper Sulphides Intersected

VANCOUVER, BC, Aug. 3, 2022 /CNW/ – Bravo Mining Corp. (TSX.V: BRVO), (“Bravo” or the “Company“) today announced that a diamond drill hole at its Luanga Project (“Luanga“), located in the Carajás Mineral Province, state of Pará, Brazil, intersected massive sulphide and semi-massive sulphide mineralization. Based on visual inspection by experienced geologists the core is interpreted to contain pyrrhotite, pentlandite (a primary nickel sulphide mineral) and chalcopyrite (a primary copper sulphide mineral). This style of sulphide mineralization, in these concentrations, has not previously been observed at the Luanga platinum group metals (palladium + platinum + rhodium) + gold + nickel (PGM+Au+Ni) project. Likewise, primary copper mineralization (interpreted as chalcopyrite) has previously only been observed in trace amounts at Luanga.

DDH22LU047: Massive sulphide mineralization interpreted as pyrrhotite + lesser pentlandite (a nickel mineral) and chalcopyrite (a copper mineral), from 136.0 to 137.6m* (CNW Group/Bravo Mining Corp.)
DDH22LU047: Massive sulphide mineralization interpreted as pyrrhotite + lesser pentlandite (a nickel mineral) and chalcopyrite (a copper mineral), from 136.0 to 137.6m* (CNW Group/Bravo Mining Corp.)

“Intersecting this style of massive sulphide mineralization for what we believe to be the first time at Luanga is a potentially material development,” said Luis Azevedo, Chairman and CEO of Bravo. “The drill hole has already been cased with PVC for planned downhole electromagnetic survey (DHTEM), and we will shortly be commencing a detailed ground gravity survey. Both geophysical techniques could help guide follow-up drill holes. We believe that further discovery potential exists at Luanga, particularly regarding prospective zones below the PGM mineralization and the geophysics could help direct that work.”

Highlights

  • Subsequent to executing the remaining land access agreements, the first of the planned northern drill holes (DDH22LU047) intersected massive and semi-massive sulphides that are interpreted to contain both pentlandite (a primary nickel mineral) and chalcopyrite (a primary copper mineral). PGM+Au+Ni assays are pending.
  • DDH22LU047 is already PVC cased ready for DHTEM, a highly successfully geophysical tool for defining and targeting conductors generated by massive sulphides.
  • Bravo plans to commence a detailed ground gravity survey. Gravity surveys are ideally suited to detecting differences in density, such as the high densities native to massive sulphides.

Luanga Drill Program

The Phase 1 diamond drill program continues as planned at Luanga. With six drill rigs on site, drilling is now in progress in various locations along the entire 7km strike length of the project, including to the north where the latest and final surface access agreements were recently signed.

Phase 1 drilling is designed to confirm, infill and step out from the previously defined mineralization in order to increase confidence in the geological model and provide the basis for future mineral resource estimates. Additionally, deeper drilling will target extensions and exploration targets at Luanga.

DDH22LU047: Breccia sulphide interpreted as pyrrhotite + pentlandite (a nickel mineral) + chalcopyrite (a copper mineral), from 137.0 to 137.5m* (CNW Group/Bravo Mining Corp.)
DDH22LU047: Breccia sulphide interpreted as pyrrhotite + pentlandite (a nickel mineral) + chalcopyrite (a copper mineral), from 137.0 to 137.5m* (CNW Group/Bravo Mining Corp.)
DDH22LU047: Drill core showing massive and brecciated semi massive sulphides, from 131.1m to 142.1m* (CNW Group/Bravo Mining Corp.)
DDH22LU047: Drill core showing massive and brecciated semi massive sulphides, from 131.1m to 142.1m* (CNW Group/Bravo Mining Corp.)

* Depths and widths are downhole

About Bravo Mining Corp.

Bravo is a Canada and Brazil-based mineral exploration and development company focused on advancing its Luanga PGM+Au+Ni Project in the world-class Carajás Mineral Province of Brazil.

The Luanga Project benefits from being in a location close to operating mines, with excellent access and proximity to existing infrastructure, including road, rail and clean and renewable hydro grid power. The project area was previously de-forested for agricultural grazing land. Bravo’s current Environmental, Social and Governance activities includes replanting trees in the project area, hiring and contracting locally, and ensuring protection of the environment during its exploration activities.

Bravo was founded by a management team and board with extensive Brazilian and PGM exploration, permitting, project financing, construction and operating experience. This includes Luis Azevedo, Executive Chairman & CEO; Simon Mottram, President; Alex Penha, EVP Corporate Development; and Independent Directors, Dr. Nicole Adshead-Bell (Lead Director), Stuart Comline, Tony Polglase and Stephen Quin.

Technical Disclosure

Technical information in this news release has been reviewed and approved by Simon Mottram, F.AusIMM (Fellow Australia Institute of Mining and Metallurgy), President of Bravo Mining Corp. who serves as the Company’s “qualified person”, as defined in National Instrument 43-101 Standards of Disclosure for Mineral Projects (“NI 43-101“). Mr. Mottram has verified the technical data and opinions contained in this news release.

For further information about Bravo, please visit www.bravomining.com or contact:

Forward Looking Statements

This news release contains forward-looking information which is not comprised of historical facts. Forward-looking information is characterized by words such as “confirm”, “designed”, “increase confidence”, “interpreted”, “pending”, and other similar words, phrases or statements that certain events or conditions “may” or “will” occur. In particular, this news release contains forward-looking information pertaining to the Company’s ongoing re-assay and drill programs; the expected arrival of additional drill rigs and delivery of historic core; and the Company’s plans in respect thereof. Forward-looking information involves risks, uncertainties and other factors that could cause actual events, results, and opportunities to differ materially from those expressed or implied by such forward-looking information. Factors that could cause actual results to differ materially from such forward-looking information include, but are not limited to, changes in the state of equity and debt markets, fluctuations in commodity prices, delays in obtaining required regulatory or governmental approvals, environmental risks, limitations on insurance coverage; and other risks and uncertainties involved in the mineral exploration and development industry. Forward-looking information in this news release is based on the opinions and assumptions of management considered reasonable as of the date hereof, including, but not limited to, the assumption that the assay results confirm the interpreted mineralization contains significant values of nickel, copper and also contain PGMs and Au; final drill and assay results will be in line with management’s expectations; that activities will not be adversely disrupted or impeded by regulatory, political, community, economic, environmental and/or healthy and safety risks; that the Luanga Project will not be materially affected by potential supply chain disruptions; and general business and economic conditions will not change in a materially adverse manner. Although the Company believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information. The Company disclaims any intention or obligation to update or revise any forward-looking information, other than as required by applicable securities laws.

Bravo Mining LOGO (CNW Group/Bravo Mining Corp.)
Bravo Mining LOGO (CNW Group/Bravo Mining Corp.)

SOURCE Bravo Mining Corp.