Eliza silver complex, Hamilton, Nevada, included previously reported surface samples. (See September 9, 2021 News Release for comprehensive sampling data).
Eliza silver complex, Hamilton, Nevada, included previously reported surface samples. (See September 9, 2021 News Release for comprehensive sampling data).
Figure 2
Silverton claim layout with northeast sampling showing 6.1 g/t gold from a surface sample
Silverton claim layout with northeast sampling showing 6.1 g/t gold from a surface sample
VANCOUVER, British Columbia, Oct. 07, 2021 (GLOBE NEWSWIRE) — Silver Hammer Mining Corp. (CSE: HAMR / OTC: HAMRF) (“Silver Hammer” or the “Company”) is pleased to report that it has staked an additional 52 new claims at its Eliza Silver Project in the historic Hamilton District of Nevada, more than doubling its land package.
The Eliza Silver Project is located along the south side of the Eberhardt fault, opposite the past-producing Treasure Hill Mine in the Hamilton Mining District, Nevada’s highest-grade silver district producing 40 million (M) ounces (oz) silver with historic mined ore grades of up to 18,700 grams per tonne (g/t) between 1860-1872. Surface samples as high as 25,000 g/t were collected in the 1960s.1
With the addition of these new claims, the Eliza land package now comprises 88 claims totaling 5.52 square kilometres, (see Figure 1).
“Our initial exploration work has identified mineralization that extends onto these newly acquired claims along the lower half of the Eliza project,” stated President Morgan Lekstrom. “We are currently conducting a mapping and geochemistry program on the property where we see significant potential for discovery in areas that have never been explored using modern exploration techniques. We will use this data to plan an extensive initial exploration program targeted for early 2022.”
Additionally, initial results from a sampling program at the Company’s Silverton Mine, a project sharing similar geology and Aster signature to Kinross Gold’s Round Mountain project located approximately 108 kilometres to the west, have confirmed surface gold mineralization on the east side of the property. A sample of 6.1 g/t gold was taken from the silicified tuff (see Figure 2).
The Company also announces that David Grandy has stepped down as a director of the Company in order to pursue other opportunities. The Company thanks Mr. Grandy for his services, including helping take the company public, and wishes him the best in his future endeavours.
Qualified Person
Technical aspects of this press release have been reviewed and approved under the supervision of Philip Mulholland, P.Geo. Mr. Mulholland is a Qualified Person (QP) under National Instrument 43-101 Standards of Disclosure for Mineral Projects.
About Silver Hammer Mining Corp.
Silver Hammer Mining Corp. is a junior resource company advancing the past-producing Silver Strand Mine in the Coeur d’Alene Mining District in Idaho, USA, both the Eliza Silver Project and the Silverton Silver Mine in one of the world’s most prolific mining jurisdictions in Nevada and the Lacy Gold Project in British Columbia, Canada. The Company has commenced an initial drill program at Silver Strand that will test for silver and gold mineralization immediately below the mine’s lowest level extending only 90 metres below surface. Lakewood strives to become a multimine silver producer and will focus near-term exploration and drilling plans at the Company’s Idaho and Nevada silver-gold assets.
*Mineralization hosted on adjacent and/or nearby properties is not necessarily indicative of mineralization hosted on the Company’s property.
On Behalf of the Board of Silver Hammer Mining Corp.
Morgan Lekstrom, President
Corporate Office: 551 Howe Street, Vancouver, British Columbia V6C 2C2, Canada Contact: Kristina Pillon, President, High Tide Consulting Corp. 604.908.1695 / investors@silverhammermining.com
The CSE does not accept responsibility for the adequacy or accuracy of this release.
The Canadian Securities Exchange has neither approved nor disapproved the contents of this press release.
VANCOUVER, BC / ACCESSWIRE / October 7, 2021 / NV Gold Corporation (TSXV:NVX)(OTCQB:NVGLF) (“NV Gold” or the “Company“) is pleased to announce that the Company has completed 3 Notices of Intent (NOI) to commence drilling at its 100% owned Slumber, Discovery Bay and Pickhandle projects in north-central Nevada, USA. The Company also reports that a 2D seismic survey has been completed at its optioned SW Pipe Project located along the Cortez Gold Belt approximately 6 km southwest of the Pipeline Gold Complex operated by Nevada Gold Mines.
Upcoming Plans:
The upcoming Slumber drill program is designed to determine the extent of additional near-surface oxide-mineralization at its north-central Nevada (see Figure 1) project. The 6-8 drill program is expected to commence later this month.
The Discovery Bay Project is located approximately 15 km southeast of the Cove-McCoy gold deposits in Lander County, Nevada (see Figure 1) controlled by I-80 Gold Corp. This North-South structural zone, also known as the “Rabbit Suture”, hosts other significant gold deposits such as Turquoise Ridge, Twin Creeks as well as the Fortitude, Phoenix and Lone Tree Mines. Drilling of a four-hole recon program is expected to commence in November.
The Pickhandle Project is located at the structural intersection of the Rabbit Suture (Hwy 305) and the Crescent Valley Fault Zone (see Figure 1). Pickhandle is located 25 kilometers south of the Discovery Bay Project. The 3-4-hole drilling program is anticipated to begin in December.
The recently announced IP/Resistivity program at the Sandy Project has added a highly compelling target that will likely be drilled in Q1 2022. See news release on 9/28/2021.
At the SW Pipe, a 2D Seismic survey was recently completed by the optionee to determine depth to Carlin-type host lithologies and structural drill targets (see Figure 2). Drilling at SW Pipe is scheduled for mid-2022 depending on core rig availability.
Our projects are pushing forward, and I am more than pleased to have our drill contract in place, equipment committed and permits in-hand. NV Gold has high-quality projects with excellent discovery potential that can now be drill-tested. Besides Slumber, Discovery Bay and Pickhandle, there are several more projects entering the project pipeline. These projects are moving toward permitting, fulfilling our goal of drill-testing multiple, high-potential projects within the next 18 months to deliver value to our shareholders,” commented Thomas Klein, VP Exploration of NV Gold.
Figure 1: NV Gold’s projects with NOIs in place and location of SW Pipe with 2D Seismic completed.
Figure 2: 2D Seismic equipment at SW Pipe with Cortez mines in the background.
On behalf of the Board of Directors,
John E. Watson President & CEO
For further information, visit the Company’s website at www.nvgoldcorp.com or contact: Freeform Communications Inc. at 604.245.0054
Neither the TSX Venture Exchange nor its Regulation Service Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
Forward Looking Statements
This news release includes certain forward-looking statements or information. All statements other than statements of historical fact included in this release, including, without limitation, statements regarding the extent and timing of the Company’s planned exploration activities, are forward-looking statements that involve various risks and uncertainties. There can be no assurance that such statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from the Company’s plans or expectations include regulatory issues, market prices, availability of capital and financing, general economic, market or business conditions, timeliness of government or regulatory approvals, The Company disclaims any intention or obligation to update or revise any forward-looking statements whether because of new information, future events or otherwise, except as otherwise required by applicable securities legislation.
YERINGTON, Nev., Oct. 06, 2021 (GLOBE NEWSWIRE) — Nevada Copper Corp. (TSX: NCU) (OTC: NEVDD) (“Nevada Copper” or the “Company”) today provided a further update on positive September operational performance at the Company’s underground mine at its Pumpkin Hollow Project (the “Underground Mine”). In addition, the Company is pleased to announce the appointment of Randy Buffington as President and Chief Executive Officer, further strengthening its senior management team as operational productivity and production ramp-up at the Underground Mine.
September Operational Highlights
Higher Copper Production: Copper in concentrate produced during September increased by 265% compared to August driven by higher stope production. Approximately 30,386 tons of ore were processed yielding 682 tons of concentrate at an average grade of 22%, resulting in approximately 150 tons of copper production.
Improved rate of stope turnover: Stoping has accelerated significantly since mid-August, with the second and third stope panels fully mined and a fourth stope panel expected to be mined this week. Further stopes are planned in October and November, and the high-grade Sugar Cube zone is also expected to begin to be mined during Q4.
Increasing Development Rates: September saw the highest monthly development footage achieved since April 2021, with a 12% increase over August. Development activities included completion of the crossing of the water bearing dike, accessing additional stoping zones and installation of development infrastructure. A total of approximately 750 lateral equivalent feet was advanced in September.
Mike Brown, outgoing Interim President and Chief Executive Officer, commented: “I am very pleased to see the improved trajectory in our production ramp-up and a recovery in productivities. The increased ore production was a key objective for September, and together with the improving productivities on site, along with the ongoing management strengthening, provide further confidence in the mine ramp-up.”https://s.yimg.com/rq/darla/4-9-0/html/r-sf-flx.html
Management Update
Randy Buffington will join Nevada Copper as President and Chief Executive Officer with immediate effect. With extensive experience in underground and open pit mining operations, both in Nevada and internationally, Mr. Buffington has successfully delivered multiple project ramp-ups and productivity improvements in an underground setting, in addition to overseeing the development and operation of multiple large open pit projects. Most recently at Hycroft Mining, he was responsible for the operational reforms, successfully executing a project turnaround and delivering significant shareholder value as President and Chief Executive Officer. Previously, he held various senior management positions with Barrick from 2003 to 2012, overseeing North American and Zambian operations. He also held senior management positions with Placer Dome and Cominco.
Mr. Buffington brings a deep industry network in Nevada and a strong track record of value delivery in both operating underground mines and large open pit projects, ideally positioning him to lead Nevada Copper towards the delivery of steady state production from its Underground Mine and realizing the full potential of its fully-permitted open pit project and extensive landholdings within the Yerington Copper District.
“The addition of Mr. Buffington further strengthens the Company’s senior management team and provides deeply experienced, long-term leadership as the Company moves to complete the ramp-up of the Underground Mine and go on to maximize the full value of its open pit project and exploration targets,” stated Stephen Gill, Chairman of Nevada Copper.
“I look forward to working with the team at Nevada Copper as we continue to push and improve productivity and accelerate our transition into a commercial producer,” stated Randy Buffington, President and CEO of Nevada Copper. “There is a tremendous foundation to build on at Pumpkin Hollow and I am pleased to be leading the Company towards realizing its full potential as a mid-tier copper producer.”
Mike Brown will step down as Interim President and Chief Executive Officer and continue his active involvement and oversight through his ongoing role as director.
“On behalf of the Company, I would like to thank Mike Brown for his commitment as Interim President and Chief Executive Officer, and I look forward to his continued active involvement going forward,” stated Mr. Gill.
Qualified Persons The technical information and data in this news release was reviewed by Greg French, C.P.G., VP Head of Exploration of Nevada Copper, and Neil Schunke, P.Eng., a consultant to Nevada Copper, who are both non-independent Qualified Persons within the meaning of NI 43-101.
About Nevada Copper Nevada Copper (TSX: NCU) is a copper producer and owner of the Pumpkin Hollow copper project. Located in Nevada, USA, Pumpkin Hollow has substantial reserves and resources including copper, gold and silver. Its two fully permitted projects include the high-grade Underground Mine and processing facility, which is now in the production stage, and a large-scale open pit project, which is advancing towards feasibility status.
NEVADA COPPER CORP. www.nevadacopper.com Randy Buffington, President and CEO
For further information contact: Rich Matthews, Investor Relations Integrous Communications rmatthews@integcom.us +1 604 757 7179
Cautionary Language
This news release includes certain statements and information that constitute forward-looking information within the meaning of applicable Canadian securities laws. All statements in this news release, other than statements of historical facts are forward-looking statements. Such forward-looking statements and forward-looking information specifically include, but are not limited to, statements that relate to mine development, production and ramp-up plans.
Forward-looking statements and information include statements regarding the expectations and beliefs of management. Often, but not always, forward-looking statements and forward-looking information can be identified by the use of words such as “plans”, “expects”, “potential”, “is expected”, “anticipated”, “is targeted”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates”, or “believes” or the negatives thereof or variations of such words and phrases or statements that certain actions, events or results “may”, “could”, “would”, “might” or “will” be taken, occur or be achieved. Forward-looking statements or information should not be read as guarantees of future performance and results. They are subject to known and unknown risks, uncertainties and other factors which may cause the actual results and events to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements or information.
Such risks and uncertainties include, without limitation, those relating to: the ability of the Company to complete the ramp-up of the Underground Mine within the expected cost estimates and timeframe; requirements for additional capital and no assurance can be given regarding the availability thereof; the impact of the COVID-19 pandemic on the business and operations of the Company; the state of financial markets; history of losses; dilution; adverse events relating to milling operations, construction, development and ramp-up, including the ability of the Company to address underground development and process plant issues; failure to obtain extensions under and amendments to the Company’s amended and restated senior credit facility with KfW IPEX-Bank; ground conditions; cost overruns relating to development, construction and ramp-up of the Underground Mine; loss of material properties; interest rates increase; global economy; limited history of production; future metals price fluctuations; speculative nature of exploration activities; periodic interruptions to exploration, development and mining activities; environmental hazards and liability; industrial accidents; failure of processing and mining equipment to perform as expected; labor disputes; supply problems; uncertainty of production and cost estimates; the interpretation of drill results and the estimation of mineral resources and reserves; changes in project parameters as plans continue to be refined; possible variations in ore reserves, grade of mineralization or recovery rates from management’s expectations and the difference may be material; legal and regulatory proceedings and community actions; accidents; title matters; regulatory approvals and restrictions; increased costs and physical risks relating to climate change, including extreme weather events, and new or revised regulations relating to climate change; permitting and licensing; volatility of the market price of the Company’s securities; insurance; competition; hedging activities; currency fluctuations; loss of key employees; other risks of the mining industry as well as those risks discussed in the Company’s Management’s Discussion and Analysis in respect of the year ended December 31, 2020 and in the section entitled “Risk Factors” in the Company’s Annual Information Form dated March 18, 2021. Should one or more of these risks or uncertainties materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those described in forward-looking statements or information. The forward-looking information or statements are stated as of the date hereof. Nevada Copper disclaims any intent or obligation to update forward-looking statements or information except as required by law. Readers are referred to the additional information regarding Nevada Copper’s business contained in Nevada Copper’s reports filed with the securities regulatory authorities in Canada. Although the Company has attempted to identify important factors that could cause actual actions, events, or results to differ materially from those described in forward-looking statements, there may be other factors that could cause actions, events or results not to be as anticipated, estimated or intended. For more information on Nevada Copper and the risks and challenges of its business, investors should review Nevada Copper’s filings that are available at www.sedar.com.
Nevada Copper provides no assurance that forward-looking statements and information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements or information. Accordingly, readers should not place undue reliance on forward-looking statements or information.
TORONTO, Oct. 05, 2021 (GLOBE NEWSWIRE) — Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to announce that it has advanced US$3 million as property option payments, pursuant to the Private Option Agreement (the “Agreement”) to acquire a 99% interest in the Iska Iska silver-tin polymetallic project (“Iska Iska”) in the Potosi Department, southern Bolivia. The Agreement grants Eloro the option to acquire a 99% interest in Iska Iska for consideration consisting of 500,000 Eloro common shares, of which 250,000 have been issued, with the remaining 250,000 to be issued on or before January 6, 2022, and the payment of US$10 million, of which US$3 million has been paid to date, with the remaining US$7 million due on or before January 6, 2024.
To date, the Company has completed 31,500 metres (m) in 61 drill holes including three (3) in progress to test major target areas at Iska Iska. Currently three diamond drill rigs are active at Iska Iska, two surface rigs and one underground drill. Planned drilling for 2021 is 51,000m with the aim of outlining an initial inferred National Instrument (“NI”) 43-101 compliant mineral resource by Q1 2022. Additionally, a downhole induced polarization/resistivity (IP/Res) survey is in progress to further define drill targets and aid resource definition drilling. Preliminary metallurgical tests are also in progress. An updated NI 43-101 Technical Report is being prepared by independent consultant Micon International Ltd.
“We are extremely pleased with the progress and exploration effort at Iska Iska and are most grateful for the partnership and contributions to date by the title holder, Empresa Minera Villegas S.R.L.,” commented Thomas Larsen, CEO of Eloro. “Due to the positive results to date from our drill campaign, initial engineering studies to establish potential economic parameters for mineral resource definition will commence shortly, with a site visit having already been completed by a top Peruvian Engineering firm. More detailed metallurgical studies are also planned.”
About Eloro Resources Ltd.
Eloro is an exploration and mine development company with a portfolio of gold and base-metal properties in Bolivia, Peru and Quebec. Eloro has an option to acquire a 99% interest in the highly prospective Iska Iska Property, which can be classified as a polymetallic epithermal-porphyry complex, a significant mineral deposit type in the Potosi Department, in southern Bolivia. Eloro commissioned a NI 43-101 Technical Report on Iska Iska, which was completed by Micon International Limited and is available on Eloro’s website and under its filings on SEDAR. Iska Iska is a road-accessible, royalty-free property. Eloro also owns an 82% interest in the La Victoria Gold/Silver Project, located in the North-Central Mineral Belt of Peru some 50 km south of Barrick’s Lagunas Norte Gold Mine and Pan American Silver’s La Arena Gold Mine. La Victoria consists of eight mining concessions and eight mining claims encompassing approximately 89 square kilometres. La Victoria has good infrastructure with access to road, water and electricity and is located at an altitude that ranges from 3,150 m to 4,400 m above sea level.
For further information please contact either Thomas G. Larsen, Chairman and CEO or Jorge Estepa, Vice-President at (416) 868-9168.
Information in this news release may contain forward-looking information. Statements containing forward looking information express, as at the date of this news release, the Company’s plans, estimates, forecasts, projections, expectations, or beliefs as to future events or results and are believed to be reasonable based on information currently available to the Company. There can be no assurance that forward-looking statements will prove to be accurate. Actual results and future events could differ materially from those anticipated in such statements. Readers should not place undue reliance on forward-looking information.
Neither the TSXV nor its Regulation Services Provider (as that term is defined in the policies of the TSXV) accepts responsibility for the adequacy or accuracy of this release.
TORONTO, Oct. 5, 2021 /CNW/ – Vox Royalty Corp. (TSXV: VOX) (OTCQX: VOXCF) (“Vox” or the “Company“), a high growth precious metals focused royalty company, is pleased to announce an update on the producing Janet Ivy Gold Mine (“Janet Ivy“) in Western Australia, controlled by Norton Gold Fields Pty Ltd. (“Norton“); a subsidiary of Hong Kong and Shanghai-listed, Zijin Mining Group Co., Limited (“Zijin“). Vox holds an uncapped A$0.50/tonne production gold royalty over Janet Ivy, which forms the core of Zijin’s Binduli North heap leaching expansion project (“Binduli North“).
In addition to the Janet Ivy acquisition announcement by Vox on March 29, 2021, Vox has now filed on SEDAR a technical report, “NI 43-101 Technical Report, Janet Ivy Gold Mine (M26/446), Western Australia, Australia” dated October 5, 2021 by Kangari Consulting LLC.
According the Zijin’s latest public disclosures, the Binduli North expansion is targeted for completion as early as March 20221, which was the key near-term catalyst that Vox management anticipated when the royalty was acquired in March 2021. Vox congratulates Zijin on rapidly advancing the project to the commencement of construction in June 2021 and now looks forward to reaching the expansion completion milestone.
Riaan Esterhuizen, Executive Vice-President – Australia stated, “The Binduli expansion was the key near-term catalyst that Vox management anticipated when we acquired the Janet Ivy royalty in March 2021. The Binduli North heap leach expansion is expected to re-rate Janet Ivy royalty revenues from 2022 onwards. This royalty has the potential to generate A$1.5M – A$2.5M of annual revenues from Binduli North production on average across the life of mine and assuming a target production rate from Norton Gold of 5Mtpa from Binduli North.”
Asset Overview – Janet Ivy Gold Mine
Janet Ivy is located on mining lease, M26/446 and is located 10km to the west of Kalgoorlie. The deposit has been mined since 2017 as an open-cut mine to supplement baseload ore feed from the Enterprise open pit mine for the Norton-owned 3.7Mtpa Paddington Mill.2
On April 28, 2020, Zijin announced that the Zijin Board of Directors had approved the construction of the Binduli 15Mtpa heap leaching project, with the first phase at Binduli North expected to be completed and first production to commence in March 20221. The Vox royalty-linked tenure covers the core of Binduli North, including the full Janet Ivy resource as well as portions of the Fort William, Karen Louise and Fort Scott deposits (Figure 1).
In December 2020, Norton submitted a Mining Proposal (prepared by Talis Consultants Pty Ltd) to the Western Australian Environmental Protection Authority for the permitting of the Binduli North heap leach expansion, which proposed a 5Mtpa mining operation over 9 years from the Janet Ivy, Fort William, Karen Louise and Fort Scott pits.3 This Mining Proposal and an associated Application for Works Approval were approved by the Department of Water and Environmental Regulation on July 22, 2021 (Works Approval Number W6504/2021/1).4
On August 1, 2021, Zijin announced that the project design, application for permits and licenses and other preparatory work for Binduli North have been completed and that the construction had commenced in June 2021, that applications for permits and licenses for Binduli South heap leaching project is being studied and taking place, that after completion of all the Binduli construction work and upon reaching designated production capacity, approximately 7 tonnes of gold (approximately 225,000 ounces) can be produced in peak years, that the total capital cost of the combined Binduli expansion (5Mtpa Binduli North + 10Mtpa Binduli South) is A$462 million, and that investment in the project during the first half of 2021 was RMB 0.43B (A$90 million).5
Figure 1: Janet Ivy royalty tenure M26/446 in relation to Binduli North and Binduli South. (CNW Group/Vox Royalty Corp.)
Based on a Mining Proposal submitted to the Western Australian EPA in December 2020, the Binduli North expansion is a 5Mtpa heap leach project that is expected to mine 41Mt @ 0.6g/t Au over a 9 year mine life. The project covers the following royalty-linked deposits, that are approximately 85% royalty linked:
Table 1: Mining Design Results as of December 2020 (Source: Talis 2020) (CNW Group/Vox Royalty Corp.)
Timothy J. Strong, MIMMM, of Kangari Consulting Limited and a “Qualified Person” under National Instrument 43-101 – Standards of Disclosure for Mineral Projects, has reviewed and approved the scientific and technical disclosure contained in this press release.
About Vox
Vox is a high growth precious metals royalty and streaming company with a portfolio of over 50 royalties and streams spanning eight jurisdictions. The Company was established in 2014 and has since built unique intellectual property, a technically focused transactional team and a global sourcing network which has allowed Vox to become the fastest growing company in the royalty sector. Since the beginning of 2019, Vox has announced 20 separate transactions to acquire over 45 royalties.
Cautionary Note Regarding Forward Looking Information
This news release contains certain forward-looking statements. Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance (often, but not always, using words or phrases such as “expects” or “does not expect”, “is expected”, “anticipates” or “does not anticipate” “plans”, “estimates” or “intends” or stating that certain actions, events or results ” may”, “could”, “would”, “might” or “will” be taken, occur or be achieved) are not statements of historical fact and may be “forward-looking statements”.
The forward-looking statements and information in this press release include, but are not limited to, a summary of operator updates provided by management and the potential impact on the Company of such operator updates, statements regarding expectations for the timing of commencement of resource production from the project, expectations regarding the size, quality and exploitability of the resources associated with the project, future operations and work programs of Vox’s mining operator partner, the receipt of future royalty payments derived from the royalty asset, anticipated future cash flows and future financial reporting by Vox and requirements for regulatory approvals.
Forward-looking statements and information are based on forecasts of future results, estimates of amounts not yet determinable and assumptions that, while believed by management to be reasonable, are inherently subject to significant business, economic and competitive uncertainties and contingencies. Forward-looking statements and information are subject to various known and unknown risks and uncertainties, many of which are beyond the ability of Vox to control or predict, that may cause Vox’s actual results, performance or achievements to be materially different from those expressed or implied thereby, and are developed based on assumptions about such risks, uncertainties and other factors set out herein, including but not limited to: the requirement for regulatory approvals and third party consents, the impact of general business and economic conditions, the absence of control over the mining operations from which Vox will receive royalties, including risks related to international operations, government relations and environmental regulation, the inherent risks involved in the exploration and development of mineral properties; the uncertainties involved in interpreting exploration data; the potential for delays in exploration or development activities; the geology, grade and continuity of mineral deposits; the impact of the COVID-19 pandemic; the possibility that future exploration, development or mining results will not be consistent with Vox’s expectations; accidents, equipment breakdowns, title matters, labor disputes or other unanticipated difficulties or interruptions in operations; fluctuating metal prices; unanticipated costs and expenses; uncertainties relating to the availability and costs of financing needed in the future; the inherent uncertainty of production and cost estimates and the potential for unexpected costs and expenses, commodity price fluctuations; currency fluctuations; regulatory restrictions, including environmental regulatory restrictions; liability, competition, loss of key employees and other related risks and uncertainties. Should one or more of these risks, uncertainties or other factors materialize, or should assumptions underlying the forward-looking information or statement prove incorrect, actual results may vary materially from those described herein as intended, planned, anticipated, believed, estimated or expected. Vox cautions that the foregoing list of material factors is not exhaustive. When relying on the Company’s forward-looking statements and information to make decisions, investors and others should carefully consider the foregoing factors and other uncertainties and potential events.
Vox has assumed that the material factors referred to in the previous paragraph will not cause such forward looking statements and information to differ materially from actual results or events. However, the list of these factors is not exhaustive and is subject to change and there can be no assurance that such assumptions will reflect the actual outcome of such items or factors. The forward-looking information contained in this press release represents the expectations of Vox as of the date of this press release and, accordingly, is subject to change after such date. Readers should not place undue importance on forward looking information and should not rely upon this information as of any other date. While Vox may elect to, it does not undertake to update this information at any particular time except as required in accordance with applicable laws.
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
Technical and Third-Party Information
Except where otherwise stated, certain disclosure in this press release is based on information publicly disclosed by third parties (including but not limited to mining project operators and government departments) based on the information/data available in the public domain as at the date hereof, and none of this information has been independently verified by Vox. Specifically, as a royalty investor, Vox has limited, if any, access to the royalty operations. Although Vox does not have any knowledge that such information may not be accurate, there can be no assurance that such information from the project operators is complete or accurate. Some information publicly reported by the project operators may relate to a larger property than the area covered by Vox’s royalty interests. Vox’s royalty interests often cover less than 100% and sometimes only a portion of the publicly reported mineral reserves, mineral resources and production of a property.
YERINGTON, Nev., Oct. 01, 2021 (GLOBE NEWSWIRE) — Nevada Copper Corp. (TSX: NCU) (OTC: NEVDD) (“Nevada Copper” or the “Company”) is pleased announce that the Company has received a further extension of the waiver from KfW IPEX-Bank (“KfW”), the Company’s senior project lender, to October 31, 2021 to complete the project completion test (the “Project Longstop Date”) under the Company’s amended and restated credit agreement (the “Amended KfW Facility”). As previously announced, the Company and KfW are in discussions regarding a longer-term extension of the Project Longstop Date. While there can be no assurance, the Company expects to enter into this longer-term extension and finalize certain other amendments, including payment deferrals, to the Amended KfW Facility by the end of October.
As a condition to the most recent waiver from KfW, Pala Investments Limited (“Pala”), the Company’s largest shareholder, will provide a new US$12 million loan to the Company pursuant to a promissory note entered into between Pala and the Company (the “Promissory Note”). The Promissory Note has substantially the same terms as the amended and restated promissory note issued by the Company in favour of Pala, as described in the Company’s August 31, 2021 press release, however, no arrangement fee is payable to Pala under the Promissory Note. The Promissory Note was reviewed and approved by a committee of independent directors of the Company.
Effective September 30, 2021, Justin Cochrane resigned from the Company’s board of directors (the “Board”) in order to focus on the other businesses that he’s involved with and to reduce the number of boards on which he sits.https://s.yimg.com/rq/darla/4-9-0/html/r-sf-flx.html
“On behalf of the Company, I would like to thank Justin Cochrane for his contributions to the Company and wish him success in his future endeavours,” stated Stephen Gill, Chairman of the Board.
About Nevada Copper Nevada Copper (TSX: NCU) is a copper producer and owner of the Pumpkin Hollow copper project. Located in Nevada, USA, Pumpkin Hollow has substantial reserves and resources including copper, gold and silver. Its two fully permitted projects include the high-grade underground mine and processing facility, which is now in the production stage, and a large-scale open pit project, which is advancing towards feasibility status.
NEVADA COPPER CORP. www.nevadacopper.com Mike Brown, Interim President and CEO
For further information contact: Rich Matthews, Investor Relations Integrous Communications rmatthews@integcom.us +1 604 757 7179
Cautionary Language
This news release includes certain statements and information that constitute forward-looking information within the meaning of applicable Canadian securities laws. All statements in this news release, other than statements of historical facts are forward-looking statements. Such forward-looking statements and forward-looking information specifically include, but are not limited to, statements that relate to an extension and amendments in connection with the Amended KfW Facility.
Forward-looking statements and information include statements regarding the expectations and beliefs of management. Often, but not always, forward-looking statements and forward-looking information can be identified by the use of words such as “plans”, “expects”, “potential”, “is expected”, “anticipated”, “is targeted”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates”, or “believes” or the negatives thereof or variations of such words and phrases or statements that certain actions, events or results “may”, “could”, “would”, “might” or “will” be taken, occur or be achieved. Forward-looking statements or information should not be read as guarantees of future performance and results. They are subject to known and unknown risks, uncertainties and other factors which may cause the actual results and events to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements or information.
Such risks and uncertainties include, without limitation, those relating to: the ability of the Company to complete the ramp-up of its underground mine within the expected cost estimates and timeframe; requirements for additional capital and no assurance can be given regarding the availability thereof; the impact of the COVID-19 pandemic on the business and operations of the Company; the state of financial markets; history of losses; dilution; adverse events relating to milling operations, construction, development and ramp-up, including the ability of the Company to address underground development and process plant issues; failure to obtain extensions under and amendments to the Amended KfW Facility; ground conditions; cost overruns relating to development, construction and ramp-up of its underground mine; loss of material properties; interest rates increase; global economy; limited history of production; future metals price fluctuations; speculative nature of exploration activities; periodic interruptions to exploration, development and mining activities; environmental hazards and liability; industrial accidents; failure of processing and mining equipment to perform as expected; labor disputes; supply problems; uncertainty of production and cost estimates; the interpretation of drill results and the estimation of mineral resources and reserves; changes in project parameters as plans continue to be refined; possible variations in ore reserves, grade of mineralization or recovery rates from management’s expectations and the difference may be material; legal and regulatory proceedings and community actions; accidents; title matters; regulatory approvals and restrictions; increased costs and physical risks relating to climate change, including extreme weather events, and new or revised regulations relating to climate change; permitting and licensing; volatility of the market price of the Company’s securities; insurance; competition; hedging activities; currency fluctuations; loss of key employees; other risks of the mining industry as well as those risks discussed in the Company’s Management’s Discussion and Analysis in respect of the year ended December 31, 2020 and in the section entitled “Risk Factors” in the Company’s Annual Information Form dated March 18, 2021. Should one or more of these risks or uncertainties materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those described in forward-looking statements or information. In particular, there can be no assurance that the extension and amendments to the Amended KfW Facility or the conditions for their effectiveness will be achieved at all or within the necessary timeframe, in which case the Company may have to cease operations in the absence of an alternative financing transaction. The forward-looking information or statements are stated as of the date hereof. Nevada Copper disclaims any intent or obligation to update forward-looking statements or information except as required by law. Readers are referred to the additional information regarding Nevada Copper’s business contained in Nevada Copper’s reports filed with the securities regulatory authorities in Canada. Although the Company has attempted to identify important factors that could cause actual actions, events, or results to differ materially from those described in forward-looking statements, there may be other factors that could cause actions, events or results not to be as anticipated, estimated or intended. For more information on Nevada Copper and the risks and challenges of its business, investors should review Nevada Copper’s filings that are available at www.sedar.com.
Nevada Copper provides no assurance that forward-looking statements and information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements or information. Accordingly, readers should not place undue reliance on forward-looking statements or information.
Vancouver, British Columbia, October 1, 2021 (NYSE American: EMX; TSX Venture: EMX; Frankfurt: 6E9) – EMX Royalty Corporation (the “Company”, or “EMX”) is pleased to announce that it intends to carry out a private placement of up to 5,000,000 units at C$ 3.30 each for gross proceeds of up to C$ 16,500,000. Members of the Sprott Group have agreed to act as finders in connection with the sale of some of the units.
The units will consist of one common share of the Company and one-half of one transferable warrant. Each whole warrant will entitle the purchase for two years of one common share at C$ 4.00 in the first year and C$ 4.50 in the second year.
Eligible finders will be paid a 6.0% cash commission and issued that number of non-transferable compensation warrants equal to 6.0% of the number of units sold to investors introduced by them. Each compensation warrant will entitle the purchase for one year of one common share of the Company for C$ 3.50.
The placement is subject to stock exchange approval.
This news release does not constitute an offer to sell or a solicitation of an offer to buy any of the securities in the United States. The securities have not been and will not be registered under the United States Securities Act of 1933, as amended (the “1933 Act”), or any U.S. state securities laws and may not be offered or sold within the “United States” or to “U.S. Persons” (as such terms are defined in Regulation S under the 1933 Act) unless registered under the 1933 Act and applicable U.S. state securities laws, or an exemption from such registration is available.
About EMX. EMX is a precious, base and battery metals royalty company. EMX’s investors are provided with discovery, development, and commodity price optionality, while limiting exposure to risks inherent to operating companies. The Company’s common shares are listed on the NYSE American Exchange and TSX Venture Exchange under the symbol EMX, as well as on the Frankfurt exchange under the symbol “6E9”. Please see www.EMXroyalty.com for more information.
For further information contact:
David M. Cole President and Chief Executive Officer Phone: (303) 979-6666 Dave@EMXroyalty.com
Scott Close Director of Investor Relations Phone: (303) 973-8585 SClose@EMXroyalty.com
Neither the TSX-V nor its Regulation Services Provider (as that term is defined in policies of the TSX-V) accepts responsibility for the adequacy or accuracy of this release.
Forward-Looking Statements This news release may contain “forward looking statements” that reflect the Company’s current expectations and projections about its future results. These forward-looking statements may include statements regarding completion of the transaction, perceived merits of properties, exploration results and budgets, mineral reserves and resource estimates, work programs, capital expenditures, timelines, strategic plans, market prices for precious and base metal, or other statements that are not statements of fact. When used in this news release, words such as “estimate,” “intend,” “expect,” “anticipate,” “will”, “believe”, “potential”, “upside” and similar expressions are intended to identify forward-looking statements, which, by their very nature, are not guarantees of the Company’s future operational or financial performance, and are subject to risks and uncertainties and other factors that could cause the Company’s actual results, performance, prospects or opportunities to differ materially from those expressed in, or implied by, these forward-looking statements. These risks, uncertainties and factors may include, but are not limited to: unavailability of financing, failure to identify commercially viable mineral reserves, fluctuations in the market valuation for commodities, difficulties in obtaining required approvals for the development of a mineral project, increased regulatory compliance costs, expectations of project funding by joint venture partners and other factors. It is possible EMX may not complete the transaction, as a result of failure to fulfill conditions of closing, unavailability of financing or for other reasons EMX cannot anticipate at this time.
Readers are cautioned not to place undue reliance on these forward-looking statements, which speak only as of the date of this news release or as of the date otherwise specifically indicated herein. Due to risks and uncertainties, including the risks and uncertainties identified in this news release, and other risk factors and forward-looking statements listed in the Company’s MD&A for the quarter ended June 30, 2021 and the year ended December 31, 2020 (the “MD&A”), and the most recently filed Revised Annual Information Form (the “AIF”) for the year ended December 31, 2020, actual events may differ materially from current expectations. More information about the Company, including the MD&A, the AIF and financial statements of the Company, is available on SEDAR at www.sedar.com and on the SEC’s EDGAR website at www.sec.gov.
My western friends would leave me if I were openly crooked. There are no such consequences in India. “Friends” in India would respect you for your crookedness if you can get away with it. And there is no social opprobrium. No wonder crookedness grows like a weed in India. Here is a conversation with Richard Kary:
In the past, I have followed and written about Riverside Resources (RRI; C$0.135) and its CEO, John-Mark Staude. RRI is a project generation company and a very innovative one. They have several projects in Mexico, the USA, and Canada. They have C$5 million in cash and equities, making their enterprise value C$5 million, rather low for a company that has an interesting agreement with BHP, which will fund US$6.5 million in drilling two projects and generative work over the next year. RRI gets to charge a 10% fee on the expenses made, which enables it to sometimes reduce its corporate cash burn to zero. While BHP funds the projects, RRI gets to keep at least 20% ownership—100% if BHP decides not to pursue any project.
A major investor recently liquidated his position in RRI, the reason why it has fallen a lot. That is my opportunity to add to my position.
Disclaimer: All information found here, including any ideas, opinions, views, predictions, forecasts, commentaries, suggestions, or stock picks, expressed or implied herein, are for informational, entertainment, or educational purposes only and should not be construed as personal investment advice. While the information provided is believed to be accurate, it may include errors or inaccuracies. The sole purpose of these musings is to show my thinking process when analyzing a stock, not to provide any recommendation. I will not and cannot be held liable for any actions you take as a result of anything you read here. Conduct your own due diligence, or consult a licensed financial advisor or broker before making any and all investment decisions. Any investments, trades, speculations, or decisions made on the basis of any information found on this site, expressed or implied herein, are committed at your own risk, financial or otherwise.
VANCOUVER, British Columbia, Sept. 29, 2021 (GLOBE NEWSWIRE) — Lakewood Exploration Inc. (CSE: LWD) (the “Company” or “Lakewood”) is pleased to announce that effective at market open on Friday, October 1, 2021, the Company’s name will change from “Lakewood Exploration Inc.” to “Silver Hammer Mining Corp.”
The Company’s common shares will begin trading on the CSE on October 1, 2021 under the new name and the trading symbol for the Company will change from “LWD” to “HAMR”. The new CUSIP will be 827733106 and the new ISIN number will be CA8277331069. The share capital of the Company remains unchanged.
No action will be required by existing shareholders with respect to the name change. Certificates representing common shares of Lakewood Exploration Inc. will not be affected by the name change and will not need to be exchanged. There is no consolidation of capital. The Company encourages any shareholder concerns in this regard to be directed to such person’s broker or agent.https://s.yimg.com/rq/darla/4-9-0/html/r-sf-flx.html
Silver Hammer’s President, Morgan Lekstrom stated, “We feel that the name Silver Hammer Mining better reflects our commitment to building a multi-asset silver-focused mining company with both large-scale resource growth and near-term production potential, as demonstrated by our recent acquisitions of three highly prospective silver assets in the USA.”
Effective this Friday, the Company’s new website will be available at www.silverhammermining.com and will showcase the Company’s asset base as it grows and provide access to all technical reports, presentations, and investor news.
About Lakewood Exploration Inc.
Lakewood Exploration Inc. is a junior resource company advancing the past-producing Silver Strand Mine in the Coeur d’Alene Mining District in Idaho, USA, both the Eliza Silver Project and the Silverton Silver Mine in one of the world’s most prolific mining jurisdictions in Nevada and the Lacy Gold Project in British Columbia, Canada. The Company has commenced an initial drill program at Silver Strand that will test for silver and gold mineralization immediately below the mine’s lowest level extending only 90 metres below surface. Lakewood strives to become a multi-mine silver producer and will focus near-term exploration and drilling plans at the Company’s Idaho and Nevada silver-gold assets.
On Behalf of the Board of Lakewood Exploration Inc.
Morgan Lekstrom, President
Corporate Office: 551 Howe Street, Vancouver, British Columbia V6C 2C2, Canada Contact: Kristina Pillon, President, High Tide Consulting Corp. 604.908.1695 / investors@silverhammermining.com
The CSE does not accept responsibility for the adequacy or accuracy of this release.
The Canadian Securities Exchange has not in any way passed upon the merits of the Proposed Transaction and has neither approved nor disapproved the contents of this press release.
Recently, CEO Greg Beischer presented at the Denver Gold Group Explorer and Developer Forumin Colorado Springs and we were lucky enough to get our hands on his presentation to share with all of you.
In the presentation, Greg provides an update on the current state of our company and covers numerous projects including Treasure Creek, Ester Dome, and 64North projects in Alaska.
To make it easy to digest, I’ve pulled out the key highlights below.
Key Highlights: 0:39 – Greg provides context on how the Apex Gold project came about and how Millrock attracted the interest of a mid-tier mining company to partner with. 0:31 – An explanation of the Project Generator model and shows how reduces investor risk. 2:16 – An overview of Millrock’s partners which include both major mining companies and smaller miners. 5:10 – Greg explains why Millrock has chosen Alaska as our home base to explore. 5:52 – Overview of our current active projects in Alaska including an overview of the Tintina Gold Province. 7:28 – Greg provides a history of the Fairbanks Gold District and explains Millrock’s current projects in the district including Treasure Creek, Ester Dome, and 64North. 13:50 – Greg provides a high-level overview of all the upcoming catalysts Milrock has including work in Sonora state, Mexico. 15:10 – Greg answers questions from the audience.
It’s a great presentation, so please take a listen below.
Take care and enjoy the day.
Best regards,
Melanee Henderson, Manager of Investor Relations Millrock Resources Inc. | MRO.V | MLRKF.OTCQB Toll-Free: 877-217-8978 | Local: 604-638-3164