Categories
Base Metals Energy Junior Mining Precious Metals

Metallic Minerals Drills 1,540 g/t Ag Eq over 1.63 meters within 20.9 meters of 230 g/t Ag Eq at Keno Silver Project in Yukon, Canada

VANCOUVER, BC / ACCESSWIRE / January 30, 2023 / Metallic Minerals Corp. (TSX.V:MMG)(OTCQB:MMNGF) (“Metallic Minerals” or the “Company”) is pleased to announce additional results from the 2022 field program at the Keno Silver project in the historic Keno Hill silver district of the Yukon: Canada’s most important silver mining district. These results cover the West Keno area and represent the second in a series of results to be released from the Company’s 2022 exploration program, which included 3,265 meters (“m”) of diamond core drilling in 23 drill holes focused on expansion of advanced stage, “resource-ready” targets in anticipation of an inaugural NI 43-101 mineral resource estimate in 2023.

Exploration in 2022 at West Keno focused on drilling at the advanced-stage Formo target, which produced silver at various times since the 1930s from high-grade vein structures that graded over 1,000 g/t silver1. Formo is a significant inholding within the neighbouring Hecla Mining property and is on trend with the historic Hector-Calumet Mine, which produced nearly 100 million ounces of silver making it the largest individual mine in the district1.

2022 West Keno Exploration highlights

  • High-grade silver (“Ag”), lead (“Pb”) and zinc (“Zn”) mineralization was encountered in five of seven holes (See Table 1). Both high-grade Ag-Pb-Zn vein-style mineralization and broader zones of moderate grade Ag-Pb-Zn mineralization were encountered.
  • A total of 40 high-grade samples of over 100 g/t silver equivalent (“Ag Eq”) were intercepted in the 2022 West Keno drilling, including:
    • FOR22-01, 0.54 m @ 2,291 g/t Ag Eq (1,139 g/t Ag, 18.32% Pb, 14.79% Zn)
    • FOR22-02, 0.5 m @ 1,025.1 g/t Ag Eq (14 g/t Ag, 0.07% Pb, 23.36% Zn)
    • FOR22-04, 1.63 m @ 1,536.2 g/t Ag Eq (1,049.5 g/t Ag, 4.21% Pb, 9.45% Zn)
    • FOR22-04, 0.64 m @ 2,127.9 g/t Ag Eq (1,358 g/t Ag, 4.16% Pb, 16.42% Zn)
    • FOR22-05, 0.5 m @ 1,215.3 g/t Ag Eq (850 g/t Ag, 7.65% Pb, 3.97% Zn)
  • All five holes encountering significant silver mineralization in 2022 also intercepted broad bulk-tonnage zones averaging 26.2 m @ 85.6 g/t Ag Eq comprised of multiple high-grade vein intervals with associated stringers and stockwork veining.

Metallic Minerals President, Scott Petsel, stated, “Impressive drill results, year over year, have consistently demonstrated that Formo is one of Metallics’ highest-grade targets and have cemented it as a priority for a planned, near-term NI 43-101 resource estimate. The strategic location of the Formo deposit along the Silver Trail Highway provides easy access and adjacent electrical power and it is only two kilometers from the largest individual silver deposit in the district and less than five kilometers from both Hecla’s active mine development operations at Bermingham and the Keno operations mill at Keno City. This new step-out drilling continues to show that the deposit remains open to further testing along trend and down dip with room for significant expansion of the mineralized footprint and additional new discoveries. With these results complete we have initiated resource modelling work with SGS Geological Services on the Formo deposit.

“The Company expects to announce additional drill results from both the Keno Silver Project (primarily at the advanced-stage Caribou target), and from follow up expansion drilling at the La Plata Project over the coming weeks.”

Upcoming Events

Vancouver Resource Investment Conference – Metallic Minerals will be participating in the Vancouver Resource Investment Conference at the Yukon Pavilion on Monday January 30th. For more information, visit here.

GCFF Virtual Conference – Scott Petsel will be presenting during the GCFF Metals Investing Virtual Conference on February 23rd at 10am PT | 1pm ET. To register, click here.

OTC Markets Battery & Precious Metals Virtual Investor Conference – Metallic will be participating in the upcoming OTC Markets Battery & Precious Metals Investor Conference on Wednesday, February 15 at 10am PT | 1pm ET. To register, click here.

2023 Prospectors and Developers Convention (PDAC) – Booth, Presentation & YMA Core Shack

Metallic Minerals will be attending PDAC 2023 in Booth IE3024. Additionally, President Scott Petsel will be providing a corporate presentation at a Forum for Investors during the 2023 Prospectors and Developers convention in Toronto Monday March 6th in the silver-focused session, Room 803, between 10:00 am and 12:00 pm at the Metro Toronto Convention Center. For more information, visit here.

Figure 1. Keno Silver District Geology and Deposits

Metallic Minerals Corp., Monday, January 30, 2023, Press release picture
Metallic Minerals Corp., Monday, January 30, 2023, Press release picture

West Keno 2022 Drilling Program

Drilling at West Keno focused on the advanced-stage “resource-ready” Formo target area. A total of seven holes were completed over 1,145.6 meters on known projections of mineralization with the goal of expanding the potential resource footprint of the deposit in anticipation of an inaugural 43-101 mineral resource estimate in 2023. Previous drilling has recognized at least three separate parallel high-grade Ag-Pb-Zn vein structures and results of the 2022 drilling continue to demonstrate multiple vein zones in each hole with individual grades commonly more than 1,000 g/t Ag Eq (See Table 1). The Formo target represents one of the highest-grade areas drilled to date on Metallic’s Keno Silver Property with 4.1 m of 2,536 g/t Ag Eq (FOR20-03) and 1 m of 2,961.6 g/t Ag Eq (FOR21-06) as examples of drill results from previous years efforts.

Table 1 – Highlights of 2022 Drill Results from the West Keno – Formo Target Area

DDH Hole IDFrom (m)To (m)Length (m)Ag Eq (g/t)Ag (g/t)Au (g/t)Pb (%)Zn (%)
FOR22-0172.3103.9531.6586.541.10.010.540.70
incl72.372.80.5496.43490.003.701.17
And incl97.3103.956.65324.6148.40.022.072.73
And incl98.899.340.54229111390.0618.3214.79
FOR22-0291119.228.269.811.60.020.111.25
incl91105.514.512317.10.010.162.34
And incl91921744.4740.020.3115.35
And incl95.395.80.51,025.1140.010.0723.36
FOR22-0377814154.293.60.010.830.90
incl7777.810.81489.63860.003.540.31
and125141.616.666.4360.010.370.45
incl126.81347.2107.858.40.000.650.74
FOR22-04125.1314620.87228.8144.60.010.701.59
incl126.75127.50.71,168.53450.073.5216.81
And incl137.61446.4557.7395.90.021.652.99
And incl141.81143.441.631,536.21,049.50.114.219.45
And incl142.8143.440.642,127.91,3580.004.1616.42
FOR22-0560.961.620.72293.53.53.340.010.10
and131.5164.9533.4567.942.10.050.370.28
incl1471514283195.30.001.810.96
And incl148.8149.30.51,215.38500.007.653.97
And incl164.45164.950.52801.93.250.000.00
FOR22-0675.777.151.4541.821.30.010.440.17
and131.52132.070.5542.815.30.020.120.53
FOR22-0793.493.90.544.922.30.010.200.39
and123.45124.040.5943.831.10.000.210.18

Notes to reported values:

  1. Ag equivalent is presented for comparative purposes using conservative long-term metal prices (all USD): $20.0/oz silver (Ag), $1.00/lb lead (Pb), $1.40/lb zinc (Zn).
  2. Rcovered Silver Equivalent in Table 1 is determined as follows: Ag Eq g/t = [Ag g/t x recovery] + [Au g/t x recovery x Au price/ Ag price] + [Pb % x 10,000 x recovery x Pb price / Ag price] + [Zn% x 10,000 x recovery x Zn price / Ag price].
  3. In the above calculations: 1% = 10,000 ppm = 10,000 g/t.
  4. The following recoveries have been assumed for purposes of the above equivalent calculations: 95% for precious metals (Ag/Au) and 90% for all other listed metals, based on recoveries at similar nearby operations.
  5. Intervals are reported as measured drill intersect lengths and may not represent true width.

West Keno and the Formo Area Target

The Western Keno Hill district is host to the largest historic production and current resources in the prolific Keno Hill silver district. The Formo target is located at the intersection of a north-easterly structural zone extending from the Hector-Calumet mine, which was the largest producer in the district producing nearly 100 million ounces of silver and the Elsa structural trend, which was the second largest silver producer in the district (see Figure 2).

The Formo property, which include the Formo Mine, also known as the Yukeno Mine, was acquired by Metallic Minerals in 2017. The historic Formo mine produced high-grade silver at various times since the 1930s from high-grade vein structures that graded over 1,000 g/t silver1. Significant underground exploration drifts were developed in the 1950s with most of the historic production from an open pit located alongside of the Silver Trail highway between the Elsa townsite and Keno City and last mined in the 1980s.

Figure 2 – West Keno Plan Map

Metallic Minerals Corp., Monday, January 30, 2023, Press release picture
Metallic Minerals Corp., Monday, January 30, 2023, Press release picture

Figure 3 – Formo Vein Long Section (looking NW)

Metallic Minerals Corp., Monday, January 30, 2023, Press release picture
Metallic Minerals Corp., Monday, January 30, 2023, Press release picture

The primary Formo vein structure is exposed at surface in an open cut. Multiple veins have been encountered in the target area that demonstrate an association with Triassic greenstones in the Earn group schist, similar to the Sadie Ladue deposit which produced 12.7 Moz silver at a grade of 1,620 g/t Ag1. In addition to the mineralization at the known Formo deposit, two new surface targets have been identified through soil and rock sampling along the same structural corridors that show potential to host high-grade and bulk tonnage Keno-style Ag-Pb-Zn veins on the Formo property.

Since 2020 Metallic Minerals has drilled 22 holes (3,306.9 m) at the Formo Target to compliment the six core holes and 54 percussion holes drilled by previous owners between 1980 and 1981. The Formo Target is open to significant expansion opportunities and is poised to lead the Company’s efforts to establish resources on the Keno Silver Project.

Grant of Long-Term Performance Incentives

Metallic Minerals further announces that, subject to the approval of the TSX Venture Exchange, it has granted 1,490,000 stock options (each, an “Option”) to certain directors, officers and employees of the Company in accordance with the Company’s Long-Term Performance Incentive Plan. Each Option is exercisable into one common share in the capital of the Company (“Share”) at a price of $0.23 per share, being the closing price of the Shares on the TSX Venture Exchange on January 27, 2023, for a period of five years from the date of grant. The Options are subject to certain vesting requirements in accordance with the shareholder approved plan.

About Metallic Minerals

Metallic Minerals Corp. is a leading exploration and development stage company, focused on silver and gold in the high-grade Keno Hill and Klondike districts of the Yukon, and copper, silver and critical minerals in the La Plata mining district in Colorado. Our objective is to create shareholder value through a systematic, entrepreneurial approach to making exploration discoveries, growing resources and advancing projects toward development. Metallic Minerals has consolidated the second-largest land position in the historic Keno Hill silver district of Canada’s Yukon Territory, directly adjacent to Hecla Mining’s operations, with more than 300 million ounces of high-grade silver in past production and current M&I resources. Hecla Mining Company, the largest primary silver producer in the USA and third largest in the world, completed the acquisition of Alexco Resources and their Keno Hill operations in September 2022. Metallic Minerals is also one of the largest holders of alluvial gold claims in the Yukon and is building a production royalty business by partnering with experienced mining operators. At the Company’s La Plata project in southwestern Colorado an inaugural NI 43-101 mineral resource estimate in April 2022 returned a significant porphyry copper-silver resource with results from the 2022 expansion drill program pending. All of the districts in which Metallic Minerals operates have seen significant mineral production and have existing infrastructure, including power and road access. Metallic Minerals is led by a team with a track record of discovery and exploration success on several major precious and base metal deposits in the region, as well as having large-scale development, permitting and project financing expertise. The Metallic Minerals team has been recognized for its environmental stewardship practices and is committed to responsible and sustainable resource development.

Footnotes:

  1. Cathro, R. J., Great Mining Camps of Canada 1. The History and Geology of the Keno Hill Silver Camp, Yukon Territory. Geoscience Canada, Sept. 2006. ISSN 1911-4850.

FOR FURTHER INFORMATION, PLEASE CONTACT:

Website: www.mmgsilver.com Phone: 604-629-7800

Email: cackerman@mmgsilver.com Toll Free: 1-888-570-4420

Qualified Person

The disclosure in this news release of scientific and technical information regarding exploration projects on Metallic Minerals’ mineral properties has been reviewed and approved by Debbie James, Senior Geologist for TruePoint Exploration, who is a Qualified Person as defined by National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”).

Quality Assurance / Quality Control

All samples were assayed by 36 Element Aqua Regia Digestion ICP-MS methods at Bureau Veritas labs in Vancouver with sample preparation in Whitehorse, Yukon and geochemical analysis in Vancouver, British Columbia. Samples with over limit silver and gold were re-analyzed using a 30-gram fire assay fusion with a gravimetric finish. Over-limit lead and zinc samples were analyzed by multi-acid digestion and atomic absorption spectrometry. All results have passed the QAQC screening by the lab and the company utilized a quality control and quality assurance protocol for the project, including blank, duplicate, and standard reference samples.

Forward-Looking Statements

This news release includes certain statements that may be deemed “forward-looking statements”. All statements in this release, other than statements of historical facts including, without limitation, statements regarding potential mineralization, historic production, estimation of mineral resources, the realization of mineral resource estimates, interpretation of prior exploration and potential exploration results, the timing and success of exploration activities generally, the timing and results of future resource estimates, permitting time lines, metal prices and currency exchange rates, availability of capital, government regulation of exploration operations, environmental risks, reclamation, title, statements about expected results of operations, royalties, cash flows, financial position and future dividends as well as financial position, prospects, and future plans and objectives of the Company are forward-looking statements that involve various risks and uncertainties. Although Metallic Minerals believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in the forward-looking statements. Forward-looking statements are based on a number of material factors and assumptions. Factors that could cause actual results to differ materially from those in forward-looking statements include failure to obtain necessary approvals, unsuccessful exploration results, unsuccessrul operations, changes in project parameters as plans continue to be refined, results of future resource estimates, future metal prices, availability of capital and financing on acceptable terms, general economic, market or business conditions, risks associated with regulatory changes, defects in title, availability of personnel, materials and equipment on a timely basis, accidents or equipment breakdowns, uninsured risks, delays in receiving government approvals, unanticipated environmental impacts on operations and costs to remedy same and other exploration or other risks detailed herein and from time to time in the filings made by the Company with securities regulators. Readers are cautioned that mineral resources that are not mineral reserves do not have demonstrated economic viability. Mineral exploration, development of mines and mining operations is an inherently risky business. Accordingly, the actual events may differ materially from those projected in the forward-looking statements. For more information on Metallic Minerals and the risks and challenges of their businesses, investors should review their annual filings that are available at www.sedar.com.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

SOURCE: Metallic Minerals Corp.

Categories
Base Metals Exclusive Interviews Junior Mining Precious Metals

Goldshore Resources – Potential Tier 1 Gold Deposit + Battery Metals

Flagship Project: The Moss Lake Property located in Ontario, Canada has 1.47 M oz of Indicated and 2.51 M oz of Inferred historical gold resources, along with a robust Preliminary Economic Assessment conducted in 2020.

Goldshore Resources – (TSX.V: GSHR | OTCQB: GSHRF)
CEO: Brett Richards
Website: https://goldshoreresources.com/
3D Deck: https://goldshoreresources.com/investors/#corporate-presentation
Company Filings: https://www.sedar.com/DisplayCompanyDocuments.do?lang=EN&issuerNo=00030293

The Best Video on Why and When to Buy and Sell Physical Precious Metals:

This image has an empty alt attribute; its file name is BitcoinSidebar.png.pagespeed.ce.6z1FEqVkO4.png

I’m a licensed broker for Miles Franklin Precious Metals InvestmentsThe Only Online Dealer that is Licensed and Bonded Period! Where we provide unlimited options to expand your precious metals portfolio, from:

Websitewww.provenandprobable.com
Call Me |855.505.1900 or email: Maurice@MilesFranklin.com
Precious Metals FAQ – https://www.milesfranklin.com/faq-maurice/

Categories
Base Metals Breaking Energy Junior Mining Precious Metals Uncategorized

Stillwater Critical Minerals Expands Resource 62% to 1.6 Blbs Battery Metals and 3.8 Moz PGE+Gold at Stillwater West Project in Montana, USA

VANCOUVER, BC / ACCESSWIRE / January 25, 2023 / Stillwater Critical Minerals (TSX.V:PGE)(OTCQB:PGEZF)(FSE:5D32) (the “Company” or “SWCM”) is pleased to report a 62% increase in the updated independent National Instrument 43-101 (“NI 43-101”) mineral resource estimate (the “2023 Resource”) for its 100%-owned Stillwater West platinum group element, nickel, copper, cobalt, and gold (“PGE-Ni-Cu-Co + Au”) project in Montana, USA. The study, which was completed by SGS Geological Services (“SGS”), showed significant increases in tonnage and contained metal at both a bulk tonnage 0.20% nickel equivalent (“NiEq”) cut-off (“Base Case”) and a 0.35% NiEq higher grade bulk tonnage cut-off. A high-grade, selective mining component at a 0.70% NiEq cut-off is presented for the first time.

The Company will host a live webcast on January 31, 2023, at 10am PT | 1pm ET to discuss the Stillwater West project and the 2023 Resource. To register, click here.

2023 Resource Highlights

  • Base Case Inferred mineral resources of 1.6 billion pounds (“Blbs”) of nickel, copper and cobalt and 3.8 million ounces (“Moz”) palladium, platinum, rhodium, and gold (“4E”) in a constrained model totaling 255 million tonnes (“Mt”) at an average grade of 0.39% total estimated recovered NiEq (or 1.19 g/t Palladium Equivalent “PdEq”). See detailed breakdown in Tables 1 and 2, below.
  • Significant increases in contained metals over the 2021 study at the Base Case 0.20% NiEq cut-off:
Tonnage: 255Mt (62% increase)Palladium: 2.05Moz (56% increase)
Nickel: 1.05Blbs (52% increase)Platinum: 1.26Moz (66% increase)
Copper: 499Mlbs (44% increase)Gold: 395Koz (30% increase)
Cobalt: 91Mlbs (31% increase)Rhodium: 115Koz (76% increase)
  • The selective mining high-grade component yielded 11.6Mt at 1.05% Total NiEq (or 3.24 g/t Total PdEq) as 0.56% Ni, 0.33% Cu, 0.03% Co with 0.54 g/t Pd, 0.27 g/t Pt, 0.15 g/t Au and 0.019 g/t Rh. Expansion of this high-grade component results from the addition of high-grade mineralization encountered in the 2021 drill campaign.
  • Sulphur grades of 1.13% to 6.16% indicate desirable high nickel tenor in sulphide, supporting effective recovery via conventional flotation techniques.
  • 2.27Blbs of chromium has been inventoried. Chromium is defined by the US government as a critical mineral.
  • Deposits in the 2023 Resource are defined by 156 drill holes from a total of 230 holes drilled on the Stillwater West property and include all holes from the Company’s three campaigns to date.
  • The 2023 Resource is contained within five deposits in the 9-kilometer central area of the project, all of which are open along strike and at depth. Multi-kilometer scale geophysical targets (Figure 1) and metal-in-soil anomalies indicate excellent expansion potential (Figures 2 to 4). Untested anomalies and earlier stage targets extend across much of the 32-kilometer-long Stillwater West project.

An NI 43-101-compliant technical report on the 2023 Resource for the Stillwater West project will be filed on Sedar.com within 45 days.

Michael Rowley, President and CEO stated, “We are very pleased with the expanded 2023 resource, which returned substantial increases in tonnage and contained metals while also increasing the high-grade component. Overall, these increases speak to the fantastic growth potential and under-explored nature of the Stillwater West project, and to our ability to rapidly increase resources in these wide-open deposits with targeted expansion drilling at low discovery costs. Our Stillwater West project, with its world-class endowment of eight critical minerals, is unique in the United States as a district-scale asset located in an active, producing district that has a long history of large-scale critical mineral production. The US government has recognized the importance of critical minerals to both economic and national security interests and is taking increasing action to secure domestic supply of these key metals at a time when we are advancing Stillwater West and demonstrating its potential. Our exceptional team, with multi-decades of experience at both Stillwater and in the parallel layered geology of the Bushveld Igneous Complex, is well-positioned to advance the asset. We look forward to continuing to build on our success and low discovery costs as we finalize our follow up expansion programs for 2023.”

Dr. Danie Grobler, Vice-President of Exploration, commented, “The 2022 field season, with a renewed focus on geology and structure, has contributed to the understanding of the multi-target geometry and mineralization controls within the Ultramafic Series of the Stillwater Complex, as an analogue to the Platreef of the Bushveld Complex. Our advanced understanding of Platreef-style mineralization and ore mineralogy, and our collaboration with Professor Wolfgang Maier at Cardiff University United Kingdom, as well as key staff at the US Geological Survey, has increased our confidence in the stratigraphic and structural models guiding resource estimation. Enhanced continuity and a significant tonnage increase, as well as increased medium and higher-grade categories, is a direct result of this effort. Our 2023 exploration programs will be focused on expansion of these thick zones of mineralized pegmatoidal pyroxenite/peridotite and associated chromites, as well as broad zones of massive to net-textured sulphides near the base of the layered sequence. We are seeing similar metal distribution characteristics when compared to the Platreef, as well as sulfur contents in relation to distance from the footwall contact. Our direct application of the detailed controls to mineralization in the Platreef-style models is guiding us along an exciting path of discovery.”

TABLE 1 – Grade and Contained Metal at Various NiEq Cut-off Grades

Stillwater Critical Minerals, Wednesday, January 25, 2023, Press release picture
Stillwater Critical Minerals, Wednesday, January 25, 2023, Press release picture
Stillwater Critical Minerals, Wednesday, January 25, 2023, Press release picture
Stillwater Critical Minerals, Wednesday, January 25, 2023, Press release picture

Stillwater West Inferred Mineral Resource Estimate, January 20, 2023

Notes: 1) In-Pit Inferred Mineral Resources are reported at a base case cut-off grade of 0.20% NiEq. Values in this table reported above and below the cut-off grades are only presented to show the sensitivity of the block model estimates to the selection of cut-off grade. Equivalent grade and contained metal calculations do not include Rhodium values; 2) All figures are rounded to reflect the relative accuracy of the estimate. Totals may not add or calculate exactly due to rounding.

TABLE 2 – BASE CASE – Grade and Contained Metal by Deposit at 0.20% NiEq Cut-Off (Equals 0.62 g/t PdEq) Stillwater West 2023 Inferred Mineral Resource Estimate, January 20, 2023

Stillwater Critical Minerals, Wednesday, January 25, 2023, Press release picture
Stillwater Critical Minerals, Wednesday, January 25, 2023, Press release picture
Stillwater Critical Minerals, Wednesday, January 25, 2023, Press release picture
Stillwater Critical Minerals, Wednesday, January 25, 2023, Press release picture

Notes: 1) No assays shown as – ; 2) equivalent contained metal and grades do not include Rh. See additional notes on page 4.

2023 Exploration Planning

The Company is finalizing 2023 exploration plans with work expected to include extension of the highly effective geophysical surveys and completion of expansion drilling, focused on large, thick zones of mineralized pegmatoidal pyroxenite and peridotite within the resource areas. These zones show direct parallels to the thick Flatreef-style mineralized zones discovered in recent years by Ivanhoe Mines on the Platreef. A second focus for drilling will be to expand on the nickel-rich massive sulphide zones, as well as the very high-grade gold-PGE mineralization within structurally controlled zones.

Metallurgy

Preliminary metallurgical assessments by SWCM returned strong nickel tenor in sulphides drilled by the Company to date. In addition, favorable historic bench-scale metallurgical results completed historically by AMAX at the Iron Mountain target area demonstrate the potential for effective nickel and copper sulphide flotation and PGE recovery. Sample collection for more detailed metallurgical testing is on-going as part of the expanding development of Stillwater West, with a view to including full metallurgical assessment in future studies.

Carbon Capture at Stillwater West

All five deposits in the 2023 Resource contain desirable nickel sulphide mineralization that has been shown to require a much lower environmental footprint in subsequent processing to nickel metal or nickel sulphate in comparison to the laterite nickel ores that dominate global production. As part of SWCM’s commitment to global sustainability initiatives, the Company is also examining the potential for large-scale carbon sequestration with the objective of further reducing and possibly eliminating the carbon footprint of a potential mining operation at Stillwater West.

Preliminary results demonstrate the presence of certain ultramafic minerals that are known to have high capacity to bind carbon dioxide by a natural process known as mineral carbonation. As announced in a news release on September 23, 2021, the Company is continuing its research with Dr. Greg Dipple and his team at ARCA (formerly based at the University of British Columbia, Canada), to assess the capacity of rock samples from Stillwater West to bind carbon dioxide for permanent disposal as part of a potential mining operation. The Company has partnered with Cornell University for more active carbon sequestration methods, as well as hydrometallurgical processing.

This work strongly aligns with SWCM’s Environmental, Social and Governance guidelines and principles, and the incorporation of carbon uptake may bring financial benefits via initiatives such as the 45Q Tax Credit for Carbon Oxide Sequestration that is now in place in the US.

About Stillwater West

Stillwater Critical Minerals is rapidly advancing the Stillwater West PGE-Ni-Cu-Co + Au project towards becoming a world-class source of low-carbon, sulphide-hosted nickel, copper, and cobalt, critical to the electrification movement, as well as key catalytic metals including platinum, palladium and rhodium used in catalytic converters, fuel cells, and the production of green hydrogen. Stillwater West positions SWCM as the second-largest landholder in the Stillwater Complex, with a 100%-owned position adjoining and adjacent to Sibanye-Stillwater’s operating PGE mines in south-central Montana, USA1. The Stillwater Complex is recognized as one of the top regions in the world for PGE-Ni-Cu-Co mineralization, alongside the Bushveld Complex and Great Dyke in southern Africa, which are similar layered intrusions. The J-M Reef, and other PGE-enriched sulphide horizons in the Stillwater Complex, share many similarities with the highly prolific Merensky and UG2 Reefs in the Bushveld Complex. SWCM’s work in the lower Stillwater Complex has demonstrated the presence of large-scale disseminated and high-sulphide battery metals and PGE mineralization, similar to the Platreef in the Bushveld Complex2. Drill campaigns by the Company, complemented by a substantial historic drill database, have delineated five deposits of Platreef-style mineralization across a core 12-kilometer span of the project, all of which are open for expansion into adjacent targets. Multiple earlier-stage Platreef-style and reef-type targets are also being advanced across the remainder of the 32-kilometer length of the project based on strong correlations seen in soil and rock geochemistry, geophysical surveys, geologic mapping, and drilling.

About Stillwater Critical Minerals Corp.

Stillwater Critical Minerals (TSX.V: PGE | OTCQB: PGEZF) is a mineral exploration company focused on its flagship Stillwater West PGE-Ni-Cu-Co + Au project in the iconic and famously productive Stillwater mining district in Montana, USA. With the recent addition of two renowned Bushveld and Platreef geologists to the team, the Company is well positioned to advance the next phase of large-scale critical mineral supply from this world-class American district, building on past production of nickel, copper, and chromium, and the on-going production of platinum group and other metals by neighboring Sibanye-Stillwater. The Platreef-style nickel and copper sulphide deposits at Stillwater West contain a compelling suite of critical minerals and are open for expansion along trend and at depth, with an updated NI 43-101 mineral resource update announced in January 2023.

Stillwater Critical Minerals’ Black Lake-Drayton Gold project adjacent to Treasury Metals’ development-stage Goliath Gold Complex in northwest Ontario is currently under an earn-in agreement with Heritage Mining and the Company also holds the Kluane PGE-Ni-Cu-Co project on trend in Canada‘s Yukon Territory.

Note 1: References to adjoining properties are for illustrative purposes only and are not necessarily indicative of the exploration potential, extent or nature of mineralization or potential future results of the Company’s projects.

Note 2: Magmatic Ore Deposits in Layered Intrusions-Descriptive Model for Reef-Type PGE and Contact-Type Cu-Ni-PGE Deposits, Michael Zientek, USGS Open-File Report 2012-1010.

FOR FURTHER INFORMATION, PLEASE CONTACT:

Michael Rowley, President, CEO & Director
Email: info@criticalminerals.com Phone: (604) 357 4790
Web: http://criticalminerals.com Toll Free: (888) 432 0075

Resource estimate notes for Tables 1 and 2:

  1. The classification of the current Mineral Resource Estimate into Inferred is consistent with current 2014 CIM Definition Standards – For Mineral Resources and Mineral Reserves.
  2. All figures are rounded to reflect the relative accuracy of the estimate. Totals may not add or calculate exactly due to rounding.
  3. All Resources are presented undiluted and in situ, constrained by continuous 3D wireframe models, and are considered to have reasonable prospects for eventual economic extraction.
  4. Mineral resources which are not mineral reserves do not have demonstrated economic viability. An Inferred Mineral Resource has a lower level of confidence than that applying to an Indicated Mineral Resource and must not be converted to a Mineral Reserve. It is reasonably expected that the majority of Inferred Mineral Resources could be upgraded to Indicated Mineral Resources with continued exploration.
  5. The update MRE is based on data for 156 surface drill holes representing 29,392 m of drilling, including data for 14 surface drill holes for 5,143 m completed by Stillwater in 2021.
  6. The mineral resource estimate is based on 6 three-dimensional (“3D”) resource models representing the Chrome Mountain (Hybrid and DR), Camp, HGR, Central and Crescent Zones.
  7. Composites of 1.2 to 3.0 m have been capped where appropriate.
  8. Fixed specific gravity values of 2.90 – 3.10 g/cm3 (depending on deposit) were used to estimate the Mineral Resource tonnage from block model volumes (% block model). Waste in all areas was given a fixed density of 2.9 g/cm3.
  9. Cu, Ni, Co, Pt, Pd, Au and Cr are estimated for each mineralized zone; S and Rh for the majority of the zones. Blocks (5x5x5) within each resource model were interpolated using 1.2 to 3.0 m capped composites assigned to that resource model. To generate grade within the blocks, the inverse distance squared (ID2) interpolation method was used for all domains.
  10. Based on a review of the project location, size, geometry, continuity of mineralization and proximity to surface of the Deposits, and spatial distribution of the five main deposits of interest (all within a 8.7 km strike length), it is envisioned that the Deposits may be mined by open pit.
  11. In-pit Mineral Resources are reported at a base case cut-off grade of 0.20% NiEq. Pit optimization and Cut-off grades are based on metal prices of $9.00/lb Ni, $3.75/lb Cu, $24.00/lb Co, $1,000/oz Pt, $2,000/oz Pd and $1,800/oz Au, assumed metal recoveries of 80% for Ni, 85% for copper, 80% for Co, Pt, Pd and Au, a mining cost of US$2.50/t rock and processing and G&A cost of US$18.00/t mineralized material.
  12. The in-pit Mineral Resource grade blocks were quantified above the base case cut-off grade. At this base case cut-off grade the deposits show excellent geologic and grade continuity. The project is at an early stage of exploration and all deposits are open along strike and down dip. The cut-off grades should be re-evaluated in light of future prevailing market conditions (metal prices, exchange rates, mining costs etc.).
  13. The results from the pit optimization are used solely for the purpose of testing the “reasonable prospects for economic extraction” by an open pit and do not represent an attempt to estimate mineral reserves. There are no mineral reserves on the Property. The results are used as a guide to assist in the preparation of a Mineral Resource statement and to select an appropriate resource reporting cut-off grade. Pit optimization does not represent an economic study.
  14. The estimate of Mineral Resources may be materially affected by environmental, permitting, legal, title, taxation, socio-political, marketing, or other relevant issues.
  15. The Author is not aware of any known mining, processing, metallurgical, environmental, infrastructure, economic, permitting, legal, title, taxation, socio-political, or marketing issues, or any other relevant factors not reported in this technical report, that could materially affect the current Mineral Resource Estimate.

Qualified Person

The Stillwater West PGE-Ni-Cu-Co + Au project 2023 Resource estimate was prepared by Allan Armitage, Ph.D., P.Geo., of SGS Geological Services, an independent Qualified Person, in accordance with the guidelines of the Canadian Securities Administrators’ National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”) with an effective date of January 20, 2023. Armitage conducted a recent site visit to the property on June 29 and 30, 2022. Mr. Armitage reviewed and approved the technical content of this news release with respect to the 2023 Resource estimate.

Mr. Mike Ostenson, P.Geo., is the Qualified Person for the purposes of National Instrument 43-101, and he has reviewed and approved the technical disclosure outside of the 2023 Resource estimate that is contained in this news release.

Forward-Looking Statements

Forward Looking Statements: This news release includes certain statements that may be deemed “forward-looking statements”. All statements in this release, other than statements of historical facts including, without limitation, statements regarding potential mineralization, historic production, estimation of mineral resources, the realization of mineral resource estimates, interpretation of prior exploration and potential exploration results, the timing and success of exploration activities generally, the timing and results of future resource estimates, permitting time lines, metal prices and currency exchange rates, availability of capital, government regulation of exploration operations, environmental risks, reclamation, title, and future plans and objectives of the company are forward-looking statements that involve various risks and uncertainties. Although Stillwater Critical Minerals believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in the forward-looking statements. Forward-looking statements are based on a number of material factors and assumptions. Factors that could cause actual results to differ materially from those in forward-looking statements include failure to obtain necessary approvals, unsuccessful exploration results, changes in project parameters as plans continue to be refined, results of future resource estimates, future metal prices, availability of capital and financing on acceptable terms, general economic, market or business conditions, risks associated with regulatory changes, defects in title, availability of personnel, materials and equipment on a timely basis, accidents or equipment breakdowns, uninsured risks, delays in receiving government approvals, unanticipated environmental impacts on operations and costs to remedy same, and other exploration or other risks detailed herein and from time to time in the filings made by the companies with securities regulators. Readers are cautioned that mineral resources that are not mineral reserves do not have demonstrated economic viability. Mineral exploration and development of mines is an inherently risky business. Accordingly, the actual events may differ materially from those projected in the forward-looking statements. For more information on Stillwater Critical Minerals and the risks and challenges of their businesses, investors should review their annual filings that are available at www.sedar.com.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Stillwater Critical Minerals, Wednesday, January 25, 2023, Press release picture
Stillwater Critical Minerals, Wednesday, January 25, 2023, Press release picture

Figure 1 2023 DEPOSIT MODELS WITH SELECT DRILL RESULTS OVER 3D INDUCED POLARIZATION (IP) GEOPHYSICAL SURVEY RESULTS

Stillwater Critical Minerals, Wednesday, January 25, 2023, Press release picture
Stillwater Critical Minerals, Wednesday, January 25, 2023, Press release picture

Figure 2 2023 DEPOSIT OUTLINES WITH DRILL DATA OVER PRECIOUS AND BASE METALS IN SOILS

Stillwater Critical Minerals, Wednesday, January 25, 2023, Press release picture
Stillwater Critical Minerals, Wednesday, January 25, 2023, Press release picture

Figure 3 2023 DEPOSIT OUTLINES WITH DRILL DATA OVER GEOPHYSICS (CONDUCTIVITY)

Stillwater Critical Minerals, Wednesday, January 25, 2023, Press release picture
Stillwater Critical Minerals, Wednesday, January 25, 2023, Press release picture

Figure 4 14 TARGET AREAS ACROSS MAIN CLAIM BLOCK INCLUDING PICKET PIN (UPDATED JANUARY 2023)

SOURCE: Stillwater Critical Minerals

Categories
Base Metals Energy Junior Mining

Rover Metals Provides Jurisdictional News for Western Nevada Lithium

Rover Metals Corp.
Rover Metals Corp.

VANCOUVER, British Columbia, Jan. 23, 2023 (GLOBE NEWSWIRE) — Rover Metals Corp. (TSXV: ROVR) (OTCQB: ROVMF) (FSE:4XO) (“Rover” or the “Company”) reports on the progress being made in claystone lithium mining in southwest Nevada.

Southwest Nevada Claystone Jurisdiction
In the past six months, both Cypress Development Corp. (Sep-2022) and American Lithium Corporation (Jan-2023) have reported on the recovery of battery grade lithium carbonate from their respective claystone lithium projects in southwest Nevada. See the link to the jurisdictional map below. Cypress Development owns the Clayton Valley project, and American Lithium owns the TLC project. Additionally, on January 16, 2023, feasibility-stage Ioneer Ltd. announced the finalization of a conditional commitment for a proposed loan of USD700 million from the U.S. Department of Energy Lian Programs Office.

Jurisdictional Map
https://rovermetals.com/lgllocation

Judson Culter, CEO at Rover Metals, states “claystone lithium mining continues to disrupt an industry that is trying to reinvent itself to become more environmentally friendly and sustainable. Mining of claystones uses less water than traditional brine lithium mining. The majority of the claystone lithium projects are also nearer to surface then hard rock lithium projects, and as a result, are less intrusive to underground ecosystems. Additionally, claystone operations require a more simplified mining circuit to process lithium as compared to hard rock operations. Innovations in claystone mining being made by later-stage companies like Cypress Development Corp. and American Lithium Corporation continue to decrease the cash cost per production tonne of Lithium Carbonate (Li2CO3). Cypress Development’s prefeasibility study (dated August 5, 2020 and amended March 15, 2021) for its Clayton Valley Project, NV, estimates the cash production per tonne of lithium to be approximately USD3.500 per tonne. Historic brine lithium mining operations typically have a cash cost per tonne of between USD2,500 – USD4,000 tonne1, putting Cypress Development’s claystone project will within industry standards.

Rover Metals’ Let’s Go Lithium project is an early stage comparable to both the TLC project and the Clayton Valley project. The claystone at LGL is at and near surface, extending to an average depth of approximately 100 meters. The LGL project is also located close to the historic Franklin Wells hectorite mine (see map link above) which has documented historic high-grade lithium production2. Exploration work done at LGL to date also logs the claystone body to be well above important underground ecosystems in the area. In H2 of 2022, Rover Metals reported on some very prospective surface grab samples from the LGL project. The Company’s next phase of exploration will be a maiden reverse circulation drill program at LGL, subject to permit approval from the Bureau of Land Management.

  1. Industry and public mining company reports.
  2. Gregg Wilkerson, Bureau of Land Management, Bakersfield, CA 93301; Larry Vredenburgh , Bureau of Land Management; Thomas J. Serenko , Southern Clay Products, Inc; Ted H. Eyde, Gadsden Sonora Holdings LLC

About Rover Metals
Rover is a publicly traded junior mining company that trades on the TSXV under symbol ROVR, on the OTCQB under symbol ROVMF, and on the FSE under symbol 4XO. Rover is currently focussed on the development of a claystone lithium project in southwest Nevada, USA. Plans for 2023 include a 1,200-meter reverse circulation drill program at the Let’s Go Lithium projectRover Metals is an attractive affordable early-stage lithium stock for investors wanting exposure to the sector.

The Company has a diverse portfolio of mining resource development projects with varying exploration timelines. Its critical mineral projects include lithium, zinc, and copper. Its precious metals projects include gold and silver. The Company is exclusive to the mining jurisdictions of Canada and the U.S.
You can follow Rover on its social media channels:
Twitter: https://twitter.com/rovermetals
LinkedIn: https://www.linkedin.com/company/rover-metals/
Facebook: https://www.facebook.com/RoverMetals/
for daily company updates and industry news, and
YouTube: https://www.youtube.com/channel/UCJsHsfag1GFyp4aLW5Ye-YQ?view_as=subscriber
for corporate videos.
Subscribe to our Newsletter on our Website: https://www.rovermetals.com/

ON BEHALF OF THE BOARD OF DIRECTORS
“Judson Culter”
Chief Executive Officer and Director

For further information, please contact:
Email: info@rovermetals.com
Phone: +1 (778) 754-2855

Statement Regarding Forward-Looking Information

This news release contains statements that constitute “forward-looking statements.” Such forward-looking statements involve known and unknown risks, uncertainties and other factors that may cause Rover’s actual results, performance or achievements, or developments in the industry to differ materially from the anticipated results, performance or achievements expressed or implied by such forward-looking statements. Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by the words “expects,” “plans,” “anticipates,” “believes,” “intends,” “estimates,” “projects,” “potential” and similar expressions, or that events or conditions “will,” “would,” “may,” “could” or “should” occur. There can be no assurance that such statements prove to be accurate. Actual results and future events could differ materially from those anticipated in such statements, and readers are cautioned not to place undue reliance on these forward-looking statements. Any factor could cause actual results to differ materially from Rover’s expectations. Rover undertakes no obligation to update these forward-looking statements in the event that management’s beliefs, estimates or opinions, or other factors, should change.

THE FORWARD-LOOKING INFORMATION CONTAINED IN THIS NEWS RELEASE REPRESENTS THE EXPECTATIONS OF THE COMPANY AS OF THE DATE OF THIS NEWS RELEASE AND, ACCORDINGLY, IS SUBJECT TO CHANGE AFTER SUCH DATE. READERS SHOULD NOT PLACE UNDUE IMPORTANCE ON FORWARD-LOOKING INFORMATION AND SHOULD NOT RELY UPON THIS INFORMATION AS OF ANY OTHER DATE. WHILE THE COMPANY MAY ELECT TO, IT DOES NOT UNDERTAKE TO UPDATE THIS INFORMATION AT ANY PARTICULAR TIME EXCEPT AS REQUIRED IN ACCORDANCE WITH APPLICABLE LAWS.

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OF THIS RELEASE.

Categories
Base Metals Energy Junior Mining Project Generators

Riverside Stakes the Duc Project in the Porcupine Mining District, Ontario

Vancouver, British Columbia–(Newsfile Corp. – January 23, 2023) – Riverside Resources Inc. (TSXV: RRI) (OTCQB: RVSDF) (FSE: 5YY) (“Riverside” or the “Company”), is pleased to announce it has staked additional claims in northwestern Ontario and acquired the Duc Project (“the Project”), located south of the town of Kapuskasing, part of the Porcupine Mining District. The Project is roughly 600 hectares in size and located west of the past producing Agrium Ltd. carbonatite phosphate mine, within the Wawa Subprovince, which hosts several rare earth element occurrences and orogenic gold deposits. Gold typically occurs in older folded rocks associated with larger northeast trending structures related to Kapuskasing Structural Zone (“KSZ”). The Wawa Subprovince is host to multi-million-ounce large gold mines that include Alamos Gold’s Island Gold Deposit and Argonaut’s Magino Gold Deposit amongst others.

Riverside’s President and CEO, John-Mark Staude stated: “We are excited to pick up more prospective ground in Ontario within the fertile Wawa Subprovince, which is host to many present and past producing mines in Ontario and Minnesota. Using the company’s prospect generator approach, experience in the belt and industry presence, we plan to add value to the Duc Project through additional exploration and joint-venture partner-funded programs.”

The Project area has excellent infrastructure, with road access from the Trans-Canada Highway and only 10km from the producing Agrium Ltd. Mine. The Project also has nearby existing power and within a 40-minute drive from the town of Kapuskasing (pop. 8,300). Interest in Ontario’s critical minerals sector has attracted new explorers to this region, which in our opinion can open this area further to development for the rare earth element potential, along with the known gold endowment.

The Project is underlain by an Archean-aged metavolcanic and metasedimentary suite consisting of greywacke, arkose, and iron formation similar to the rocks known to host both the carbonatite and gold deposits. To the west and north, the terrain is underlain by east-west striking metasedimentary schists and mafic metavolcanic flows belonging to the Quetico Subprovince. The south and east areas of the Project are underlain by hornblende-quartz feldspar gneiss and granite bodies belonging to the Wawa Subprovince. The Project also lies within the LePage Fault System. This system is part of the western margin of the KSZ and consists of a series of parallel northeast trending fault structures, which include the Rufus Lake and Opasatika Lake faults. Both faults cross the property and are easily identifiable on the regional government airborne magnetic survey sheets. Given the structural feeders and tectonic evolution the Company sees high prospectivity for discoveries of potential large bodies associated with dynamic tectonic- magmatic evolution.


Figure 1:Geology on regional airborne mag

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/6101/152129_0b54368a3429eb93_002full.jpg



Figure 2: Simplified Cross Section

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/6101/152129_0b54368a3429eb93_003full.jpg

The next phase of proposed exploration includes ground-based geophysics building upon previous work to further refine the larger structures likely responsible for gold mineralization in the area. Past work included sonic drilling and basal till sampling which may be needed in areas of thick cover.

Qualified Person & QA/QC:

The scientific and technical data contained in this news release was reviewed and approved by Freeman Smith, P.Geo, a non-independent qualified person to Riverside Resources, who is responsible for ensuring that the geologic information provided within this news release is accurate and who acts as a “qualified person” under National Instrument 43-101 Standards of Disclosure for Mineral Projects.

About Riverside Resources Inc.:

Riverside is a well-funded exploration company driven by value generation and discovery. The Company has over $8M in cash, no debt and less than 75M shares outstanding with a strong portfolio of gold-silver and copper assets and royalties in North America. Riverside has extensive experience and knowledge operating in Mexico and Canada and leverages its large database to generate a portfolio of prospective mineral properties. In addition to Riverside’s own exploration spending, the Company also strives to diversify risk by securing joint-venture and spin-out partnerships to advance multiple assets simultaneously and create more chances for discovery. Riverside has properties available for option, with information available on the Company’s website at www.rivres.com.

ON BEHALF OF RIVERSIDE RESOURCES INC.
“John-Mark Staude”

Dr. John-Mark Staude, President & CEO

For additional information contact:

John-Mark Staude
President, CEO
Riverside Resources Inc.
info@rivres.com
Phone: (778) 327-6671
Fax: (778) 327-6675
Web: www.rivres.com

Mehran Bagherzadeh
Corporate Communications
Riverside Resources Inc.
Mehran@rivres.com
Phone: (778) 327-6671
TF: (877) RIV-RES1
Web: www.rivres.com

Certain statements in this press release may be considered forward-looking information. These statements can be identified by the use of forward-looking terminology (e.g., “expect”,” estimates”, “intends”, “anticipates”, “believes”, “plans”). Such information involves known and unknown risks — including the availability of funds, the results of financing and exploration activities, the interpretation of exploration results and other geological data, or unanticipated costs and expenses and other risks identified by Riverside in its public securities filings that may cause actual events to differ materially from current expectations. Readers are cautioned not to place undue reliance on these forward-looking statements, which speak only as of the date of this press release.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/152129

Categories
Base Metals Energy Junior Mining Precious Metals

Mundoro Options to BHP Exploration Properties in Timok, Serbia

Vancouver, British Columbia–(Newsfile Corp. – January 23, 2023) – Mundoro Capital Inc. (TSXV: MUN) (www.mundoro.com) (“Mundoro” or the “Company“), announces it has entered into a definitive agreement with a wholly owned subsidiary of BHP Group Limited (“BHP“), which provides BHP with the right to earn-in to three (each, an “Option“) exploration areas that Mundoro holds in the Timok region (“Timok Properties“).

Ms. Teo Dechev, Chief Executive Officer, President and Director of Mundoro commented,Mundoro welcomes BHP as an exploration partner that recognizes the potential of further exploration in the western Tethyan Belt. We are looking forward to commencing field exploration at the Timok Properties in order to advance targeting and testing of undercover, and near surface, porphyry and related epithermal systems in the Timok region of eastern Serbia.”

Ms. Dechev added, “Mundoro has established a decade-long history of generative and early-stage exploration in Serbia and Bulgaria. Partner funded exploration programs along with Mundoro’s generative programs have invested over C$30 million of exploration expenditures which bring value to stakeholders in the communities where we operate, to our partners, and to our shareholders.”

Regional Setting

The porphyry copper projects under the Options with BHP are located in and around the Timok Magmatic Complex in Serbia. The Timok region is known as a mining district with more than 100 years of mining comprising approximately 4 billion tons in porphyry systems over 5 known mines. The Timok Magmatic Complex is host to the largest copper-gold porphyry deposits in the western portion of the Tethyan Belt such as (i) Cukaru-Peki, a high sulphidation epithermal copper-gold and porphyry copper deposit, (ii) Bor underground mine which is a copper-gold porphyry (“Bor Mining Complex”), (iii – iv) Veliki Krivelj and Majdanpek open-pit mines which are both copper-gold porphyries and (v) the recently re-opened Cerovo porphyry copper -gold open-pit mine (see Figure 1).

Dr. Richard Jemeilita, Chief Geologist at Mundoro commented: “The Timok Properties represent a district scale, attractive exploration package in this prospective mineral belt in Serbia. Our exploration team in the region has identified, in the South Timok Properties exploration area, extending south from the Timok Magmatic Complex, continuation of fertile geological units for further copper exploration. We are encouraged by the initial reconnaissance sampling which has identified anomalous copper zones.”

Follow our weekly updates on: LinkedIn and Twitter: @Mundoro



Figure 1 – Location Map for Timok Region, Serbia

To view an enhanced version of Figure 1, please visit:
https://images.newsfilecorp.com/files/2408/152060_caef5c79b404a95d_001full.jpg

Property Information

Borsko

The Borsko Jezero Project (“Borsko“) is located in the central portion of the Timok Magmatic Complex and aggregates an exploration area of 34.5 sqkm. The project is directly adjacent to and west of the producing Bor copper porphyry mine (see Figure 1). Exploration completed to date by Mundoro has identified several targets of which, Target 1 is an undercover preserved advanced argillic alteration lithocap covering an area approximately 1.6 km in strike length, discovered using a combination of geophysical techniques. The Target 1 system contains elevated copper-gold-arsenic geochemical results indicative of high sulphidation epithermal type mineralization with elevated copper at the bottom of the lithocap suggesting a porphyry source beyond the immediate drill tested area.

South Timok

An area that aggregates 213 sqkm, located at the southern end of the Timok Magmatic Complex and approximately 60 km south-southeast of Bor mining district in Central Timok. The northern parts of exploration ground is covered by Paleogene sediments interlayered with Paleogene pyroclastics, while the central area consists of Upper Cretaceous sediments and volcanics. To the east the area is almost entirely covered by Upper Cretaceous volcanics from the Timok Magmatic Complex. Hornblende andesite that intrudes the Upper Cretaceous sediments from both licenses are considered to have the potential for copper-gold porphyry and epithermal related systems. Several small-scale coal mines and old workings have been exploited by the state during the 1950’s in this area.

The southern portion of the exploration area comprises Cretaceous volcano-sedimentary lithologies intruded by late Cretaceous latite intrusions and partly overlain by Paleogene sediments. The volcanic-intrusive lithologies form part of the northwest-southeast L-shape-striking Cretaceous magmatic arc of Eastern Serbia. Mundoro started a stream sediment program over the favorable geological setting in the southern portion of the exploration area that yielded several drainage areas anomalous for gold, copper, lead and zinc within two outlined targets internally named Ponor North and Ponor South, respectively.

Trstenik

This exploration area covers an aggregate of 55 sqkm and lies within the northern portion of the Timok Magmatic Complex directly north of Majdanpek Mine Complex. To date, the systematic exploration work carried out by Mundoro in the exploration area has identified several target areas. Two of the targets at the southern end of the exploration area have similarities with the Majdanpek deposit in that the targets share similar geology, structural settings, and mineralisation – porphyry and skarn/massive sulphide replacement type and occur along strike of the main Timok trend.

Transaction Overview

Each of the three Options provides BHP with the right to earn a 100% interest in the relevant Timok Property by making (i) annual cash payments and operator payments (“Payments”) to Mundoro, with the aggregate amount of Payments for the three properties over three years amounting to approximately US$1,700,020, and (ii) incurring exploration expenditures within three years on the three properties amounting to US$7,500,000. The earn-in also includes an exploration expenditure commitment related to drilling by March 2023. BHP may exercise each Option independently or elect to extend each Option by one year by making additional Payments and incurring additional exploration expenditures. Upon exercise of each Option, Mundoro will retain a 2% net smelter return (“NSR”) royalty that includes development milestone payments for a total up to US$9,000,000 and annual cash payments until commercial production commences. Mundoro is appointed as the initial operator under the Options.

Qualified Person

The scientific and technical information in this news release was prepared under the supervision of, and approved by, T. Dechev, a Qualified Person as defined by NI 43-101, and the Company’s Chief Executive Officer and R. Jemielita, PhD, MIMMM, a Qualified Person as defined by NI 43-101 and Chief Geologist to the Company.

About Mundoro Capital Inc.

Mundoro is a publicly listed company on the TSX-V in Canada and OTCQB in the USA with a portfolio of mineral properties focused primarily on base and precious metals. To drive value for shareholders, Mundoro’s asset portfolio generates near-term cash payments to Mundoro from partners and creates royalties attached to each mineral property. The portfolio of mineral properties is currently focused on predominantly copper in two mineral districts: Western Tethyan Belt in Eastern Europe and the Laramide Belt in the southwest USA.

Caution Concerning Forward-Looking Statements

This News Release contains forward-looking statements. Forward-looking statements can be identified by the use of forward-looking words such as “will”, “expect”, “intend”, “plan”, “estimate”, “anticipate”, “believe” or “continue” or similar words or the negative thereof, and include the following: completion of earn-in expenditures, options and completion of a definitive agreement by the parties. The material assumptions that were applied in making the forward looking statements in this News Release include expectations as to the mineral potential of the Company’s projects, the Company’s future strategy and business plan and execution of the Company’s existing plans. We caution readers of this News Release not to place undue reliance on forward looking statements contained in this News Release, as there can be no assurance that they will occur and they are subject to a number of uncertainties and other factors that could cause actual results to differ materially from those expressed or implied by such forward-looking statements. These factors include general economic and market conditions, exploration results, commodity prices, changes in law, regulatory processes, the status of Mundoro’s assets and financial condition, actions of competitors and the ability to implement business strategies and pursue business opportunities. The forward-looking statements contained in this News Release are expressly qualified in their entirety by this cautionary statement. The forward-looking statements included in this News Release are made as of the date of this News Release and the Board undertakes no obligation to publicly update such forward-looking statements, except as required by law. Shareholders are cautioned that all forward-looking statements involve risks and uncertainties and for a more detailed discussion of such risks and other factors that could cause actual results to differ materially from those expressed or implied by such forward-looking statements, refer to the Company’s filings with the Canadian securities regulators available on www.sedar.com.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

For further information, please visit Mundoro Capital website www.mundoro.com

Teo Dechev, Chief Executive Officer, President and Director
+1-604-669-8055
info@mundoro.com

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/152060

Categories
Base Metals Energy

Rover Metals Reprices Stock Options Issued to Consultants and Reprices Previously Oustanding Warrants Issued to Shareholders

VANCOUVER, British Columbia, Jan. 20, 2023 (GLOBE NEWSWIRE) — Rover Metals Corp. (TSXV: ROVR) (OTCQB: ROVMF) (FSE:4XO) (“Rover” or the “Company”) announces that is has received approval from the Toronto Venture Exchange (the “TSXV”) to re-price issued and outstanding stock options granted to arm’s length consultants of the Company. Also, further to its news release of January 3, 2023, the Company has received approval from the TSXV to re-price and extend the lives of warrants issued under previous private placements.

Terms of the Stock Option Repricings
On a post-consolidation basis (see October 28, 2022 release), the Company has 208,332 stock options outstanding, with an exercise price of $0.36. The Company has amended the exercise price to $0.15 per option share.

On a post-consolidation basis, the Company has 58,333 stock options outstanding, with an exercise price of $0.39. The Company has amended the exercise price to $0.15 per option share.

On a post-consolidation basis, the Company has 50,000 stock options outstanding, with an exercise price of $0.45. The Company has amended the exercise price to $0.15 per option share.

On a post-consolidation basis, the Company has 29,166 stock options outstanding, with an exercise price of $0.72. The Company has amended the exercise price to $0.15 per option share.

On a post-consolidation basis, the Company has 8,733 stock options outstanding, with an exercise price of $0.90. The Company has amended the exercise price to $0.15 per option share.

A total of 354,564 outstanding stock options have had their exercises prices amended to $0.15 per warrant share.

Warrant Repricings
Further to its news release of January 3, 2023, the Company has received approval from the TSXV to reprice and extend the lives of the following issued and outstanding warrants:

No. of WarrantsOld PriceNew PriceExpiry
6,170,799$0.90$0.15May 31, 2025
2,981,237$0.45$0.20May 31, 2025
849,953$0.72$0.20August 23, 2024
179,719$0.72$0.20January 27, 2025
138,887$0.72$0.20April 24, 2025
208,333$0.72$0.20May 31, 2025
10,528,928Total  

Pursuant with TSXV policies, the warrants now have an acceleration clause such that if the closing price for the Company’s shares are 25% higher then the exercise price (or greater) for a period of 10 consecutive trading days, then the warrant holders will have 30 days to exercise their warrants; otherwise, the warrants will expire on the 31st day.

Judson Culter, CEO at Rover Metals, states “repricing our stock options and warrants to these levels provides a realistic hurdle to access quick growth capital, free of corporate finance fees and marketing and travel fees that are associated with traditional financing instruments. Additionally, stock options and warrants priced at these new levels has the potential to reward our retail investors and consultants that have taken the risks associated with getting involved with our company in the early stages. We are committed to our shareholder-base and our management team will work hard in the coming year to try and unlock the value of these warrants for them.”

About Rover Metals
Rover is a publicly traded junior mining company that trades on the TSXV under symbol ROVR, on the OTCQB under symbol ROVMF, and on the FSE under symbol 4XO. Rover is currently focussed on the development of a claystone lithium project in southwest Nevada, USA. Plans for 2023 include a 1,200-meter reverse circulation drill program at the Let’s Go Lithium project.

The Company has a diverse portfolio of mining resource development projects with varying exploration timelines. Its critical mineral projects include lithium, zinc, and copper. Its precious metals projects include gold and silver. The Company is exclusive to the mining jurisdictions of Canada and the U.S.

You can follow Rover on its social media channels:

Twitter: https://twitter.com/rovermetals
LinkedIn: https://www.linkedin.com/company/rover-metals/
Facebook: https://www.facebook.com/RoverMetals/
for daily company updates and industry news, and
YouTube: https://www.youtube.com/channel/UCJsHsfag1GFyp4aLW5Ye-YQ?view_as=subscriber
for corporate videos.
Subscribe to our Newsletter on our Website: https://www.rovermetals.com/

ON BEHALF OF THE BOARD OF DIRECTORS
“Judson Culter”
Chief Executive Officer and Director

For further information, please contact:
Email: info@rovermetals.com
Phone: +1 (778) 754-2855

Statement Regarding Forward-Looking Information
This news release contains statements that constitute “forward-looking statements.” Such forward-looking statements involve known and unknown risks, uncertainties and other factors that may cause Rover’s actual results, performance or achievements, or developments in the industry to differ materially from the anticipated results, performance or achievements expressed or implied by such forward-looking statements. Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by the words “expects,” “plans,” “anticipates,” “believes,” “intends,” “estimates,” “projects,” “potential” and similar expressions, or that events or conditions “will,” “would,” “may,” “could” or “should” occur. There can be no assurance that such statements prove to be accurate. Actual results and future events could differ materially from those anticipated in such statements, and readers are cautioned not to place undue reliance on these forward-looking statements. Any factor could cause actual results to differ materially from Rover’s expectations. Rover undertakes no obligation to update these forward-looking statements in the event that management’s beliefs, estimates or opinions, or other factors, should change.

THE FORWARD-LOOKING INFORMATION CONTAINED IN THIS NEWS RELEASE REPRESENTS THE EXPECTATIONS OF THE COMPANY AS OF THE DATE OF THIS NEWS RELEASE AND, ACCORDINGLY, IS SUBJECT TO CHANGE AFTER SUCH DATE. READERS SHOULD NOT PLACE UNDUE IMPORTANCE ON FORWARD-LOOKING INFORMATION AND SHOULD NOT RELY UPON THIS INFORMATION AS OF ANY OTHER DATE. WHILE THE COMPANY MAY ELECT TO, IT DOES NOT UNDERTAKE TO UPDATE THIS INFORMATION AT ANY PARTICULAR TIME EXCEPT AS REQUIRED IN ACCORDANCE WITH APPLICABLE LAWS.

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OF THIS RELEASE.

Categories
Base Metals Emx Royalty Junior Mining Precious Metals Project Generators

EMX Royalty Provides an Update on the Diablillos Royalty Property in Argentina

Vancouver, British Columbia–(Newsfile Corp. – January 19, 2023) – EMX Royalty Corporation (NYSE American: EMX) (TSXV: EMX) (FSE: 6E9) (the “Company” or “EMX”) is pleased to provide an update on advances at the Diablillos royalty property (the “Royalty Property” or “Property”) in Argentina. The Diablillos silver-gold project is being advanced by AbraSilver Resource Corp. (“AbraSilver”). EMX’s interest in the Property consists of a 1% net smelter return (“NSR”) royalty and a pre-production payment.

AbraSilver’s ongoing 15,000 meter, Phase III diamond drill program continues to expand and delineate the Southwest Zone (JAC target) discovery with near-surface, high-grade oxide intercepts such as 40 meters averaging 203 g/t silver starting at 114 meters in hole DDH-22-060, and 103 meters averaging 139 g/t silver starting at 65 meters and including 9.0 meters averaging 477 g/t silver and 0.23 g/t gold in hole DDH-22-061 (see AbraSilver news release dated December 15, 2022)1. The Southwest Zone (JAC) provides significant exploration upside to increase the mineral resources of the Property.

The JAC target is located along trend to the southwest of Oculto resource deposit, which had been the previous focus of exploration. AbraSilver announced an updated mineral resource estimate for Oculto reported at a 35 g/t silver equivalent2 cutoff that included measured and indicated resources of 51.3 Mtonnes averaging 66 g/t silver (109 Moz contained Ag) and 0.79 g/t gold (1.3 Moz contained Au) in Q4 of 2022.3 AbraSilver expects a maiden mineral resource estimate for the Southwest Zone (JAC) in the first half of 2023.

The Diablillos Royalty Property provides an example of an EMX royalty acquisition with significant exploration and development optionality resulting from early-stage advancements by the project operator. These advancements create value at no additional cost to EMX. The high-grade nature of the mineralization and exploration potential of multiple targets are particularly compelling upside aspects of the Property.

Commercial Terms Summary (all dollar amounts in USD)The royalty and payment obligations due to EMX are per an agreement originally between SSR Mining and AbraSilver, with EMX acquiring SSR Mining’s interests in 2021 (see EMX news releases dated July 29, and October 21, 2021). EMX’s 1% NSR royalty is uncapped and cannot be bought down. A payment to EMX of $7 million will be due in 2025, or upon commencement of commercial production, whichever comes first.

Royalty Property Summary. Diablillos is a high-sulfidation epithermal silver-gold project located in the Puna region of Salta Province, Argentina. Mineralization is hosted in Tertiary volcanic and sedimentary rocks. As a precursor to the current Phase III program, AbraSilver’s 20,000 meter, Phase II drill program (completed in 2022) resulted in: a) multiple, near-surface high-grade silver-gold (Ag-Au) intercepts, b) expansion of the mineralized zones at Oculto, c) in-fill of Oculto’s high grade Tesoro Zone, and d) the discovery of the Southwest Zone’s JAC target from a 500 meter step out reconnaissance hole.4 Phase II select intercepts reported by AbraSilver are summarized in the table below.5

ZoneHole IDFrom (m)To (m)Interval (m)Ag g/tAu g/t
Oculto Northeast21-06486147611400.71
Oculto Northeast21-06724230866571.90
Oculto Southwest21-06889146571081.47
Oculto Southwest22-00584151.567.51571.95
Tesoro21-038112221.3109.3176.81.53
Tesoro22-0041312711402191.17
Tesoro22-015131.5157.5262,3580.36
Tesoro22-037712261551851.48
Southwest (JAC)22-01989176873460.15

According to AbraSilver, a number of these intercepts are among the best drill results reported for primary silver projects over the last two years.6 Furthermore, the JAC discovery and Oculto Northeast Zone combine to extend the total strike length of gold-silver mineralization to over two kilometers, which remains open for further expansion.

The Oculto open pit constrained mineral resource update was reported at a 35 g/t silver equivalent cutoff for oxide and transition material as:7 (refer to AbraSilver’s November 3, 2022 news release and Technical Report):

  • Measured of 19.3 Mtonnes averaging 98 g/t silver (60.6 Moz contained Ag) and 0.88 g/t gold (544 Koz contained Au),
  • Indicated of 31.0 Mtonnes averaging 47 g/t silver (48.7 Moz contained Ag) and 0.73 g/t gold (752 Koz contained Au), and
  • Inferred of 2.2 Mtonnes averaging 30 g/t silver (2.1 Moz contained Ag) and 0.51 g/t gold (37 Koz contained Au).

Overall, the updated measured and indicated resources resulted in a 22% increase in contained silver and 29% increase in contained gold from the 2021 resource estimate. There was a 135% increase in measured resource tonnage compared to the 2021 estimate, all of which is in the high-grade Tesoro Zone (refer to AbraSilver’s November 3, 2022 news release). Importantly, 94% of the measured and indicated resources are oxide material, reflecting the oxidized character of Oculto to depths of 300-400 meters from surface.

AbraSilver’s ongoing Phase III drill program continues to yield high-grade oxide results at the JAC target, as well as at Oculto’s Tesoro Zone8:

ZoneHole IDFrom (m)To (m)Interval (m)Ag g/tAu g/t
Tesoro22-0451222491275061.99
Tesoro22-0432042272319390.28
Southwest (JAC)22-046123165.542.54000.11
Southwest (JAC)22-0527490.516.53890.01
Southwest (JAC)22-05295.5126.531630.23
Southwest (JAC)22-052139.5164.5257540.12
Southwest (JAC)22-057679326141
Southwest (JAC)22-05710313835900.21
Southwest (JAC)22-057144164204990.10
Southwest (JAC)22-06011415440203
Southwest (JAC)22-06165168103139
including14915894770.23

According to AbraSilver, advancement of the Diablillos Property is now focused on a) Phase III drilling at the Southwest Zone’s JAC target, b) completion of the maiden resource for the Southwest Zone (JAC) in H1 2023, c) conducting PFS metallurgical testwork, and d) completing a PFS project study in H1 2023.9 In addition, follow-up on the Property’s additional targets (e.g., Fantasma, etc.) is underway.

Qualified Person. Michael P. Sheehan, CPG, a Qualified Person as defined by National Instrument 43-101 and employee of the Company, has reviewed, verified and approved the disclosure of the technical information contained in this news release.

About EMX. EMX is a precious, base and battery metals royalty company. EMX’s investors are provided with discovery, development, and commodity price optionality, while limiting exposure to risks inherent to operating companies. The Company’s common shares are listed on the NYSE American Exchange and the TSX Venture Exchange under the symbol EMX, and also trade on the Frankfurt exchange under the symbol “6E9”. Please see www.EMXroyalty.com for more information.

For further information contact:

David M. Cole
President and Chief Executive Officer
Phone: (303) 973-8585
Dave@emxroyalty.com

Scott Close
Director of Investor Relations
Phone: (303) 973-8585
SClose@emxroyalty.com

Isabel Belger
Investor Relations (Europe)
Phone: +49 178 4909039
IBelger@EMXroyalty.com

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Forward-Looking Statements

This news release may contain “forward looking statements” that reflect the Company’s current expectations and projections about its future results. These forward-looking statements may include statements regarding perceived merit of properties, exploration results and budgets, mineral reserve and resource estimates, work programs, capital expenditures, timelines, strategic plans, market prices for precious and base metal, or other statements that are not statements of fact. When used in this news release, words such as “estimate,” “intend,” “expect,” “anticipate,” “will”, “believe”, “potential” and similar expressions are intended to identify forward-looking statements, which, by their very nature, are not guarantees of the Company’s future operational or financial performance, and are subject to risks and uncertainties and other factors that could cause the Company’s actual results, performance, prospects or opportunities to differ materially from those expressed in, or implied by, these forward-looking statements. These risks, uncertainties and factors may include, but are not limited to: unavailability of financing, failure to identify commercially viable mineral reserves, fluctuations in the market valuation for commodities, difficulties in obtaining required approvals for the development of a mineral project, increased regulatory compliance costs, expectations of project funding by joint venture partners and other factors.

Readers are cautioned not to place undue reliance on these forward-looking statements, which speak only as of the date of this news release or as of the date otherwise specifically indicated herein. Due to risks and uncertainties, including the risks and uncertainties identified in this news release, and other risk factors and forward-looking statements listed in the Company’s MD&A for the quarter ended September 30, 2022 and the year ended December 31, 2021 (the “MD&A”), and the most recently filed Revised Annual Information Form (the “AIF”) for the year ended December 31, 2021, actual events may differ materially from current expectations. More information about the Company, including the MD&A, the AIF and financial statements of the Company, is available on SEDAR at www.sedar.com and on the SEC’s EDGAR website at www.sec.gov.

____________________________

1 True widths are approximately 80% of reported interval lengths.
2 AgEq calculated using a) metal prices (USD) of $25/oz Ag & $1750/oz Au, and b) recoveries of 73.5% for Ag & 86% for Au.
3 See AbraSilver news release dated November 3, 2022 and report titled “NI 43-101 Technical Report Mineral Resource Estimate Diablillos Project” with an effective date of October 31, 2022 and dated November 28, 2022. Qualified person is Luis Rodrigo Peralta, B.Sc. (Geo) FAusIMM, an independent Senior Resource Geologist.
4 See AbraSilver October 2022 Corporate Presentation and August 3, 2022 news release.
5 See AbraSilver news releases dated June 13, July 25, August 3, and August 22, 2022. True widths are approximately 80% of reported interval lengths.
6 See AbraSilver October 2022 Corporate Presentation.
7 Refer to AbraSilver’s 11/3/2022 news release and 11/28/2022 Technical Report.
8 See AbraSilver news releases dated September 29, October 12, November 9 & 22, and December 15, 2022. True widths are approximately 80% of reported interval lengths.
9 See AbraSilver October 2022 Corporate Presentation.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/151799

Categories
Base Metals Energy Precious Metals

Stillwater Critical Minerals Reports up to 0.396 g/t Rhodium in Drill Results from the Stillwater West PGE-Ni-Cu-Co + Au Project, Montana, USA

VANCOUVER, BC / ACCESSWIRE / January 18, 2023 / Stillwater Critical Minerals Corp. (formerly Group Ten Metals) (TSXV:PGE)(OTCQB:PGEZF)(FSE:5D32) (the “Company” or “SWCM”) is pleased to announce results of rhodium assays conducted on core from resource expansion drilling on its 100%-owned Stillwater West platinum group element, nickel, copper, cobalt, and gold (“PGE-Ni-Cu-Co + Au”) project in Montana, USA, adjacent to Sibanye-Stillwater’s world-class critical minerals mining operations.

These results, along with the integration of deposit models from South Africa’s Bushveld complex, provide the Company and SGS Geological Services (“SGS”) with the remaining components necessary to finalize an update of the Company’s inaugural October 2021 resource estimate (the “2021 Resource”), which delineated five Platreef-style deposits totaling 1.1 billion pounds of nickel, copper and cobalt, and 2.4 million ounces of palladium, platinum, rhodium and gold (see Figure 1).

Rhodium intercept highlights from resource expansion drilling include:

  • Widespread rhodium in drill results at potentially significant co-product grades including:
    • 0.122 g/t Rh over 7.2 meters in CM2021-01 starting at 304.8 meters;
    • 0.104 g/t Rh over 8.3 meters in CM2021-03 starting at 252.2 meters; and
    • 0.396 g/t Rh over 1.2 meters in CM2021-01 starting at 411.6 meters.
  • Current results expand upon similar results in past campaigns which returned 0.103 g/t Rh over 7.9 meters in hole CM2020-05, and 0.100 g/t Rh over 6.1 meters in hole CM2007-02.
  • Rhodium is mined solely as a co-product at grades that are often below 0.1 g/t. South Africa dominates global production, and there is very little mine supply in North America. Sibanye-Stillwater, adjacent to SWCM’s Stillwater West project, is the primary US producer.
  • Supply constraints have resulted in elevated rhodium prices since 2017. At its current spot price of more than USD 12,000/oz, 0.1 g/t rhodium equates to more than 0.6 g/t gold or palladium equivalent, and more than 1.2 g/t platinum equivalent.
  • Rhodium has a high melting point, is highly corrosion resistant, and is critical in catalytic converters, along with platinum and palladium, for cleaner vehicle emissions.
  • Complete results from the 14-hole expansion drill campaign, which consisted of wide step-outs at three of the five deposits defined by the 2021 Resource, are being incorporated into the updated block models by SGS. As shown in Table 1, results continue to demonstrate impressive grade and scale with wide intervals at successively higher grades contained within very wide bulk-tonnage grade intervals, including:
    • 13.2 meters of 2.31% Ni, 0.35% Cu, 0.115% Co, and 1.51 g/t 4E (Pt+Pd+Au+Rh) starting at 37.6 meters and within 400.8 meters of continuous mineralization in hole CM2021-05;
    • 44.1 meters of 0.57% Ni, 0.34% Cu, 0.045% Co, and 0.74 g/t 4E starting at 32.8 meters and within 367.6 meters of continuous mineralization in hole CZ2021-01; and
    • 50.2 meters of 1.05 g/t 4E plus 0.19% Ni and other values within 728.1 meters of continuous mineralization in hole CM2021-01.
  • Metallurgical testing completed by AMAX confirmed recovery of rhodium along with palladium and platinum in preliminary bench-scale flotation testing at the CZ deposit area in the early 1970s.
  • Past work previously reported by the Company included surface sample results of up to 5.78 g/t Rh at the HGR target in the Iron Mountain area, and 1.07 g/t Rh at Chrome Mountain in reconnaissance-scale rock sample programs (see June 11, 2020, news release).
  • Early results for other rare Platinum Group Elements (“PGE”) show potential for additional value from iridium, osmium, and ruthenium which often occur along with platinum, palladium, and rhodium at Stillwater West.

Table 1 – Final results from resource expansion drilling including recent rhodium assay results.

INTERVALPRECIOUS METALSBASE METALSTOTAL METALEQUIVALENTS
HOLE IDFrom(m)To(m)Width(m)Pt(g/t)Pd(g/t)Au(g/t)Rh(g/t)4E(g/t)Ni(%)Cu(%)Co(%)NiEq*(%)NiEq*(%)PdEq*(g/t)
DR / HYBRID DEPOSIT AREA – RESOURCE EXPANSION DRILLING
CM2021-010.0728.1728.10.120.170.020.0130.320.130.030.0130.160.260.66
including230.5583.4352.90.210.270.030.0220.540.170.040.0150.200.380.95
including304.8312.07.20.630.640.030.1221.430.110.020.0080.130.671.68
including324.0385.261.20.190.170.020.0390.420.200.040.0150.230.390.98
including397.2556.4159.20.310.410.050.0250.790.180.030.0170.220.471.17
including397.2447.450.20.480.480.040.0501.050.190.030.0150.220.561.40
including423.4430.67.20.931.330.050.0272.340.240.030.0180.270.962.39
including479.8549.269.40.270.470.060.0170.820.180.040.0170.220.481.20
including530.0543.213.20.260.810.060.0391.170.210.060.0170.250.671.67
including530.0537.27.20.331.070.080.0491.540.210.050.0170.240.791.97
including687.4728.140.70.070.200.020.0080.290.180.070.0210.240.340.84
CM-2021-020.0333.0333.00.080.100.020.0060.200.110.040.0110.140.210.52
including118.7232.8114.10.070.120.040.0070.240.190.090.0150.240.320.79
including131.5148.417.00.160.250.050.0240.490.190.100.0220.270.441.11
including256.9267.010.20.140.380.070.0160.610.250.130.0140.310.521.29
CM-2021-030.0428.2428.20.080.130.020.0090.240.100.030.0150.140.220.56
including106.0115.29.20.020.030.060.0080.120.280.110.0450.410.461.14
including165.0215.450.40.060.060.030.0050.150.130.040.0170.170.220.55
including165.0172.27.20.010.050.040.0020.100.290.100.0440.410.451.11
including240.1270.430.30.310.650.050.0481.060.140.030.0130.170.551.37
including252.2260.58.30.491.060.050.1041.700.130.030.0130.160.812.02
CM-2021-040.0208.8208.80.050.080.020.0040.140.110.050.0150.160.200.50
including0.067.267.20.100.170.020.0100.300.130.050.0160.180.280.69
including3.616.813.20.170.520.030.0250.750.150.040.0150.190.461.14
including198.0208.810.80.020.040.030.0020.100.250.220.0260.380.411.02
CM-2021-0536.4437.2400.80.060.120.040.0080.220.170.030.0150.200.270.68
including36.4132.496.00.060.120.120.0020.300.400.050.0240.430.521.30
including37.650.813.20.250.430.820.0151.512.310.350.1152.432.897.21
including37.643.66.00.500.771.340.0242.633.470.240.1953.584.3810.92
including190.0208.018.00.180.580.040.0250.820.160.050.0150.200.491.22
including191.2196.04.80.401.410.090.0711.980.210.070.0160.260.982.43
including345.7364.018.30.210.430.050.0340.720.160.060.0140.200.461.14
CM-2021-060.0376.8376.80.080.130.020.0090.240.120.030.0140.150.230.57
including123.0150.827.80.150.410.040.0300.630.160.050.0150.200.431.07
including125.1129.44.30.280.990.070.0961.440.230.070.0200.280.862.15
including254.0264.810.80.050.120.030.0040.210.270.060.0300.330.401.01
including303.4376.873.40.200.260.030.0200.510.140.020.0170.170.340.84
including305.8328.422.60.320.440.020.0350.810.110.010.0170.140.421.04
including315.4327.211.80.420.630.020.0481.120.100.010.0170.140.521.29
CZ DEPOSIT AREA – RESOURCE EXPANSION DRILLING
CZ2021-0110.8378.4367.60.060.170.020.0090.260.150.060.0150.200.290.72
including13.276.963.70.120.420.070.0270.640.470.270.0400.620.862.15
including32.876.944.10.120.490.090.0350.740.570.340.0450.751.042.58
CZ-2021-0287.694.87.20.030.100.080.0020.210.170.110.0180.240.310.78
HGR DEPOSIT AREA – RESOURCE EXPANSION DRILLING
IM-2021-01Did not reach target depth due to bad ground conditions
IM-2021-02Did not reach target depth due to bad ground conditions, repeated as IM-2021-03
IM-2021-03Did not reach target depth due to bad ground conditions
115.0118.63.60.321.170.060.0671.620.140.020.0120.160.761.90
IM-2021-040.0306.5306.50.050.090.020.0050.150.130.080.0130.180.230.57
including92.2207.6115.40.090.160.030.0090.280.190.100.0150.250.340.85
including92.2102.09.80.391.020.060.0691.540.190.060.0180.240.802.00
including147.6200.452.80.070.110.040.0030.220.230.160.0140.310.370.93
including256.0260.84.80.000.150.090.0550.300.740.650.0701.111.283.19
IM-2021-050.0379.2379.20.070.130.020.0060.220.170.090.0140.220.290.74
including66.899.232.40.150.300.040.0170.500.220.110.0160.280.451.12
including310.2378.067.80.060.160.030.0060.260.250.140.0160.320.401.01
including313.4334.921.50.070.240.040.0130.350.380.130.0240.450.581.43
including313.4315.82.40.000.650.110.0860.851.550.170.0871.632.045.08
including327.7334.97.30.130.340.040.0070.510.450.170.0260.530.701.74
including346.8347.81.00.030.310.110.0900.552.520.310.0972.542.847.09
including354.3364.810.50.070.220.040.0030.330.340.330.0180.490.591.48
including354.3355.51.20.070.820.060.0010.951.330.710.0551.601.924.79
IM-2021-060.0333.0333.00.080.140.020.0080.250.130.040.0120.160.240.60
including70.8164.894.00.140.320.050.0160.530.200.090.0140.250.431.06
including82.8109.226.40.190.410.080.0130.690.270.140.0160.340.561.40
including298.6314.215.60.160.330.020.0310.550.140.030.0160.180.380.95
including299.8304.64.80.420.830.050.0771.380.160.030.0160.190.701.75

*Notes to reported values:

  1. Ni and Pd equivalents are presented for comparative purposes using conservative long-term metal prices (all USD): $8.00/lb nickel (Ni), $4.00/lb copper (Cu), $24.00/lb cobalt (Co), $1,000/oz platinum (Pt), $2,200/oz palladium (Pd), $1,800/oz gold (Au), and $10,000/oz rhodium (Rh).
  2. Recovered Nickel Equivalent in Table 1 is determined as follows: NiEq% = [Ni% x recovery] + [Cu% x recovery x Cu price/ Ni price] + [Co% x recovery x Co price / Ni price] + [Pt g/t x recovery / 31.103 x Pt price / Ni price / 2,204 x 100] + [Pd g/t x recovery / 31.103 x Pd price / Ni price / 2,204 x 100] + [Au g/t x recovery / 31.103 x Au price / Ni price / 2,204 x 100]
  3. Palladium Equivalent is determined as follows: PdEq g/t = NiEq x 0.401
  4. In the above calculations: 31.103 = grams per troy ounce, 2,204 = lbs per metric tonne, and 100 and 0.01 convert assay results reported in % and g/t.
  5. The following recoveries have been assumed for purposes of the above equivalent calculations: 85% for Ni and 90% for all other listed metals, based on recoveries at similar nearby operations.
  6. Intervals are reported as drilled widths and are believed to be representative of the true width of mineralization.

Dr. Danie Grobler, Vice-President of Exploration, commented, “We see an overall trend of increasing PGE content up-sequence within the Ultramafic Series of the Stillwater Complex (“SWC”), like that observed within ultramafic portions of the Bushveld Complex (South Africa), as well as the Great Dyke in Zimbabwe. Scientific studies have shown that the Ultramafic Series of the SWC are enriched in PGE relative to most mafic magmas. Furthermore, the chromitite layers correlate with and are particularly enriched in rhodium and the lesser PGEs osmium, iridium, and ruthenium. More importantly, the reported high-grade rhodium results correlate with specific chromite seams and correspond to geochemical and geophysical anomalies associated with our existing resource areas defined during 2021, highlighting our rapidly advancing understanding of their occurrence, and our ability to effectively target new areas.”

Stillwater Critical Minerals President and CEO, Michael Rowley, stated, “Our 2022 programs built on the success of past campaigns, continuing to return rhodium at significant potential co-product values at a time when the U.S. is looking to increase domestic supplies of this very rare element, alongside 49 other critical minerals. We look forward to reporting our updated and expanded resource models in the near term as we advance Stillwater West towards its potential to become a primary low-carbon source of eight of the minerals listed as critical by the US government, effectively ushering in the next phase of critical mineral supply from the iconic and productive Stillwater Complex.”

Upcoming Events

The Company at is pleased to advise it will be presenting at the Emerging Growth Conference: January 25th at 9:30am PT | 12:30pm ET (virtual). To register, click here.

For a full list of upcoming events, visit our website: https://criticalminerals.com/investors/events/

About Stillwater West

Stillwater Critical Minerals is rapidly advancing the Stillwater West PGE-Ni-Cu-Co + Au project towards becoming a world-class source of low-carbon, sulphide-hosted nickel, copper, and cobalt, critical to the electrification movement, as well as key catalytic metals including platinum, palladium and rhodium used in catalytic converters, fuel cells, and the production of green hydrogen. Stillwater West positions SWCM as the second-largest landholder in the Stillwater Complex, with a 100%-owned position adjoining and adjacent to Sibanye-Stillwater’s PGE mines in south-central Montana, USA1. The Stillwater Complex is recognized as one of the top regions in the world for PGE-Ni-Cu-Co mineralization, alongside the Bushveld Complex and Great Dyke in southern Africa, which are similar layered intrusions. The J-M Reef, and other PGE-enriched sulphide horizons in the Stillwater Complex, share many similarities with the highly prolific Merensky and UG2 Reefs in the Bushveld Complex. SWCM’s work in the lower Stillwater Complex has demonstrated the presence of large-scale disseminated and high-sulphide battery metals and PGE mineralization, similar to the Platreef in the Bushveld Complex2. Drill campaigns by the Company, complemented by a substantial historic drill database, have delineated five deposits of Platreef-style mineralization across a core 12-kilometer span of the project, all of which are open for expansion into adjacent targets. Multiple earlier-stage Platreef-style and reef-type targets are also being advanced across the remainder of the 32-kilometer length of the project based on strong correlations seen in soil and rock geochemistry, geophysical surveys, geologic mapping, and drilling.

About Stillwater Critical Minerals Corp.

Stillwater Critical Minerals (TSX.V: PGE | OTCQB: PGEZF) is a mineral exploration company focused on its flagship Stillwater West PGE-Ni-Cu-Co + Au project in the iconic and famously productive Stillwater mining district in Montana, USA. With the recent addition of two renowned Bushveld and Platreef geologists to the team, the Company is well positioned to advance the next phase of large-scale critical mineral supply from this world-class American district, building on past production of nickel, copper, and chromium, and the on-going production of platinum group and other metals by neighbouring Sibanye-Stillwater. The Platreef-style nickel and copper sulphide deposits at Stillwater West contain a compelling suite of critical minerals and are open for expansion along trend and at depth, with an updated NI 43-101 mineral resource update expected in 2022.

Stillwater Critical Minerals also holds the high-grade Black Lake-Drayton Gold project adjacent to Treasury Metals’ development-stage Goliath Gold Complex in northwest Ontario, which is currently under an earn-in agreement with an option to joint venture whereby Heritage Mining may earn up to a 90% interest in the project by completing payments and work on the project. The Company also holds the Kluane PGE-Ni-Cu-Co project on trend with Nickel Creek Platinum‘s Wellgreen deposit in Canada‘s Yukon Territory.

Note 1: References to adjoining properties are for illustrative purposes only and are not necessarily indicative of the exploration potential, extent or nature of mineralization or potential future results of the Company’s projects.

Note 2: Magmatic Ore Deposits in Layered Intrusions-Descriptive Model for Reef-Type PGE and Contact-Type Cu-Ni-PGE Deposits, Michael Zientek, USGS Open-File Report 2012-1010.

FOR FURTHER INFORMATION, PLEASE CONTACT:

Michael Rowley, President, CEO & Director

Email: info@criticalminerals.com Phone: (604) 357 4790
Web: http://criticalminerals.com Toll Free: (888) 432 0075

Quality Control and Quality Assurance

2021 drill core samples were analyzed by ACT Labs in Vancouver, B.C. Sample preparation: crush (< 7 kg) up to 80% passing 2 mm, riffle split (250 g) and pulverize (mild steel) to 95% passing 105 µm included cleaner sand. Gold, platinum, and palladium were analyzed by fire assay (1C-OES) with ICP finish. Rhodium was analyzed by fire assay (1C-Rhodium). Selected major and trace elements were analyzed by peroxide fusion with 8-Peroxide ICP-OES finish to insure complete dissolution of resistate minerals. Following industry QA/QC standards, blanks, duplicate samples, and certified standards were also assayed.

Mr. Mike Ostenson, P.Geo., is the qualified person for the purposes of National Instrument 43-101, and he has reviewed and approved the technical disclosure contained in this news release.

Forward-Looking Statements

Forward Looking Statements: This news release includes certain statements that may be deemed “forward-looking statements”. All statements in this release, other than statements of historical facts including, without limitation, statements regarding potential mineralization, historic production, estimation of mineral resources, the realization of mineral resource estimates, interpretation of prior exploration and potential exploration results, the timing and success of exploration activities generally, the timing and results of future resource estimates, permitting time lines, metal prices and currency exchange rates, availability of capital, government regulation of exploration operations, environmental risks, reclamation, title, and future plans and objectives of the company are forward-looking statements that involve various risks and uncertainties. Although Stillwater Critical Minerals believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in the forward-looking statements. Forward-looking statements are based on a number of material factors and assumptions. Factors that could cause actual results to differ materially from those in forward-looking statements include failure to obtain necessary approvals, unsuccessful exploration results, changes in project parameters as plans continue to be refined, results of future resource estimates, future metal prices, availability of capital and financing on acceptable terms, general economic, market or business conditions, risks associated with regulatory changes, defects in title, availability of personnel, materials and equipment on a timely basis, accidents or equipment breakdowns, uninsured risks, delays in receiving government approvals, unanticipated environmental impacts on operations and costs to remedy same, and other exploration or other risks detailed herein and from time to time in the filings made by the companies with securities regulators. Readers are cautioned that mineral resources that are not mineral reserves do not have demonstrated economic viability. Mineral exploration and development of mines is an inherently risky business. Accordingly, the actual events may differ materially from those projected in the forward-looking statements. For more information on Stillwater Critical Minerals and the risks and challenges of their businesses, investors should review their annual filings that are available at www.sedar.com.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

SOURCE: Stillwater Critical Minerals Corp.



View source version on accesswire.com:
https://www.accesswire.com/735657/Stillwater-Critical-Minerals-Reports-up-to-0396-gt-Rhodium-in-Drill-Results-from-the-Stillwater-West-PGE-Ni-Cu-Co-Au-Project-Montana-USA

Categories
Base Metals Energy Junior Mining Precious Metals

Silver Bullet Mines Intercepts Vein in Arizona

Burlington, Ontario–(Newsfile Corp. – January 17, 2023) – Silver Bullet Mines Corp. (TSXV: SBMI) (OTCQB: SBMCF) (‘SBMI’ or ‘the Company’) is pleased to announce it has intercepted the targeted vein, behind the historical Treasure Room at its Buckeye Silver Mine. This interception occurred on schedule and within SBMI’s budget. To intercept the vein SBMI rehabilitated, extended, screened and bolted the upper development drift. The material being removed is being deposited in specific locations for future evaluation.

SBMI next intends to drift along the vein to an area believed to contain higher grade mineralization (see page 8 of the Geologic Report dated January 8, 2021). The Company believes this target area to be approximately 200 feet from where SBMI recently intercepted the vein.

SBMI intends to carry out multiple daily assays of the materials referred to above at its assay facility at its millsite. The mill is ready to recommence processing immediately upon receipt of mineralized material from the Buckeye. The assay results are intended to inform the geologic team and not all such results will be disseminated.

In its December 15, 2022 press release, SBMI advised third party geologic consultants would be providing the Company with a report including observations, comments, and recommendations, based upon their November 29 – December 14, 2022 site visit to Arizona. They inspected the third-party independent lab used for sample testing, visited the Buckeye Mine site, visited the Company’s millsite, and visited the Black Copper and Helena occurrences, both of which are situated on SBMI’s Black Diamond property and are referred to in the January, 2021 Geologic Report.

Those geologic consultants also carried out a brief initial re-inspection of NQ core drilled at the Buckeye Mine by a previous optionee. This re-inspection has revealed coarse grained gabbronorite phases containing magnetite disseminations and thin bands within an area previously mapped as diabase. Small intervals containing olivine phenocrysts were also noted. These rocks may have potential for PGM mineralization. Further examination is being undertaken on these in situ rocks, the core, the Black Copper and the Helena occurrences. Samples from each has been sent to a third-party accredited lab for analysis and further work is ongoing. The Company can find no evidence of any PGM testing having previously been undertaken on this core or the rock labelled as diabase.

Finally, contact with various mineralogical and geochemical labs is ongoing to resolve metallurgical and refractory issues encountered while trying to pour dore bars from the Buckeye Mine material.

Mr. Robert G. Komarechka, P.Geo., an independent consultant, has reviewed and verified SBMI’s work referred to herein, and is the Qualified Person for this release.

For further information, please contact:

John Carter
Silver Bullet Mines Corp., CEO
cartera@sympatico.ca
+1 (905) 302-3843

Peter M. Clausi
Silver Bullet Mines Corp., VP Capital Markets
pclausi@brantcapital.ca
+1 (416) 890-1232

Cautionary and Forward-Looking Statements

This news release contains certain statements that constitute forward-looking statements as they relate to SBMI and its subsidiaries. Forward-looking statements are not historical facts but represent management’s current expectation of future events, and can be identified by words such as “believe”, “expects”, “will”, “intends”, “plans”, “projects”, “anticipates”, “estimates”, “continues” and similar expressions. Although management believes that the expectations represented in such forward-looking statements are reasonable, there can be no assurance that they will prove to be correct.

By their nature, forward-looking statements include assumptions, and are subject to inherent risks and uncertainties that could cause actual future results, conditions, actions or events to differ materially from those in the forward-looking statements. If and when forward-looking statements are set out in this new release, SBMI will also set out the material risk factors or assumptions used to develop the forward-looking statements. Except as expressly required by applicable securities laws, SBMI assumes no obligation to update or revise any forward-looking statements. The future outcomes that relate to forward-looking statements may be influenced by many factors, including but not limited to: the impact of SARS CoV-2 or any other global pathogen; reliance on key personnel; the thoroughness of its QA/QA procedures; the continuity of the global supply chain for materials for SBMI to use in the production and processing of mineralized material; shareholder and regulatory approvals; activities and attitudes of communities local to the location of the SBMI’s properties; risks of future legal proceedings; income tax matters; fires, floods and other natural phenomena; the rate of inflation; availability and terms of financing; distribution of securities; commodities pricing; currency movements, especially as between the USD and CDN; effect of market interest rates on price of securities; and, potential dilution. SARS CoV-2 and other potential global pathogens create risks that at this time are immeasurable and impossible to define.

The Issuer has not based its production decision on current resources or the results of a pre-feasibility study of mineral resources to establish mineral reserves demonstrating technical and economic viability. Significant uncertainty exists on the presence of any economic mineable material.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/151438