Categories
Base Metals Collective Mining Energy Junior Mining Precious Metals

Collective Mining Discovers New High-Grade Vein and Breccia Systems at Apollo Including 17.5 Metres at 12.79 g/t Gold and 21 g/t Silver

Collective Mining Ltd.

Collective Mining Ltd.

Figure 1

Plan View of the Guayabales Project Highlighting the Apollo Target Area
Plan View of the Guayabales Project Highlighting the Apollo Target Area

Figure 2

Plan View of the Apollo Target Area Outlining the Porphyry and Breccia Targets, their Related Soil Anomalies and Drill Holes Completed or Currently Underway
Plan View of the Apollo Target Area Outlining the Porphyry and Breccia Targets, their Related Soil Anomalies and Drill Holes Completed or Currently Underway

Figure 3

Plan View of Apollo with Drill Hole Traces Completed to Date Highlighting the New High-Grade Vein System and Northern Breccia System Discoveries from Pad 2 and Pad 1 Respectively
Plan View of Apollo with Drill Hole Traces Completed to Date Highlighting the New High-Grade Vein System and Northern Breccia System Discoveries from Pad 2 and Pad 1 Respectively
  • APC-4, which is the first hole drilled to test a grassroot generated vein target located shallower and above the Main Breccia discovery at Apollo cut a near surface zone of sheeted veins and returned:
    • 17.5 metres @ 12.79 g/t gold and 21 g/t silver (65 metres vertical)
  • APC-7 and predecessor scout hole OLCS-3 were drilled to test a grassroot generated breccia target located 250 metres to the north of the Main Breccia discovery at Apollo and intersected multiple zones of mineralization between 45 metres and 320 metres below surface including:
    • 41.8 metres @ 1.07 g/t gold equivalent; and
    • 38.4 metres @ 1.51 g/t gold equivalent
  • Four rigs continue to actively drill at the Guayabales project with assay results anticipated in the near term for two holes as follows:
    • APC-6 and APC-8 tested the Main Breccia discovery at Apollo with both holes intersected more than 265 metres of potentially favourable mineralization

TORONTO, Sept. 07, 2022 (GLOBE NEWSWIRE) — Collective Mining Ltd. (TSXV: CNL) (OTCQX: CNLMF) (“Collective” or the “Company”) is pleased to announce assay results from reconnaissance holes completed designed to test new ideas at the Apollo target (“Apollo”) at the Company’s Guayabales project located in Caldas, Colombia. Targets within Apollo consists of hydrothermal breccia, porphyry and vein systems including the recently discovered copper-gold-silver Main Breccia highlighted by drill hole APC-2, which intersected 207.15 metres @ 2.68 g/t AuEq (see press release dated August 10, 2022). Apollo is one of eight porphyry-related target zones situated within a three-by-four-kilometre cluster area generated by the Company through grassroots exploration at the Guayabales project. As part of its fully funded 20,000+ metre drill program for 2022, there are currently three diamond drill rigs operating at the Apollo target with an additional rig drilling from underground at the Olympus target.

“Our very first reconnaissance drill holes undertaken outside of the Main Breccia at Apollo has led to some very positive and exciting surprises which include the presence of a high grade late-stage porphyry related CBM vein zone adjacent to our exciting Main Breccia discovery. These discoveries attest to the amazing potential of the Apollo target area, which continues to expand as we step-out with drilling. Over the coming months, our drilling will be aggressively focused on flushing out the multi-million-ounce potential of the Main Breccia discovery at Apollo, but without question the new discoveries announced today highlight excellent additional opportunities for follow up in the future,” commented Ari Sussman, Executive Chairman.

Details (See Table 1 and Figures 1 – 3)

The Company recently completed five scout and reconnaissance diamond drill holes to test various conceptual targets locating within the Apollo area but outside of the Main Breccia discovery. APC-4 was designed to test a zone of northwest trending high grade, carbonate base metal veins (“CBM”), located shallower and above the Main Breccia system. APC-7 and the earlier drilled scout hole, OLCS-3, drilled beneath surface soil anomalies and discovered new, mineralized breccia bodies located approximately 250 metres north of the Main Breccia system.

APC-4, which was drilled to the southeast from Pad 2, intersected a high-grade zone of sheeted CBM veins and returned:

  • 17.5 metres @ 12.79 g/t Au and 21 g/t Ag from 132.3 metres (65 metres vertical) including 0.65 metres @ 331.47 g/t Au and 53 g/t Ag

Mineralization relates to multiple sheeted CBM veins hosting sphalerite and pyrite sulphides.

APC-7 and OLCS-3 were drilled to the southwest from Pad 1 and intersected multiple mineralized breccia bodies at various depths and returned the following intercepts:

  • APC-7: 25.55 metres @ 0.69 g/t AuEq from 85.65 metres (98 metres vertical);
  • APC-7: 38.40 metres @ 1.51 g/t AuEq from 199.85 metres (195 metres vertical);
  • APC-7: 20.45 metres @ 0.89 g/t AuEq from 325.0 metres (320 metres vertical); and
  • OLCS-3: 41.8 metres @ 1.07 g/t AuEq from 37.0 metres (45 metres vertical)

In addition to the new CBM vein discoveries a further two reconnaissance holes were drilled south from Pad 1 and southeast from Pad 2 to respectively test for breccia mineralisation and a mineralised porphyry body. Diamond Hole APC-9 had to be discontinued due to drilling problems and stopped short of the target zone. Diamond Hole APC-10 intersected altered quartz diorites with a porphyry vein stockwork and hosting anomalous copper, molybdenum, and gold values. The hole is interpreted to be peripheral to the main porphyry target as defined by copper soil anomalism and surface mapping. Further drilling is warranted in the future to better test both conceptual targets. Drill holes APC-12, APC-13 and APC-14 are underway with all three holes targeting the Main Breccia discovery at Apollo. Assay results for holes APC-6 and APC-8 are expected in the near term, with both holes intercepting more than 265 metres of potentially favourable mineralization.

The Apollo target area, as defined to date by surface mapping, rock sampling and copper and molybdenum soil geochemistry, covers an 800 metre X 700 metre area. The Apollo target area hosts the Company’s new grassroots Main Breccia discovery plus additional yet untested breccia, porphyry and vein targets. The Apollo target area also remains open for further expansion.

Table 1: Assays Results

HoleIDFrom
(m)
To
(m)
Intercept
(m)
Au
(g/t)
Ag
(g/t)
AuEq
(g/t)*
Notes
APC-4132.30149.8017.5012.7921 New sheeted vein discovery
 143.60144.250.65331.4753  
APC-785.65111.2025.550.40230.69New Northern Breccia discovery
Incl110.10111.201.105.621587.48 
APC-7199.85238.2538.401.30211.51 
Incl207.10222.3515.252.29332.62 
and325.00345.4520.450.49310.89 
OLCS-337.0078.8041.800.64341.07New Northern Breccia discovery
Incl38.5048.9010.401.67362.08 
 73.6078.805.200.781172.33 
APC-9      NSV**
APC-10      NSV**

*AuEq (g/t) is calculated as follows: (Au (g/t) x 0.95) + (Ag g/t x 0.014 x 0.95) utilizing metal prices of Ag – $20/oz and Au – US$1,400/oz and recovery rates of 95% for Au, Ag. Recovery rate assumptions are speculative as no metallurgical work has been completed to date. A 0.2 g/t AuEq cut-off grade was employed with no more than 15% internal dilution. True widths are unknown, and grades are uncut.
** NSV: No significant Values

Figure 1: Plan View of the Guayabales Project Highlighting the Apollo Target Area
https://www.globenewswire.com/NewsRoom/AttachmentNg/f6c9e1d6-62a3-458c-a1e7-62ad29f1ce07

Figure 2: Plan View of the Apollo Target Area Outlining the Porphyry and Breccia Targets, their Related Soil Anomalies and Drill Holes Completed or Currently Underway
https://www.globenewswire.com/NewsRoom/AttachmentNg/b01745dd-572d-4aec-8188-2e96d863e5a4

Figure 3: Plan View of Apollo with Drill Hole Traces Completed to Date Highlighting the New High-Grade Vein System and Northern Breccia System Discoveries from Pad 2 and Pad 1 Respectively
https://www.globenewswire.com/NewsRoom/AttachmentNg/6973bcf0-0397-4440-9052-1464d12d4ec8

About Collective Mining Ltd.

To see our latest corporate presentation and related information, please visit www.collectivemining.com

Collective Mining is an exploration and development company focused on identifying and exploring prospective mineral projects in South America. Founded by the team that developed and sold Continental Gold Inc. to Zijin Mining for approximately $2 billion in enterprise value, the mission of the Company is to repeat its past success in Colombia by making significant new mineral discoveries and advance the projects to production. Management, insiders and close family and friends own nearly 45% of the outstanding shares of the Company and as a result, are fully aligned with shareholders.

The Company currently holds an option to earn up to a 100% interest in two projects located in Colombia. As a result of an aggressive exploration program on both the Guayabales and San Antonio projects, a total of eight major targets have been defined. The Company has made significant grassroot discoveries at both projects with near-surface discovery holes at the Guayabales project yielding 302 metres at 1.11 g/t AuEq at the Olympus target, 163 metres at 1.3 g/t AuEq at the Donut target and recently, at the Apollo target, 207.15 metres at 2.68 g/t AuEq, 180.6 metres at 2.43 g/t AuEg and 87.8 metres at 2.49 g/t AuEg. At the San Antonio project, the Company intersected, from surface, 710 metres at 0.53 AuEq. (See related press releases on our website for AuEq calculations)

Qualified Person (QP) and NI43-101 Disclosure

David J Reading is the designated Qualified Person for this news release within the meaning of National Instrument 43-101 (“NI 43-101”) and has reviewed and verified that the technical information contained herein is accurate and approves of the written disclosure of same. Mr. Reading has an MSc in Economic Geology and is a Fellow of the Institute of Materials, Minerals and Mining and of the Society of Economic Geology (SEG).
Technical Information

Rock and core samples have been prepared and analyzed at SGS laboratory facilities in Medellin, Colombia and Lima, Peru. Blanks, duplicates, and certified reference standards are inserted into the sample stream to monitor laboratory performance. Crush rejects and pulps are kept and stored in a secured storage facility for future assay verification. No capping has been applied to sample composites. The Company utilizes a rigorous, industry-standard QA/QC program.

Contact Information

Collective Mining Ltd. 
Steven Gold, Vice President, Corporate Development and Investor Relations
Tel. (416) 648-4065

FORWARD-LOOKING STATEMENTS  
This news release contains certain forward-looking statements, including, but not limited to, statements about the drill programs, including timing of results, and Collective’s future and intentions. Wherever possible, words such as “may”, “will”, “should”, “could”, “expect”, “plan”, “intend”, “anticipate”, “believe”, “estimate”, “predict” or “potential” or the negative or other variations of these words, or similar words or phrases, have been used to identify these forward-looking statements. These statements reflect management’s current beliefs and are based on information currently available to management as at the date hereof.   

Forward-looking statements involve significant risk, uncertainties, and assumptions. Many factors could cause actual results, performance, or achievements to differ materially from the results discussed or implied in the forward-looking statements. These factors should be considered carefully, and readers should not place undue reliance on the forward-looking statements. Although the forward-looking statements contained in this news release are based upon what management believes to be reasonable assumptions, Collective cannot assure readers that actual results will be consistent with these forward-looking statements. These forward-looking statements are made as of the date of this news release, and Collective assumes no obligation to update or revise them to reflect new events or circumstances, except as required by law.

Neither the TSXV nor its Regulation Services Provider (as that term is defined in the policies of the TSXV) accepts responsibility for the adequacy or accuracy of this news release.

Categories
Base Metals Collective Mining Energy Junior Mining Precious Metals

Collective Mining Discovers a Broad Mineralized Zone and More High-Grade Gold and Silver Veins from Sampling at the Olympus Target; Drilling to Commence in August

Collective Mining Ltd.
Collective Mining Ltd.

Figure 1

Plan View of the Guayabales Project Highlighting the Olympus Target
Plan View of the Guayabales Project Highlighting the Olympus Target

Figure 2

Plan View of the Olympus Central Target Outlining the BMZ Area and the Zone of Multiple, High-Grade, CBM  Veins
Plan View of the Olympus Central Target Outlining the BMZ Area and the Zone of Multiple, High-Grade, CBM Veins

Figure 3

Photos of High-Grade CBM Veins Reported Herein
Photos of High-Grade CBM Veins Reported Herein

TORONTO, July 19, 2022 (GLOBE NEWSWIRE) — Collective Mining Ltd. (TSXV: CNL) (OTCQX: CNLMF) (“Collective” or the “Company”) is pleased to announce the discovery of a potentially significant broad mineralized zone as well as additional high-grade gold and silver assay results from channel samples taken at the Olympus target (“Olympus”) at the Company’s 100% owned Guayabales project in Caldas, Colombia. A noteworthy discovery drill hole from the northern area of Olympus was announced by the Company in March 2022, with OLC-3 yielding 302 metres @ 1.11 g/t AuEq from near surface. Olympus is one of the eight porphyry-related targets situated within a three-by-four-kilometre cluster area generated by the Company through grassroots exploration at the Guayabales project. As part of its fully funded 20,000+ metre drill program for 2022, there are currently three diamond drill rigs operating at the Apollo target, which is located approximately 800 metres south-southeast of Olympus. Furthermore, additional rigs have been secured to begin the Phase II program at Olympus with the first hole anticipated to commence drilling from underground in August 2022.

Highlights (See Tables 1-2 and Figures 1-3)

  • Continuous channel sampling, where possible, were taken by the Company along a historical crosscut covering a 182.45 metre horizontal width and hosting multiple mineralized veins, veinlets and structures within intensely altered porphyry and country rocks. This sampling has outlined a broad mineralized zone (“BMZ”) with assay results as follows:
    • 182.45 metres @ 1.15 g/t gold equivalent (true horizontal width)

Sampling from the eastern half of the crosscut was in oxidized material, which the Company believes may be underrepresenting the actual grade because previously announced chip channel sample assay results within vein material at slightly lower elevations directly below this area of the crosscut yielded materially higher grades. (See press releases dated May 12, 2022 and June 1, 2022)

Table 1: Crosscut Channel Sampling Assay Results

Crosscut SamplingFrom
(m)
To
(m)
Width
(m)
Au
(g/t)
Ag
(g/t)
AuEq
(g/t)*
 0.00182.45182.450.89231.15
Incl.7.7013.205.502.62563.23
 113.70120.006.302.73292.98
 130.15132.152.001.831964.34
 162.15167.054.902.44583.10
 177.40182.455.058.03698.55

*AuEq (g/t) is calculated as follows: (Au (g/t) x 0.95) + (Ag g/t x 0.014 x 0.95), Ag – $21/oz and Au US$1,500/oz and recovery rates of 95% for Au, Ag. Recovery rate assumptions are speculative as no metallurgical work has been completed to date. Channel samples are taken continuously along the walls of the underground crosscuts. Approximately 8% of the total horizontal length could not be sampled due to timber support. Assay results are uncapped, and no cut-off grade has been applied.

  • Assay results of chip channel samples taken from veins located within historical, shallow underground working faces at Olympus, directly west of the BMZ zone, continue to confirm the presence of multiple, high-grade carbonate base metal (“CBM”) sheeted vein systems with results as follows:

Table 2: Chip Channel Sample Assay Results from Olympus

Channel
Sample
Au
(g/t)
Ag
(g/t)
AuEq
(g/t)*
True Width
(metres)
1118.792,359144.230.25
224.6216025.523.00
33.311825.571.40
433.2332835.930.50
523.6146628.630.90
69.716610.101.30
79.15469.311.00
83.17904.201.55
96.53697.121.00
104.021455.761.70

* AuEq (g/t) is calculated as follows: (Au (g/t) x 0.95) + (Ag g/t x 0.014 x 0.95), Ag – $21/oz and Au US$1,500/oz and recovery rates of 95% for Au, Ag. Recovery rate assumptions are speculative as no metallurgical work has been completed to date. Channel samples are taken across the working faces of historical and current artisanal mining drifts. Assay results are uncapped, and no cut-off grade has been applied. Assay results for base metals are still pending for all channel samples listed above.

  • The high-grade CBM veins outlined above are located directly west of the BMZ and collectively both areas outline a target zone measuring greater than 300 metres of width which remains open in all directions. Historical workings along veins to the northwest and southeast of the crosscut indicate a potential strike length to the systems of at least 500 metres which is open for expansion.
  • Drilling, underground sampling and surface mapping to date have expanded Olympus to a target area measuring more than 1,400 metres by 900 metres, which hosts over 50 artisanal mines with over 25 veins mapped from available exposures. The results outlined in this press release cover only the southwest portion of this target area. Previous drilling in the northern portion of the target area returned broad intercepts of up to 301.9 metres @ 1.11 g/t gold equivalent (see press release dated March 15, 2022). The Company believes that the probability is high that additional veins and BMZ zones will be discovered as exploration ramps up. To date only small portions of the target area have been drill tested or sampled and the Olympus target remains open to the east, west, northwest, south and at depth.
  • A phase II underground drill program will commence in August 2022 and is expected to ramp up in scale for the balance of the year as new drill chambers are constructed and additional rigs are added.

“The presence of both broad mineralized zones and high grade CBM veins at Olympus is exciting and highlights the potential for a combination of both bulk and selective mining scenarios in the future. To date we have only covered with drilling and sampling a few small windows within this large mineralized system. We look forward to drilling the southwest portion of the system beginning in August as the highest-grade samples found to date are from within this area,” commented Ari Sussman, Executive Chairman.

“On another front, we are now drilling with three rigs at the Apollo target and continue to intercept potentially significant lengths of mineralized breccia with overprinting CBM veins. We will provide further details in the coming weeks once new holes are completed and logged. Assay results from holes APC-1W and APC-2 at Apollo are expected shortly and will be announced once results have been received, compiled are interpreted by the Company.”

Figure 1: Plan View of the Guayabales Project Highlighting the Olympus Target
https://www.globenewswire.com/NewsRoom/AttachmentNg/2f58ea15-a41e-4bb9-82c4-fdd5692a5322

Figure 2: Plan View of the Olympus Central Target Outlining the BMZ Area and the Zone of Multiple, High-Grade, CBM Veins
https://www.globenewswire.com/NewsRoom/AttachmentNg/22aa4689-7f30-49d6-997e-81b182606357

Figure 3: Photos of High-Grade CBM Veins Reported Herein
https://www.globenewswire.com/NewsRoom/AttachmentNg/00651ec9-46bd-4198-841f-e237644b06ef

About Collective Mining Ltd.

Twitter: @CollectiveMini1
Instagram: CollectiveMining
LinkedIn: Collective Mining
Facebook: Collective Mining

To see our latest corporate presentation, please visit www.collectivemining.com

Collective Mining is an exploration and development company focused on identifying and exploring prospective mineral projects in South America. Founded by the team that developed and sold Continental Gold Inc. to Zijin Mining for approximately $2 billion in enterprise value, the mission of the Company is to repeat its past success in Colombia by making significant new mineral discoveries and advance the projects to production. Management, insiders and close family and friends own nearly 45% of the outstanding shares of the Company and as a result, are fully aligned with shareholders. The Company currently holds an option to earn up to a 100% interest in two projects located in Colombia. As a result of an aggressive exploration program on both the Guayabales and San Antonio projects, a total of eight major targets have been identified. The Company is fortuitous to have made significant grassroot discoveries at both projects with near-surface discovery holes at the Guayabales project yielding 302 metres at 1.1 g/t AuEq at the Olympus target, 163 metres at 1.3 g/t AuEq at the Donut target and 87.8 metres at 2.49 g/t AuEg at the Apollo target. At the San Antonio project, the Company intersected, from surface, 710 metres at 0.53 AuEq. (See press releases dated October 27th, 2021, November 15, 2021, March 15, 2022 and June 22, 2022 for AuEq calculations.)

Qualified Person (QP) and NI43-101 Disclosure

David J Reading is the designated Qualified Person for this news release within the meaning of National Instrument 43-101 (“NI 43-101”) and has reviewed and verified that the technical information contained herein is accurate and approves of the written disclosure of same. Mr. Reading has an MSc in Economic Geology and is a Fellow of the Institute of Materials, Minerals and Mining and of the Society of Economic Geology (SEG).

Technical Information

Rock and core samples have been prepared and analyzed at SGS laboratory facilities in Medellin, Colombia and Lima, Peru. Blanks, duplicates, and certified reference standards are inserted into the sample stream to monitor laboratory performance. Crush rejects and pulps are kept and stored in a secured storage facility for future assay verification. No capping has been applied to sample composites. The Company utilizes a rigorous, industry-standard QA/QC program.

Contact Information

Collective Mining Ltd.
Steve Gold, Vice President, Corporate Development and Investor Relations
Tel. (416) 648-4065

FORWARD-LOOKING STATEMENTS

This news release contains certain forward-looking statements, including, but not limited to, statements about the drill programs, including timing of results, and Collective’s future and intentions. Wherever possible, words such as “may”, “will”, “should”, “could”, “expect”, “plan”, “intend”, “anticipate”, “believe”, “estimate”, “predict” or “potential” or the negative or other variations of these words, or similar words or phrases, have been used to identify these forward-looking statements. These statements reflect management’s current beliefs and are based on information currently available to management as at the date hereof.

Forward-looking statements involve significant risk, uncertainties, and assumptions. Many factors could cause actual results, performance, or achievements to differ materially from the results discussed or implied in the forward-looking statements. These factors should be considered carefully, and readers should not place undue reliance on the forward-looking statements. Although the forward-looking statements contained in this news release are based upon what management believes to be reasonable assumptions, Collective cannot assure readers that actual results will be consistent with these forward-looking statements. These forward-looking statements are made as of the date of this news release, and Collective assumes no obligation to update or revise them to reflect new events or circumstances, except as required by law.

Neither the TSXV nor its Regulation Services Provider (as that term is defined in the policies of the TSXV) accepts responsibility for the adequacy or accuracy of this news release.

Categories
Base Metals Collective Mining Energy Exclusive Interviews Junior Mining

(VIDEO) Collective Mining Intercepts over 200 Metres of Mineralized Breccia in Drill Hole APC-2 at the Apollo Target

Collective Mining Ltd.
Collective Mining Ltd.

Figure 1:

Plan View of the Guayabales Project Highlighting the Apollo Target
Plan View of the Guayabales Project Highlighting the Apollo Target

Figure 2:

Plan View of the Apollo Target Area Outlining the Porphyry and Breccia Targets, their Related Soil Anomalies and Drill Holes Completed or Currently Underway
Plan View of the Apollo Target Area Outlining the Porphyry and Breccia Targets, their Related Soil Anomalies and Drill Holes Completed or Currently Underway

Figure 3:

Plan View of the Hydrothermal Breccia Discovery Made at Apollo highlighting APC-2
Plan View of the Hydrothermal Breccia Discovery Made at Apollo highlighting APC-2

Figure 4:

Apollo Target Cross Section NE-SW With APC-2 mineralized interval and position relative to APC-1. Related Core Photos Highlighted
Apollo Target Cross Section NE-SW With APC-2 mineralized interval and position relative to APC-1. Related Core Photos Highlighted

TORONTO, July 06, 2022 (GLOBE NEWSWIRE) — Collective Mining Ltd. (TSXV: CNL) (OTCQX: CNLMF) (“Collective” or the “Company”) is pleased to announce visual observations from the third completed drill hole at the Apollo target (“Apollo”). Apollo is a newly discovered high-grade copper-gold-silver porphyry-related breccia and the Company recently announced the assay results for the discovery hole (APC-1), which intersected 87.8 metres @ 2.49 g/t AuEq. Apollo is one of eight porphyry-related targets situated within a three-by-four-kilometre cluster area generated by the Company through grassroots exploration at the Guayabales project, located in Caldas, Colombia. As part of its fully funded 20,000-metre drill program for 2022, there are currently three diamond drill rigs operating at Guayabales, with two turning at Apollo and one turning at the Trap target.

Highlights (See Figures 1 – 4)

  • APC-2, which was drilled to the southwest from a drill pad located 200 metres southeast of the collars for APC-1 and APC-1W, intercepted over 200 metres of mineralized breccia from 154.7 metres downhole (100 metres vertical). Core from this hole and APC-1W have been sent to the lab as a batch and assay results are expected shortly.
  • Mineralization is remarkably continuous along the axis of the intercept of interest in APC-2 and is hosted within a breccia sulphide matrix consisting of chalcopyrite (Cu), pyrite and pyrrhotite. Additionally, overprinting carbonate base metal (“CBM”) veins flood the breccia matrix in various locations along the mineralized interval in APC-2 with visible sphalerite (Zn) and Galena (Pb) observed. The breccia clasts are all quartz diorite in composition and this hydrothermal system is clearly linked to a porphyry system. The mineralization in APC-2 is remarkably consistent with the mineralization observed in APC-1 and APC-1W (refer to press releases dated April 27, 2022 and June 22, 2022 for further details).
  • APC-2 extends this mineralized system at least 200 metres to the northeast and 100 metres to the southwest and is located centrally within the 800 metre X 700 metre Apollo target area. The Company is currently drilling two additional holes, APC-3 and APC-4, which aims to expand the mineralized system and better understand the morphology of this new discovery.
  • Apollo remains open to the east, west, south and at depth for further expansion. Due to the size of the target area and success in early drilling, a fourth drill pad is now under construction.
  • The Apollo target area consists of newly generated porphyry and porphyry related breccia and vein targets with coincidental high-grade copper and molybdenum soil anomalies in places measuring greater than 500 parts per million (“ppm”) in copper and 30 ppm in molybdenum. Additionally, surface sampling at Apollo has uncovered a series of high-grade gold outcrops with numerous rock samples assaying greater than 3 g/t gold.
  • Apollo is road accessible all year-round and is situated within an elevation range of 1,800 to 2,000 metres above sea level. Additionally, an electrical substation is located less than one kilometre from the target area.

    “At more than 200 metres in length and with at least three distinct overprinting types of mineralization observed, APC-2 is a nice surprise and has the potential to provide another high-grade intercept of bulk-style mineralization. Although we are at an early stage in understanding Apollo, the target is clearly demonstrating excellent potential to ultimately evolve into a large mineralized system. We will continue to be aggressive in drilling Apollo at various orientations and dips in order to learn the geometry of the system and unlock the potential of this very exciting new discovery,” commented Ari Sussman, Executive Chairman.

Figure 1: Plan View of the Guayabales Project Highlighting the Apollo Target
https://www.globenewswire.com/NewsRoom/AttachmentNg/a179f373-5e53-4e98-877d-93edcd4e9a26

Figure 2: Plan View of the Apollo Target Area Outlining the Porphyry and Breccia Targets, their Related Soil Anomalies and Drill Holes Completed or Currently Underway
https://www.globenewswire.com/NewsRoom/AttachmentNg/d09c45bd-778a-4b15-9fb1-3d4ece1e8369

Figure 3: Plan View of the Hydrothermal Breccia Discovery Made at Apollo highlighting APC-2
https://www.globenewswire.com/NewsRoom/AttachmentNg/928a6b1f-00a1-484c-b57f-cbc19db505f4

Figure 4: Apollo Target Cross Section NE-SW With APC-2 mineralized interval and position relative to APC-1. Related Core Photos Highlighted
https://www.globenewswire.com/NewsRoom/AttachmentNg/0f3c2c27-f4cf-4910-8fbf-4daf894dd2cc

Re-Approval of Stock Option Plan

The Company also announces that at the annual special meeting of shareholders of the Company held on June 29, 2022, the Company’s 10% “rolling” stock option plan (“Plan”) was re-approved by shareholders in accordance with the policies of the TSX Venture Exchange (“TSXV”). The newly approved Plan also reflected certain house-keeping amendments to ensure compliance with the new Policy 4.4 of the Exchange which came into effect on November 24, 2021.

About Collective Mining Ltd.

Twitter: @CollectiveMini1
Instagram: CollectiveMining
LinkedIn: Collective Mining
Facebook: Collective Mining Colombia

To see our latest corporate presentation, please visit www.collectivemining.com

Collective Mining is an exploration and development company focused on identifying and exploring prospective mineral projects in South America. Founded by the team that developed and sold Continental Gold Inc. to Zijin Mining for approximately $2 billion in enterprise value, the mission of the Company is to repeat its past success in Colombia by making significant new mineral discoveries and advance the projects to production. Management, insiders and close family and friends own nearly 45% of the outstanding shares of the Company and as a result, are fully aligned with shareholders. Collective currently holds an option to earn up to a 100% interest in two projects located in Colombia. As a result of an aggressive exploration program on both the Guayabales and San Antonio projects, a total of eight major targets have been defined. The Company is fortuitous to have made significant grassroot discoveries at both projects with near-surface discovery holes at the Guayabales project yielding 302 metres at 1.11 g/t AuEq at the Olympus target, 163 metres at 1.3 g/t AuEq at the Donut target and 87.8 metres at 2.49 g/t AuEg at the Apollo target. At the San Antonio project, the Company intersected, from surface, 710 metres at 0.53 AuEq. (See press releases dated October 27th, 2021, November 15, 2021, March 15, 2022 and June 22, 2022 for AuEq calculations.)

Qualified Person (QP) and NI43-101 Disclosure

David J Reading is the designated Qualified Person for this news release within the meaning of National Instrument 43-101 (“NI 43-101”) and has reviewed and verified that the technical information contained herein is accurate and approves of the written disclosure of same. Mr. Reading has an MSc in Economic Geology and is a Fellow of the Institute of Materials, Minerals and Mining and of the Society of Economic Geology (SEG).

Technical Information

Rock and core samples have been prepared and analyzed at SGS laboratory facilities in Medellin, Colombia and Lima, Peru. Blanks, duplicates, and certified reference standards are inserted into the sample stream to monitor laboratory performance. Crush rejects and pulps are kept and stored in a secured storage facility for future assay verification. No capping has been applied to sample composites. The Company utilizes a rigorous, industry-standard QA/QC program.

Contact Information

Collective Mining Ltd.
Steve Gold, Vice President, Corporate Development and Investor Relations
Tel. (416) 648-4065

FORWARD-LOOKING STATEMENTS

This news release contains certain forward-looking statements, including, but not limited to, statements about the drill programs, including timing of results, and Collective’s future and intentions. Wherever possible, words such as “may”, “will”, “should”, “could”, “expect”, “plan”, “intend”, “anticipate”, “believe”, “estimate”, “predict” or “potential” or the negative or other variations of these words, or similar words or phrases, have been used to identify these forward-looking statements. These statements reflect management’s current beliefs and are based on information currently available to management as at the date hereof.

Forward-looking statements involve significant risk, uncertainties, and assumptions. Many factors could cause actual results, performance, or achievements to differ materially from the results discussed or implied in the forward-looking statements. These factors should be considered carefully, and readers should not place undue reliance on the forward-looking statements. Although the forward-looking statements contained in this news release are based upon what management believes to be reasonable assumptions, Collective cannot assure readers that actual results will be consistent with these forward-looking statements. These forward-looking statements are made as of the date of this news release, and Collective assumes no obligation to update or revise them to reflect new events or circumstances, except as required by law.

Neither the TSXV nor its Regulation Services Provider (as that term is defined in the policies of the TSXV) accepts responsibility for the adequacy or accuracy of this news release.