Categories
Junior Mining Precious Metals

Provenance Gold Concludes its 35 Hole Exploration Program at White Rock which Returned Numerous Strong Gold Intercepts

Vancouver, British Columbia–(Newsfile Corp. – December 2, 2021) – Provenance Gold Corp. (CSE: PAU) (OTCQB: PVGDF) (the “Company” or “Provenance”) announces that it has completed drilling of 35 RC holes and has received all assays for its White Rock Gold Project. The Company is pleased to report that every hole intercepted gold mineralization.

The White Rock gold project consists of 258 lode mining claims (5,160 acres) with gold hosted in silicified limestones and shales over an area 3.2 km in length and 1.3 km wide. The White Rock property was originally optioned from Ely Gold Royalties Inc., which was recently acquired by Gold Royalty Corp., combining to create a leading growth and Americas-focused precious metals royalty company. The project has a total of 101 drill holes completed, of which 67 historic holes were drilled by four previous operators. Data from these older holes has now been verified for use in a future technical report. The Company believes White Rock likely hosts an extensive open-pit grade gold deposit, with grades similar to currently operating Nevada open pit mines.

The following table lists the more significant holes obtained during Provenance’s drilling program.

White Rock Assay Summaries / Selected Drill Holes – 2021 Drill Program

0.1 g Au cutoff
HoleDepthInclineBearingInterval-FtThickness-FtAu g/tAu optComments
WR-15500-900120-215950.6360.0185Hole completed
“Including”160-185251.4520.042
235-4101750.1970.0058
240-265250.4270.012
420-435150.130.004
WR-16300-509095-2751800.6180.018Hole terminated
**“Including”95-135400.830.024Broken ground
“Including”95-10053.550.104
235-255202.310.067
WR-19300-50090-125350.7920.023Hole lost in Au
**“Including”95-10053.2270.094
150-175250.3210.009
290-300100.4040.012
WR-23480-452600-75750.2560.007Hole completed
95-3602650.3880.011
“Including”100-125250.7780.023
“Including”160-180200.3970.012
“Including”200-220200.5260.015
“Including”260-310500.650.019
WR-24300-602600-40400.4540.013Hole terminated
**90-3002100.2930.009Broken ground
“Including”95-130350.7130.021
“Including”230-240100.4070.012
WR-28530-90075-3402650.3760.011Hole completed
“Including”205-260550.7290.021
355-405500.2420.007
450-470200.1260.004
485-510250.1070.003
WR-32380-60120165-3802150.3050.009Hole lost in Au
**“Including”175-240650.4110.012
“Including”350-365150.4920.014
WR-45340-8018055-2752200.5170.015Hole lost in Au
**“Including”70-1701000.880.026
“Including”120-160401.10.032
WR-47310-652700-3103100.3590.01Hole lost in Au
**“Including”35-1351000.5350.016
“Including”170-195250.7170.21

The assay results received this year confirm similar results achieved by past operators and therefore will be used in a planned NI 43-101 resource report that will be completed in the coming months. This new report, which will report tonnage and grade at different cutoffs, will be the first gold mineral resource ever calculated for the property.

The Company currently has a permit revision being reviewed by the BLM for additional drill sites for a proposed 2022 drilling program. Once bonded, drilling could be initiated as early as next May after the snow has melted.

Steve Craig, project manager, stated: “Over the decades, I have managed many successful exploration programs in Nevada, and this is exactly what exploration companies in Nevada hope to find. I believe we have found an exceptional one.”

Rauno Perttu, Provenance’s CEO states, “It has been an extremely successful initial drilling program. Our work this season gave us a much clearer picture of the gold mineralization controls. We discovered our first feeder structure and started to outline extensive areas of strong gold mineralization. We also recognize several step-out and infill areas that we will follow up on with new exploration next season. Provenance has a large gold system that we believe will be advanced into a new mine and are looking forward to next year’s program.”

Along with the initial gold mineral resource calculation and 43-101 the Company will be further updating investors in the coming weeks with maps and diagrams of the drill program which should help as a visualization to show the size and scope of the mineralized zones.



Figure 1 – Project manager Steve Craig sitting on ore-grade outcrop near newly found feeder structure.

To view an enhanced version of Figure 1, please visit:
https://orders.newsfilecorp.com/files/5654/106266_3c7c34820407caed_001full.jpg

Quality Assurance and Quality Control: The reverse-circulation drilling program utilized by Provenance completed a quality assurance / quality control program (QA/QC) with control samples consisting of standards, blanks and duplicates inserted approximately every 100 feet. Control samples were randomly inserted into the sample stream prior to being sent to the laboratory. The RC drill sampling was in five-foot sample intervals. Drill samples were taken to Paragon Geochemical, an ISO 9001 compliant company in Sparks, Nevada for fire assaying for gold and silver. The rejects and pulps remain with Paragon in Sparks, Nevada. The QA/QC program was implemented as part of the sampling procedures for the exploration program.

Rauno Perttu, P. Geo., a Qualified Person (as defined by National Instrument 43-101), and the Chief Executive Officer of the Company, has reviewed and approved the technical contents of this News Release.

About Provenance Gold Corp.

Provenance Gold Corp. is a precious metals exploration company with a focus on gold and silver resources within North America. The Company currently holds interests in three properties in Nevada, USA. For further information please visit the Company’s website at https://provenancegold.com or contact rclark@provenancegold.com.

On behalf of the Board,

Provenance Gold Corp.

Rauno Perttu, Chief Executive Officer

Neither the Canadian Securities Exchange, nor its regulation services provider, accepts responsibility for the adequacy or accuracy of this press release. This news release may contain certain “Forward-Looking Statements” within the meaning of the United States Private Securities Litigation Reform Act of 1995 and applicable Canadian securities laws. When or if used in this news release, the words “anticipate”, “believe”, “estimate”, “expect”, “target, “plan”, “forecast”, “may”, “schedule” and similar words or expressions identify forward-looking statements or information. Such statements represent the Company’s current views with respect to future events and are necessarily based upon a number of assumptions and estimates that, while considered reasonable by the Company, are inherently subject to significant business, economic, competitive, political and social risks, contingencies and uncertainties. Many factors, both known and unknown, could cause results, performance or achievements to be materially different from the results, performance or achievements that are or may be expressed or implied by such forward-looking statements. The Company does not intend, and does not assume any obligation, to update these forward-looking statements or information to reflect changes in assumptions or changes in circumstances or any other events affecting such statements and information other than as required by applicable laws, rules and regulations.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/106266

Categories
Base Metals Blog Energy Junior Mining

US adds Nickel, Zinc to critical minerals list

United States adds nickel, zinc to critical minerals list

Nickel smelter in Sorowako, Indonesia. (Image by Marcelo Coelho, courtesy of Vale).

(The views and opinions expressed herein are the views and opinions of the author, Andy Home, a columnist for Reuters.)

Nickel and zinc are now deemed critical minerals by the United States.

SIGN UP FOR THE BATTERY METALS DIGEST

SIGN UP

The US Geological Survey (USGS) is proposing both metals be included in the redrafted critical minerals list. The list has grown from 35 to 50 since the last iteration in 2018, but that largely reflects the splitting out of rare earth elements and precious group metals into separate entities.

Four minerals – helium, potash, rhenium, and strontium – have been dropped. The United States is the world’s leading producer and net exporter of helium, while import dependency for the other three is mitigated by “low disruption potential”. Uranium was also dropped after being reclassified as a “mineral fuel”.

Nickel and zinc are the only two new additions, and each reflects an evolution of the methodology used to determine whether a mineral is critical to the well-being of the US economy.

Single point of failure

According to the USGS, the United States relies on refined nickel imports for around half of its annual consumption.

The top three suppliers last year were Canada (42%), Norway (10%) and Finland (9%) – all deemed “friendly” countries.

This relatively benign supply profile kept nickel off the critical minerals list in the past.

But it’s now included for two reasons.

Firstly, the USGS has expanded its criticality criteria to look beyond trade dependency to domestic supply, particularly what it calls “single points of failure”.

There is currently only one domestic operating nickel mine in the United States – the Eagle mine in Michigan – which exports concentrates for overseas refining.

There is a single producer of nickel sulphate, but only as a by-product of precious group metals production.

This limited domestic nickel production base was also highlighted in the Biden Administration’s 100-day review of critical supply chains, which recommended the government should invest as a priority in a new nickel refinery.

The second reason is nickel’s changing usage profile from alloy in stainless steel production to chemical component in electric vehicle batteries.

The combination of limited, single-point-of-failure domestic supply and the expected demand growth from battery manufacturers makes “a compelling case for inclusion” of nickel in the critical minerals list, the USGS noted.

Or, as the supply-chain review put it, not having enough battery-grade nickel “poses a supply chain risk for battery manufacturing globally, not just in the United States”.

Zinc concentration

The United States’ domestic supply chain of zinc is less fragile.

The country has 14 operating mines and three smelter facilities, one primary and two secondary, one of which resumed operations in 2020 after several years of inactivity.

However, the country’s refined zinc import dependency is relatively high. Imports of 710,000 tonnes last year represented 83% of domestic consumption, according to the USGS.

Global supply trends make this problematic.

“For zinc, global mine and smelter production concentration has increased notably during the past few decades,” the USGS said, adding that “this change has been driven mainly by increased production in China”.

Part of the thinking behind the latest critical minerals list is moving the analysis beyond simple import dependency to encompass broader global supply trends.

The more supply is concentrated in one country, the higher the potential risk factor, particularly if that country is designated a mineral competitor, as is the case with China.

Zinc’s supply risk is now above the 0.40 threshold used by the USGS to help determine criticality at 0.48.

Top of the supply-risk table are gallium, niobium and cobalt, followed by several rare earth elements.

Aluminum lies in eighth place with a score of 0.60, thanks to the concentration of smelting in China, and tin is also on the supply risk spectrum with a score of 0.50.

A continuum of supply risk

The USGS stresses that falling below the 0.40 cut-off point doesn’t mean there is no supply risk.

“The metrics developed with (the new) methodology are best viewed as a continuum of supply risk”, and one which is continuously moving as global supply chains for each commodity evolve, it said.

Out of the major industrial metals traded on the London Metal Exchange, only two are now not deemed critical minerals by the United States.

Copper has a low supply-risk profile due to a large domestic mining, smelting and recycling industry.

Lead is more interestingly poised on the USGS supply-risk table with a score of 0.39, just below the cut-off point, again due to a growing concentration of global mining and smelting capacity in China.

None of these industrial metals feature on the European Union’s critical minerals list.

In part that’s a reflection of Europe’s domestic production base both at the mining and smelting level.

But in part it may be because the USGS is ahead of its European peers in analysing global supply patterns and the resulting potential threats to critical minerals availability.

Nickel and zinc may not spring to mind when most people think of critical minerals, but as far as the United States is concerned, they both are.

(Editing by Jan Harvey)

Categories
Junior Mining Precious Metals

Silver Bullet Mines Corp. (Formerly Pinehurst Capital I Inc.) Closes Qualifying Transaction

Toronto, Ontario, Dec. 01, 2021 (GLOBE NEWSWIRE) —

Silver Bullet Mines Corp. (TSXV: SBMI) (“Silver Bullet” or the “Company”), formerly Pinehurst Capital I Inc., is pleased to announce that the Company has closed its qualifying transaction (the “Transaction”) previously announced in the Company’s comprehensive press releases dated November 12, 2020 and June 28, 2021 and more particularly set out in its filing statement dated September 27, 2021 (the “Filing Statement”) which is available under the Company’s profile at www.sedar.com, subject to final approval of the TSX Venture Exchange (the “TSXV”). The Company’s shares, which had traded on the TSXV, were halted on August 27, 2020, at the Company’s request pending completion of the Transaction and receipt of final approval of the TSXV. The Company’s common shares will commence trading on the TSXV as a Tier 2 mining issuer under the symbol “SBMI” on or about December 6, 2021.

The Transaction

Pursuant to an amalgamation agreement, Pinehurst I Acquisition Corp., a wholly owned subsidiary of the Company, and an entity formerly named Silver Bullet Mines Inc. amalgamated under the Canada Business Corporations Act (the “Amalgamation”) to form Silver Bullet Mining Inc. As a result of the Amalgamation, (i) all common shares of Pinehurst Capital I Inc. were consolidated on the basis of one (1) post-consolidation common share for every 2.1428 pre-consolidation common shares (the “Consolidation”); and (ii) in exchange for each (1) security held in the capital of Silver Bullet Mining Inc., each securityholder received one (1) security in the capital of the Company. Concurrently with the closing of the Transaction, the Company changed its name to Silver Bullet Mines Corp.

Outstanding Share Capital and Escrow

Following the closing of the Transaction, the Company has a total of 55,458,038 common shares issued and outstanding. An aggregate 24,071,668 common shares and 2,605,763 stock options held by the principals of the Company are subject to Tier 2 Surplus Security Escrow and will be released from escrow as follows: five percent (5%) of the escrowed shares will be released from escrow on the issuance of the final exchange bulletin confirming the completion of the Transaction by the TSXV (the “Final Exchange Bulletin”), five percent (5%) will be released 6 months thereafter, ten percent (10%) will be released 12 months and 18 months following the issue of the Final Exchange Bulletin, fifteen percent (15%) will be released 24 months and 30 months following the issue of the Final Exchange Bulletin, and the balance of forty percent (40%) will be released 36 months after the issue of the Final Exchange Bulletin. An additional 6,000,000 shares and 428,571 stock options held by non-principals of the Company are subject to Tier 2 Value Security Escrow and will be released from escrow as follows: ten percent (10%) of the escrowed shares will be released from escrow on the issuance of the Final Exchange Bulletin, fifteen percent (15%) will be released on each of the 6 months, 12 months, 18 months, 24 months, 30 months and 36 months thereafter.

New Board and Management

On closing of the Transaction, David Rosenkrantz, Daniel Tobon, Ilana Prussky, John A. Leja, Maurice Kagan and Shael Soberano resigned as the directors and officers of the Company.

On closing, the following individuals were appointed as directors and officers of the Company:

John Carter – CEO and Director
Ron Wortel – President and Director
Ron Murphy – Vice President Mining and Director
Eric Balog – Director
J. Birks Bovaird – Director
Peter Clausi – Vice President Capital Markets and Director
Jon Wiesblatt – Director
Brian Crawford – Chief Financial Officer and Corporate Secretary

The incoming board of directors would like to thank Messrs. Rosenkrantz, Tobon, Leja, Kagan and Soberano and Ms. Prussky for their contributions and service to the Company.

For further information, please contact:

John Carter
Silver Bullet Mines Corp.
e: info@silverbulletmines.com
p: 905-302-3843

Neither the Exchange nor its Regulation Services Provider (as that term is defined in the policies of the Exchange) accepts responsibility for the adequacy or accuracy of this release.

The securities referenced herein have not been, nor will be, registered under the United States Securities Act of 1933, as amended, and may not be offered or sold within the United States or to, or for the account or benefit of, U.S. persons absent U.S. registration or an applicable exemption from U.S. registration requirements. This release does not constitute an offer for sale of securities in the United States.

Investors are cautioned that, except as disclosed in the Filing Statement, any information released or received with respect to the Transaction may not be accurate or complete and should not be relied upon.

Categories
Base Metals Energy Junior Mining

Granite Creek Copper Announces Results of Mine Planning & Mineral Processing Work Conducted on the Carmacks Copper-Gold Project by Sedgman and Mining Plus

VANCOUVER, BC / ACCESSWIRE / December 1, 2021 / Granite Creek Copper Ltd. (TSXV:GCX)(OTCQB:GCXXF) (“Granite Creek” or the “Company“) is pleased to announce the results of work completed by Sedgman Canada and Mining Plus on the Company’s Carmacks copper-gold-silver deposit in the Minto Copper Belt located in central Yukon, Canada. The Company has received a final report on studies that include review of alternate leach technologies, mine planning, ore sorting and other key elements which are expected to be highly influential on the updated preliminary economic assessment (“PEA”) planned for H1 2022.

Highlights include:

  • Excellent results from initial metallurgical testing on sulfide material;
  • Confirmation of in tank leaching as the preferred method of extraction of both copper and precious metals from oxide ores;
  • Identification of conventional flotation as the preferred method of producing a copper concentrate from sulfide ores;
  • Development of a draft underground mine plan, with sub-level block cave as the preferred underground mining method at Carmacks;

Granite Creek President & CEO, Tim Johnson, stated, “We are extraordinarily pleased with the results provided by Sedgman and Mining Plus and the degree of efficiency, expertise and professionalism they have demonstrated since Granite Creek initially engaged them in May of this year. The studies have provided a great deal of new insight and clarity on the best path forward as we continue to advance Carmacks toward updated economics and, ultimately, production. We are very confident that these elements of mine planning and optimization, combined with the updated 43-101 mineral resource estimate we anticipate in Q1, will form the basis of a robust new PEA. The Yukon is an exceptional mining jurisdiction, the Minto belt has excellent infrastructure and robust mineralization currently being mined by Minto Metals Corp. just to the north of us who are now publicly traded on the Venture Exchange. We look forward to additional announcements soon as the pieces continue to fall into place at Carmacks.”

Virtual Investor Conference – OTC Markets Group

Granite Creek will be presenting at the upcoming Mining & Metals Virtual Investor Conference hosted by OTC Markets Group on Wednesday, December 8th at 11:30 AM PT / 2:30 PM ET. Topics of discussion will include the Company’s 2021 drilling campaign, the mine planning and mineral processing results described herein, and implications for the expected updates to both the existing 43-101 mineral resource estimate and PEA. To register, click here.

Sedgman / Mining Plus Report Discussion

An initial review of geotechnical studies as referenced in the 2017 PEA1,2, has indicated that a sub-level block cave is likely the most cost-effective method of underground mining of Zone 1 at the Carmacks Deposit. Based on this, Granite Creek will now move to initiate costing studies to support an updated PEA that includes potential underground resources not only in Zone 1 but other adjacent zones. In addition, the Company will launch pit design and optimization efforts on mineralized zones that lie outside of the pit contemplated in the 2017 PEA. Specifically, Zones 2000S and 13 will see pit optimization scenarios that will determine how much material could potentially be mined via open pit and what portion of the resources will be extracted by underground mining methods.

Metallurgical testing of sulfide mineralization to determine recovery of copper minerals using conventional flotation technology to create a copper concentrate was highly successful, achieving copper recoveries of up to 95%. Further testing is planned to confirm these recovery rates and to add gold and silver to a concentrate scenario. This work will be used identify the correct sizing of a copper-gold-silver concentrator circuit and the associated economics.

Previous economic assessments did not consider the potential value from processing of the high-grade sulphide material at Carmacks, despite a defined sulfide resource. In conducting a comprehensive review of the Carmacks deposit and the Carmacks North target area, the presence of significant sulfide mineralization became immediately apparent and Granite Creek felt it prudent to examine its potential inclusion as a means to expand the overall resource, extend mine life and improve economics. The majority of the Company’s 2021 drilling campaign focused on delineating and expanding sulfide resources with both near surface and deeper targets explored. Both oxide and sulphide mineralized zones remain open to expansion, with a significant expansion of the sulphide resource anticipated in the upcoming resource estimate update in Q1 2022. The updated PEA will incorporate this expanded resource and will include review of the mining sequence including an assessment of whether any sulfide resources may be mined via open pit and the optimal sequence for sulfide flotation and oxide leaching.

Table 1. Current Mineral Resource Estimate on the Carmacks Copper Project1,2

CategoryTonnes (000)Cu (%)Au (g/t)Ag (g/t)
Oxide & Transition MineralizationMeasured6,4840.860.414.24
Indicated9,2060.970.363.80
M&I15,6900.940.383.97
Inferred9130.450.121.90
Sulphide MineralizationMeasured1,3810.640.192.17
Indicated6,6870.690.172.34
M&I8,0680.680.182.33
Inferred8,4070.630.151.99

[1] JDS Energy and Mining. Feb 9, 2017. NI 43-101 Preliminary Economic Assessment Technical Report on the Carmacks Project, Yukon, Canada. Contained metal based on 23.76 million tonnes of NI 43-101 compliant resources in the Measured and Indicated categories grading 0.85% Cu, 0.31 g/t Au, 3.14 g/t Ag.

[2] Arseneau Consulting Services, 2016 Independent Technical Report on the Carmacks Copper Project, Yukon, Canada.

About Granite Creek Copper

Granite Creek, a member of the Metallic Group of Companies, is a Canadian exploration company focused on the 176 square kilometer Carmacks project in the Minto copper district of Canada’s Yukon Territory. The project is on trend with the high-grade Minto copper-gold mine, operated by Minto Metals Corp., to the north, and features excellent access to infrastructure with the nearby paved Yukon Highway 2, along with grid power within 12 km. More information about Granite Creek Copper can be viewed on the Company’s website at www.gcxcopper.com.

FOR FURTHER INFORMATION PLEASE CONTACT:

Timothy Johnson, President & CEO
Telephone: 1 (604) 235-1982
Toll-Free: 1 (888) 361-3494
E-mail: info@gcxcopper.com
Website: www.gcxcopper.com
Metallic Group: www.metallicgroup.ca
Twitter: @yukoncopper

Qualified Person

Ms. Debbie James, P.Geo., a qualified person for the purposes of National Instrument 43-101, has reviewed and approved the technical disclosure contained in this news release.

Forward-Looking Statements

This news release includes certain statements that may be deemed “forward-looking statements”. All statements in this release, other than statements of historical facts including, without limitation, statements regarding potential mineralization, historic production, estimation of mineral resources, the realization of mineral resource estimates, interpretation of prior exploration and potential exploration results, the timing and success of exploration activities generally, the timing and results of future resource estimates, permitting time lines, metal prices and currency exchange rates, availability of capital, government regulation of exploration operations, environmental risks, reclamation, title, and future plans and objectives of the company are forward-looking statements that involve various risks and uncertainties. Although Granite Creek Copper believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in the forward-looking statements. Forward-looking statements are based on a number of material factors and assumptions. Factors that could cause actual results to differ materially from those in forward-looking statements include failure to obtain necessary approvals, unsuccessful exploration results, changes in project parameters as plans continue to be refined, results of future resource estimates, future metal prices, availability of capital and financing on acceptable terms, general economic, market or business conditions, risks associated with regulatory changes, defects in title, availability of personnel, materials and equipment on a timely basis, accidents or equipment breakdowns, uninsured risks, delays in receiving government approvals, unanticipated environmental impacts on operations and costs to remedy same, and other exploration or other risks detailed herein and from time to time in the filings made by the companies with securities regulators. Readers are cautioned that mineral resources that are not mineral reserves do not have demonstrated economic viability. Mineral exploration and development of mines is an inherently risky business. Accordingly, the actual events may differ materially from those projected in the forward-looking statements. For more information on Granite Creek Copper and the risks and challenges of their businesses, investors should review their annual filings that are available at www.sedar.com.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

SOURCE: Granite Creek Copper Ltd.



View source version on accesswire.com:
https://www.accesswire.com/675433/Granite-Creek-Copper-Announces-Results-of-Mine-Planning-Mineral-Processing-Work-Conducted-on-the-Carmacks-Copper-Gold-Project-by-Sedgman-and-Mining-Plus

Categories
Base Metals Energy Junior Mining Precious Metals Project Generators

Riverside Resources Repatriates Its Portfolio in the Geraldton Gold Belt in Ontario, Canada

Vancouver, British Columbia–(Newsfile Corp. – December 1, 2021) – Riverside Resources Inc. (TSXV: RRI) (OTCQB: RVSDF) (FSE: 5YY) (“Riverside” or the “Company”), is pleased to announce the repatriation of its 3 projects in the Beardmore-Geraldton Greenstone Belt (“BGGB”) in Ontario, Canada. In February 2021, Riverside offered the sale of its portfolio to iMetal Resources Inc. (“iMetal”). The Purchase Agreement was contingent upon a series of conditions which were not completed. At this time both parties have mutually agreed to dissolve the transaction and Riverside has now retained 100% ownership of the project portfolio of: Oakes, Longrose and Pichette located in the well-endowed and prolific BGGB. The recovery of these projects occurs at an opportune time for Riverside, particularly since the region is experiencing a renaissance in mining activity. Specifically, the recent launch of construction at the Greenstone Mine (an Equinox Gold / Orion Joint Venture) near the town of Geraldton, which bodes extremely well for Riverside’s own projects which are located along the trans-Canada highway and in close proximity to the Greenstone Mine.

During the past 7 months Riverside acted as exploration operator completing a summer field program. During the agreement with iMetal, Riverside more than doubled the induced polarization survey (IP) grid as well as conducted a focused sampling and mapping program along the survey grid at the Oakes Gold Project.

Highlights of the BGGB portfolio can be found in the press release dated February 10, 2021, which summarizes the previous work done at Oakes and also Riverside’s work on the three properties (see Figure 1).



Figure 1: Riverside’s 3 projects in the Geraldton-Beardmore gold belt shown in red along 90 km trend

To view an enhanced version of Figure 1, please visit:
https://orders.newsfilecorp.com/files/6101/106007_6ff1e4a98493e910_002full.jpg

Riverside’s President and CEO, John-Mark Staude: “Regaining control of this three-project portfolio of further de-risked gold properties near the developing Greenstone Gold Mine provides Riverside with a unique opportunity to advance exploration ourselves. Drill target generation progressed this summer, we have a drill permit in hand and will start with further exploration work at Oakes with a view towards drilling initial targets there during 2022.”

Oakes Project:

Riverside acquired the BGGB portfolio in 2019, through a staking program with the opportunity to secure open ground in a prolific gold belt in northwestern Ontario adjacent to the Greenstone Gold Mine, a large gold resource and near-term future mining operation. Since 2019, Riverside’s technical teams have progressed and defined a large undrilled exploration target through the compilation of historical work including high grade gold drill and trench results, and an IP survey. Riverside controls a total of 55 km2 (5,544 hectares) at the Oakes Project, which is defined as being the most advanced project within the recovered BGGB portfolio. The latest exploration work included defining drill targets over a 2.3 km long IP anomaly corresponding to approximately 30% of the property explored as presented below.

The 2021 IP survey included a total of 12 line-km with the intention to identifying continuity to the east and west of the known mineralized system. These new geophysical results show an increased anomaly from 600 m length to a total of 2.2 km with continuity of the anomaly from the 2010 IP1 grid to the 2021 grid extension. Recent field work from Riverside’s team aimed to verify the IP anomalies on the ground looking for any potential associated evidence of mineralization and collect samples (pending).

At least three targets have been described as presented below, all of them drill-ready:

  • High Grade (“HG”) target reporting up to 31.9 g/t Au at surface (see press release July 29, 2019)
  • Brinklow target reporting a sample of 0.8 g/t Au
  • Crib target with sample assays pending

The high chargeability anomalies are not restricted along strike, neither to the west nor the east side, leaving the possibility for extension beyond the 2.2 km three parallel chargeable corridors. This will allow for additional exploration follow up in 2022 heading toward drilling.



Figure 2: Normalized chargeability (IP) combined 2010 (Golden Chalice, 2010) and Riverside 2021 covering about 30% of the Oakes Project. Anomalies presented as targets are understood to be related to geological features/variations, all of interest potentially related to mineralization. Overall, IP anomalies strike at Az100. Assay results are from Riverside’s field work in 2019.

To view an enhanced version of Figure 2, please visit:
https://orders.newsfilecorp.com/files/6101/106007_6ff1e4a98493e910_003full.jpg

Moving forward, Riverside wishes to advance the project with a drill program. De-risking has allowed the company to build confidence for additional project investment. The company is also very pleased to have the projects back into its current portfolio, setting up new opportunities to move ahead in a belt that sees substantial mining investment now with the Equinox Gold / Orion Mine Finance partnership on building a large new gold mine operation at Greenstone near the Company’s property holdings.

Options Grant

On November 16, 2021 the Company granted 1,000,000 incentive stock options (the “Options”) to Directors, Officers and Consultants of the Company. The Options are exercisable at $0.16 per share for a period of 5 years from the date of grant. Options granted to individuals in their capacity as a Director vest in 3 equal instalments over 18 months and Options granted to Officers and Consultants vest in 4 equal instalments over 12 months. The Options were granted pursuant to the Company’s shareholder-approved stock option plan and are subject to the policies of the TSX Venture Exchange and any applicable regulatory hold periods.

Qualified Person & QA/QC:

The scientific and technical data contained in this news release was reviewed and approved by Freeman Smith, P.Geo, a non-independent qualified person to Riverside Resources, who is responsible for ensuring that the geologic information provided within this news release is accurate and who acts as a “qualified person” under National Instrument 43-101 Standards of Disclosure for Mineral Projects.

All data represented here from historical reporting, including but not limited to, drill results and resource estimates are historical in nature and require caution readers as the vintage work.

About Riverside Resources Inc.:

Riverside is a well-funded exploration company driven by value generation and discovery. The Company has over $5M in cash, no debt and less than 72M shares outstanding with a strong portfolio of gold-silver and copper assets and royalties in North America. Riverside has extensive experience and knowledge operating in Mexico and Canada and leverages its large database to generate a portfolio of prospective mineral properties. In addition to Riverside’s own exploration spending, the Company also strives to diversify risk by securing joint-venture and spin-out partnerships to advance multiple assets simultaneously and create more chances for discovery. Riverside has properties available for option, with information available on the Company’s website at www.rivres.com.

ON BEHALF OF RIVERSIDE RESOURCES INC.

“John-Mark Staude”

Dr. John-Mark Staude, President & CEO

For additional information contact:

John-Mark Staude
President, CEO
Riverside Resources Inc.
info@rivres.com
Phone: (778) 327-6671
Fax: (778) 327-6675
Web: www.rivres.com

Raffi Elmajian
Corporate Communications
Riverside Resources Inc.
relmajian@rivres.com
Phone: (778) 327-6671
TF: (877) RIV-RES1
Web: www.rivres.com

Certain statements in this press release may be considered forward-looking information. These statements can be identified by the use of forward-looking terminology (e.g., “expect”,” estimates”, “intends”, “anticipates”, “believes”, “plans”). Such information involves known and unknown risks — including the availability of funds, the results of financing and exploration activities, the interpretation of exploration results and other geological data, or unanticipated costs and expenses and other risks identified by Riverside in its public securities filings that may cause actual events to differ materially from current expectations. Readers are cautioned not to place undue reliance on these forward-looking statements, which speak only as of the date of this press release.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

1 Golden Chalice, 2010

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/106007

Categories
Base Metals Energy Junior Mining

Noram Announces Appointment of President and Chief Operating Officer

VANCOUVER, BC / ACCESSWIRE / December 1, 2021 / Noram Lithium Corp. (“Noram” or the “Company”) (TSX.V:NRM)(Frankfurt:N7R)(OTCQB:NRVTF) today announced the appointment of Peter A. Ball as President and Chief Operating Officer. The addition of Mr. Ball strengthens Noram’s Senior Management team as its 100%-owned Zeus Lithium Project in Nevada continues to transition from an advanced exploration project to a potential company-making development-stage asset with the imminent completion of its Preliminary Economic Assessment (“PEA”).

“We are excited to have Mr. Ball join our team as we transition from explorer to developer,” stated Mr. Sandy MacDougall, CEO of Noram Lithium“Peter is an experienced capital markets executive and brings with him field experience from years in the mining sector. Peter adds considerable strength to our management team as we advance our Zeus Lithium Project toward production.”

“I am thrilled to join the exceptional team at Noram Lithium at this key transformational period of the Company’s advancement of its 100% owned high-grade Zeus Lithium Project,”commented Mr. Peter A. Ball, Noram’s new President and COO.“I appreciate the opportunity to be a part of Noram’s lithium development story and leverage the current global battery metals bull market. At Noram, we are executing an aggressive and focused resource development strategy to fully understand the economics of the Zeus Lithium Project. We believe the upcoming PEA, which is anticipated to be completed before the end of 2021, will clearly highlight to the market and global lithium and battery metal investors that the Zeus Project has the potential to not only reach the production stage, but significantly assist battery metal end-users tackle the demand/supply crunch clearly evident over the next decade and beyond. The Zeus Project’s resource model indicates a high-grade shallow lithium deposit located in Nevada, one of the top mining jurisdictions globally, and is also immediately adjacent to the only Lithium producer in United States. I look forward to contributing to what will be Noram’s biggest year ahead as we focus on aggressively elevating the Zeus Lithium Project amongst our peers and rewarding our supportive shareholders.”

Mr. Ball brings a progressive track record of proven leadership experience covering more than thirty years in the mining and finance sectors. He has demonstrated competencies in the resource industry on an international level, leveraging senior executive management roles in business, engineering, finance, and securities. Mr. Ball has served in various management and senior executive roles for numerous companies most recently in Nevada at NV Gold Corp., and including Redstar Gold Corp., Columbus Gold Corp., Hudson Bay Mining & Smelting, Echo Bay Mines Ltd., RBC Dominion Securities and Eldorado Gold Corp. Mr. Ball is a graduate of the Haileybury School of Mines, Georgian Business College and is a member of CIMM.

Noram has granted 1,000,000 incentive stock options to an officer and consultant of the Company. The Options are exercisable at a price of $0.77 per share for a period of ten (10) years, expiring on November 30, 2031. All options granted are in accordance with the Company’s 10% Rolling Stock Option Plan, and subject to TSX Venture acceptance.

About Noram Lithium Corp.

Noram Lithium Corp (TSX.V:NRM)(Frankfurt:N7R)(OTCQB:NRVTF) is a Canadian based advanced Lithium exploration stage company. Noram is aggressively advancing its 100%-owned Zeus Lithium Project in Nevada from the current advanced resource stage to the development-stage level through the completion of its Preliminary Economic Assessment by the end of 2021. The Company’s flagship asset is the Zeus Lithium Project (“Zeus”), located in Clayton Valley, Nevada. The Zeus Project contains a current 43-101 measured and indicated resource estimate of 363 million tonnes grading 923 ppm lithium, and an inferred resource of 827 million tonnes grading 884 ppm lithium utilizing a 400 ppm Li cut-off.

Noram’s long term strategy is to become a leader in the development of lithium deposits, become a low-cost producer and supplier, and sell lithium into the markets of Europe, North America and Asia.

Please visit our web site for further information: www.noramlithiumcorp.com.

ON BEHALF OF THE BOARD OF DIRECTORS

Sandy MacDougall
CEO and Director

Investor Relations Contact:
Rich Matthews
Managing Partner
Integrous Communications
rmatthews@integcom.us
+1 604 757 7179

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. This news release may contain forward-looking information which is not comprised of historical facts. Forward-looking information involves risks, uncertainties and other factors that could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. Forward-looking information in this news release includes statements regarding, among other things, the completion transactions completed in the Agreement. Factors that could cause actual results to differ materially from such forward-looking information include, but are not limited to, regulatory approval processes. Although Noram believes that the assumptions used in preparing the forward-looking information in this news release are reasonable, including that all necessary regulatory approvals will be obtained in a timely manner, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. Noram disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by applicable securities laws.

SOURCE: Noram Lithium Corp.



View source version on accesswire.com:
https://www.accesswire.com/675431/Noram-Announces-Appointment-of-President-and-Chief-Operating-Officer

Categories
Base Metals Energy Junior Mining

Nevada Copper Provides Update on Operational Advances

YERINGTON, Nev., Nov. 30, 2021 (GLOBE NEWSWIRE) — Nevada Copper Corp. (TSX: NCU) (OTC: NEVDF) (FSE: ZYTA) (“Nevada Copper” or the “Company”) today provided an update on its operations, including advances at the Company’s underground mine at its Pumpkin Hollow Project (the “Underground Mine”) and an update on its 2022 development plan.

Underground Mine Operations Highlights

  • Lateral Development Rates Continue to Rise. The Company has advanced approximately 760 lateral equivalent feet in the past 30 days, a 20% increase in average daily footage from the previous 30 days. Lateral development continues on multiple headings, providing access to ore mining zones in the East South orebody and advancing development towards the East North orebody.
  • Sugar Cube to be Blasted Shortly. The high-grade Sugar Cube zone is planned to be drilled in December and mining is expected to commence in early Q1 2022. This will be the first stope mined in the East North orebody, which is expected to have higher quality ground conditions and significantly larger stope sizes.
  • Processing Plant Operating Well. The mill continues to run at design specifications with the grinding, flotation, thickening, and concentrate filtration circuits performing well mechanically. The Company anticipates increased production and recovery rates with the addition of the Sugar Cube zone to the processing plant’s ore feed in Q1 2022.
  • Surface Ventilation Fans on Schedule. The surface ventilation fans are on schedule to arrive on site in approximately 3 weeks with installation and commissioning expected to be completed on time in line with the demands of the mine plan.

2022 Development Plan Update

  • Open Pit Drilling and Progressing. With additional funding received from the Company’s recent public equity offering, the Company intends to undertake an infill drilling campaign and to update its open pit studies to reflect opportunities for increased scale, larger resource and other optimization workstreams. Further updates on the Company’s 2022 development plan will be released shortly.

“I am pleased with the operational advances we have achieved this month, as we build on the progress from Q3,” stated Randy Buffington, President and Chief Executive Officer. “Our development rates continue to increase on a weekly basis and will soon provide access to the larger high-grade stopes, which is expected to result in increased ore feed delivered to our fully operational processing plant for a step further in our ramp-up progression.”

Qualified Persons
The technical information and data in this news release was reviewed by Greg French, C.P.G., VP Head of Exploration of Nevada Copper, and Neil Schunke, P.Eng., a consultant to Nevada Copper, who are non-independent Qualified Persons within the meaning of NI 43-101.

About Nevada Copper
Nevada Copper (TSX: NCU) is a copper producer and owner of the Pumpkin Hollow copper project. Located in Nevada, USA, Pumpkin Hollow has substantial reserves and resources including copper, gold and silver. Its two fully permitted projects include the high-grade Underground Mine and processing facility, which is now in the production stage, and a large-scale open pit project, which is advancing towards feasibility status.

NEVADA COPPER CORP.
www.nevadacopper.com

Randy Buffington, President and CEO

For further information contact:
Rich Matthews, Investor Relations
Integrous Communications
rmatthews@integcom.us
+1 604 757 7179

Cautionary Language

This news release includes certain statements and information that constitute forward-looking information within the meaning of applicable Canadian securities laws. All statements in this news release, other than statements of historical facts are forward-looking statements. Such forward-looking statements and forward-looking information specifically include, but are not limited to, statements that relate to mine development, production and ramp-up objectives, equipment installation, drilling programs and the completion of a new feasibility study.

Forward-looking statements and information include statements regarding the expectations and beliefs of management. Often, but not always, forward-looking statements and forward-looking information can be identified by the use of words such as “plans”, “expects”, “potential”, “is expected”, “anticipated”, “is targeted”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates”, or “believes” or the negatives thereof or variations of such words and phrases or statements that certain actions, events or results “may”, “could”, “would”, “might” or “will” be taken, occur or be achieved. Forward-looking statements or information should not be read as guarantees of future performance and results. They are subject to known and unknown risks, uncertainties and other factors which may cause the actual results and events to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements or information.

Such risks and uncertainties include, without limitation, those relating to: the ability of the Company to complete the ramp-up of the Underground Mine within the expected cost estimates and timeframe; requirements for additional capital and no assurance can be given regarding the availability thereof; the impact of the COVID-19 pandemic on the business and operations of the Company; the state of financial markets; history of losses; dilution; adverse events relating to milling operations, construction, development and ramp-up, including the ability of the Company to address underground development and process plant issues; ground conditions; cost overruns relating to development, construction and ramp-up of the Underground Mine; loss of material properties; interest rates increase; global economy; limited history of production; future metals price fluctuations; speculative nature of exploration activities; periodic interruptions to exploration, development and mining activities; environmental hazards and liability; industrial accidents; failure of processing and mining equipment to perform as expected; labor disputes; supply problems; uncertainty of production and cost estimates; the interpretation of drill results and the estimation of mineral resources and reserves; changes in project parameters as plans continue to be refined; possible variations in ore reserves, grade of mineralization or recovery rates from management’s expectations and the difference may be material; legal and regulatory proceedings and community actions; accidents; title matters; regulatory approvals and restrictions; increased costs and physical risks relating to climate change, including extreme weather events, and new or revised regulations relating to climate change; permitting and licensing; volatility of the market price of the Company’s securities; insurance; competition; hedging activities; currency fluctuations; loss of key employees; other risks of the mining industry as well as those risks discussed in the Company’s Management’s Discussion and Analysis in respect of the year ended December 31, 2020 and in the section entitled “Risk Factors” in the Company’s Annual Information Form dated March 18, 2021. Should one or more of these risks or uncertainties materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those described in forward-looking statements or information. The forward-looking information or statements are stated as of the date hereof. Nevada Copper disclaims any intent or obligation to update forward-looking statements or information except as required by law. Readers are referred to the additional information regarding Nevada Copper’s business contained in Nevada Copper’s reports filed with the securities regulatory authorities in Canada. Although the Company has attempted to identify important factors that could cause actual actions, events, or results to differ materially from those described in forward-looking statements, there may be other factors that could cause actions, events or results not to be as anticipated, estimated or intended. For more information on Nevada Copper and the risks and challenges of its business, investors should review Nevada Copper’s filings that are available at www.sedar.com.

Nevada Copper provides no assurance that forward-looking statements and information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements or information. Accordingly, readers should not place undue reliance on forward-looking statements or information.

Categories
Junior Mining Precious Metals Uncategorized

Novo Identifies Ni-Cu Targets at Southcourt, Andover Intrusion, Adjacent to Azure’s Andover VC-07 Ni-Cu-Co Discovery

HIGHLIGHTS
 

  • Novo’s extensive greenfields exploration program has recently identified and advanced a series Ni-Cu-Co targets adjacent to Azure Minerals Limited’s (“ Azure ”) (ASX: AZS) Andover VC-07 Ni-Cu-Co massive sulphide discovery (“ Andover ”) and Artemis Resources Limited’s (“ Artemis ”) (ASX: ARV) Carlow Castle Au-Cu-Co discovery (“ Carlow Castle ”)
  • Novo’s 100%-owned exploration licence 47/1745 contains several airborne electromagnetic (“ VTEM ”) anomalies (previously defined in 2007 by Legend Mining Limited (“ Legend ”) (ASX: LEG)) which have not been drill tested, along with large high order soil geochemical anomalies (including Cu, Ni and Co) associated with the VTEM conductors, including the Southcourt and Milburn prospects
  • Novo is now progressing ground electromagnetic (“ EM ”) geophysical surveys in the near-term to advance these discoveries
  • This work is consistent with Novo’s accelerated exploration strategy targeted at growing the Company’s portfolio of gold and battery metals prospects in the Pilbara region of Western Australia

VANCOUVER, British Columbia, Nov. 30, 2021 (GLOBE NEWSWIRE) — Novo Resources Corp. “Novo” or the “Company” ) (TSX: NVO, NVO.WT & NVO.WT.A) (OTCQX: NSRPF) is pleased to advise that it has recently identified and advanced a series of Au-Cu and Ni-Cu-Co targets on EL47/1745, adjacent to Andover and Carlow Castle in the West Pilbara region of Western Australia, although there is no certainty that EL47/1745 contains the same levels of mineralization as either of these discoveries.

The general area has benefited from a renewed exploration interest since Azure announced its drilling success on Andover in November 2020 with 3.9m @ 2.85% Ni and 0.47% Cu from 94.5m in their maiden drill hole ANDD001, subsequent to success by the Creasy Group, in 2018, who intersected 7m @ 2.62% Ni and 0.65% Cu in ADRC002 .

Recent geochemical sampling by Novo over previously defined VTEM conductors on EL47/1745 (weak conductors within airborne electro-magnetic surveys by Legend ) has defined several large high-order Cu, Ni and Co anomalies relating to the VTEM targets.

Results and technical information referred to in this news release from Azure, Legend, Artemis, Westfield Minerals Ltd (“ Westfield ”) and AMAX Exploration (“ AMAX ”) are not necessarily representative of mineralization throughout the district. This historical data was disclosed in ASX announcements, other public disclosure documents, and annual exploration reports filed on the Western Australian Department of Mines, Industry Regulation and Safety’s (“ DMIRS ”) website (collectively, “ Disclosure ”) issued by Azure, Legend, Artemis, Westfield, and AMAX. The technical information contained herein has been extracted from this Disclosure. Reference should be made to the relevant Disclosure which is available online at the links provided in various footnotes throughout this news release.

A qualified person has not verified the technical information contained in the Disclosure, and Novo is unaware of the existence of any technical report prepared in accordance with National Instrument 43-101 Standards of Disclosure for Mineral Projects or the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves in connection with the technical information contained in the Disclosure. Novo is unable to comment on the reliability of the technical information contained in the Disclosure and therefore, reliance should not be placed on such technical information.

https://www.globenewswire.com/NewsRoom/AttachmentNg/639bed66-5cfe-4d58-ac4f-9ead23808126

Figure 1 – EL47/1745 location and priority targets, in relation to Andover and Carlow Castle.)

Southcourt Anomalies

Three weak VTEM conductors 3km WNW of Andover are present in a zone of complex geology within the Andover intrusion at Novo’s Southcourt prospect ( Figure 1 ), including layered gabbro and ultramafic intrusive rocks.

Detailed 20 x 20 m to 20 x 40 m spaced soil sampling undertaken by Novo utilizing a Niton XL5 pXRF has defined a high-order 500 m long Cu anomaly flanking the western two VTEM conductors ( Figure 2 ). Co and Ni partially overlap the broad copper anomaly ( Figure 3 ). Peak pXRF soil values include 1,456 ppm Cu, 1,521 ppm Ni, and 1,938 ppm Co. Peak rock chip results utilizing the pXRF for spot assaying on sulphide minerals or Cu-Ni oxide minerals yielded up to 19.6% Cu, 0.13% Co and 2.07% Ni. These results are not necessarily representative of mineralization throughout the entire district. Novo interprets the broad anomaly to be a zone of disseminated sulphide ( Figure 5a ) on the margin of potentially more substantial sulphide bodies at depth (VTEM target). Additional assay results are pending.

Milburn Anomaly

One high intensity VTEM anomaly is present at Milburn, 1.4km ESE from the east end of Carlow Castle. Previous work by Legend included eight lines of ground EM which identified a single conductor modelled to a dip of 45 west at a depth of 35 m. The EM anomaly was followed up by Legend with 17 -2 mm soil samples which returned peak values of 36 and 33 ppb Au and previous rock chip sampling yielded values of 4.83% Cu, 0.15 g/t Au and 0.21% Ni. The anomaly was not drilled by Legend.

In 1967, Westfields Minerals defined a 1 km long induced polarization (“ IP ”) anomaly (Fig. 3) to the south of the EM conductor and completed shallow vertical percussion holes with a best result of 6m @ 0.22% Ni and 0.15% Cu (BH31) (Fig. 3). Subsequent drilling in 1971 by AMAX 10 intersected a sequence of mafic and ultramafic rocks with 1 to 10% disseminated sulfides (pyrite, pyrrhotite and rare chalcopyrite) with best results from PDH20A (Fig. 3) of 3.66 m @ 0.23% Ni and 0.17% Cu. These results are not necessarily representative of mineralization throughout the entire district. Importantly, Au, Co and PGE minerals were not analyzed.

Detailed 20 x 20m spaced soil sampling undertaken by Novo utilizing a Niton XL5 pXRF has defined a high-order 450 m long Cu anomaly flanking the eastern side of the VTEM conductor ( Figure 4 ). Peak pXRF soil values include 1,677 ppm Cu, 1,131 ppm Ni, and 238 ppm Co. Peak rock chip results utilizing the pXRF for spot assaying on sulphide minerals or Cu-NI oxide minerals yielded up to 15.2% Cu, 92 ppm Co and 0.33% Ni. These results are not necessarily representative of mineralization throughout the entire district. Figure 5b highlights a copper rich siliceous altered mafic rock from the trend. Additional assay results are pending.

https://www.globenewswire.com/NewsRoom/AttachmentNg/d4efe865-748e-4f4f-9a3c-e129a140dd07

Figure 2 – Southcourt Cu soil geochemistry (pXRF) with overlapping Co anomaly and VTEM conductors (white dashed circles).)

https://www.globenewswire.com/NewsRoom/AttachmentNg/18c3576f-1fd3-4dc7-8356-f69f9583be31

Figure 3 – Southcourt Ni soil geochemistry (pXRF) with overlapping Cu anomaly Co anomaly (white shapes) and VTEM conductors (white dashed circles.))

https://www.globenewswire.com/NewsRoom/AttachmentNg/19312c11-f490-4c79-afbe-5d01f9ab6588

Figure 4 – Milburn Cu soil geochemistry (pXRF) and VTEM conductors (white dashed circles) and the location of Westfields IP anomaly and drillholes in the general area.)

Other significant targets ( Figure 1 ) on EL47/1745 include:

Anna Valley which is in the SW corner of EL47/1745. This VTEM anomaly defined by Legend was followed up with a ground fixed loop transient EM (“ FLTEM ”) survey defining a strong conductor dipping between 35 – 55°to the northwest with a modelled depths of 30 to 35 m. The target was thought to relate to a chert body which outcrops to the west, but the target is under thick alluvial and colluvial cover.

Fortune South #1 and #2 , which are part of a 2 km long shear zone with several historic workings and a number of metal detector pits where sheared gabbro and anastomosing quartz veins are present. Previous sampling has assayed up to 8.51 g/t Au and 0.134% Cu on EL47/1745 . pXRF rock chip samples at Fortune South #2 into banded and sheared Cu-rich gossan ( Figure 5d ) yielded peak values of 60% Cu and 802 ppm Ni. These target types (shear-related Au-Cu) are not highlighted by VTEM.

Thorpe East , which is part of a 2 km long shear corridor with several historic workings and peak assay results of 3.11 ppm Au . Novo has identified significant gossanous zones ( Figure 5c ) associated with quartz veining, yielding up to 676 ppm As, 3.5% Cu, 0.15% Ni, and 48.6 ppm Mo. These target types (shear-related Au-Cu) are not highlighted by VTEM.

Carlow Castle Extension , on which Artemis have reported a soil geochemical anomaly and favourable stratigraphy along strike and to the east of Carlow Castle, on EL47/1745, directly north of Milburn. Novo has not yet conducted any work on this 1.7 km long zone of potential. This orogenic Au-Cu-Co target type is not highlighted by VTEM.

The foregoing results at Anna Valley, Fortune South #1 and #2, and Thorpe East are not necessarily representative of mineralization throughout the entire district.

Exploration planned for EL47/1745 by Novo in early 2022 includes ground FLTEM surveys to better define the EM conductors, possible induced polarization lines across the identified target zones pending results of EM, and drilling into the main target areas, including the Milburn, Southcourt and Anna Valley prospects. Drill holes will be surveyed using downhole EM techniques to locate off-hole conductors. Extensive first pass reconnaissance soil sampling, regional to detailed mapping, and rock chip sampling will be conducted across highly prospective EL47/1745.

https://www.globenewswire.com/NewsRoom/AttachmentNg/bdab9da9-60a8-46a9-b9fa-cc9b7af6d6e3

Figure 5a, 5b, 5c, 5d – Milburn Cu soil geochemistry (pXRF) and VTEM conductors (white dashed circles).)

Analytic Methodology

The pXRF assay technique utilized a Niton XL5 handheld XRF machine. The Niton is calibrated daily, with 4 QAQC standards (fit for purpose including certified Ni, Cu and Co values) run concurrently, with an additional 2 standards checked per 100 readings and 4 QAQC standard assayed before the machine is shut down. pXRF is utilized as a preliminary exploration technique for base metals. Soil samples are unprepared and analysed for 30 seconds using two machine filters and rock chip samples are point analysed for 90 seconds using 4 machine filters. The pXRF is a spot reading device and has diminished precision due to grainsize effect, especially on rock samples where peak results represent a window of < 10mm field of view.

QP STATEMENT

Dr. Quinton Hennigh (P.Geo.) is the qualified person, as defined under National Instrument 43-101 Standards of Disclosure for Mineral Projects , responsible for, and having reviewed and approved, the technical information contained in this news release other than the technical information extracted from the Disclosure. Dr. Hennigh is the non-executive co-chairman and a director of Novo.

ABOUT NOVO

Novo operates its flagship Beatons Creek gold project while exploring and developing its prospective land package covering approximately 13,250 square kilometres in the Pilbara region of Western Australia. In addition to the Company’s primary focus, Novo seeks to leverage its internal geological expertise to deliver value-accretive opportunities to its shareholders. For more information, please contact Leo Karabelas at (416) 543-3120 or e-mail leo@novoresources.com .

On Behalf of the Board of Directors,

Novo Resources Corp.

“ Michael Spreadborough 

Michael Spreadborough

Executive Co-Chairman

Forward-looking information

Some statements in this news release contain forward-looking information (within the meaning of Canadian securities legislation) including, without limitation, planned exploration activities. These statements address future events and conditions and, as such, involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements to be materially different from any future results, performance or achievements expressed or implied by the statements. Such factors include, without limitation, customary risks of the resource industry and the risk factors identified in Novo’s management’s discussion and analysis for the nine-month period ended September 30, 2021, which is available under Novo’s profile on SEDAR at www.sedar.com. Forward-looking statements speak only as of the date those statements are made. Except as required by applicable law, Novo assumes no obligation to update or to publicly announce the results of any change to any forward-looking statement contained or incorporated by reference herein to reflect actual results, future events or developments, changes in assumptions or changes in other factors affecting the forward-looking statements. If Novo updates any forward-looking statement(s), no inference should be drawn that the Company will make additional updates with respect to those or other forward-looking statements.

______________________________

Refer to Azure’s ASX announcement dated November 9, 2020 .

Refer to Artemis’ ASX announcement dated November 20, 2019 .

Refer to Azure’s ASX announcement dated August 6, 2020 .

Refer to Legend’s ASX announcement dated July 23, 2007 .

Refer to Legend’s Annual Report 2009 – WAMEX Open File Data Rept. A82043

Refer to Legend’s ASX announcement dated October 02, 2007 .

Refer to Legend’s ASX announcement dated January 24, 2008 .

Refer to Legend’s Annual Report 2009 – WAMEX Open File Data Rept. A69000

Refer to Westfields Final Report 1967 – WAMEX Open File Data Rept. A982

10 Refer to AMAX Final Report 1972 – WAMEX Open File Data Rept. A3472

Primary Logo
Categories
Junior Mining Precious Metals

NV Gold Confirms Potential Extension of Gold Mineralization at Slumber Project

VANCOUVER, BC / ACCESSWIRE / November 30, 2021 / NV Gold Corporation (TSXV:NVX)(OTCQB:NVGLF)(Frankfurt:8NV) (“NV Gold” or the “Company“) has confirmed the correlation of a “low-resistivity zone” with known alteration and possible gold mineralization at its 100% controlled Slumber Gold Project (“Slumber”) located approximately 50 miles northwest of Winnemucca, Humboldt County, Nevada, USA.

The Q4-2021 drill program at Slumber has currently completed five RC (reverse circulation) drill holes totaling approximately 900 meters. The goal of this program is the confirmation of a reinterpreted geological model and correlation of alteration and possible gold mineralization with a low resistivity zone identified by last year’s CSAMT work (see press release September 7th, 2021). The initial holes appear to confirm this previously untested concept.

These initial holes have been visually encouraging, extending the zone of alteration by at least 500 meters to the north, while now demonstrating significant thickness as well (+150 m). All holes into the resistor zone have encountered highly-brecciated, silicified, hematitic rocks that remained in strong alteration at termination (see figure 1). Abundant groundwater has continued to be a depth-limiting factor for the RC equipment; therefore, the Company will limit the balance of this program to testing remaining shallower resistivity zones. Follow-up drilling will be dependent upon core rig availability. Initial analytical results from this program are expected to be received in mid to late January, depending upon laboratory constraints related to COVID and staffing.

“I am very pleased with these preliminary drilling results. This drilling campaign was designed to give Slumber an additional chance to move to a pre-discovery level. I am gratified to see these intensely silicified and brecciated rocks supporting the reinterpretation of the geological model. High grades would be a success, pointing towards a discovery. NV Gold will expand the geophysical coverage and utilize core drilling equipment to test the extensive and thick piles of mineralized silicified rock possibly containing high-grade sulfide feeders,”commented Thomas Klein VP Exploration NV Gold.

After the completion of the Slumber drilling the RC rig will be mobilized to NV Gold’s next encouraging project, Discovery Bay, located 50 kilometers south of Battle Mountain and 14 kilometers southeast of the McCoy-Cove property owned and currently under exploration by i-80 Gold Corp.

A picture containing piece, chocolate, meat, eatenDescription automatically generated
A picture containing piece, chocolate, meat, eatenDescription automatically generated

Figure 1: Intensely silicified and hematitic rhyolite breccia. (To view the full sized image, please click here.)

Near-Term Strategy and Outlook

The Company continues its focus on Nevada and the Great Basin, one of the largest and most productive gold provinces in the world. On a regional-scale, Nevada is thought by many to be a thoroughly explored gold province. Much of the near surface gold that has been found over the past 40 years has already been mined or is being mined today. To find significant new deposits, the successful explorer needs to employ modern, sensitive sampling and interpretive techniques and a willingness to drill. The breadth of experience of our staff and advisors gives us our advantage. Over 50% of Nevada is covered by recent basin sediments or volcanic cover, which often obscures the classic, visible expressions of mineralization. These covered areas are composed of the same rocks with the same temporal placement as the gold deposits found in the nearby ranges. There is a strong likelihood that other, similar-sized deposits await discovery! Significant discovery potential continues to remain in one of the preeminent gold provinces on Earth. The Company has a strong property position with over 20 projects, ranging from Greenfields to advanced “pre-discovery”. Our property portfolio covers a number of geologic environments and at varying levels of advancement. Holding costs for most of these properties are minimal, particularly those that are held as joint venture or lease-out possibilities.

It is our plan to drill 4-6 projects in the 12-18-month time horizon, providing a good news flow and multiple opportunities for success. We look forward to a productive and successful exploration season ahead.

About NV Gold Corporation

NV Gold (TSXV:NVX)(OTCQB:NVGLF)(FSE:8NV) is a well-financed exploration company with ~80 million shares issued, a solid treasury and no debt. The Company is based in Vancouver, British Columbia, and Reno, Nevada and is focused on delivering value through mineral discoveries in Nevada, USA. Leveraging its expansive property portfolio, its highly experienced in-house technical team, and its extensive geological data library, 2021 and 2022 promise to be highly productive for NV Gold.

We seek safe harbor.

On behalf of the Board of Directors,

John E. Watson, President & CEO

For further information, visit the Company’s website at www.nvgoldcorp.com or contact:
Freeform Communications at 604.245.0054

Neither the TSX Venture Exchange nor its Regulation Service Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Forward Looking Statements

This news release includes certain forward-looking statements or information. There can be no assurance that such statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from the Company’s plans or expectations include regulatory issues, market prices, availability of capital and financing, general economic, market or business conditions, timeliness of government or regulatory approvals, The Company disclaims any intention or obligation to update or revise any forward-looking statements whether because of new information, future events or otherwise, except as otherwise required by applicable securities legislation.

SOURCE: NV Gold Corporation



View source version on accesswire.com:
https://www.accesswire.com/675194/NV-Gold-Confirms-Potential-Extension-of-Gold-Mineralization-at-Slumber-Project

Categories
Base Metals Breaking Junior Mining Precious Metals Project Generators

Millrock Partner Felix Gold Lodges Initial Publuc Offering Prospectus on ASX, Fairbanks Area Gold Projects, Alaska

Figure 1

Plan View Map showing the location of the project within the Tintina Gold Province.
Plan View Map showing the location of the project within the Tintina Gold Province.
Plan View Map showing the location of the project within the Tintina Gold Province.

Figure 2

Plan View Map of Felix Gold land holdings in relation to the City of Fairbanks, Kinross’ Fort Knox Mine and Gil satellite mine, and Freegold Ventures Golden Summit / Cleary Hill gold deposit.
Plan View Map of Felix Gold land holdings in relation to the City of Fairbanks, Kinross’ Fort Knox Mine and Gil satellite mine, and Freegold Ventures Golden Summit / Cleary Hill gold deposit.
Plan View Map of Felix Gold land holdings in relation to the City of Fairbanks, Kinross’ Fort Knox Mine and Gil satellite mine, and Freegold Ventures Golden Summit / Cleary Hill gold deposit.

VANCOUVER, British Columbia, Nov. 30, 2021 (GLOBE NEWSWIRE) — Millrock Resources Inc. (TSX-V: MRO, OTCQB: MLRKF) (“Millrock” or the “Company”) is pleased to have received notice from Felix Gold that it has lodged a prospectus with the Australian Securities and Investments Commission. The filing initiates the process by which Felix Gold may become a publicly-traded company on the Australian Securities Exchange (“ASX”). If successful under the proposed schedule the company shares would begin trading in January 2022. Depending on the concurrent capital raise, Felix Gold would have between AUD$10 million and AUD$13 million in their treasury, with much of that funding to be directed to exploration of the mineral claims that have been contributed by Millrock and/or staked or acquired by Felix Gold in the Fairbanks Mining District. Upon successful IPO and capital raise, Millrock will be entitled to a payment of Felix Gold shares. It is anticipated that the ASX will impose a mandatory restriction on the disposal of these shares of up to two years. Readers are cautioned that the share payment will only be made if the IPO is successfully completed.

Millrock President and CEO Gregory Beischer commented: “This is great news for Millrock and its shareholders. Depending on the amount of money raised in the IPO, Millrock will receive Felix Gold shares with an initial value ranging between approximately US$1.7 million and US$1.9 million. Additionally, Millrock will be entitled to production royalties on all of the claims comprising the current extensive property position and on future claims that may be acquired within a large Area of Interest surrounding the Fairbanks Mining District. Millrock will be entitled to Advanced Minimum Royalty payments that begin January 2022. Some excellent targets have been developed over the past year, while Felix Gold was an unlisted company. With a strong treasury and a robust 2022 budget, Felix Gold will have a great chance to make new gold discoveries and expand the gold resource at the Grant Mine. Any exploration success should result in strong appreciation of the Felix Gold shares that Millrock will hold, and also should support Millrock’s share price.”

As reported in a January 12, 2021 press release, Millrock assigned Felix all of its rights in the Fairbanks area Ester Dome and Treasure Creek properties. It had held these rights for several years under agreements with prospectors. The Fairbanks Mining District is located within the prolific Tintina Gold Province, which spans Alaska and Yukon.

The Felix Gold prospectus indicates that (assuming the IPO and capital raise is successful) Millrock will be issued a minimum of 9,957,157 and a maximum of 11,442,384 Felix Gold shares at an IPO price of AUD$0.25 with an indicative initial value ranging between AUD$2,249,289 (CDN$2,047,389) and AUD$2,860,596 (CDN$2,603,491). The number of shares to be issued is dependent on the amount of capital raised. The shares will only be issued to Millrock if the IPO and capital raise is successfully completed.

Since signing the initial agreements in January 2021, the Felix Gold team, working in collaboration with Millrock, significantly expanded the claim package, targeting areas that appeared to have high potential based on a systematic evaluation of public data and Millrock’s proprietary database. A large soil sampling effort was carried out in 2021. More than 3,000 soil samples were collected using power augers which allow for the collection of soil at the bedrock – overburden interface. Overlying overburden in the Fairbanks area often consists of very fine grained windblown sediments with or without permafrost making traditional soil geochemical surveys less effective. This work has served to identify strongly anomalous areas on the Treasure Creek project with three main prospects: NW Array, Scrafford, and Eastgate. The survey also identified strong anomalies at the Northeast Fairbanks portion of the project, which is proximal to Kinross’ Fort Knox gold mine, the satellite Gil deposit recently put into production by Kinross, and the Golden Summit / Cleary Hill deposit, which is being actively explored by Freegold Ventures Limited with strong success.

Felix Gold has examined data from the former-producing Grant Mine upon which they have an option to purchase a 100% interest. As a result of the data analysis, Felix Gold has been able to calculate a gold resource that is compliant with the Australia Joint Ore Reserves Committee (“JORC”) standards that govern such calculations in Australia (source: INDEPENDENT GEOLOGIST’S REPORTS ON FELIX GOLD LIMITED’S MINERAL EXPLORATION PROJECTS IN ALASKA, Prepared by Independent Geologist Mr. Ian Taylor of Mining Associates Pty Ltd., October 15, 2021).

The independent geologist’s report is appended to the Felix Gold prospectus and reports the following:

  • Inferred Mineral Resource estimate (JORC 2012) for Grant Mine of 5.8 million tonnes @ 1.95 grams per tonne gold for 364,000 ounces of contained gold including an underground resource of 136,000 ounces of gold grading 6.2 grams of gold per tonne.
  • And also: Grant Mine Exploration Target (JORC 2012) of 5.6 million tonnes to 6.6 million tonnes at a grade of 1.9 grams per tonne gold to 2.1 grams per tonne gold for 338,000 to 545,000 ounces of gold (exclusive of the Mineral Resource).

Note: The NI43-101 standards are the standards to which Millrock must adhere as a TSX Venture Exchange issuer, and the Australia JORC standards are those to which Felix Gold must comply as an Australian issuer. The JORC standards are robust, similar and parallel to the NI43-101 standards. JORC (2012) is defined as an ‘acceptable foreign code’ under NI43-101 reporting standards and the definition and classification of Mineral Resources are essentially the same as the NI43-101 Canadian Institute of Mining Definition standards. The Millrock qualified person has not independently verified the drill hole data, drill core, and estimation methodology as reported by Felix.

Figure 1. Plan View Map showing the location of the project within the Tintina Gold Province.
https://www.globenewswire.com/NewsRoom/AttachmentNg/71c71907-ec2d-4791-a632-b1e2fbbd4fca

Figure 2. Plan View Map of Felix Gold land holdings in relation to the City of Fairbanks, Kinross’ Fort Knox Mine and Gil satellite mine, and Freegold Ventures Golden Summit / Cleary Hill gold deposit.
https://www.globenewswire.com/NewsRoom/AttachmentNg/d99e5cc4-19be-44d7-964d-0ca5df2fe96f

Qualified Person
The scientific and technical information disclosed within this document has been prepared, reviewed, and approved by Gregory A. Beischer, President, CEO, and a director of Millrock Resources. Mr. Beischer is a qualified person as defined in NI 43-101.

About Millrock Resources Inc.
Millrock Resources Inc. is a premier project generator to the mining industry. Millrock identifies, packages, and operates large-scale projects for joint venture, thereby exposing its shareholders to the benefits of mineral discovery without the usual financial risk taken on by most exploration companies. The company is recognized as the premier generative explorer in Alaska, holds royalty interests in British Columbia, Canada, and Sonora State, Mexico, is a significant shareholder of junior explorer ArcWest Exploration Inc. and owns a large shareholding in Resolution Minerals Limited. Funding for drilling at Millrock’s exploration projects is primarily provided by its joint venture partners. Business partners of Millrock have included some of the leading names in the mining industry: EMX Royalty, Centerra Gold, First Quantum, Teck, Kinross, Vale, Inmet and, Altius as well as junior explorers Resolution, Riverside, PolarX, Felix Gold and Tocvan.

ON BEHALF OF THE BOARD
“Gregory Beischer”
Gregory Beischer, President & CEO

FOR FURTHER INFORMATION, PLEASE CONTACT:
Melanee Henderson, Investor Relations
Toll-Free: 877-217-8978 | Local: 604-638-3164
Twitter | Facebook | LinkedIn

Some statements in this news release may contain forward-looking information (within the meaning of Canadian securities legislation) including without limitation the successful completion of an IPO and capital raise by Felix Gold and the intention to mount further exploration including drilling in 2022. These statements address future events and conditions and, as such, involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements to be materially different from any future results, performance or achievements expressed or implied by the statements.