Categories
Junior Mining Precious Metals Rover Metals

ROVER METALS PROVIDES AN INFRASTRUCTURE UPDATE FOR ITS NORTHERN CANADA GOLD PROJECTS

Rover Metals Corp.
Rover Metals Corp.

VANCOUVER, British Columbia, May 31, 2022 (GLOBE NEWSWIRE) — Rover Metals Corp. (TSXV: ROVR) (OTCQB: ROVMF) (FSE:4XO) (“Rover” or the “Company”) is pleased to provide an infrastructure update for its Cabin Gold Project and its Up Town Gold Project, located at the 60th parallel of the Northwest Territories of Canada.

NWT Infrastructure Initiatives
The Government of Canada has moved one step closer to funding the expansion of the Taltson Hydro dam into the city of Yellowknife, NWT. In a recent interview with the CBC, the federal infrastructure minister provides an update on the project. One of the many benefits of bringing additional green power into the city of Yellowknife includes a more cost-effective source of power for the future mines being developed near the city. Green energy is also amongst the ESG initiatives that major gold producers are looking for when it comes to taking an interest in development-stage gold projects.

The expansion of the Taltson Hydro dam into the city of Yellowknife also has the potential to free up hydro at both the Strutt and Snare hydro facilities which are located close to Rover’s Cabin Gold, Slemon Gold, and Camp Gold Projects.

Mineral resource exploration, and the development of mines in the Northwest Territories, remains a priority of all levels of government (not just at the federal level). In 2021, Rover received two exploration grants from the territorial government to assist with advancing exploration at its Cabin Gold Project. Also in 2021, the federally funded Tlicho All Season Road (“TASR”) opened to the public. TASR connects the cities of Yellowknife and Hay River, via Highway NT3, to Rover’s Cabin Gold Project, Fortune Minerals’ NICO Project, and Nighthawk Gold’s Indin Lake Gold Project.

Collaboration between the government and the mining industry will continue to grow economic prospects for Northern Canada and will work towards the reinforcement of Canada’s northern sovereignty. As much of the world begins to look for more ethically sourced natural resources, companies like Rover Metals are investing heavily into exploration to build the mines of the future.https://embed.fireplace.yahoo.com/embed?ctrl=Monalixa&m_id=monalixa&m_mode=document&site=sports&os=android&pageContext=%257B%2522ctopid%2522%253A%25221542500%253B1577000%2522%252C%2522hashtag%2522%253A%25221542500%253B1577000%2522%252C%2522wiki_topics%2522%253A%2522Canada%253BProvinces_and_territories_of_Canada%253BGovernment_of_Canada%253BNorthwest_Territories%253BGold%253BYellowknife%253BCompany%253BVancouver%253BExploration%2522%252C%2522lmsid%2522%253A%2522a0770000002m0AbAAI%2522%252C%2522revsp%2522%253A%2522globenewswire.com%2522%252C%2522lpstaid%2522%253A%25225be403c1-59e4-385c-9bc8-6c6aa5f27790%2522%252C%2522pageContentType%2522%253A%2522story%2522%257D

Q1-2022 Financial Package
Rover is pleased to report that it has SEDAR filed its March 31, 2022 Financial Statements and Management Discussion and Analysis (“MD&A”). The MD&A includes management’s milestone for the first three months of the year.

Grant of Stock Options
The Company has granted 500,000 incentive stock options to a new consultant of the Company. The options have a five-year life, and an exercise price of $0.06 per share. The options have been granted from the Company’s 10% rolling stock option plan, approved by its shareholders at its August 2021 Annual General Meeting.

About Rover Metals
Rover is a precious metals exploration company specialized in North American (Canada and U.S.) precious metal resources, which is currently advancing the gold potential of its existing projects in the Northwest Territories of Canada (60th parallel), and north-central Nevada, USA. The Company owns five gold projects. Phase 3 Exploration at its Cabin Gold Project, 60th Parallel, NT, Canada, commenced in March 2022 and continues through to the date of this release. Phase 1 Exploration at its Tobin Gold Project commenced in May 2022 and continues through to the date of this release. Lastly, the Company, is also awaiting news from the Phase 2 Exploration Program at its Up Town Gold Project, in the Northwest Territories of Canada (60th parallel).

You can follow Rover on its social media channels: 
Twitter: https://twitter.com/rovermetals 
LinkedIn: https://www.linkedin.com/company/rover-metals/ 
Facebook: https://www.facebook.com/RoverMetals/
for daily company updates and industry news, and
YouTube: https://www.youtube.com/channel/UCJsHsfag1GFyp4aLW5Ye-YQ?view_as=subscriber
for corporate videos.
Website: https://www.rovermetals.com/

ON BEHALF OF THE BOARD OF DIRECTORS
“Judson Culter”
Chief Executive Officer and Director

For further information, please contact:
Email: info@rovermetals.com
Phone: +1 (778) 754-2617

Statement Regarding Forward-Looking Information
This news release contains statements that constitute “forward-looking statements.” Such forward-looking statements involve known and unknown risks, uncertainties and other factors that may cause Rover’s actual results, performance or achievements, or developments in the industry to differ materially from the anticipated results, performance or achievements expressed or implied by such forward-looking statements. Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by the words “expects,” “plans,” “anticipates,” “believes,” “intends,” “estimates,” “projects,” “potential” and similar expressions, or that events or conditions “will,” “would,” “may,” “could” or “should” occur. There can be no assurance that such statements prove to be accurate. Actual results and future events could differ materially from those anticipated in such statements, and readers are cautioned not to place undue reliance on these forward-looking statements. Any factor could cause actual results to differ materially from Rover’s expectations. Rover undertakes no obligation to update these forward-looking statements in the event that management’s beliefs, estimates or opinions, or other factors, should change.

THE FORWARD-LOOKING INFORMATION CONTAINED IN THIS NEWS RELEASE REPRESENTS THE EXPECTATIONS OF THE COMPANY AS OF THE DATE OF THIS NEWS RELEASE AND, ACCORDINGLY, IS SUBJECT TO CHANGE AFTER SUCH DATE. READERS SHOULD NOT PLACE UNDUE IMPORTANCE ON FORWARD-LOOKING INFORMATION AND SHOULD NOT RELY UPON THIS INFORMATION AS OF ANY OTHER DATE. WHILE THE COMPANY MAY ELECT TO, IT DOES NOT UNDERTAKE TO UPDATE THIS INFORMATION AT ANY PARTICULAR TIME EXCEPT AS REQUIRED IN ACCORDANCE WITH APPLICABLE LAWS.

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OF THIS RELEASE.

Categories
Energy Junior Mining Precious Metals

Eloro Resources Closes C$9.775 Million Bought Deal Financing

TORONTO, May 19, 2022 (GLOBE NEWSWIRE) — Eloro Resources Ltd. (the “Company” or “Eloro”) (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) is pleased to announce that it has closed its previously announced bought deal financing of 3,007,710 units of the Company (the “Units”) at a price of C$3.25 per Unit for gross proceeds to the Company of C$9,775,057.50 (the “Offering”). The Offering was underwritten on a bought deal basis by Cormark Securities Inc. as underwriter (the “Underwriter”), pursuant to an underwriting agreement dated May 16, 2022 between the Company and the Underwriter. Haywood Securities Inc. participated as a special selling group member in connection with the Offering. The Offering included the exercise in full by the Underwriter of the over-allotment option granted by the Company pursuant to the terms of the Offering. Each Unit consists of one common share in the capital of the Company (each a “Common Share”) and one-half of one Common Share purchase warrant of the Company (each whole warrant, a “Warrant”). Each Warrant entitles the holder to acquire an additional Common Share at a price of C$4.75 for a period of 24 months following the closing of the Offering.

The securities issued under the Offering were qualified for distribution pursuant to a prospectus supplement dated May 16, 2022 (the “Supplement”) to the Company’s short form base shelf prospectus dated May 11, 2022.

The net proceeds from the Offering will be used for continued exploration and development of the Company’s Iska Iska project in Bolivia, as further set out in the Supplement filed on the Company’s SEDAR profile at www.sedar.com.

In connection with the Offering, the Company paid the Underwriter a cash commission equal to 6% of the gross proceeds of the Offering (for a total cash commission of C$586,503.45) and issued to the Underwriter and its selling group members that number of non-transferable compensation options (the “Compensation Options”) equal to 6% of the aggregate number of Units sold under the Offering (for a total of 180,462 Compensation Options). Each Compensation Option entitles the holder to acquire one Common Share at a price of C$3.25 per Common Share for a period of 24 months following the closing of the Offering.

The securities offered in the Offering have not been, and will not be, registered under the U.S. Securities Act of 1933, as amended (the “U.S. Securities Act”) or any U.S. state securities laws, and may not be offered or sold in the United States or to, or for the account or benefit of, United States persons absent registration or any applicable exemption from the registration requirements of the U.S. Securities Act and applicable U.S. state securities laws. This press release shall not constitute an offer to sell or the solicitation of an offer to buy securities in the United States, nor there be any sale of these securities in any jurisdiction in which such offer, solicitation or sale would be unlawful.

About Eloro Resources Ltd.

Eloro is an exploration and mine development company with a portfolio of gold and base-metal properties in Bolivia, Peru and Quebec. Eloro has an option to acquire a 99% interest in the highly prospective Iska Iska Property, which can be classified as a polymetallic epithermal-porphyry complex, a significant mineral deposit type in the Potosi Department, in southern Bolivia. A NI 43-101 Technical Report on Iska Iska, which was completed by Micon International Limited, is available under Eloro’s filings on SEDAR. Iska Iska is a road-accessible, royalty-free property. Eloro also owns an 82% interest in the La Victoria Gold/Silver Project, located in the North-Central Mineral Belt of Peru some 50 km south of Barrick’s Lagunas Norte Gold Mine and Pan American Silver’s La Arena Gold Mine. La Victoria consists of eight mining concessions and eight mining claims encompassing approximately 89 square kilometres. La Victoria has good infrastructure with access to road, water and electricity and is located at an altitude that ranges from 3,150 m to 4,400 m above sea level.

For further information please contact either Thomas G. Larsen, Chairman and CEO or Jorge Estepa, Vice-President at (416) 868-9168.

Information in this news release may contain forward-looking information. Statements containing forward-looking information express, as at the date of this news release, the Company’s plans, estimates, forecasts, projections, expectations, or beliefs as to future events or results and are believed to be reasonable based on information currently available to the Company (forward-looking statements in this news release include, without limitation, statements regarding the use of proceeds from the Offering). There can be no assurance that forward-looking statements will prove to be accurate. Actual results and future events could differ materially from those anticipated in such statements. Readers should not place undue reliance on forward-looking information. The Company does not intend to update any such forward-looking information, except in accordance with applicable laws.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Categories
Base Metals Energy Junior Mining Metallic Group Metallic Minerals Precious Metals

Metallic Minerals Announces C$4 Million Flow-Through Private Placement Financing

Metallic Minerals, Proven and Probable

VANCOUVER, BC / ACCESSWIRE / May 18, 2022 / Metallic Minerals Corp. (TSX-V:MMG) (OTCQB:MMNGF) (“Metallic Minerals” or the “Company”) is pleased to announce a non-brokered private placement offering of 9,600,000 flow-through units (“Units”) at a price of $0.42 per Unit for aggregate gross proceeds of $4,032,000 (the “Offering”), which represents a premium to the May 17th closing price of the Company’s common shares on the TSX Venture Exchange (the “Exchange”). The Units consist of a flow-through share and a half warrant and are being issued as part of a charity arrangement structured by Peartree Securities Inc.

All net proceeds from the Offering are planned to be used to incur Canadian Exploration Expenses (“CEE”) under the Income Tax Act (Canada) primarily at Metallic Minerals’ Keno Silver project in the historic, high-grade Keno Hill Silver District in Canada’s Yukon Territory.

Greg Johnson, CEO & Chairman, stated, “We are very pleased to add these new investors to our supportive shareholder base and are in a position to complete important follow-up programs at the Company’s Keno Silver and the La Plata projects, using a combination of existing funding and new flow-through funds. We remain positive on the underlying fundamentals for commodities as the current cycle continues to build and look forward to providing additional project updates as our exploration programs get underway.”

Each whole share purchase warrant is exercisable into one additional common share of the Company at a price of $0.50 per share for a period of 30 months from the date of closing. Subject to approval by the Exchange, if the closing share price five (5) trading days prior to the end of the 30-month warrant period is at or below $0.50, the Company shall, upon written request by a warrant holder, extend expiry of such warrants for an additional six (6) months.

Closing of the Offering is expected on or about June 8, 2022, subject to certain customary conditions, including, but not limited to, acceptance of the Exchange. All securities issued under the Offering will be subject to a statutory hold period of four months plus a day following the date of closing.

The securities offered have not been registered under the U.S. Securities Act of 1933, as amended, and may not be offered or sold in the United States absent registration or an applicable exemption from the registration requirements. This press release shall not constitute an offer to sell or the solicitation of an offer to buy nor shall there be any sale of the securities in any State in which such offer, solicitation or sale would be unlawful.

About Metallic Minerals

Metallic Minerals Corp. is an exploration and development stage company, focused on silver, gold and copper in the high-grade Keno Hill and La Plata mining districts of North America. Our objective is to create shareholder value through a systematic, entrepreneurial approach to making exploration discoveries, growing resources and advancing projects toward development. Metallic Minerals has consolidated the second-largest land position in the historic Keno Hill silver district of Canada’s Yukon Territory, directly adjacent to Alexco Resource Corp’s operations, with more than 300 million ounces of high-grade silver in past production and current M&I resources. In addition, the Company recently announced the inaugural resource estimate for the La Plata silver-gold-copper project in southwestern Colorado. All of the districts in which the Company works have seen significant mineral production and have existing infrastructure, including power and road access. Metallic Minerals is led by a team with a track record of discovery and exploration success on several major precious and base metal deposits, as well as having large-scale development, permitting and project financing expertise.

About the Metallic Group of Companies

The Metallic Group is a collaboration of leading precious and base metals exploration and development companies, with a portfolio of large, brownfields assets in established mining districts adjacent to some of the industry’s highest-grade producers of silver and gold, platinum and palladium, and copper. Member companies include Metallic Minerals in the Yukon’s high-grade Keno Hill silver district and La Plata silver-gold-copper district of Colorado, Granite Creek Copper in the Yukon’s Minto copper district, and Group Ten Metals in the Stillwater PGM-nickel-copper district of Montana and Kluane district in the Yukon. The founders and team members of the Metallic Group include highly successful explorationists formerly with some of the industry’s leading explorer/developers and major producers. With this expertise, the companies are undertaking a systematic approach to exploration and development using new models and technologies to facilitate discoveries in these proven, but under-explored, mining districts. Members of the Metallic Group have been recognized as recipients of awards for excellence in environmental stewardship demonstrating commitment to responsible resource development and appropriate ESG practices. The Metallic Group is headquartered in Vancouver, BC, Canada, and its member companies are listed on the Toronto Venture, US OTCQB and Frankfurt stock exchanges.

FOR FURTHER INFORMATION, PLEASE CONTACT:

Website: mmgsilver.com
Phone: 604-629-7800
Email: cackerman@mmgsilver.com
Toll Free: 1-888-570-4420

Forward-Looking Statements

Forward Looking Statements: This news release includes certain statements that may be deemed “forward-looking statements”. All statements in this release, other than statements of historical facts including, without limitation, statements regarding the completion of the financing and the gross proceeds raised therefrom, the use of proceeds from the financing and their qualification as CEE, the date of closing of the financing, potential mineralization, historic production, estimation of mineral resources, the realization of mineral resource estimates, interpretation of prior exploration and potential exploration results, the timing and success of exploration activities generally, the timing and results of future resource estimates, permitting time lines, metal prices and currency exchange rates, availability of capital, government regulation of exploration operations, environmental risks, reclamation, title, trends in commodities prices and future plans and objectives of the Company are forward-looking statements that involve various risks and uncertainties. Although Metallic Minerals believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in the forward-looking statements. Forward-looking statements are based on a number of material factors and assumptions. Factors that could cause actual results to differ materially from those in forward-looking statements include failure to obtain necessary approvals, unsuccessful exploration results, changes in project parameters as plans continue to be refined, results of future resource estimates, future metal prices, availability of capital and financing on acceptable terms, general economic, market or business conditions, risks associated with regulatory changes, defects in title, availability of personnel, materials and equipment on a timely basis, accidents or equipment breakdowns, uninsured risks, delays in receiving government approvals, unanticipated environmental impacts on operations and costs to remedy same, and other exploration or other risks detailed herein and from time to time in the filings made by the companies with securities regulators. Readers are cautioned that mineral resources that are not mineral reserves do not have demonstrated economic viability. Mineral exploration and development of mines is an inherently risky business. Accordingly, the actual events may differ materially from those projected in the forward-looking statements. For more information on Metallic Minerals and the risks and challenges of their businesses, investors should review their annual filings that are available at www.sedar.com.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

SOURCE: Metallic Minerals Corp.

Categories
Exclusive Interviews Precious Metals Rover Metals

Rover Metals Corporate Webinar Recording

Rover Metals Corp.

VANCOUVER, British Columbia, May 16, 2022 (GLOBE NEWSWIRE) — Rover Metals Corp. (TSXV: ROVR) (OTCQB: ROVMF) (FSE:4XO) (“Rover” or the “Company”) is pleased to provide a recording of the Company’s CEO, Judson Culter, presenting Rover’s high-grade gold exploration story in northern Canada, including an overview of current operations and upcoming milestones, while sharing the most recent Investor Presentation. We invite all investors and other interested parties to watch the recorded webinar at the link below. The discussion also includes Rover’s plans for gold exploration at its new project in the Battle Mountain gold district of Nevada.

Recorded Webinarhttps://www.youtube.com/watch?v=eXEpbUBOYSQ

About Rover Metals
Rover is a precious metals exploration company specialized in North American (Canada and U.S.) precious metal resources, which is currently advancing the gold potential of its existing projects in the Northwest Territories of Canada (60th parallel), and north-central Nevada, USA. The Company owns five gold projects. Phase 3 Exploration at its Cabin Gold Project, 60th Parallel, NT, Canada, commenced in March 2022 and continues through to the date of this release. Phase 1 Exploration at its Tobin Gold Project commenced in May 2022 and continues through to the date of this release. Lastly, the Company, is also awaiting news from the Phase 2 Exploration Program at its Up Town Gold Project, in the Northwest Territories of Canada (60th parallel).

You can follow Rover on its social media channels:
Twitter: https://twitter.com/rovermetals
LinkedIn: https://www.linkedin.com/company/rover-metals/
Facebook: https://www.facebook.com/RoverMetals/
for daily company updates and industry news, and
YouTube: https://www.youtube.com/channel/UCJsHsfag1GFyp4aLW5Ye-YQ?view_as=subscriber
for corporate videos.
Website: https://www.rovermetals.com/

ON BEHALF OF THE BOARD OF DIRECTORS
“Judson Culter”
Chief Executive Officer and Director

For further information, please contact:
Email: info@rovermetals.com
Phone: +1 (778) 754-2617

Statement Regarding Forward-Looking Information
This news release contains statements that constitute “forward-looking statements.” Such forward-looking statements involve known and unknown risks, uncertainties and other factors that may cause Rover’s actual results, performance or achievements, or developments in the industry to differ materially from the anticipated results, performance or achievements expressed or implied by such forward-looking statements. Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by the words “expects,” “plans,” “anticipates,” “believes,” “intends,” “estimates,” “projects,” “potential” and similar expressions, or that events or conditions “will,” “would,” “may,” “could” or “should” occur. There can be no assurance that such statements prove to be accurate. Actual results and future events could differ materially from those anticipated in such statements, and readers are cautioned not to place undue reliance on these forward-looking statements. Any factor could cause actual results to differ materially from Rover’s expectations. Rover undertakes no obligation to update these forward-looking statements in the event that management’s beliefs, estimates or opinions, or other factors, should change.

THE FORWARD-LOOKING INFORMATION CONTAINED IN THIS NEWS RELEASE REPRESENTS THE EXPECTATIONS OF THE COMPANY AS OF THE DATE OF THIS NEWS RELEASE AND, ACCORDINGLY, IS SUBJECT TO CHANGE AFTER SUCH DATE. READERS SHOULD NOT PLACE UNDUE IMPORTANCE ON FORWARD-LOOKING INFORMATION AND SHOULD NOT RELY UPON THIS INFORMATION AS OF ANY OTHER DATE. WHILE THE COMPANY MAY ELECT TO, IT DOES NOT UNDERTAKE TO UPDATE THIS INFORMATION AT ANY PARTICULAR TIME EXCEPT AS REQUIRED IN ACCORDANCE WITH APPLICABLE LAWS.

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OF THIS RELEASE.

Categories
Junior Mining Precious Metals Silver Hammer

Silver Hammer Purchases Strategic California Mine Patent Claim and Reports up
to 1290 g/t Silver and 7.7% Copper from Spring Sampling Program at its Eliza
Silver-Gold Project in Nevada

Silver Hammer Mining Corp.
Silver Hammer Mining Corp.

Figure 1

Eliza Property Map, Including Newly Acquired California Patent Claim
Eliza Property Map, Including Newly Acquired California Patent Claim

Table 1

Notable Results from the Spring Sampling Program at Eliza
Notable Results from the Spring Sampling Program at Eliza

VANCOUVER, British Columbia, May 11, 2022 (GLOBE NEWSWIRE) — Silver Hammer Mining Corp. (CSE: HAMR/OTCQB:HAMRF) (“Silver Hammer” or the “Company”) is pleased to report high-grade silver assay results obtained during an early phase of exploration at the Company’s Eliza Project (“Eliza” or the “Project”) in Nevada, plus the acquisition of the California Patent (“the Patent”), a strategic claim within the Project area.
https://embed.fireplace.yahoo.com/embed?ctrl=Monalixa&m_id=monalixa&m_mode=document&site=sports&os=android&pageContext=%257B%2522ctopid%2522%253A%25221542500%253B1480989%253B1481489%2522%252C%2522hashtag%2522%253A%25221542500%253B1480989%253B1481489%2522%252C%2522wiki_topics%2522%253A%2522British_Columbia%253BPatent_claim%253BQualified_person_(European_Union)%253BCalifornia%253BLead%2522%252C%2522lmsid%2522%253A%2522a0770000002m0AbAAI%2522%252C%2522revsp%2522%253A%2522globenewswire.com%2522%252C%2522lpstaid%2522%253A%2522e15ee30c-2af4-334d-a8a9-262c0ee2bf34%2522%252C%2522pageContentType%2522%253A%2522story%2522%257D

Silver Hammer recently completed the purchase of the strategic California Mine Patent claim, which is located entirely within the Eliza Project claim block. The Patent covers an area of 4.6 acres and includes the past-producing California Mine (Figure 1).

Figure 1. Eliza Property Map, Including Newly Acquired California Patent Claim

https://www.globenewswire.com/NewsRoom/AttachmentNg/9a6873fd-55a6-4ac7-9d2c-63b2a8908d10

A spring sampling program collected a total of 25 rock chip and grab samples from sites in the northern sector of Eliza, which includes the newly acquired California Mine area. Analytical results derived from these samples confirm the existence of high-grade silver (“Ag”) mineralization, and the presence of significant concentrations of copper (“Cu”), lead (“Pb”) and zinc (“Zn”) associated with the silver.

Sample Highlights Include:

  • PN662703: 1290 grams per tonne (“g/t”) Ag
  • PN662717: 1180 g/t Ag; 7.70% Cu; 11.00% Pb; 13.40% Zn
  • PN662715: 632 g/t silver; 2.2% Cu; 1.49% Pb; 0.55% Zn

See Table 1 for additional results.

“Although we are in the early days of exploring Eliza, these high-grade samples provide further evidence that the Project, including the newly acquired California Patent, is an exciting and high potential area,” stated President & CEO Morgan Lekstrom. “Our exploration work continues to demonstrate the existence of high-grade silver mineralization in a historic mining district that has seen limited modern exploration work. An especially interesting aspect of the results from this recent round of sampling is the presence of high-grade copper, lead and zinc, in addition to the silver. This particular suite of metals is characteristic of vein and replacement-style mineral deposits commonly found peripheral to porphyry copper deposits. Given the recent sampling results, the potential for porphyry-related mineralization will be assessed by our geologists as we further investigate the known silver prospects and potential.”

Table 1: Notable Results from the Spring Sampling Program at Eliza

https://www.globenewswire.com/NewsRoom/AttachmentNg/4cc37fae-9ae8-44e6-869b-8a48ef2bb77d

Ongoing field work at Eliza includes soil sampling and geological mapping. A program of geophysical surveying is planned to commence in Q2-Q3, 2022. Results of the geochemical and geophysical surveys will be used to define priority drill targets ahead of an initial phase of drilling at the Project.

Technical Observations at Eliza

The geological setting at Eliza is similar to that of other mines in the area. District-scale folding of Middle Paleozoic limestone and shale formations appears to have formed open-space fault and fracture zones which channeled mineralizing fluids through chemically receptive host rocks, specifically the Devonian Guillmette and Joana Limestone formations.

The spring sampling program done at and around the historic mines found on the Eliza Project has shown that the replacement-style mineralized zones in limestone exist along axial planar faults and fracture zones and commonly weather into resistant ridges.

The assay results from the sampling program confirm observations made in the field: limestone and dolomite micro-breccia replacement zones show strong to very strong enrichments in Ag, arsenic (“As”), barium (“Ba”), Cu, manganese (“Mn”), Pb and Zn. Notable results are shown in Table 1 and Figure 1.

Qualified Person

Technical aspects of this press release have been reviewed and approved by Philip Mulholland, a Certified Professional Geologist (CPG) with the American Institute of Professional Geologists, a contractor of the Company and the designated Qualified Person (QP) under National Instrument 43-101.

Quality Assurance, Quality Control Sample Security

The following measures were taken to ensure sample security: samples were submitted to AAS American Analytical Services; only authorized personnel attended the samples; samples were collected and recorded by Silver Hammer geologists and then shipped to the AAS lab in Osburn, Idaho.

Analysis Suite

All samples were analyzed by AAS using conventional assay methods involving fire assaying of 50-gram charges of pulverized sample material for gold and silver, with Fire Assay ICP Finish (FA-ICP); AND ICP-35 Element Scan (M-ICP-35).

Audits or reviews

Internal review of sampling techniques, data, and results by the Company’s geologist’s and management was routinely done through the course of the project.

Blanks and Duplicates

For quality assurance/quality control purposes, the batches of samples sent to AAS for assaying and ICP analyses were regularly infused with ‘duplicate’, and ‘blank’ samples. The ‘duplicates’ were created during sample preparation at AAS. The laboratory also provided analytical results for their own reference samples for further QA/QC check.

Disclaimer note: Mineralization hosted on adjacent and/or nearby properties is not necessarily indicative of mineralization hosted on the Company’s projects.

About Silver Hammer Mining Corp.

Silver Hammer Mining Corp. is a junior resource company advancing the flagship past-producing Silver Strand Mine in the Coeur d’Alene Mining District in Idaho, USA, as well both the Eliza Silver Project and the Silverton Silver Mine in one of the world’s most prolific mining jurisdictions in Nevada and the Lacy Gold Project in British Columbia, Canada. Silver Hammer’s primary focus is defining and developing silver deposits near past-producing mines that have not been adequately tested. The Company’s portfolio also provides exposure to copper and gold discoveries.

On Behalf of the Board of Silver Hammer Mining Corp.
Morgan Lekstrom, President and CEO
Corporate Office: 551 Howe Street, Vancouver, British Columbia V6C 2C2, Canada

For investor relations inquiries, contact:
Kristina Pillon, High Tide Consulting Corp.
T: 604.908.1695
E: investors@silverhammermining.com

For media inquiries, contact:
Adam Bello, Primoris Group Inc.
T: 416.489.0092
E: media@primorisgroup.com

The CSE does not accept responsibility for the adequacy or accuracy of this release.

The Canadian Securities Exchange has neither approved nor disapproved the contents of this press release.

Categories
Exclusive Interviews Junior Mining Labrador Gold

Labrador Gold – Discovers 54.17 GPT at Big Vein on Kingsway Gold Project

Labrador Gold: https://labradorgold.com/

Ticker: TSX.V: LAB | OTCQX: NKOSF

Corporate Presentation: https://labradorgold.com/investors/presentations/

Telephone: (416) 704-8291

Email: info@labradorgold.com

Labrador Gold Intersects 54.17 G/T Au Over 0.95m at the Big Vein Target

TORONTO, May 05, 2022 (GLOBE NEWSWIRE) — Labrador Gold Corp. (TSX.V:LAB | OTCQX:NKOSF | FNR: 2N6) (“LabGold” or the “Company”) is pleased to announce the continued extension of the Big Vein Zone to the southwest with an intersection of 54.17 g/t Au over 0.95m as well as the intersection of near surface gold mineralization from initial diamond drilling of the Pristine target at its 100% controlled Kingsway project near Gander, Newfoundland. These holes were drilled as part of the Company’s ongoing 100,000 metre drill program at Kingsway.

At Big Vein, the intercept of 54.17g/t Au over 0.95m in hole K-22-122 contains visible gold and is the furthest intersection of the Big Vein Zone to the southwest drilled to date. This extends the strike length of the zone to 320m and it remains open in this direction. Hole K-22-116 targeted the HTC zone and intersected 14.67 g/t over a 1m interval that also contained visible gold.

At the Pristine target the first six holes all intersected significant near surface gold mineralization, including hole K-21-109 that assayed 3.55 g/t Au over 2.33m from 17.15m that contained visible gold and hole K-21-100 that intersected 3.89 g/t Au over 3m from 53m downhole.

The initial assays from the Pristine target, located approximately 800m northeast of Big Vein along the Appleton Fault Zone, are very similar to the first reported holes from Big Vein that assayed 1.11 g/t Au over 5.50m, 5.0 g/t Au over 0.9m and 2.26 g/t Au over 7.0m in Hole K-21-01 and 1.72 g/t Au over 3.0min Hole K-21-02 (see news release dated May 10, 2021).

The stratigraphy encountered is also very similar to Big Vein, with the mineralized Doyle Zone defined by a network of shear veining that is associated with a highly fractured sandstone in fault contact with a deformed black graphitic shale.

“We are very pleased with the initial results from the Pristine target which proves our interpretation of the existence of a gold occurrence not too far up ice from the pristine gold grains found in till. Pristine is the third of three targets tested to date to show significant near surface gold assays, a result of our systematic exploration strategy at Kingsway and the prospectivity of the Appleton Fault Zone,” said Roger Moss, President and CEO of the LabGold. “We have named the mineralized zone at Pristine the Doyle Zone after our friend and strong supporter James Doyle, who passed away suddenly, and much too early, in late 2020. James helped and advised us in every financing since the start of Labrador Gold in 2017, and gave us support in the market, often when no-one else was interested. James would have loved witnessing all the exploration activity in central Newfoundland over the last two years and would have been working the telephones daily. We will endeavour to ensure that the Doyle Zone lives up to the big personality of its namesake.”

Pristine Target and Appleton Fault Zone

The visible gold found in hole K-21-109 drilled into the Doyle Zone is the third occurrence of visible gold found, after Big Vein and Golden Glove, along the Appleton Fault Zone. The Doyle Zone is the furthest northeast, approximately 4.5km from Golden Glove which lies close to the southern property boundary. The Doyle Zone lies to the east of a fault with a major damage zone approximately 30m wide which may represent the expression of the Appleton Fault Zone in this area. Further work is necessary to determine if this is, in fact, the the case or if it is a major splay of the Appleton Fault Zone. In either case it is a significant structure associated with gold mineralization in the Doyle Zone.

The most detailed exploration along the Appleton Fault Zone to date has been over an approximately 2km section from just southwest of Big Vein to the Pristine target, leaving the remaining 10km length of the fault zone relatively underexplored. This will be a major focus of LabGold’s upcoming field program.

Hole IDfrom (m)to (m)width (m)Au (g/t)Target
K-22-1429610043.44Big Vein
including979925.37
K-22-125707771.72HTC
K-22-12426426622.03Big Vein
28328417.68
K-22-12299114151.46Big Vein
123.33124.280.9554.17*
K-22-116178179114.67*HTC


19419624.18
20720813.25
K-22-143758271.53Pristine
K-22-123232411.98Pristine
434412.3
K-22-119313321.92Pristine
K-21-10917.1518.32.33.55*Pristine


47.4550.4531.31
54.4559.4551.48
K-21-107485241.16Pristine


868931.58
9610371.81
K-21-100535633.89Pristine

Table 1. Summary of Assay Results
* Interval contains visible gold. All intersections are downhole length
as there is insufficient Information to calculate true width.

Hole IDNorthingEastingElevation (m)AzimuthDipDepth (m)
K-22-143543603466180154.126045299.06
K-22-142543501566142636.815545167.00
K-22-125543528366160042.514050326.00
K-22-124543514366140550.214060494.00
K-22-123543610366180856.130045236.00
K-22-122543501666142636.914550228.63
K-22-119543610566180356.230045185.00
K-21-116543528066160042.314560236.00
K-21-109543605866178955.526060218.00
K-21-107543605866178955.629550209.00
K-21-100543619166185158.614045230.00

Table 2. Drill hole collar details

Figure 1. Doyle Zone plan map
https://www.globenewswire.com/NewsRoom/AttachmentNg/d658d985-d462-4293-a32f-4db3365c5d7d

Figure 2. Big Vein Plan Map.
https://www.globenewswire.com/NewsRoom/AttachmentNg/44a9f7c4-1910-4bea-99a8-e815f6ef56c2

QA/QC

True widths of the reported intersections have yet to be calculated. Assays are uncut. Samples of HQ split core are securely stored prior to shipping to Eastern Analytical Laboratory in Springdale, Newfoundland for assay. Eastern Analytical is an ISO/IEC17025 accredited laboratory. Samples are routinely analyzed for gold by standard 30g fire assay with atomic absorption finish as well as by ICP-OES for an additional 34 elements. Samples containing visible gold are assayed by metallic screen/fire assay, as are any samples with fire assay results greater than 1g/t Au. The company submits blanks and certified reference standards at a rate of approximately 5% of the total samples in each batch.

Qualified Person

Roger Moss, PhD., P.Geo., President and CEO of LabGold, a Qualified Person in accordance with Canadian regulatory requirements as set out in NI 43-101, has read and approved the scientific and technical information that forms the basis for the disclosure contained in this release.

The Company gratefully acknowledges the Newfoundland and Labrador Ministry of Natural Resources’ Junior Exploration Assistance (JEA) Program for its financial support for exploration of the Kingsway property.

About Labrador Gold
Labrador Gold is a Canadian based mineral exploration company focused on the acquisition and exploration of prospective gold projects in Eastern Canada.

In early 2020, Labrador Gold acquired the option to earn a 100% interest in the Kingsway project in the Gander area of Newfoundland. The three licenses comprising the Kingsway project cover approximately 12km of the Appleton Fault Zone which is associated with gold occurrences in the region, including those of New Found Gold immediately to the south of Kingsway. Infrastructure in the area is excellent located just 18km from the town of Gander with road access to the project, nearby electricity and abundant local water. LabGold is drilling a projected 50,000 metres targeting high-grade epizonal gold mineralization along the Appleton Fault Zone following encouraging early results. The Company has approximately $28 million in working capital and is well funded to carry out the planned program.

The Hopedale property covers much of the Florence Lake greenstone belts that stretches over 60 km. The belt is typical of greenstone belts around the world but has been underexplored by comparison. Work to date by Labrador Gold show gold anomalies in rocks, soils and lake sediments over a 3 kilometre section of the northern portion of the Florence Lake greenstone belt in the vicinity of the known Thurber Dog gold showing where grab samples assayed up to 7.8g/t gold. In addition, anomalous gold in soil and lake sediment samples occur over approximately 40 km along the southern section of the greenstone belt (see news release dated January 25 th 2018 for more details). Labrador Gold now controls approximately 40km strike length of the Florence Lake Greenstone Belt.

The Company has 156,439,526 common shares issued and outstanding and trades on the TSX Venture Exchange under the symbol LAB.

For more information please contact:

Roger Moss, President and CEO      Tel: 416-704-8291

Or visit our website at: www.labradorgold.com

Twitter: @LabGoldCorp

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release .

Forward-Looking Statements: This news release contains forward-looking statements that involve risks and uncertainties, which may cause actual results to differ materially from the statements made. When used in this document, the words “may”, “would”, “could”, “will”, “intend”, “plan”, “anticipate”, “believe”, “estimate”, “expect” and similar expressions are intended to identify forward-looking statements. Such statements reflect our current views with respect to future events and are subject to risks and uncertainties. Many factors could cause our actual results to differ materially from the statements made, including those factors discussed in filings made by us with the Canadian securities regulatory authorities. Should one or more of these risks and uncertainties, such as actual results of current exploration programs, the general risks associated with the mining industry, the price of gold and other metals, currency and interest rate fluctuations, increased competition and general economic and market factors, occur or should assumptions underlying the forward looking statements prove incorrect, actual results may vary materially from those described herein as intended, planned, anticipated, or expected. We do not intend and do not assume any obligation to update these forward-looking statements, except as required by law. Shareholders are cautioned not to put undue reliance on such forward-looking statements .

Categories
Base Metals Energy Granite Creek Copper Junior Mining Metallic Group Precious Metals

Granite Creek Copper and Metallic Group of Companies Expand Community and First Nations Relations Team with Dedicated Community Relations Manager

VANCOUVER, BC / ACCESSWIRE / May 4, 2022 / Granite Creek Copper Ltd. (TSXV:GCX)(OTCQB:GCXXF) (“Granite Creek” or the “Company“) is pleased to announce the creation of a dedicated Community & First Nations Relations Team for the Metallic Group of Companies and the appointment of Lindsay Wilson to the role of Manager, Community and Investor Relations. Ms. Wilson will be working alongside Lauren Blackburn, the Company’s Yukon-based Regulatory & Permitting Manager, in further strengthening our relationships with First Nations, local communities and governments.

The Metallic Group is well established in the Yukon with multiple projects under development by member companies. The Group employs dedicated personnel in Whitehorse, who are long-time residents of the Yukon and, as such, have an affinity for and understanding of its people, its history and its robust mineral endowment. Ms. Blackburn has been with Metallic Minerals and the Metallic Group since its founding and has taken a leading role in the Company’s community, permitting and regulatory initiatives. The addition of Ms. Wilson greatly increases our capacity to build meaningful and long-lasting and mutually beneficial partnerships in keeping with our strong commitment to environmental, social, and governance (“ESG”) aspects of the resource sector. The Metallic Group is committed to applying best industry practices to exploration and to make positive contributions in the Territory and the specific communities in which we work.

Lauren Blackburn – Manager, Regulatory and Permitting

Ms. Blackburn has over 15 years of Yukon-based experience in the mineral exploration sector focused on the exploration and development of early to advanced-stage silver, gold, and base metal deposits. Her primary concentration has been in northern Canada where she has garnered a dynamic skill set that includes expertise in the exploration process, permitting, lands management, regulatory lobbying, land-use planning and community engagement. Ms. Blackburn is highly involved in Territorial legislation and policy review, permitting activities and assists in evaluation of potential project acquisitions and strategic development.

Lindsay Wilson – Manager, Community & Investor Relations

A member of the Snuneymuxw First Nation on Vancouver Island, Ms. Wilson is focused on incorporating traditional ways of being into her work within the resource sector and seeking to develop sustainable and credible partnerships within the communities that she works. Ms. Wilson has a comprehensive background in indigenous studies and public relations, alongside practical experience in the mineral resource sector. Having worked previously in the Yukon with the Yukon Mining Alliance, Ms. Wilson is excited about the opportunity to return to work in the Yukon and looking forward to reconnecting with the communities there.

Arctic Indigenous Investment Conference (AIIC)

The Metallic Group Community and First Nations Team will be attending the AIIC on May 4th & 5th in Whitehorse, Yukon.

Connecting globally – through a hybrid (in-person & virtual) experience – AIIC 2022 will highlight and promote indigenous development corporations and businesses in the northern economy, alongside the north’s business community and colleagues across sectors. The goals of AIIC 2022 are to support economic reconciliation and growth, and youth entrepreneurship by forging new and stronger relationships, advancing meaningful partnerships, and connecting people across the arctic. Indigenous development corporations and businesses play a key role across northern Canada. These efforts are supported when we stand together with a collaborative voice for business, northern investment and our citizens, to ensure a diverse and prosperous economy, community and future.

About the Metallic Group of Companies

The Metallic Group is a collaboration of leading precious and base metals exploration and development companies, with a portfolio of large, brownfields assets in established mining districts adjacent to some of the industry’s highest-grade producers of silver and gold, platinum and palladium, and copper. Member companies include Granite Creek Copper in the Yukon’s Minto copper district, Metallic Minerals in the Yukon’s high-grade Keno Hill silver district and La Plata silver-gold-copper district of Colorado, and Group Ten Metals in the Stillwater PGM-nickel-copper district of Montana and Kluane district in the Yukon. The founders and team members of the Metallic Group include highly successful explorationists formerly with some of the industry’s leading explorer/developers and major producers. With this expertise, the companies are undertaking a systematic approach to exploration and development using new models and technologies to facilitate discoveries in these proven, but under-explored, mining districts. Members of the Metallic Group have been recognized as recipients of awards for excellence in environmental stewardship demonstrating commitment to responsible resource development and appropriate ESG practices. The Metallic Group is headquartered in Vancouver, BC, Canada, and its member companies are listed on the Toronto Venture, US OTCQB, and Frankfurt stock exchanges.

About Granite Creek Copper

Granite Creek, a member of the Metallic Group of Companies, is a Canadian exploration company focused on the 176 square kilometer Carmacks project in the Minto copper district of Canada’s Yukon Territory. The project is south of the high-grade Minto copper-gold mine, operated by Minto Metals Corp., and features a high-grade copper, gold and silver resource with excellent access to road, power and port infrastructure. More information about Granite Creek Copper can be viewed on the Company’s website at www.gcxcopper.com.

FOR FURTHER INFORMATION PLEASE CONTACT:

Timothy Johnson, President & CEO
Telephone: 1 (604) 235-1982
Toll-Free: 1 (888) 361-3494
E-mail: info@gcxcopper.com
Website: www.gcxcopper.com
Metallic Group: www.metallicgroup.ca
Twitter: @yukoncopper

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

SOURCE: Granite Creek Copper Ltd.



View source version on accesswire.com:
https://www.accesswire.com/700049/Granite-Creek-Copper-and-Metallic-Group-of-Companies-Expand-Community-and-First-Nations-Relations-Team-with-Dedicated-Community-Relations-Manager

Categories
Base Metals Energy Granite Creek Copper Junior Mining Metallic Group Precious Metals

Granite Creek Copper Retains SGS Canada for Updated Preliminary Economic Assessment on High-Grade Carmacks Copper-Gold-Silver Project in Yukon Canada

VANCOUVER, BC / ACCESSWIRE / May 3, 2022 / Granite Creek Copper Ltd. (TSXV:GCX)(OTCQB:GCXXF) (“Granite Creek” or the “Company“) is pleased to announce that it has retained SGS to complete an updated Preliminary Economic Assessment (“PEA”) on the Carmacks project. The PEA will use the 2022 Resource Estimate (Table 1), consisting of 36.2 million tonnes (Mt) in Measured and Indicated categories (M&I), grading 1.07% CuEq (0.81% Cu, 0.26g/t Au, 3.23g/t Ag and 0.011% Mo) for a total of 651 million pounds (Mlbs) of contained M&I copper and an additional 38 Mlbs Cu Inferred as the main input. Building off a 2017 PEA(1), the updated study will encompass the following:

  • Significant Increase in Contained Copper – The 2022 resource estimate marked a 43% increase in contained copper over the previous estimate referenced(2)
  • Inclusion of Sulphide Processing – As of the publication of the 2022 resource estimate the Carmacks project consists of roughly 50/50 sulfide and oxide resources by contained metal. The Company sees the inclusion of sulphide resources as a significant potential value driver having a positive impact on the economics of the project; and
  • High Proportion of Resources Modeled in Three Conceptual Open Pits – 96% of the 2022 resources are contained within the conceptual pits (Figure 1). With a high percentage of current resources reporting in conceptual pits the cash cost per pound of copper is expected to be significantly lower when compared to a similar sized underground operation.

Timothy Johnson, Granite Creek President & CEO, stated, “The launch of the updated Preliminary Economic Assessment study marks a major milestone in the development of the Carmacks deposit at a time when commodities demand is seeing rapid growth. The Carmacks project is well-positioned by its location, access to infrastructure, and proximity to the operating, high-grade Minto mine just to the north. Both copper and molybdenum have been deemed by the Canadian government to be ‘critical minerals‘ based on their role in the transition to a low-carbon economy which we expect will provide prolonged price strength well into the future. We look forward to continuing to bring positive news as we develop this high-grade copper project.”

Upcoming Events

OTC Markets Mining and Metals Virtual Conference – Tim Johnson, President & CEO, will present live at VirtualInvestorConferences.com on May 5th, 2022 at 10am PT | 1pm ET. To register, click here.

Vancouver Resource Investment Conference – Granite Creek Copper will join fellow members of the Metallic Group of Companies at the 2022 VRIC event at the Vancouver Convention Centre on May 17-18. Visit us in Booth 111.

2022 Technical Report Filing

Granite Creek also announces that further to its news release dated March 15, 2022 it has filed on SEDAR a National Instrument 43-101 technical report (the “Technical Report”) for the Carmacks project, located in the Yukon, Canada.

The report, entitled “Technical Report on the Updated Mineral Resource Estimates for the Carmacks Cu-Au-Ag Project Near Carmacks, Yukon, Canada”, has an effective date of February 25, 2022. The Technical Report was authored Allan Armitage Ph.D., P.Geo of SGS Geological Services(“SGS”) an independent Qualified Person and was prepared in accordance with National Instrument 43-101 Standards of Disclosure for Mineral Projects.

The Technical Report is available under the Company’s profile at www.sedar.com and will also be available on the Company’s website at www.gcxcopper.com.

Table 1 – 2022 Carmacks Copper Project Mineral Resources

Granite Creek Copper Ltd., Tuesday, May 3, 2022, Press release picture
Granite Creek Copper Ltd., Tuesday, May 3, 2022, Press release picture

Cu=copper, Au=gold, Mo=molybdenum, Ag=silver, Mt=millions of tonnes, Mlbs=millions of pounds, klbs=thousands of pounds, koz=thousands of ounces. Mineral Resources are reported using the 2014 CIM Definition Standards. Mineral Resources are reported within a conceptual constraining pit shell that includes the following input parameters: Metal prices of $3.60/lb Cu, $1,750/Au, $22/oz Ag, $14/lb Mo and pit slope angles that vary from 35° for overburden to 55°for granodiorite host. Metal prices are in US$. Metallurgical recoveries reflective of prior test work that averages: 85% Cu, 85% Au, 65% Ag in the oxide domain and 90% Cu, 76% Au, 65% Ag in the sulphide domain. Mo recovery is assumed to be 70% in both oxide and sulphide domain. Tonnes are metric tonnes, with Cu and Mo grades as percentages and Au and Ag grades as gram per tonne units. Cu and Mo metal content is reported in lb and Au and Ag content is reported in troy oz. Totals and Metal content may not sum due to rounding and significant digits used in calculations. Cu Eq calculation is based on 100% recovery of all metals using the same metal prices used in the resource calculation: $3.60/lb Cu, $1,750/Au, $22/oz Ag, $14/lb Mo.

Figure 1 – Oblique view of 2022 resources and proposed pits (total strike length of 2,950 m)

Granite Creek Copper Ltd., Tuesday, May 3, 2022, Press release picture
Granite Creek Copper Ltd., Tuesday, May 3, 2022, Press release picture

Qualified Persons

The Carmacks project 2022 Resource Estimate was prepared by Allan Armitage, P.Geo., of SGS Geological Services, an independent Qualified Person, in accordance with the guidelines of the Canadian Securities Administrators’ National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”) with an effective date of February 25, 2022. Armitage conducted a site visit to the property on November 9, 2021.

Ms. Debbie James, P.Geo., a qualified person for the purposes of National Instrument 43-101, has reviewed and approved the technical disclosure not pertaining to the resource estimate contained in this news release. Ms. James is a Senior Geologist with TruePoint Exploration and a Project Manager at Carmacks.

1PEA: “NI 43-101 Preliminary Economic Assessment Technical Report on the Carmacks Project, Yukon, Canada” Effective Date 12 October 2016. Report Date: 25 November 2016. SEDAR Filing Date: 9 February 2017

1News Release: “Copper North Expands Oxide Mineral resources at Carmacks” Published on SEDAR 9 April 2018.

About Granite Creek Copper

Granite Creek, a member of the Metallic Group of Companies, is a Canadian exploration company focused on the 176 square kilometer Carmacks project in the Minto copper district of Canada’s Yukon Territory. The project is on trend with the high-grade Minto copper-gold mine, operated by Minto Metals Corp., to the north, and features excellent access to infrastructure with the nearby paved Yukon Highway 2, along with grid power within 12 km. More information about Granite Creek Copper can be viewed on the Company’s website at www.gcxcopper.com.

FOR FURTHER INFORMATION PLEASE CONTACT:

Timothy Johnson, President & CEO
Telephone: 1 (604) 235-1982
Toll-Free: 1 (888) 361-3494
E-mail: info@gcxcopper.com
Website: www.gcxcopper.com
Metallic Group: www.metallicgroup.ca
Twitter: @yukoncopper

Forward-Looking Statements

This news release includes certain statements that may be deemed “forward-looking statements”. All statements in this release, other than statements of historical facts including, without limitation, statements regarding potential mineralization, historic production, estimation of mineral resources, the realization of mineral resource estimates, interpretation of prior exploration and potential exploration results, the timing and success of exploration activities generally, the timing and results of future resource estimates, permitting time lines, metal prices and currency exchange rates, availability of capital, government regulation of exploration operations, environmental risks, reclamation, title, and future plans and objectives of the company are forward-looking statements that involve various risks and uncertainties. Although Granite Creek Copper believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in the forward-looking statements. Forward-looking statements are based on a number of material factors and assumptions. Factors that could cause actual results to differ materially from those in forward-looking statements include failure to obtain necessary approvals, unsuccessful exploration results, changes in project parameters as plans continue to be refined, results of future resource estimates, future metal prices, availability of capital and financing on acceptable terms, general economic, market or business conditions, risks associated with regulatory changes, defects in title, availability of personnel, materials and equipment on a timely basis, accidents or equipment breakdowns, uninsured risks, delays in receiving government approvals, unanticipated environmental impacts on operations and costs to remedy same, and other exploration or other risks detailed herein and from time to time in the filings made by the companies with securities regulators. Readers are cautioned that mineral resources that are not mineral reserves do not have demonstrated economic viability. Mineral exploration and development of mines is an inherently risky business. Accordingly, the actual events may differ materially from those projected in the forward-looking statements. For more information on Granite Creek Copper and the risks and challenges of their businesses, investors should review their annual filings that are available at www.sedar.com.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

SOURCE: Granite Creek Copper Ltd.



View source version on accesswire.com:
https://www.accesswire.com/699894/Granite-Creek-Copper-Retains-SGS-Canada-for-Updated-Preliminary-Economic-Assessment-on-High-Grade-Carmacks-Copper-Gold-Silver-Project-in-Yukon-Canada

Categories
Junior Mining Precious Metals Rover Metals

Rover Metals Announces Start of Phase 1 Exploration at Tobin Gold Project, Winnemucca, NV, USA

Rover Metals Corp.
Rover Metals Corp.

VANCOUVER, British Columbia, May 03, 2022 (GLOBE NEWSWIRE) — Rover Metals Corp. (TSXV: ROVR) (OTCQB: ROVMF) (FSE:4XO) (“Rover” or the “Company”) is pleased to announce the start of its Phase 1 Exploration Program at its 100% owned Tobin Gold Project, Winnemucca, NV, USA. Rover has engaged a renowned Carlin gold geologist to assist in the planning of the Phase 1 program.

Tobin Gold Project
In February 2022, Rover acquired a 100% interest in the Tobin Gold Project (“Tobin”), which is comprised of 68 claims within BLM land, for a total of 1,405 acres (or 569 hectares). Tobin is a Carlin-style gold system set in Mesozoic rocks. The project is located about 40 km from the operating Phoenix Gold Mine, which is owned by Nevada Gold Mines, a joint venture between Newmont and Barrick. Tobin is also located about 60 km from i-80 Gold’s Lone Tree Gold Mine, 50 kms from SSR’s Marigold Mine and is in close proximity to other proven gold deposits owned by i-80 Gold, SSR Mining, and Kinross. See property map below for more details.

The property sits in the historical Mt. Tobin mercury district within an area of widespread silicification and banded chalcedony veins over an area of several square kilometers. Both structural and strata bound jasperoids are present in the adjoining Triassic and Paleozoic carbonate and fine-grained clastic sediments along the range-front structure as well as higher in the range. The prospect area was identified during a BLEG stream sediment sampling program. Follow up rock chip sampling along and above the range front confirmed that there are multiple structures carrying mineralization. Gold values run as high as 2.3 g/t Au, with many samples having gold content between 200 ppb Au and 1000 ppb Au. Pathfinder elements run as high as 200 ppm Sb, 1100 ppm As and 29 ppm Hg. Mineralization at the Tobin Project appears to be localized along two subparallel trends. The first is the range-front fault, and the second is structural zone located several tens of meters above the valley that trends somewhat obliquely to the range-front. To date, the better mineralized rocks were largely collected from this second structure located higher on the mountain front.

Proximity Map – Tobin Gold Project

Judson Culter, CEO at Rover Metals, states, “The Tobin Gold Project is our first low-cost gold exploration project. We believe that future drill programs will be reverse circulation (“RC”) drill programs. Tobin is located in the mining friendly jurisdiction of Nevada, in the Battle Mountain region, which has seen significant consolidation in the past several years.”

Annual Report
Rover has SEDAR filed its Annual 2021 Comparative Financial Statements and Management Discussion and Analysis (“MD&A”) for the years ended December 31, 2021 and December 31, 2020. The 2021 MD&A lays out management’s performance and significant milestones accomplished in 2021.

Technical information in this news release has been approved by David White, P.Geo., Technical Advisor of Rover and a Qualified Person for the purposes of National Instrument 43-101.

About Rover Metals
Rover is a precious metals exploration company specialized in North American (Canada and U.S.) precious metal resources, which is currently advancing the gold potential of its existing projects. The Company owns five gold projects. Phase 3 Exploration at its Cabin Gold Project, in the Northwest Territories of Canada (60th parallel), is also currently underway as of the date of this release. Additionally, the Company is awaiting news from the Phase 2 Exploration Program at its Up Town Gold Project, in the Northwest Territories of Canada (60th parallel).

You can follow Rover on its social media channels:
Twitter: https://twitter.com/rovermetals
LinkedIn: https://www.linkedin.com/company/rover-metals/
Facebook: https://www.facebook.com/RoverMetals/
for daily company updates and industry news, and
YouTube: https://www.youtube.com/channel/UCJsHsfag1GFyp4aLW5Ye-YQ?view_as=subscriber
for corporate videos.
Website: https://www.rovermetals.com/

ON BEHALF OF THE BOARD OF DIRECTORS
“Judson Culter”
Chief Executive Officer and Director

For further information, please contact:
Email: info@rovermetals.com
Phone: +1 (778) 754-2617

Statement Regarding Forward-Looking Information
This news release contains statements that constitute “forward-looking statements.” Such forward-looking statements involve known and unknown risks, uncertainties and other factors that may cause Rover’s actual results, performance or achievements, or developments in the industry to differ materially from the anticipated results, performance or achievements expressed or implied by such forward-looking statements. Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by the words “expects,” “plans,” “anticipates,” “believes,” “intends,” “estimates,” “projects,” “potential” and similar expressions, or that events or conditions “will,” “would,” “may,” “could” or “should” occur. There can be no assurance that such statements prove to be accurate. Actual results and future events could differ materially from those anticipated in such statements, and readers are cautioned not to place undue reliance on these forward-looking statements. Any factor could cause actual results to differ materially from Rover’s expectations. Rover undertakes no obligation to update these forward-looking statements in the event that management’s beliefs, estimates or opinions, or other factors, should change.

THE FORWARD-LOOKING INFORMATION CONTAINED IN THIS NEWS RELEASE REPRESENTS THE EXPECTATIONS OF THE COMPANY AS OF THE DATE OF THIS NEWS RELEASE AND, ACCORDINGLY, IS SUBJECT TO CHANGE AFTER SUCH DATE. READERS SHOULD NOT PLACE UNDUE IMPORTANCE ON FORWARD-LOOKING INFORMATION AND SHOULD NOT RELY UPON THIS INFORMATION AS OF ANY OTHER DATE. WHILE THE COMPANY MAY ELECT TO, IT DOES NOT UNDERTAKE TO UPDATE THIS INFORMATION AT ANY PARTICULAR TIME EXCEPT AS REQUIRED IN ACCORDANCE WITH APPLICABLE LAWS.

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OF THIS RELEASE.

Categories
Energy Junior Mining Metallic Minerals Precious Metals Stillwater Critical Minerals

Group Ten Reports 13.2 Meters of 3.33% Nickel Equivalent Within 401 Meters Continuous Mineralization from Resource Expansion Drilling at Stillwater West Critical Minerals Project in Montana, USA

VANCOUVER, BC / ACCESSWIRE / May 3, 2022 / Group Ten Metals Inc. (TSX.V:PGE; OTCQB: PGEZF; FSE:5D32) (the “Company” or “Group Ten”) today reports wide, high-grade intervals of nickel sulphide with palladium, platinum, rhodium, cobalt, copper and gold in a third tranche of drill results from the 14-hole resource expansion campaign completed at the Company’s flagship Stillwater West PGE-Ni-Cu-Co + Au project in Montana, USA.

Results continue to support the Company’s priority objective of expanding the October 2021 inaugural mineral resource estimates with multiple wide and highly mineralized intervals returned in step-out drilling in the DR-Hybrid deposit area at Chrome Mountain (see Table 1 and Figure 1). Drilling in 2021 focused on resource expansion in three of the five deposit areas delineated by the 2021 estimates. Similar wide and well-mineralized intervals have now been reported from all three deposit areas as announced December 20, 2021, and March 7, 2022. Mineralization remains open to expansion along trend and at depth in all five deposit areas, that are in the 12-kilometer-long resource area within the broader 32-kilometer-long land package in the lower Stillwater Igneous Complex (see Figure 2).

Group Ten Metals Inc. , Tuesday, May 3, 2022, Press release picture
Group Ten Metals Inc. , Tuesday, May 3, 2022, Press release picture

Live Webinar with Q&A

Group Ten President & CEO, Michael Rowley, will be joined by newly appointed Vice-President Exploration, Danie Grobler, for a live webinar on Wednesday, May 4th at 10am PT (1pm ET). To register click here or the thumbnail.

Highlights:

  • CM2021-05 returned 400.8 meters of continuous battery and precious metal mineralization grading 0.30% Nickel Equivalent (“NiEq”), equal to 0.80 g/t Palladium Equivalent (“PdEq”), with successive contained higher-grade intervals including 96 meters of 0.60% NiEq (1.56 g/t PdEq) and including 13.2 meters of 3.33% NiEq (8.88 g/t PdEq) as 2.31% Ni, 1.51 g/t Pd+Pt+Au+Rh (“4E”), 0.35% Cu and 0.115% Co starting at 37.6 meters. This is one of the widest high-grade intercepts ever recorded in the Stillwater district.
  • The results from CM2021-05 represent an important new discovery with the same distinctive signature of high-grade nickel sulphide, platinum group metals and gold as encountered in CM2020-04, which returned 8.5 meters of 1.74% NiEq (or 4.65 g/t PdEq) within a broad mineralized package located approximately 125 meters to the west. This zone remains open to further expansion with additional drilling.
  • CM2021-06 returned 0.26% NiEq (0.71 g/t PdEq) over 345.0 meters, including 75.4 meters of 0.37% NiEq, or 0.99 g/t PdEq, and a second, lower interval with 148.4 meters of 0.30% NiEq, or 0.79 g/t PdEq.
  • CM2021-04 returned 247.2 meters of 0.21% NiEq (0.57 g/t PdEq) mineralization including two long intervals at higher grades.
  • Results also continue to highlight the potential for significant co-product rhodium values at Stillwater West, with drill samples in Chrome Mountain holes CM2021-04, -05, and -06 up to 0.36 g/t Rh within the mineralized horizons. At recent values, rhodium trades at more than 16 times the value of platinum and 8 times the value of palladium on a spot price basis at over USD 16,000 per ounce. Sibanye-Stillwater, adjacent to Group Ten’s Stillwater West project, is the primary US producer. Supply constraints for rhodium have supported rising prices since 2017.
  • Assay results remain pending from five holes in the HGR deposit area at Iron Mountain and portions of holes CZ2021-01 and IM2021-04, in addition to rhodium assay results on a number of mineralized intervals reported to date.
https://embed.fireplace.yahoo.com/embed?ctrl=Monalixa&m_id=monalixa&m_mode=document&site=sports&os=android&pageContext=%257B%2522ctopid%2522%253A%25221542500%253B1577000%2522%252C%2522hashtag%2522%253A%25221542500%253B1577000%2522%252C%2522wiki_topics%2522%253A%2522Platinum_group%253BNickel_sulfide%253BRhodium%253BStillwater_igneous_complex%253BBushveld_Igneous_Complex%2522%252C%2522lmsid%2522%253A%2522a077000000LnOyOAAV%2522%252C%2522revsp%2522%253A%2522accesswire.ca%2522%252C%2522lpstaid%2522%253A%25225f9d4b09-c878-3f52-8f08-4cf8fe2fdeb3%2522%252C%2522pageContentType%2522%253A%2522story%2522%257D

These results, in addition to results released March 7, 2022 and December 20, 2021, demonstrate significant potential to expand the October 2021 mineral resource estimates with multiple long intervals at grades well above the 0.20% NiEq cut-off grade used in that study (see bolded assay values on Table 1). Potential is also shown to expand existing resources at higher cut-off grades, such as 0.35% and 0.50% NiEq (red values and shaded rows, respectively, on Table 1). Moreover, as shown in Figures 1 to 4, these results provide important intercepts in step-out drill holes located up to several hundred meters from the resource estimate block models.

Dr. Danie Grobler, Group Ten’s Vice-President of Exploration, commented “I am excited to extend my experience obtained over the past two decades at the Platreef in the northern Bushveld Complex to Group Ten’s Stillwater West project. We see significant comparability with Platreef-style mineralization in the lower Stillwater Complex and in particular, early evidence of higher-grade Flatreef pegmatoidal-style mineralization targets within the project’s layered magmatic stratigraphy.”

Michael Rowley, President and CEO, commented, “The high-grade intercept in hole CM2021-05 is the latest in a series of exciting discoveries made by our team in the lower Stillwater complex through the development of a new predictive geologic model for this famously metal-rich district. This notable intercept demonstrates the same high tenor nickel sulphide mineralization as a similar interval in CM2020-04, 125 meters away, and is in an area that is completely outside of the current resource block model. It also represents one of the widest high-grade battery and precious metal intercepts to date in the Stillwater district. Further step-outs on this new target, situated between the existing DR and Hybrid deposit areas, are a priority for the coming season. Overall, we continue to see confirmation of a large mineralized system with an impressive endowment of eight of the commodities listed as critical by the US government. We look forward to reporting additional remaining drill results from the 2021 Iron Mountain drilling, exploration plans for 2022, and other news in the near term.”

Table 1 – Highlight Results from the 2021 Expansion Drill Campaign at the DR and Hybrid Deposit Areas

Group Ten Metals Inc. , Tuesday, May 3, 2022, Press release picture
Group Ten Metals Inc. , Tuesday, May 3, 2022, Press release picture

Highlighted significant mineralized intercepts are presented above. Grade-thickness values cover significant mineralized intervals with total palladium and nickel equivalent grade-thickness determined by multiplying the thickness of continuous mineralization (in meters) by the palladium equivalent grade (in grams/tonne) to provide gram-meter values (g-m) or by multiplying the nickel equivalent grade (in percent) to provide percent-meter values as shown. Total nickel and palladium equivalent calculations reflect total gross metal content using long term metal prices (all USD): $7.00/lb nickel (Ni), $3.50/lb copper (Cu), $20.00/lb cobalt (Co), $1,000/oz platinum (Pt), $1,800/oz palladium (Pd), and $1,600/oz gold (Au). Equivalent values have not been adjusted to reflect metallurgical recoveries. Total metal equivalent values include both base and precious metals. Intervals are reported as drilled widths and are believed to be representative of the actual width of mineralization.

Upcoming News and Events

Geological Survey of Nevada Symposium

Dr. Craig Bow will present recent findings in a technical session at the GSN Symposium May 4th in Reno, Nevada.

OTC Markets Metals and Mining Conference Virtual Conference

Michael Rowley will present on Thursday, May 5 at 10:30am PT (1:30PM ET). To register, click here.

Vancouver Resource Investment Conference

Group Ten will join fellow Metallic Group company members in Booth 111 at the 2022 VRIC event.

About Stillwater West

Group Ten is rapidly advancing the Stillwater West PGE-Ni-Cu-Co + Au project towards becoming a world-class source of low-carbon, sulphide-hosted nickel, copper, and cobalt, critical to the electrification movement, as well as key catalytic metals including platinum, palladium and rhodium used in catalytic converters, fuel cells, and the production of green hydrogen. Stillwater West positions Group Ten as the second-largest landholder in the Stillwater Complex, with a 100%-owned position adjoining and adjacent to Sibanye-Stillwater’s PGE mines in south-central Montana, USA1. The Stillwater Complex is recognized as one of the top regions in the world for PGE-Ni-Cu-Co mineralization, alongside the Bushveld Complex and Great Dyke in southern Africa, which are similar layered intrusions. The J-M Reef, and other PGE-enriched sulphide horizons in the Stillwater Complex, share many similarities with the highly prolific Merensky and UG2 Reefs in the Bushveld Complex. Group Ten’s work in the lower Stillwater Complex has demonstrated the presence of large-scale disseminated and high-sulphide battery metals and PGE mineralization, similar to the Platreef in the Bushveld Complex2. Drill campaigns by the Company, complemented by a substantial historic drill database, have delineated five deposits of Platreef-style mineralization across a core 12-kilometer span of the project, all of which are open for expansion into adjacent targets. Multiple earlier-stage Platreef-style and reef-type targets are also being advanced across the remainder of the 32-kilometer length of the project based on strong correlations seen in soil and rock geochemistry, geophysical surveys, geologic mapping, and drilling.

About Group Ten Metals Inc.

Group Ten Metals Inc. is a TSX-V-listed Canadian mineral exploration company focused on the development of high-quality platinum, palladium, nickel, copper, cobalt, and gold exploration assets in top North American mining jurisdictions. The Company’s core asset is the Stillwater West PGE-Ni-Cu-Co + Au project adjacent to Sibanye-Stillwater’s high-grade PGE mines in Montana, USA. Group Ten also holds the high-grade Black Lake-Drayton Gold project adjacent to Treasury Metals’ development-stage Goliath Gold Complex in northwest Ontario, which is currently under an earn-in agreement with an option to joint venture whereby Heritage Mining may earn up to a 90% interest in the project by completing payments and work on the project. The Company also holds the Kluane PGE-Ni-Cu-Co project on trend with Nickel Creek Platinum‘s Wellgreen deposit in Canada‘s Yukon Territory.

About the Metallic Group of Companies

The Metallic Group is a collaboration of leading precious and base metals exploration companies, with a portfolio of large, brownfield assets in established mining districts adjacent to some of the industry’s highest-grade producers of silver and gold, platinum and palladium, and copper. Member companies include Metallic Minerals in the Yukon’s high-grade Keno Hill silver district and La Plata silver-gold-copper district of Colorado, Granite Creek Copper in the Yukon’s Minto copper district, and Group Ten Metals in the Stillwater PGM-nickel-copper district of Montana. The founders and team members of the Metallic Group include highly successful explorationists formerly with some of the industry’s leading explorers/developers and major producers. With this expertise, the companies are undertaking a systematic approach to exploration using new models and technologies to facilitate discoveries in these proven, but under-explored, mining districts. The Metallic Group is headquartered in Vancouver, BC, Canada, and its member companies are listed on the Toronto Venture, US OTC, and Frankfurt stock exchanges.

Note 1: References to adjoining properties are for illustrative purposes only and are not necessarily indicative of the exploration potential, extent or nature of mineralization or potential future results of the Company’s projects.

Note 2: Magmatic Ore Deposits in Layered Intrusions-Descriptive Model for Reef-Type PGE and Contact-Type Cu-Ni-PGE Deposits, Michael Zientek, USGS Open-File Report 2012-1010.

FOR FURTHER INFORMATION, PLEASE CONTACT:

Michael Rowley, President, CEO & Director
Email: info@grouptenmetals.com Phone: (604) 357 4790
Web: http://grouptenmetals.com Toll Free: (888) 432 0075

Quality Control and Quality Assurance

2021 drill core samples were analyzed by ACT Labs in Vancouver, B.C. Sample preparation: crush (< 7 kg) up to 80% passing 2 mm, riffle split (250 g) and pulverize (mild steel) to 95% passing 105 µm included cleaner sand. Gold, platinum, and palladium were analyzed by fire assay (1C-OES) with ICP finish. Selected major and trace elements were analyzed by peroxide fusion with 8-Peroxide ICP-OES finish to insure complete dissolution of resistate minerals. Following industry QA/QC standards, blanks, duplicate samples, and certified standards were also assayed.

Mr. Mike Ostenson, P.Geo., is the qualified person for the purposes of National Instrument 43-101, and he has reviewed and approved the technical disclosure contained in this news release.

Forward-Looking Statements

Forward Looking Statements: This news release includes certain statements that may be deemed “forward-looking statements”. All statements in this release, other than statements of historical facts including, without limitation, statements regarding potential mineralization, historic production, estimation of mineral resources, the realization of mineral resource estimates, interpretation of prior exploration and potential exploration results, the timing and success of exploration activities generally, the timing and results of future resource estimates, permitting time lines, metal prices and currency exchange rates, availability of capital, government regulation of exploration operations, environmental risks, reclamation, title, and future plans and objectives of the company are forward-looking statements that involve various risks and uncertainties. Although Group Ten believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in the forward-looking statements. Forward-looking statements are based on a number of material factors and assumptions. Factors that could cause actual results to differ materially from those in forward-looking statements include failure to obtain necessary approvals, unsuccessful exploration results, changes in project parameters as plans continue to be refined, results of future resource estimates, future metal prices, availability of capital and financing on acceptable terms, general economic, market or business conditions, risks associated with regulatory changes, defects in title, availability of personnel, materials and equipment on a timely basis, accidents or equipment breakdowns, uninsured risks, delays in receiving government approvals, unanticipated environmental impacts on operations and costs to remedy same, and other exploration or other risks detailed herein and from time to time in the filings made by the companies with securities regulators. Readers are cautioned that mineral resources that are not mineral reserves do not have demonstrated economic viability. Mineral exploration and development of mines is an inherently risky business. Accordingly, the actual events may differ materially from those projected in the forward-looking statements. For more information on Group Ten and the risks and challenges of their businesses, investors should review their annual filings that are available at www.sedar.com.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

SOURCE: Group Ten Metals Inc.



View source version on accesswire.com:
https://www.accesswire.com/699896/Group-Ten-Reports-132-Meters-of-333-Nickel-Equivalent-Within-401-Meters-Continuous-Mineralization-from-Resource-Expansion-Drilling-at-Stillwater-West-Critical-Minerals-Project-in-Montana-USA