Categories
Base Metals Emx Royalty Energy Exclusive Interviews Junior Mining Precious Metals Project Generators

EMX Royalty – Immediate Cashflow

Vancouver, British Columbia, October 1, 2021 (NYSE American: EMX; TSX Venture: EMX; Frankfurt: 6E9) – EMX Royalty Corporation (the “Company”, or “EMX”) is pleased to announce that it intends to carry out a private placement of up to 5,000,000 units at C$ 3.30 each for gross proceeds of up to C$ 16,500,000. Members of the Sprott Group have agreed to act as finders in connection with the sale of some of the units.

The units will consist of one common share of the Company and one-half of one transferable warrant. Each whole warrant will entitle the purchase for two years of one common share at C$ 4.00 in the first year and C$ 4.50 in the second year.

Eligible finders will be paid a 6.0% cash commission and issued that number of non-transferable compensation warrants equal to 6.0% of the number of units sold to investors introduced by them. Each compensation warrant will entitle the purchase for one year of one common share of the Company for C$ 3.50.

The placement is subject to stock exchange approval.

This news release does not constitute an offer to sell or a solicitation of an offer to buy any of the securities in the United States. The securities have not been and will not be registered under the United States Securities Act of 1933, as amended (the “1933 Act”), or any U.S. state securities laws and may not be offered or sold within the “United States” or to “U.S. Persons” (as such terms are defined in Regulation S under the 1933 Act) unless registered under the 1933 Act and applicable U.S. state securities laws, or an exemption from such registration is available.

About EMX. EMX is a precious, base and battery metals royalty company. EMX’s investors are provided with discovery, development, and commodity price optionality, while limiting exposure to risks inherent to operating companies. The Company’s common shares are listed on the NYSE American Exchange and TSX Venture Exchange under the symbol EMX, as well as on the Frankfurt exchange under the symbol “6E9”. Please see www.EMXroyalty.com for more information.

For further information contact:

David M. Cole
President and Chief Executive Officer
Phone: (303) 979-6666
Dave@EMXroyalty.com

Scott Close
Director of Investor Relations
Phone: (303) 973-8585
SClose@EMXroyalty.com

Isabel Belger
Investor Relations (Europe)
Phone: +49 178 4909039
Ibelger@EMXroyalty.com

Neither the TSX-V nor its Regulation Services Provider (as that term is defined in policies of the TSX-V) accepts responsibility for the adequacy or accuracy of this release.

Forward-Looking Statements
This news release may contain “forward looking statements” that reflect the Company’s current expectations and projections about its future results. These forward-looking statements may include statements regarding completion of the transaction, perceived merits of properties, exploration results and budgets, mineral reserves and resource estimates, work programs, capital expenditures, timelines, strategic plans, market prices for precious and base metal, or other statements that are not statements of fact. When used in this news release, words such as “estimate,” “intend,” “expect,” “anticipate,” “will”, “believe”, “potential”, “upside” and similar expressions are intended to identify forward-looking statements, which, by their very nature, are not guarantees of the Company’s future operational or financial performance, and are subject to risks and uncertainties and other factors that could cause the Company’s actual results, performance, prospects or opportunities to differ materially from those expressed in, or implied by, these forward-looking statements. These risks, uncertainties and factors may include, but are not limited to: unavailability of financing, failure to identify commercially viable mineral reserves, fluctuations in the market valuation for commodities, difficulties in obtaining required approvals for the development of a mineral project, increased regulatory compliance costs, expectations of project funding by joint venture partners and other factors. It is possible EMX may not complete the transaction, as a result of failure to fulfill conditions of closing, unavailability of financing or for other reasons EMX cannot anticipate at this time.

Readers are cautioned not to place undue reliance on these forward-looking statements, which speak only as of the date of this news release or as of the date otherwise specifically indicated herein. Due to risks and uncertainties, including the risks and uncertainties identified in this news release, and other risk factors and forward-looking statements listed in the Company’s MD&A for the quarter ended June 30, 2021 and the year ended December 31, 2020 (the “MD&A”), and the most recently filed Revised Annual Information Form (the “AIF”) for the year ended December 31, 2020, actual events may differ materially from current expectations. More information about the Company, including the MD&A, the AIF and financial statements of the Company, is available on SEDAR at www.sedar.com and on the SEC’s EDGAR website at www.sec.gov.

Categories
Base Metals Capitalism Morality Energy Junior Mining Project Generators

Beyond the Official Narrative

Riverside Resources

My western friends would leave me if I were openly crooked. There are no such consequences in India. “Friends” in India would respect you for your crookedness if you can get away with it. And there is no social opprobrium. No wonder crookedness grows like a weed in India. Here is a conversation with Richard Kary:

On Investments

In the past, I have followed and written about Riverside Resources (RRI; C$0.135) and its CEO, John-Mark Staude. RRI is a project generation company and a very innovative one. They have several projects in Mexico, the USA, and Canada. They have C$5 million in cash and equities, making their enterprise value C$5 million, rather low for a company that has an interesting agreement with BHP, which will fund US$6.5 million in drilling two projects and generative work over the next year. RRI gets to charge a 10% fee on the expenses made, which enables it to sometimes reduce its corporate cash burn to zero. While BHP funds the projects, RRI gets to keep at least 20% ownership—100% if BHP decides not to pursue any project.

A major investor recently liquidated his position in RRI, the reason why it has fallen a lot. That is my opportunity to add to my position.

Jayant Bhandari

Disclaimer: All information found here, including any ideas, opinions, views, predictions, forecasts, commentaries, suggestions, or stock picks, expressed or implied herein, are for informational, entertainment, or educational purposes only and should not be construed as personal investment advice. While the information provided is believed to be accurate, it may include errors or inaccuracies. The sole purpose of these musings is to show my thinking process when analyzing a stock, not to provide any recommendation. I will not and cannot be held liable for any actions you take as a result of anything you read here. Conduct your own due diligence, or consult a licensed financial advisor or broker before making any and all investment decisions. Any investments, trades, speculations, or decisions made on the basis of any information found on this site, expressed or implied herein, are committed at your own risk, financial or otherwise.

Categories
Base Metals Energy Exclusive Interviews Junior Mining MillRock Resources Precious Metals Project Generators

Greg Beischer of Millrock Resources Presents at the Denver Gold Group Explorer and Developer Forum, Colorado Springs, Colorado

Recently, CEO Greg Beischer presented at the Denver Gold Group Explorer and Developer Forumin Colorado Springs and we were lucky enough to get our hands on his presentation to share with all of you.

In the presentation, Greg provides an update on the current state of our company and covers numerous projects including Treasure Creek, Ester Dome, and 64North projects in Alaska.

To make it easy to digest, I’ve pulled out the key highlights below.

Key Highlights:
0:39
 – Greg provides context on how the Apex Gold project came about and how Millrock attracted the interest of a mid-tier mining company to partner with.
0:31 – An explanation of the Project Generator model and shows how reduces investor risk.
2:16 – An overview of Millrock’s partners which include both major mining companies and smaller miners.
5:10 – Greg explains why Millrock has chosen Alaska as our home base to explore.
5:52 – Overview of our current active projects in Alaska including an overview of the Tintina Gold Province.
7:28 – Greg provides a history of the Fairbanks Gold District and explains Millrock’s current projects in the district including Treasure Creek, Ester Dome, and 64North.
13:50 – Greg provides a high-level overview of all the upcoming catalysts Milrock has including work in Sonora state, Mexico.
15:10 – Greg answers questions from the audience.

It’s a great presentation, so please take a listen below.

Take care and enjoy the day.

Best regards,

Melanee Henderson, Manager of Investor Relations
Millrock Resources Inc.  |  MRO.V  |  MLRKF.OTCQB
Toll-Free: 877-217-8978  |  Local: 604-638-3164
Categories
Base Metals Emx Royalty Energy Exclusive Interviews Junior Mining Precious Metals Project Generators

EMX Royalty CEO David Cole provides an update on recent royalty acquisitions and other matters at the 2021 Gold Forum Americas

Please find the below link to David Cole’s presentation at the 2021 Gold Forum Americas in Colorado Springs, Colorado, USA. This presentation provides investors with a number of fresh insights into recent material developments in the Company.


https://www.emxroyalty.com/investors/video-presentations/

Categories
Base Metals Energy Junior Mining Project Generators Uncategorized

Skyharbour Resources Receives $585,000 from Warrant and Option Exercises

VANCOUVER, British Columbia, Sept. 15, 2021 (GLOBE NEWSWIRE) — Skyharbour Resources Ltd. (TSX-V: SYH(OTCQB: SYHBF) (Frankfurt: SC1P(the “Company”) is pleased to announce it has it has received an aggregate CAD $584,995 from the exercise of share purchase warrants and stock options since its news release dated August 11th, 2021. A total of 2,191,111 warrants and stock options have been exercised with a batch of options expiring on Sept. 29th.

The Company has also entered into an agreement with Think Inc. to provide strategic digital media and consulting services to the Company. Think Inc. delivers services to a diverse group of clients across North America, providing strategic digital media services, marketing and data analytic services. The Company and Think Inc. act at arm’s length. Under the terms of the agreement, Think Inc. will provide strategic digital media services including marketing services, news dissemination, data analytics services, content development, media buying and distribution, campaign reporting and optimization, as well as potentially attracting option / joint venture partners for business opportunities. The Company has agreed to pay Think Inc. a total initial cost of USD $300,000 over an expected 6-month period.

About Skyharbour Resources Ltd.:

Skyharbour holds an extensive portfolio of uranium exploration projects in Canada’s Athabasca Basin and is well positioned to benefit from improving uranium market fundamentals with six drill-ready projects covering over 250,000 hectares of land. Skyharbour has acquired from Denison Mines, a large strategic shareholder of the Company, a 100% interest in the Moore Uranium Project which is located 15 kilometres east of Denison’s Wheeler River project and 39 kilometres south of Cameco’s McArthur River uranium mine. Moore is an advanced stage uranium exploration property with high grade uranium mineralization at the Maverick Zone that returned drill results of up to 6.0% U3O8 over 5.9 metres including 20.8% U3Oover 1.5 metres at a vertical depth of 265 metres. The Company is actively advancing the project through drill programs.

Skyharbour has a joint-venture with industry-leader Orano Canada Inc. at the Preston Project whereby Orano has earned a 51% interest in the project through exploration expenditures and cash payments. Skyharbour now owns a 24.5% interest in the Project. Skyharbour also has a joint-venture with Azincourt Energy at the East Preston Project whereby Azincourt has earned a 70% interest in the project through exploration expenditures, cash payments and share issuance. Skyharbour now owns a 15% interest in the Project. Preston and East Preston are large, geologically prospective properties proximal to Fission Uranium’s Triple R deposit as well as NexGen Energy’s Arrow deposit.

The Company also owns a 100% interest in the South Falcon Uranium Project on the eastern perimeter of the Basin, which contains a NI 43-101 inferred resource totaling 7.0 million pounds of U3Oat 0.03% and 5.3 million pounds of ThO2 at 0.023%. Skyharbour has signed a Definitive Agreement with ASX-listed Valor Resources on the Hooke Lake (previously North Falcon Point) Uranium Project whereby Valor can earn-in 80% of the project through $3,500,000 in total exploration expenditures, $475,000 in total cash payments over three years and an initial share issuance.

Skyharbour’s goal is to maximize shareholder value through new mineral discoveries, committed long-term partnerships, and the advancement of exploration projects in geopolitically favourable jurisdictions.

Skyharbour’s Uranium Project Map in the Athabasca Basin:
http://skyharbourltd.com/_resources/maps/SYH-Athabasca-Map.jpg

Qualified Person:

The technical information in this news release has been prepared in accordance with the Canadian regulatory requirements set out in National Instrument 43-101 and reviewed and approved by Richard Kusmirski, P.Geo., M.Sc., Skyharbour’s Head Technical Advisor and a Director, as well as a Qualified Person.

To find out more about Skyharbour Resources Ltd. (TSX-V: SYH) visit the Company’s website at www.skyharbourltd.com.

SKYHARBOUR RESOURCES LTD.

“Jordan Trimble”
____________________________________
Jordan Trimble
President and CEO

For further information contact myself or:
Riley Trimble
Corporate Development and Communications
Skyharbour Resources Ltd.
Telephone: 604-687-3376
Toll Free: 800-567-8181
Facsimile: 604-687-3119
Email: info@skyharbourltd.com

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THE CONTENT OF THIS NEWS RELEASE.

This release includes certain statements that may be deemed to be “forward-looking statements”. All statements in this release, other than statements of historical facts, that address events or developments that management of the Company expects, are forward-looking statements. Although management believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance, and actual results or developments may differ materially from those in the forward-looking statements. The Company undertakes no obligation to update these forward-looking statements if management’s beliefs, estimates or opinions, or other factors, should change. Factors that could cause actual results to differ materially from those in forward-looking statements, include market prices, exploration and development successes, continued availability of capital and financing, and general economic, market or business conditions. Please see the public filings of the Company at www.sedar.com for further information.

Categories
Base Metals Emx Royalty Energy Junior Mining Precious Metals Project Generators Uncategorized

EMX to Receive Initial Royalty Payment from the Caserones Copper-Molybdenum Mine in Northern Chile

Vancouver, British Columbia–(Newsfile Corp. – September 14, 2021) –  EMX Royalty Corporation (NYSE American: EMX) (TSXV: EMX) (FSE: 6E9) (the “Company“, or “EMX“) is pleased to announce that it expects to receive an initial quarterly after-tax payment of approximately US$974,000 from the Company’s effective 0.418% net smelter return royalty (“NSR“) interest in the Caserones Copper-Molybdenum Mine (“Caserones“) in northern Chile. This payment to EMX, anticipated later this month, is based upon second quarter (“Q2”,i.e., April – June) royalty distributions for copper and molybdenum production.

As previously reported, EMX formed a 50%-50% strategic partnership with Altus Strategies Plc (“Altus“) (AIM: ALS; TSX Venture: ALTS; OTCQX: ALTUF) to acquire an effective 0.836% NSR royalty on Caserones (the “Caserones Royalty“) for US$68.2 million. EMX and Altus each control an effective 0.418% royalty interest after each contributed US$34.1 million towards the Caserones Royalty purchase price (see EMX news releases dated August 17, August 23, and September 3, 2021). The effective date of the Caserones Royalty acquisition was April 1, 2021, and as a result will include proceeds from Q2, 2021, thereby establishing immediate cash flow to EMX.

EMX’s effective royalty interest in the Caserones Royalty has secured a source of long-term proceeds from copper-molybdenum production in one of the world’s top copper mining regions.

Eric P. Jensen, CPG, a Qualified Person as defined by National Instrument 43-101 and an employee of the Company, has reviewed, verified, and approved the disclosure of the technical information contained in this news release.

About EMX. EMX is a precious, base and battery metals royalty company. EMX’s investors are provided with discovery, development, and commodity price optionality, while limiting exposure to risks inherent to operating companies. The Company’s common shares are listed on the NYSE American Exchange and TSX Venture Exchange under the symbol “EMX”, as well as on the Frankfurt exchange under the symbol “6E9”. Please see www.EMXroyalty.com for more information.

For further information contact:

David M. Cole
President and Chief Executive Officer
Phone: (303) 979-6666
Dave@EMXroyalty.com

Scott Close
Director of Investor Relations
Phone: (303) 973-8585
SClose@EMXroyalty.com

Isabel Belger
Investor Relations (Europe)
Phone: +49 178 4909039
Ibelger@EMXroyalty.com

Neither the TSX-V nor its Regulation Services Provider (as that term is defined in policies of the TSX-V) accepts responsibility for the adequacy or accuracy of this release.

Forward-Looking Statements

This news release may contain “forward looking statements” that reflect the Company’s current expectations and projections about its future results. These forward-looking statements may include statements regarding completion of the second closing of the Caserones royalty purchase, , expected cash flows from EMX’s interest in the Caserones royalty, perceived merits of properties, exploration results and budgets, mineral reserves and resource estimates, work programs, capital expenditures, timelines, strategic plans, market prices for precious and base metal, or other statements that are not statements of fact. When used in this news release, words such as “estimate,” “intend,” “expect,” “anticipate,” “will”, “believe”, “potential”, “upside” and similar expressions are intended to identify forward-looking statements, which, by their very nature, are not guarantees of the Company’s future operational or financial performance, and are subject to risks and uncertainties and other factors that could cause the Company’s actual results, performance, prospects or opportunities to differ materially from those expressed in, or implied by, these forward-looking statements. These risks, uncertainties and factors may include, but are not limited to: failure of the vendors under the Share Purchase Agreement to perform their obligations, fluctuations in or problems with production from the Caserones mine, unavailability of financing, failure to identify commercially viable mineral reserves, fluctuations in the market valuation for commodities, difficulties in obtaining required approvals for the development of a mineral project, increased regulatory compliance costs, expectations of project funding by joint venture partners and other factors. It is possible EMX may not complete the transaction, as a result of failure to fulfill conditions of closing, unavailability of financing or for other reasons EMX cannot anticipate at this time.

Readers are cautioned not to place undue reliance on these forward-looking statements, which speak only as of the date of this news release or as of the date otherwise specifically indicated herein. Due to risks and uncertainties, including the risks and uncertainties identified in this news release, and other risk factors and forward-looking statements listed in the Company’s MD&A for the quarter ended June 30, 2021 and the year ended December 31, 2020 (the “MD&A”), and the most recently filed Revised Annual Information Form (the “AIF”) for the year ended December 31, 2020, actual events may differ materially from current expectations. More information about the Company, including the MD&A, the AIF and financial statements of the Company, is available on SEDAR at www.sedar.com and on the SEC’s EDGAR website at www.sec.gov.info 

EMX Royalty Corp.

Similar Stories

Mining and Metals

Precious Metals

Tell Us Your Story

LEARN MORE

Vancouver
380 – 1100 Melville Street
Vancouver, BC, Canada
V6E 4A6
Phone: 604-609-0244

Calgary
2500 – 500 4th Ave SW
Calgary, AB, Canada
T2P 2V6
Phone: 403-806-0664

Toronto
601 – 15 Toronto Street
Toronto, ON, Canada
M5C 2E3
Phone: 416-806-1750

New York
5881 – 99 Wall Street
New York, NY, USA
10005
Phone: 646-609-8767

Terms of Use
Anti-Spam Policy
Privacy Policy

Copyright 2021 Newsfile Corp. All rights reserved.

Categories
Base Metals Energy Junior Mining Project Generators Uncategorized

Skyharbour Intersects High Grade Uranium Mineralization at Maverick East Zone with Drill Results of 2.54% U3O8 over 6.0m including 6.80% U3O8 over 2.0m; Additional Assays Pending and Drilling to Continue

VANCOUVER, British Columbia, Sept. 14, 2021 (GLOBE NEWSWIRE) — Skyharbour Resources Ltd. (TSX-V: SYH) (OTCQB: SYHBF) (Frankfurt: SC1P(the “Company”) is pleased to announce the initial set of diamond drill results from its 2021 summer diamond drilling program at its 100% owned, 35,705 hectare Moore Uranium Project, located approximately 15 kilometres east of Denison Mine’s Wheeler River project and proximal to regional infrastructure for Cameco’s Key Lake and McArthur River operations in the Athabasca Basin, Saskatchewan. Drillhole ML21-03 intersected additional high grade, basement hosted uranium mineralization at the Maverick East Zone. This hole returned 2.54% U3O8 over 6.0 metres including 6.80% U3Oover 2.0 metres. Furthermore, drilling on the regional Grid 19 target identified several prospective geological features that are indicative of uranium mineralizing systems.

Moore Uranium Project Claims Map:
http://skyharbourltd.com/_resources/maps/MooreLakeRegionalTenure.jpg

Highlights:

  • Hole ML21-03 was drilled within the eastern half of the Maverick East Zone. This hole intersected predominantly basement-hosted uranium mineralization and returned 2.54% U3O8 over 6.0 metres from 276.0 to 282.0 metres, including 6.8.0% U3O8 over 2.0 metres from 278.5 to 280.5 metres. The uranium mineralization is accompanied by intense clay alteration of pelitic assemblages below the unconformity as well as up to 0.83% Cu and 0.73% Ni in half metre sample intervals.
  • The mineralized intercept in hole ML21-02 occurs in a broad zone that returned 0.19% U3O8 over an 11.7 metre interval from 271.8 to 283.5 metres downhole. This mineralization straddles the unconformity, with most of the interval within basement rocks comprised of sheared, clay-altered to -replaced felsic intrusives. The intercept confirms continuity within the central portion of the Maverick East Zone.
  • Substantial portions of the 4.7 kilometre long Maverick corridor remain to be systematically drill tested leaving robust discovery potential along strike as well as at depth in the basement rocks.
  • Drill holes ML21-07, -08 and -09 were the first holes drilled within the regional Grid 19 target area, where two prospective EM conductors were identified by this winter’s SML-EM geophysical program. All three holes intersected highly prospective altered, graphitic and sulphide bearing basement lithologies. The pending geochemical results will further define the prospectivity of this area for winter follow-up when frozen conditions will facilitate additional drilling.
  • Final assay results are pending for seven more drill holes.
  • Additional drilling of 1,500 to 2,000 metres in four to five holes has commenced at Moore.

Jordan Trimble, President and CEO of Skyharbour Resources, stated: “We are thrilled with the first batch of drill results announced herein highlighted by drill hole ML21-03 which returned the best intercept to date in the basement rocks at the Maverick East Zone. Our geological team is continuing to explore for higher grade uranium mineralization along strike and down plunge at this zone with an expanded drill program. We are successfully increasing the size of the high grade zones at the Maverick corridor and these results illustrate the notable discovery upside potential at the Project especially in the basement rock feeder-zones which have had limited drill-testing historically. Furthermore, there is good progress being made at regional targets at Moore and we intend to follow up on other high-priority targets throughout the Project. The remaining assay results from the drill program are pending which will provide additional news flow in the months to come amidst a significant resurgence in the uranium market.”

Summary of 2021 Drilling Program to Date:

Drilling to date in 2021 on the Moore Project has totalled 4,578 metres in thirteen holes. Seven holes (ML21-01 to -05 and ML21-12 and -13) were drilled on the Maverick East Zone, three on the Esker Target (ML21-06, -10, -11) and three on the Grid 19 Target conductors (ML21-07 to -09). Complete results for holes ML21-01 to -05 have been received and reported herein, while samples for the latter seven holes have been delivered to the SRC Geoanalytical Laboratories in Saskatoon. After a short break in the drill program, field crews have remobilized to Moore and an anticipated 1,500 to 2,000 metres in four to five holes are yet to be drilled. This expanded drill program will test targets identified by prior modelling down plunge of the Maverick East zone, an untested gap between the Main Maverick and the Maverick East Zones as well as targets at the west end of the Main Maverick Zone where the geochemistry (pathfinders) and geology are strongly indicative of a potentially uraniferous mineralizing system.

Moore Uranium Project Regional Grid Targets Map:
http://skyharbourltd.com/_resources/maps/Moore-Lake-Property-Wide.jpg

Maverick East Zone Drilling:

Drill hole ML21-01 was drilled just west of hole ML20-12 which had intersected 0.28% U3O8 over 17.9 metres in the winter of 2020. Hole ML21-01 intersected a broad interval of uranium mineralization returning 0.07% U3O8, beginning at 268.8 metres and extending 18.2 metres to encompass both sandstone and basement lithologies. This hole migrated well into the footwall and intersected structurally disrupted and clay altered to replaced sandstone and granite, along with uranium mineralization. The hole did return a typical footwall geochemical signature, with intense boron enrichment (up to 8,060 ppm) in the sandstone as well as elevated uranium, nickel and other pathfinders in the sandstone and basement.

Moore Uranium Project – Maverick East Zone Drilling Map:
https://www.skyharbourltd.com/_resources/maps/maverick-release.jpg

Hole ML20-02 was drilled to test for continuity of the uranium mineralization within the central portion of the Maverick East Zone. The mineralized intercept in ML21-02 occurs in a broad zone that returned 0.19% U3O8 over an 11.7 metre interval from 271.8 to 283.5 metres downhole. This mineralization straddles the unconformity with approximately two thirds of the interval within basement rocks comprised of sheared, clay-altered to -replaced felsic intrusives. This hole once again intersected the main Maverick Fault towards the footwall side and the geochemistry is indicative of that with highly anomalous boron within the basement and the sandstone. The intercept confirms continuity within the central portion of the Maverick East Zone.

Drill hole ML21-03 was drilled to test for continuity of the mineralization within the eastern half of the Maverick East Zone, ten metres northeast of hole ML20-09 which returned 0.72% U3O8 over 17.5m. Hole ML21-03 intersected one of the highest grade intercepts to date on the Maverick East Zone including the highest grades discovered to date in the basement rocks at the zone. The hole returned 2.54% U3O8 over 6.0 metres from 276.0 to 282.0 metres including 6.80% U3O8 over 2.0 metres from 278.5 to 280.5 metres. This mineralization is predominantly basement-hosted and accompanied by intense clay alteration of pelitic assemblages below the unconformity as well as up to 0.83% Cu and 0.73% Ni in half metre sample intervals. This high grade zone of mineralization is open down plunge.

Drill holes ML21-04 and ML21-05 were collared to test for continuity between holes ML20-04 and -13. Hole ML21-04 was lost just above the target and the unconformity in the Maverick Fault at 238 metres. ML21-05 successfully tested the unconformity, but did not intersect significant uranium mineralization. The basement lithologies in this hole are typically intrusive in character within clay-altered to -replaced granites throughout. The sandstone is enriched in pathfinder elements, primarily boron, as is typical of footwall holes along the Maverick Fault.

Holes ML21-12 and -13 were drilled as follow up holes within the eastern end of the Maverick East Zone. Both holes were completed to depth and intersected the expected prospective faulting and geology that has been identified in the Maverick East to date. Final geochemical assay results are pending and will be reported on once received and correlated with the noted geological features.

Grid 19 Zone Drilling:

Three holes ML21-07 to -09 were drilled on the newly emplaced Grid 19 Target area located approx. ten kilometres NE of Main Maverick Zone, where two sub-parallel north trending conductors were identified by the winter SML-EM program. Holes ML21-07 and -09 were drilled along strike, 400 metres apart on the westernmost of these conductors. These holes intersected significant graphitic conductors and sulphides, basement faults, and in the case of hole ML21-07, anomalous radioactivity. Hole ML21-08 also intersected prospective basement geology. The unconformity in the Grid 19 Target area occurs at a shallow depth of approximately 190 metres. The final geochemical assay results are pending for these holes and will be reported once received and fully evaluated.

Moore Uranium Project – Grid 19 Zone and Esker Zone Drilling:
https://www.skyharbourltd.com/_resources/maps/esker-grid-19.jpg

Esker Zone Drilling:

Three holes ML21-06, -10 and -11 were drilled as a follow up to historic drilling in the Esker Target area located approx. five kilometres NE of the Main Maverick Zone where anomalous uranium geochemistry was intersected in historical holes MT-04 and MT-10 drilled in the 1980’s. Hole ML21-06 was lost prior to intersecting the target and the unconformity. Hole ML21-10 and -11 intersected significant graphitic conductors associated with faulting and pelitic rocks. The final geochemical assay results will be reported once received and fully evaluated.

Uranium Market Commentary and Update:

The uranium market has recently shown notable signs of recovery with increasing uranium prices and improving sentiment, and this recovery appears to be accelerating amid recent news and several sector-specific developments. Analysts that cover the sector have stated that this could be a sustained upswing as they are currently seeing some of the best fundamentals since pre-Fukushima which should be supportive of higher uranium prices as a major supply-side response is playing out while the sticky demand-side continues to improve. Primary mine supply has been declining and amounted to approx. 125 million lbs U3O8 in 2020 while demand continues to rise and amounted to over 180 million lbs in 2020. The spot uranium price has risen to approx. $40 / lb U3O8 but it is still below the price needed to incentivize new development to ensure sustainable and secure supply to meet growing global demand. More recently, financial entities like the Sprott Physical Uranium Trust have been purchasing millions of pounds of uranium providing upward pressure on the price.

There are 443 operable nuclear reactors and 51 new reactors under construction globally with hundreds more planned in the pipeline. China and India continue to be at the forefront of demand growth and have the largest reactor pipelines making up a significant portion of the global growth. More recently, an important emerging market for nuclear and uranium demand in small modular reactors has gained notable positive press and momentum. As the global push for decreasing carbon emissions continues, nuclear energy will play a vital role in providing base-load, carbon emissions-free, low-cost electricity generation.

On the supply-side, mine closures and production curtailment continue to dominate headlines which was exacerbated by the pandemic clearly illustrating the risks to global primary mine supply. Major production cuts and depleting mine reserves appear to be working their way into the uranium market and driving prices higher. The two largest producers, Cameco and Kazatomprom, have announced large supply cuts over the last several years and have been actively buying uranium directly in the spot market to fulfill their contract deliveries as their production profiles have decreased.

Moore Uranium Project Overview:

In June 2016, Skyharbour secured an option to acquire Denison Mine’s Moore Uranium Project, on the southeastern side of the Athabasca Basin, in northern Saskatchewan and has fulfilled its earn in. The project consists of 12 contiguous claims totalling 35,705 hectares located 42 kilometres northeast of the Key Lake mill, approx. 15 kilometres east of Denison’s Wheeler River project, and 39 kilometres south of Cameco’s McArthur River uranium mine. Unconformity style uranium mineralization was discovered on the Moore Project at the Maverick Zone in April 2001. Historical drill highlights include 4.03% eU3O8 over 10 metres including 20% eU3O8over 1.4 metres, and in 2017, Skyharbour announced drill results including 6.0% U3O8 over 5.9 metres including 20.8% U3O8 over 1.5 metres at a vertical depth of 265 metres. In addition to the Maverick Zone, the project hosts other mineralized targets with strong discovery potential which the Company plans to test with future drill programs. The project is fully accessible via winter and ice roads which simplifies logistics and lowers costs. Large proportions of the property are accessible in the summer as well.

Moore Lake Uranium Project Geophysics Map:
http://skyharbourltd.com/_resources/maps/MooreLake-Basic-geo-revamp.jpg

Qualified Person:

The technical information in this news release has been prepared in accordance with the Canadian regulatory requirements set out in National Instrument 43-101 and reviewed and approved by Richard Kusmirski, P.Geo., M.Sc., Skyharbour’s Head Technical Advisor and a Director, as well as a Qualified Person.

About Skyharbour Resources Ltd.:

Skyharbour holds an extensive portfolio of uranium exploration projects in Canada’s Athabasca Basin and is well positioned to benefit from improving uranium market fundamentals with six drill-ready projects covering over 240,000 hectares of land. Skyharbour has acquired from Denison Mines, a large strategic shareholder of the Company, a 100% interest in the Moore Uranium Project which is located 15 kilometres east of Denison’s Wheeler River project and 39 kilometres south of Cameco’s McArthur River uranium mine. Moore is an advanced stage uranium exploration property with high grade uranium mineralization at the Maverick Zone that returned drill results of up to 6.0% U3O8 over 5.9 metres including 20.8% U3Oover 1.5 metres at a vertical depth of 265 metres. The Company is actively advancing the project through drill programs.

Skyharbour has a joint-venture with industry-leader Orano Canada Inc. at the Preston Project whereby Orano has earned a 51% interest in the project through exploration expenditures and cash payments. Skyharbour now owns a 24.5% interest in the Project. Skyharbour also has a joint-venture with Azincourt Energy at the East Preston Project whereby Azincourt has earned a 70% interest in the project through exploration expenditures, cash payments and share issuance. Skyharbour now owns a 15% interest in the Project. Preston and East Preston are large, geologically prospective properties proximal to Fission Uranium’s Triple R deposit as well as NexGen Energy’s Arrow deposit.

The Company also owns a 100% interest in the South Falcon Uranium Project on the eastern perimeter of the Basin, which contains a NI 43-101 inferred resource totaling 7.0 million pounds of U3Oat 0.03% and 5.3 million pounds of ThO2 at 0.023%. Skyharbour has signed a Definitive Agreement with ASX-listed Valor Resources on the Hooke Lake (previously North Falcon Point) Uranium Project whereby Valor can earn-in 80% of the project through $3,500,000 in total exploration expenditures, $475,000 in total cash payments over three years and an initial share issuance.

Skyharbour’s goal is to maximize shareholder value through new mineral discoveries, committed long-term partnerships, and the advancement of exploration projects in geopolitically favourable jurisdictions.

Skyharbour’s Uranium Project Map in the Athabasca Basin:
http://skyharbourltd.com/_resources/maps/SYH-Athabasca-Map.jpg

To find out more about Skyharbour Resources Ltd. (TSX-V: SYH) visit the Company’s website at www.skyharbourltd.com.

SKYHARBOUR RESOURCES LTD.

“Jordan Trimble”

Jordan Trimble
President and CEO

For further information contact myself or:
Riley Trimble
Corporate Development and Communications
Skyharbour Resources Ltd.
Telephone: 604-687-3376
Toll Free: 800-567-8181
Facsimile: 604-687-3119
Email: info@skyharbourltd.com

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THE CONTENT OF THIS NEWS RELEASE.

This release includes certain statements that may be deemed to be “forward-looking statements”. All statements in this release, other than statements of historical facts, that address events or developments that management of the Company expects, are forward-looking statements. Although management believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance, and actual results or developments may differ materially from those in the forward-looking statements. The Company undertakes no obligation to update these forward-looking statements if management’s beliefs, estimates or opinions, or other factors, should change. Factors that could cause actual results to differ materially from those in forward-looking statements, include market prices, exploration and development successes, continued availability of capital and financing, and general economic, market or business conditions. Please see the public filings of the Company at www.sedar.com for further information.

Categories
Base Metals Junior Mining Precious Metals Project Generators

Vox Royalty | Construction Contract Awarded for Mt Ida Gold Project

TORONTO, Sept. 9, 2021 /CNW/ – Vox Royalty Corp. (TSXV: VOX) (OTCQX: VOXCF) (“Vox” or the “Company“), a high growth precious metals focused royalty company, is pleased to share a recent construction update from its royalty operating partners Aurenne Group Pty Ltd (“Aurenne“) and engineering firm GR Engineering Services Ltd (ASX: GRE) (“GR Engineering“), announced by GR Engineering on September 3, 2021.

Vox Royalty Logo (CNW Group/Vox Royalty Corp.)
Vox Royalty Logo (CNW Group/Vox Royalty Corp.)

Riaan Esterhuizen, Executive Vice President – Australia stated, “The construction contract award milestone for Mt Ida demonstrates Vox’s ability to identify and acquire royalties that are on the cusp of construction. Including Mt Ida, Vox management expects Vox will hold ten producing royalty assets by the end of 2023(1). We are excited to share further development milestones with Vox shareholders over the coming quarters.”

Mt Ida (Feasibility) – A$73M Construction Contract Awarded

  • Vox holds a 1.5% net smelter return royalty subsequent to the first 10,000 ounces of cumulative gold production over part of the Mt Ida project;
  • On September 3, 2021, GR Engineering announced that:
  • Vox acquired the Mt Ida royalty from hearing aid technology company Nuheara Limited (ASX: NUH) in May 2020 for US$200,000; and
  • Aurenne acquired Alt Resources Limited (“Alt Resources“) in Q4 2020 for A$40M and as a result assumed operatorship of the Mt Ida project.

Mt Ida Project Overview(2)

  • On July 10, 2020 Alt Resources released a pre-feasibility study on the Mt Ida project which outlined the following:
  • Vox’s royalty covers the Tim’s Find, Boudie Rat, Forrest Belle, Boudie West, Belvidere, Quinn’s Hills, Matisse and Spotted Dog deposits, covering a total resource base2 of approximately 1.64Mt @ 2.28g/t for 120,000 royalty-attributable ounces based on the 3 April 2020 Mineral Resource Estimate of the Mt Ida project and Vox management’s analysis and expectations.
  • Vox management expects first production at Mt Ida in 2023.

Qualified Person

Timothy J. Strong, MIMMM, of Kangari Consulting LLC and a “Qualified Person” under National Instrument 43-101 – Standards of Disclosure for Mineral Projects, has reviewed and approved the scientific and technical disclosure contained in this press release.

About Vox

Vox is a high growth precious metals royalty and streaming company with a portfolio of over 50 royalties and streams spanning eight jurisdictions. The Company was established in 2014 and has since built unique intellectual property, a technically focused transactional team and a global sourcing network which has allowed Vox to become the fastest growing company in the royalty sector. Since the beginning of 2019, Vox has announced over 20 separate transactions to acquire over 45 royalties.

Further information on Vox can be found at www.voxroyalty.com.

Cautionary Note Regarding Forward Looking Information

This news release contains certain forward-looking statements. Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance (often, but not always, using words or phrases such as “expects” or “does not expect”, “is expected”, “anticipates” or “does not anticipate” “plans”, “estimates” or “intends” or stating that certain actions, events or results ” may”, “could”, “would”, “might” or “will” be taken, occur or be achieved) are not statements of historical fact and may be “forward-looking statements”.

The forward-looking statements and information in this press release include, but are not limited to, summaries of operator updates provided by management and the potential impact on the Company of such operator updates, statements regarding expectations for the timing of commencement of resource production from various mining projects, expectations regarding the size, quality and exploitability of the resources at various mining projects, future operations and work programs of Vox’s mining operator partners, the receipt of future royalty payments derived from various royalty assets of Vox, anticipated future cash flows and future financial reporting by Vox and requirements for regulatory approvals.

Forward-looking statements and information are based on forecasts of future results, estimates of amounts not yet determinable and assumptions that, while believed by management to be reasonable, are inherently subject to significant business, economic and competitive uncertainties and contingencies. Forward-looking statements and information are subject to various known and unknown risks and uncertainties, many of which are beyond the ability of Vox to control or predict, that may cause Vox’s actual results, performance or achievements to be materially different from those expressed or implied thereby, and are developed based on assumptions about such risks, uncertainties and other factors set out herein, including but not limited to: the requirement for regulatory approvals and third party consents, the impact of general business and economic conditions, the absence of control over the mining operations from which Vox will receive royalties, including risks related to international operations, government relations and environmental regulation, the inherent risks involved in the exploration and development of mineral properties; the uncertainties involved in interpreting exploration data; the potential for delays in exploration or development activities; the geology, grade and continuity of mineral deposits; the impact of the COVID-19 pandemic; the possibility that future exploration, development or mining results will not be consistent with Vox’s expectations; accidents, equipment breakdowns, title matters, labor disputes or other unanticipated difficulties or interruptions in operations; fluctuating metal prices; unanticipated costs and expenses; uncertainties relating to the availability and costs of financing needed in the future; the inherent uncertainty of production and cost estimates and the potential for unexpected costs and expenses, commodity price fluctuations; currency fluctuations; regulatory restrictions, including environmental regulatory restrictions; liability, competition, loss of key employees and other related risks and uncertainties.

Vox has assumed that the material factors referred to in the previous paragraph will not cause such forward looking statements and information to differ materially from actual results or events. However, the list of these factors is not exhaustive and is subject to change and there can be no assurance that such assumptions will reflect the actual outcome of such items or factors. The forward-looking information contained in this press release represents the expectations of Vox as of the date of this press release and, accordingly, is subject to change after such date. Readers should not place undue importance on forward looking information and should not rely upon this information as of any other date. While Vox may elect to, it does not undertake to update this information at any particular time except as required in accordance with applicable laws.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Technical and Third-Party Information

Except where otherwise stated, the disclosure in this press release is based on information publicly disclosed by project operators based on the information/data available in the public domain as at the date hereof and none of this information has been independently verified by Vox. Specifically, as a royalty investor, Vox has limited, if any, access to the royalty operations. Although Vox does not have any knowledge that such information may not be accurate, there can be no assurance that such information from the project operators is complete or accurate. Some information publicly reported by the project operators may relate to a larger property than the area covered by Vox’s royalty interests. Vox’s royalty interests often cover less than 100% and sometimes only a portion of the publicly reported mineral reserves, mineral resources and production of a property.

References & Notes:
(1)Vox has five producing assets as of the date of this release (Segilola, Higginsville, Koolyanobbing, Brauna and Janet Ivy), and based on third-party development and construction announcements and Vox management expectations, Vox anticipates that each of its Bulong, Otto Bore, Pitombeiras, Mt Ida and Brits royalties will also be in production by the end of 2023. See slide 14 of Vox’s corporate presentation.
(2)The 3 April 2020 Mineral Resource Estimate of the Mt Ida Project, as reported in the Alt Resources Target Statement dated 17 July 2020 (link below), is the responsibility of Mr. Stephen Hyland, a Competent Person and Fellow of the AusIMM and a Qualified Person as defined by NI 43-101 guidelines, Principal Consultant Geologist with Hyland Geological and Mining Consultants (HGMC), who is a fellow of the Australian Institute of Mining and Metallurgy, contracted by Alt Resources Limited. This mineral resource estimate is compliant with the Joint Ore Reserves Committee (JORC) Code, 2012 Edition.
a. https://www.asx.com.au/asxpdf/20200717/pdf/44kmdtpsd45wjw.pdf

SOURCE Vox Royalty Corp.

Cision
Cision

View original content to download multimedia: http://www.newswire.ca/en/releases/archive/September2021/09/c2224.html

Categories
Base Metals Energy Junior Mining Project Generators Uncategorized

Azincourt Energy Completes Radioactive Survey – Updates Plans for thr East Preston Uranium Project

Figure 1: Target corridors at the East Preston Uranium Project, Western Athabasca Basin Saskatchewan

Figure 1: Target corridors at the East Preston Uranium Project, Western Athabasca Basin Saskatchewan
Figure 1: Target corridors at the East Preston Uranium Project, Western Athabasca Basin Saskatchewan
Figure 1: Target corridors at the East Preston Uranium Project, Western Athabasca Basin Saskatchewan

Figure 2: 2021 Drill Target areas at the East Preston Uranium Project

Figure 2: 2021 Drill Target areas at the East Preston Uranium Project
Figure 2: 2021 Drill Target areas at the East Preston Uranium Project
Figure 2: 2021 Drill Target areas at the East Preston Uranium Project

Figure 3: 2021 Radiometric survey coverage at East Preston Uranium Project

Figure 3: 2021 Radiometric survey coverage at East Preston Uranium Project
Figure 3: 2021 Radiometric survey coverage at East Preston Uranium Project
Figure 3: 2021 Radiometric survey coverage at East Preston Uranium Project

Figure 4: Project Location – Western Athabasca Basin, Saskatchewan, Canada

Figure 4: Project Location – Western Athabasca Basin, Saskatchewan, Canada
Figure 4: Project Location – Western Athabasca Basin, Saskatchewan, Canada
Figure 4: Project Location – Western Athabasca Basin, Saskatchewan, Canada

VANCOUVER, British Columbia, Sept. 07, 2021 (GLOBE NEWSWIRE) — AZINCOURT ENERGY CORP. (“Azincourt” or the “Company”) (TSX.V: AAZ, OTC: AZURF), is pleased to report the completion of the airborne radiometric survey and provide an update on preparations for the upcoming 2021-2022 drill program at the East Preston uranium project, located in the western Athabasca Basin, Saskatchewan, Canada.

The primary target area for the 2021-2022 program continues to be the conductive corridor from the A-Zone through to the G-Zone (Figures 1 and 2). The selection of this trend is based on a compilation of results from the 2018 through 2020 ground-based EM and gravity surveys, property wide VTEM and magnetic surveys, and the 2019 through 2021 drill programs. The 2020 HLEM survey completed in December indicates multiple prospective conductors and structural complexity along the eastern edge of this corridor.

Airborne Radiometric Survey Complete

Terralogic Exploration Inc. was contracted to facilitate an airborne radiometric survey over the previously unsurveyed southern portion of the property and conduct field investigations of resulting anomalies. Special Project Inc. (SPI) of Calgary, Alberta conducted the survey using a fixed wing aircraft to complete the airborne radiometric survey, which consisted of 2,514 km of survey lines flown at a low minimum altitude and 50 m line spacing to ensure good data collection and a high survey resolution. The survey commenced on August 4th and was completed by August 14th. Preliminary results have been received (Figure 3) and ground-based follow-up of identified anomalies is currently underway.

An airborne radiometric survey uses a gamma ray scintillometer mounted on an airborne platform to measure and map the natural radiation emitted by the rocks and soil the aircraft is flying over. Gamma radiation occurs from the natural decay of elements such as uranium, thorium, and potassium. Locations that have a higher radiation signature (anomalies) than the normal values for the surrounding area (background) would then be examined by crews on the ground for the potential presence of radioactive bedrock if there is not much glacial till cover, or boulders in the till that could be traced back to a source. Many uranium deposits in the Athabasca Basin, including the nearby Triple-R deposit, have been found by following trails of radioactive boulders in the glacial till back to their source.

“The radiometric survey coverage has further highlighted the G-zone and the Q-zone to the east, reinforcing our decision to focus on these conductive packages at this stage of the project. I’m eager to see what boots on the ground may yet show based on these results,” said VP, Exploration, Trevor Perkins.

Updated Exploration Plans

The planned early fall diamond drilling program to complete approximately 1,000 meters of drilling remaining from the shortened winter 2021 program has been rescheduled after consultation with local communities and contractors. As a result, this meterage will be used to further expand the upcoming extensive winter drill program. This program will now consist of approximately 7,000 meters in 30-35 drill holes. Preparations are set to begin in early December. Target selection is ongoing and will be refined based on the ground-based follow-up of anomalies identified from the recently completed airborne survey.

“We don’t want our activities to negatively impact traditional activities by members of the local communities in the area at this critical time of year. There are number of concerns, including the impact of this summer’s heightened fire conditions on the environment,” said VP Exploration, Trevor Perkins. “In consideration of this, we made the decision in consultation with the community to push the scheduled 1000 meters out 90 days into an expanded winter program, which is due to commence in December. We are looking forward to the upcoming drill campaign,” continued Mr. Perkins.

“The radiometric survey has successfully increased our potential target inventory at East Preston,” said Alex Klenman, President and CEO. “In addition, in a matter of weeks we’ll be starting the largest drill campaign yet at East Preston. We are heading towards discovery, with all previous work programs contributing critical data and creating what is now a very compelling exploration case. With renewed life in the sector, our timing appears to be really good. The next couple of years could be very exciting for both the Company and our shareholders,” continued Mr. Klenman.

Permits and funding are in place to complete all the planned work through the winter of 2022, and consultations and information sessions with local communities will continue throughout.

Figure 1: Target corridors at the East Preston Uranium Project, Western Athabasca Basin Saskatchewan

https://www.globenewswire.com/NewsRoom/AttachmentNg/678db516-1e2e-47ae-acb5-6ee4fe64e309

Figure 2: 2021 Drill Target areas at the East Preston Uranium Project

https://www.globenewswire.com/NewsRoom/AttachmentNg/89b870d5-adf9-4a4c-8539-826dc2b170ca

Figure 3: 2021 Radiometric survey coverage at East Preston Uranium Project.

https://www.globenewswire.com/NewsRoom/AttachmentNg/ca66b2fa-0f19-455c-88b4-656a301bbfb5

Figure 4: Project Location – Western Athabasca Basin, Saskatchewan, Canada

https://www.globenewswire.com/NewsRoom/AttachmentNg/0da59997-2297-475f-a4b6-a152359fa6f6

About East Preston

Azincourt controls a majority 70% interest in the 25,000+ hectare East Preston project as part of a joint venture agreement with Skyharbour Resources (TSX.V: SYH), and Dixie Gold. Three prospective conductive, low magnetic signature corridors have been discovered on the property. The three distinct corridors have a total strike length of over 25 km, each with multiple EM conductor trends identified. Ground prospecting and sampling work completed to date has identified outcrop, soil, biogeochemical and radon anomalies, which are key pathfinder elements for unconformity uranium deposit discovery.

The East Preston Project has multiple long linear conductors with flexural changes in orientation and offset breaks in the vicinity of interpreted fault lineaments – classic targets for basement-hosted unconformity uranium deposits. These are not just simple basement conductors; they are clearly upgraded/enhanced prospectivity targets because of the structural complexity.

The targets are basement-hosted unconformity related uranium deposits similar to NexGen’s Arrow deposit and Cameco’s Eagle Point mine. East Preston is near the southern edge of the western Athabasca Basin, where targets are in a near surface environment without Athabasca sandstone cover – therefore they are relatively shallow targets but can have great depth extent when discovered. The project ground is located along a parallel conductive trend between the PLS-Arrow trend and Cameco’s Centennial deposit (Virgin River-Dufferin Lake trend).

Qualified Person

The technical information in this news release has been prepared in accordance with the Canadian regulatory requirements set out in National Instrument 43-101 and reviewed on behalf of the company by C. Trevor Perkins, P.Geo., Vice President, Exploration of Azincourt Energy, and a Qualified Person as defined by National Instrument 43-101.

About Azincourt Energy Corp.

Azincourt Energy is a Canadian-based resource company specializing in the strategic acquisition, exploration, and development of alternative energy/fuel projects, including uranium, lithium, and other critical clean energy elements. The Company is currently active at its majority controlled joint venture East Preston uranium project in the Athabasca Basin, Saskatchewan, Canada, and the Escalera Group uranium-lithium project located on the Picotani Plateau in southeastern Peru.

ON BEHALF OF THE BOARD OF AZINCOURT ENERGY CORP.

“Alex Klenman”
Alex Klenman, President & CEO

Neither the TSX Venture Exchange nor its regulation services provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

This press release includes “forward-looking statements”, including forecasts, estimates, expectations and objectives for future operations that are subject to a number of assumptions, risks and uncertainties, many of which are beyond the control of Azincourt. Investors are cautioned that any such statements are not guarantees of future performance and that actual results or developments may differ materially from those projected in the forward-looking statements. Such forward-looking information represents management’s best judgment based on information currently available. No forward-looking statement can be guaranteed, and actual future results may vary materially.

For further information please contact:

Alex Klenman, President & CEO
Tel: 604-638-8063
info@azincourtenergy.com

Azincourt Energy Corp.
1430 – 800 West Pender Street
Vancouver, BC V6C 2V6
www.azincourtenergy.com