Pumpkin Hollow Underground Drill Program Extends Mineralization Highlighted by 36.5 feet of 2.46% Copper

Nevada Copper Corp.
Nevada Copper Corp.

Update on Underground and Regional Exploration Opportunities

Figure 1

Recent Underground Drilling
Recent Underground Drilling

Figure 2

Property Map with Exploration Target Locations
Property Map with Exploration Target Locations

Figure 3

Dimples Sampling (Gold)
Dimples Sampling (Gold)

Figure 4

Dimples Sampling (Copper)
Dimples Sampling (Copper)

YERINGTON, Nev., July 26, 2023 (GLOBE NEWSWIRE) — Nevada Copper (TSX: NCU) (OTC: NEVDF) (FSE: ZYTA) (“Nevada Copper” or the “Company”) today provides an update on its 2023 regional and underground exploration plans and recent exploration results at its approximate 36 square mile Pumpkin Hollow property located in Yerington, NV.  

Randy Buffington, President & CEO, commented, “The Pumpkin Hollow property is a significant land package, in a well-known copper belt, in a strong mining jurisdiction and with substantial mineral resources already identified. These recent underground drill results indicate expansion to known copper mineralization. Additionally, our review of historical data, coupled with recent surface sampling and analysis, has identified several targets of interest that warrant follow-up. Our team is currently focused on bringing the underground back into operation, including completion of the remaining capital projects, and advancing development activities, both of which are well underway. The planned start-up of milling operations and concentrate sales in Q3 2023 is on track with targeted nameplate milling rates of 5,000 tons per day expected to be achieved by the end of 2023. With a significant portion of the property located on private land, we are in a rare position to quickly take advantage of growth opportunities once we achieve steady state underground operations.”

2023 Underground Drilling Highlights

  • Approximately 31,500 feet of drilling planned (approximately US$5 million program).
  • Approximately 4,900 feet drilled to date with one drill rig, and a second drill rig recently deployed.
  • Results of drilling indicate mineralization extension in the ES zone (see Figure 1), including 36.5 feet of 2.46% copper within a larger interval of 99 feet of 1.4% copper (Cu) in hole NC23U-007. Other notable results include:
DDH IDFrom
(ft)
To
(ft)
Length
(ft)
Cu %Ag gptAu gpt
NC23U-0021424101.6214.2000.251
NC23U-002294304.810.81.768.4020.132
NC23U-0046070101.6311.6000.316
NC23U-005128143151.269.9130.267
NC23U-00668.479.811.41.275.7380.165
NC23U-007246344.598.51.43.5580.144
including300336.536.52.465.3420.318
NC23U-008123.515531.51.594.3420.264
NC23U-008425435101.563.2500.190
NC23U-008445480351.823.9860.291
NC23U-009188203151.321.4330.087
gpt = grams per tonne; Ag = silver
 

The 2023 East North (EN) and East South (ES) underground drill program began in the first quarter of 2023 and is focused on stope definition drilling and near-mine resource expansion targets. Drilling is expected to continue in the ES and EN zone through the remainder of the year. The deposit remains open in all directions.

The Pumpkin Hollow property has not been extensively explored in the past as the Company was focused on developing the known mineral resources, resulting in the development of the underground mine and advancement of the open pit project. Recent drone magnetic surveys have identified several high-quality targets of interest. Surface reconnaissance targeting these high-quality areas demonstrates that these targets have the potential to host additional independent mineralized systems, outside of the existing deposits.

New Area Identified in Pumpkin Hollow Site Wide Exploration – Dimples

Nevada Copper has identified a new exploration target, the Dimples target, located just south of the proposed open pit area in the southern area of the property (Figure 2). Analysis of recent surface grab samples has returned encouraging results including gold values of up to 61 gpt gold (Au). A total of 55 grab samples have been collected in 2023 with 42 of those samples returning gold values greater than 0.1 gpt Au and 14 samples being greater than 1 gpt Au, in quartz rich veins within granodiorite porphyry (Figure 3). Higher-grade copper was identified in eleven samples, with values greater than 1.0% Cu (Figure 4). High-grade copper rich zones are found in the granodiorite porphyry veins as well as skarns within metavolcanics. The Mesozoic rocks in the area are dominated by granodiorite porphyries and metavolcanics.

Additional News from the Copper Ridge Target

Surface sampling results from surface outcrops and prospect pits in the Copper Ridge area have indicated a potential for high-grade copper, highlighted by grades including 5.03% and 5.43% Cu. The Copper Ridge property is located north of the main Pumpkin Hollow property covered by 103 hectares through unpatented and patented claims. The target was mined for high-grade copper in the early 1900’s through several adits as well as a 122-meter inclined shaft.

The 2023 program is designed to follow-up on historic reconnaissance work completed in the early 1990s by a major copper company and has the potential to provide additional high-grade feed for the existing underground mill. A total of 70 historic and new rock samples were collected to confirm and extend the known mineralization along the vein and dike structures in the Yerington Batholith granodiorites. Forty-four samples assayed greater than 0.1% copper. Samples greater than 2.0% Cu were summarized in Table 1 of the Company’s February 13th, 2023, news release.

Follow-up trenching and a reverse circulation drill program are planned to further evaluate these high potential targets.

The grades identified in this press release are conceptual in nature as there has not been insufficient exploration to define a mineral resource and it is uncertain if further exploration will result in the delineation of a mineral resource.

Qualified Person
The technical information and data in this news release has been reviewed by Greg French, C.P.G., VP Exploration of Nevada Copper, who is a non-independent Qualified Person within the meaning of NI 43-101.

Quality Assurance and Quality Control
The analytical work referred to herein was performed by American Assay Labs (AAL) located in Sparks, Nevada.  AAL is an ISO/IEC 17025 accredited laboratory. The Samples were crushed so that >80% passes 10 mesh, followed by pulverizing to >90% passes 75 < 150 mesh. Prepared samples were run using a three-acid digestion process and conventional ICP-AES analysis. Gold determination was via standard atomic absorption (AA) finish 30-gram fire-assay (FA) analysis.  Blank, standard and duplicate samples were routinely inserted and monitored for quality assurance and quality control.

The historic analytical work was performed by Chemex Labs Inc. and ALS Minerals, currently ALS Geochemistry (ALS) located in Nevada.  ALS is an ISO/IEC 17025 accredited laboratory. The samples were crushed so that >80% passes 10 mesh, followed by pulverizing split to < 150 mesh. Prepared samples were run using an acid digestion process and conventional ICP-AES analysis. Gold determination was via standard atomic absorption (AA) finish 30-gram fire-assay (FA) analysis.

Nevada Copper detected no significant QA/QC issues during review of the data and is not aware of any sampling or other factors that could materially affect the accuracy or reliability of the data referred to herein.

About Nevada Copper

Nevada Copper (TSX: NCU) is the owner of the Pumpkin Hollow copper project located in Nevada, USA with substantial reserves and resources including copper, gold and silver. Its two fully permitted projects include the high-grade Underground Mine and processing facility, which is expected to restart milling operations in 2023, and a large-scale open pit PFS stage project.

Randy Buffington
President & CEO

For additional information, please see the Company’s website at www.nevadacopper.com, or contact:

Tracey Thom Vice President, IR and Community Relations
tthom@nevadacopper.com
+1 775 391 9029

Figure 1 – Recent Underground Drilling

Recent Underground Drilling
Recent Underground Drilling

*Grey holes – assays pending

Figure 2 – Property Map with Exploration Target Locations

Property Map with Exploration Target Locations
Property Map with Exploration Target Locations

Figure 3 – Dimples Sampling (Gold)

Dimples Sampling (Gold)
Dimples Sampling (Gold)

Figure 4 – Dimples Sampling (Copper)

Dimples Sampling (Copper)
Dimples Sampling (Copper)

Cautionary Language on Forward Looking Statements
This news release contains “forward-looking information” and “forward-looking statements” within the meaning of applicable Canadian securities laws. All statements in this news release, other than statements of historical facts, are forward-looking statements. Such forward-looking information and forward-looking statements specifically include, but are not limited to, statements that relate to future exploration and the potential outcome of exploration programs, development and restart and ramp-up plans and activities at the Underground Mine and the timing in respect thereof.

Forward-looking statements and information include statements regarding the expectations and beliefs of management. Often, but not always, forward-looking statements and forward-looking information can be identified by the use of words such as “plans”, “expects”, “potential”, “is expected”, “anticipated”, “is targeted”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates”, or “believes” or the negatives thereof or variations of such words and phrases or statements that certain actions, events or results “may”, “could”, “would”, “might” or “will” be taken, occur or be achieved. Forward-looking statements or information should not be read as guarantees of future performance and results. They are subject to known and unknown risks, uncertainties and other factors which may cause the actual results and events to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements or information.

Such risks and uncertainties include, without limitation, those relating to: results of exploration programs, requirements for additional capital and no assurance can be given regarding the availability thereof; the ability of the Company to complete the restart and ramp-up of the Underground Mine within the expected cost estimates and timeframe; the impact of COVID-19 on the business and operations of the Company; the state of financial markets; history of losses; dilution; adverse events relating to milling operations, construction, development and restart and ramp-up, including the ability of the Company to address underground development and process plant issues; ground conditions; cost overruns relating to development, construction and restart and ramp-up of the Underground Mine; loss of material properties; interest rate increases; global economy; limited history of production; future metals price fluctuations; speculative nature of exploration activities; periodic interruptions to exploration, development and mining activities; environmental hazards and liability; industrial accidents; failure of processing and mining equipment to perform as expected; labour disputes; supply problems; uncertainty of production and cost estimates; the interpretation of drill results and the estimation of mineral resources and reserves; changes in project parameters as plans continue to be refined; possible variations in ore reserves, grade of mineralization or recovery rates from management’s expectations and the difference may be material; legal and regulatory proceedings and community actions; accidents; title matters; regulatory approvals and restrictions; increased costs and physical risks relating to climate change, including extreme weather events, and new or revised regulations relating to climate change; permitting and licensing; dependence on management information systems and cyber security risks; volatility of the market price of the Company’s securities; insurance; competition; hedging activities; currency fluctuations; loss of key employees; other risks of the mining industry as well as those risks discussed in the Company’s Management’s Discussion and Analysis in respect of the year ended December 31, 2022 and in the section entitled “Risk Factors” in the Company’s Annual Information Form dated March 20, 2023. The forward-looking statements and information contained in this news release are based upon assumptions management believes to be reasonable, including, without limitation: no adverse developments in respect of the property or operations at the project; no material changes to applicable laws; the restart and ramp-up of operations at the Underground Mine in accordance with management’s plans and expectations; no material adverse impacts from COVID-19 going forward; the Company will be able to obtain sufficient additional funding to complete the restart and ramp-up of the Underground Mine, no material adverse change to the price of copper from current levels; and the absence of any other factors that could cause actions, events or results to differ from those anticipated, estimated or intended.

The forward-looking information and statements are stated as of the date hereof. The Company disclaims any intent or obligation to update forward-looking statements or information except as required by law. Although the Company has attempted to identify important factors that could cause actual actions, events, or results to differ materially from those described in forward-looking information and statements, there may be other factors that could cause actions, events or results not to be as anticipated, estimated or intended. Specific reference is made to “Risks and Uncertainties” in the Company’s Management’s Discussion and Analysis in respect of the year ended December 31, 2022 and “Risk Factors” in the Company’s Annual Information Form dated March 20, 2023, for a discussion of factors that may affect forward-looking statements and information. Should one or more of these risks or uncertainties materialize, should other risks or uncertainties materialize or should underlying assumptions prove incorrect, actual results and events may vary materially from those described in forward-looking statements and information. For more information on the Company and the risks and challenges of its business, investors should review the Company’s filings that are available at www.sedar.com.

The Company provides no assurance that forward-looking statements and information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements or information. Accordingly, readers should not place undue reliance on forward-looking statements or information.

Photos accompanying this announcement arer available at
https://www.globenewswire.com/NewsRoom/AttachmentNg/33287b0a-4643-4316-8a39-08e81b110e72
https://www.globenewswire.com/NewsRoom/AttachmentNg/4a06e4cb-c8da-43bc-b046-a73b578531c8
https://www.globenewswire.com/NewsRoom/AttachmentNg/287539cd-14b0-4a30-b300-a3b7553c2511
https://www.globenewswire.com/NewsRoom/AttachmentNg/981a35f8-eff7-4e75-aff0-d3ce6c056df6

Categories
Base Metals Energy Junior Mining Nevada Copper

Nevada Copper Appoints Gregory J. Martin as Chief Financial Officer

Nevada Copper Corp.
Nevada Copper Corp.

Files Third Quarter 2022 Financial Statements and MD&A

YERINGTON, Nev., Nov. 14, 2022 (GLOBE NEWSWIRE) — Nevada Copper (TSX: NCU) (OTC: NEVDF) (FSE: ZYTA) (“Nevada Copper” or the “Company”) is pleased to announce the appointment of Mr. Greg Martin as Executive Vice President and Chief Financial Officer of the Company, effective November 21, 2022.   In leading the Company’s financial functions, Mr. Martin will be integral to building fiscal discipline and structures to support the restart and ramp-up of the Company’s underground mine. In addition, he will oversee concentrate marketing, and generally assist with leading the team through the restart and ramp-up process.

Randy Buffington, President & CEO of Nevada Copper, stated, “We are very pleased that Greg will be joining the Company and taking on such a critical role in leading the finance group. His experience and leadership in mining, and specifically in Nevada operations, will be crucial in reinforcing the financial rigor needed as we transition through the capital development projects phase of the operational restart at Pumpkin Hollow to mining and milling over the next year. Looking forward, we are making good progress with the open pit prefeasibility study and look forward to Greg’s input at this key stage of development.”

Mr. Martin has nearly 30 years of experience in various financial and business development roles, primarily in the mining sector. He has held senior finance roles in several multi-national mining and mining-related companies including SSR Mining Inc. (where he was CFO from 2012 to 2021), NovaGold Resources Inc., Finning International Inc., Zincore Metals Inc. and Placer Dome Inc. He has a proven track record of providing leadership through company transitions, growth and development while implementing the fiscal discipline and structure to support sustainable operations. Mr. Martin is a Certified Professional Accountant (C.G.A.), holds an MBA from the University of Western Ontario and a Bachelor of Applied Science from the University of British Columbia.

Filing of Third Quarter 2022 Financial Statements and Management’s Discussion and Analysis (“MD&A”) of Financial Results

The Company has filed its unaudited condensed consolidated interim financial statements and the related MD&A for the third quarter and year to date periods ended September 30, 2022.  These filings can be found at www.sedar.com.

About Nevada Copper

Nevada Copper (TSX: NCU) is a copper producer and owner of the Pumpkin Hollow copper project. Located in Nevada, USA, Pumpkin Hollow has substantial reserves and resources including copper, gold and silver. Its two fully permitted projects include the high-grade Underground Mine and processing facility, which is now in the production stage, and a large-scale open pit project, which is advancing towards feasibility status.

Randy Buffington
President & CEO

For additional information, please see the Company’s website at www.nevadacopper.com, or contact:

Tracey Thom Vice President, IR and Community Relations
tthom@nevadacopper.com
+1 775 391 9029

Cautionary Language on Forward Looking Statements
This news release contains “forward-looking information” and “forward-looking statements” within the meaning of applicable Canadian securities laws. All statements in this news release, other than statements of historical facts, are forward-looking statements. Such forward-looking information and forward-looking statements specifically include, but are not limited to, statements that relate to Mr. Martin’s role with the Company.

Forward-looking statements and information include statements regarding the expectations and beliefs of management. Often, but not always, forward-looking statements and forward-looking information can be identified by the use of words such as “plans”, “expects”, “potential”, “is expected”, “anticipated”, “is targeted”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates”, or “believes” or the negatives thereof or variations of such words and phrases or statements that certain actions, events or results “may”, “could”, “would”, “might” or “will” be taken, occur or be achieved. Forward-looking statements or information should not be read as guarantees of future performance and results. They are subject to known and unknown risks, uncertainties and other factors which may cause the actual results and events to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements or information.

Such risks and uncertainties include, without limitation, those relating to: requirements for additional capital and no assurance can be given regarding the availability thereof; the outcome of discussions with vendors; the ability of the Company to complete the ramp-up of the Underground Mine within the expected cost estimates and timeframe; the impact of COVID-19 on the business and operations of the Company; the state of financial markets; history of losses; dilution; adverse events relating to milling operations, construction, development and ramp-up, including the ability of the Company to address underground development and process plant issues; ground conditions; cost overruns relating to development, construction and ramp-up of the Underground Mine; loss of material properties; interest rate increases; global economy; limited history of production; future metals price fluctuations; speculative nature of exploration activities; periodic interruptions to exploration, development and mining activities; environmental hazards and liability; industrial accidents; failure of processing and mining equipment to perform as expected; labour disputes; supply problems; uncertainty of production and cost estimates; the interpretation of drill results and the estimation of mineral resources and reserves; changes in project parameters as plans continue to be refined; possible variations in ore reserves, grade of mineralization or recovery rates from management’s expectations and the difference may be material; legal and regulatory proceedings and community actions; accidents; title matters; regulatory approvals and restrictions; increased costs and physical risks relating to climate change, including extreme weather events, and new or revised regulations relating to climate change; permitting and licensing; dependence on management information systems and cyber security risks; volatility of the market price of the Company’s securities; insurance; competition; hedging activities; currency fluctuations; loss of key employees; other risks of the mining industry as well as those risks discussed in the Company’s Management’s Discussion and Analysis in respect of the year ended December 31, 2021 and the quarter ended March 31, 2022 and in the section entitled “Risk Factors” in the Company’s Annual Information Form dated March 31, 2022. The forward-looking statements and information contained in this news release are based upon assumptions management believes to be reasonable, including, without limitation: no adverse developments in respect of the property or operations at the project; no material changes to applicable laws; the ramp-up of operations at the Underground Mine in accordance with management’s plans and expectations; no worsening of the current COVID-19 related work restrictions; reduced impacts of COVID-19 going forward; the Company will be able to obtain sufficient additional funding to complete the ramp-up, no material adverse change to the price of copper from current levels; and the absence of any other factors that could cause actions, events or results to differ from those anticipated, estimated or intended.

The forward-looking information and statements are stated as of the date hereof. The Company disclaims any intent or obligation to update forward-looking statements or information except as required by law. Although the Company has attempted to identify important factors that could cause actual actions, events, or results to differ materially from those described in forward-looking information and statements, there may be other factors that could cause actions, events or results not to be as anticipated, estimated or intended. Specific reference is made to “Risk Factors” in the Company’s Management’s Discussion and Analysis in respect of the year ended December 31, 2021 and the quarter ended March 31, 2022 and “Risk Factors” in the Company’s Annual Information Form dated March 31, 2022, for a discussion of factors that may affect forward-looking statements and information. Should one or more of these risks or uncertainties materialize, should other risks or uncertainties materialize or should underlying assumptions prove incorrect, actual results and events may vary materially from those described in forward-looking statements and information. For more information on the Company and the risks and challenges of its business, investors should review the Company’s filings that are available at www.sedar.com.

The Company provides no assurance that forward-looking statements and information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements or information. Accordingly, readers should not place undue reliance on forward-looking statements or information.

Categories
Base Metals Energy Junior Mining Nevada Copper

Nevada Copper Provides Pumpkin Hollow Update and Restart of Operations and Board Appointment

Nevada Copper Corp.
Nevada Copper Corp.

Second Dike Crossing

Completion of the second dike crossing, allowing access to the higher-grade EN Zone
Completion of the second dike crossing, allowing access to the higher-grade EN Zone

YERINGTON, Nev., Nov. 03, 2022 (GLOBE NEWSWIRE) — Nevada Copper (TSX: NCU) (OTC: NEVDF) (FSE: ZYTA) (“Nevada Copper” or the “Company”) is pleased to provide an update on restart and operational activities for its underground mine (the “Underground Mine”) following the closing of the restart financing package that provides up to US$123 million of liquidity to the Company, as announced in the Company’s October 28, 2022 press release.

Additionally, the Company announces the addition to its Board of Directors of Guillaume de Dardel, Head of Energy Transition Metals and part of the Energy Transition desk at Mercuria Energy Trading SA (“Mercuria”), one of Nevada Copper’s largest shareholders.

Operational Updates

Optimized Mine Plan – John Wood Group plc, has completed an optimized life-of-mine plan that focuses on accessing the larger, higher-grade stopes of the East North Zone (“EN Zone”) to bring value forward in the mine life. This optimized plan is being incorporated into our development and mine planning in preparation for restart of mining operations.

Final Dike Crossings – As indicated in the Company’s October 5, 2022 press release, the Company continues to build on the significant progress made to date with the completion of the second dike crossing.   This critical achievement provides access to the higher-grade stopes of the EN Zone that is estimated to represent the highest value area of the underground reserve. This zone also represents the most competent geotechnical rock mass within the reserve which is expected to allow larger stopes to be extracted, significantly improving production efficiencies. The Company is encouraged by the rock quality being encountered beyond the dike as progress is made on development headings into the EN Zone, and appears to be as predicted by the geotechnical models. To date, nine of the first stopes to be mined have been drilled to provide critical data for final stope design in preparation for the commencement of mining in the second half of 2023.

Completion of the second dike crossing, allowing access to the higher-grade EN Zone
Completion of the second dike crossing, allowing access to the higher-grade EN Zone

The underground crews have transitioned to work on the final dike crossing which is expected to be completed in early 2023. A well-known industry grouting and geotechnical consultant has been engaged in developing the final dike crossing design and plan. The completion of the dike crossing will provide necessary access for a development contractor to begin rapid development into the EN Zone in early 2023.

Development Contractor – The Company has received indications of interest in providing proposals for development mining from six large, well-known, and established mining contractors. Discussions are in the advanced stages with these contractors and the Company expects to award a contract by the end of 2022.

Capital Projects Proceeding – The Company has signed a letter of intent (“LOI”) with an engineering firm to bring critical capital projects to completion, including the coarse ore bin, permanent dewatering system, vent shaft rehabilitation and surface fans. The scope of the LOI includes delivery of construction execution plans within the next 30 days. These execution plans would identify any procurement or fabrication of materials and equipment to complete the construction activities, labor requirements, and necessary activities ancillary to these capital projects.

The Company has also secured the remaining long-lead item for the coarse ore bin project, the underground jaw crusher, which is expected to be delivered in November 2022.

Strengthening the Site Technical Leadership – The operations leadership has been strengthened with the recent additions of highly experienced individuals in critical technical and operational roles. Included in these recent additions are an Underground Mine Manager, a Capital Projects Manager, a Senior Paste Backfill Engineer, a Contracts Manager, and a Senior Geotechnical Engineer. The Company has also started to fill out the underground operations crews with several skilled mining and operations crews that will focus on capital development projects ahead of stope mining that is planned to begin in the second half of 2023.

Board Addition

Guillaume de Dardel, Head of Energy Transition Metals and part of the Energy Transition desk at Mercuria, will join the Board of Directors of the Company effective November 4, 2022. Mercuria is a significant shareholder in Nevada Copper. Mr. de Dardel studied in Sao Paulo and Switzerland and holds a BA HSG (magna cum laude) from the University of St. Gallen.

Mercuria is one of the world’s largest independent global energy and commodities groups and makes strategic investments to provide access to key infrastructure and physical commodity markets. They have expanded rapidly into renewables and the energy transition which has become a core pillar of Mercuria’s strategy.

Qualified Person

The technical information and data in this news release has been reviewed by Steven Newman, Registered Member – SME, Vice President, Technical Services for Nevada Copper, who is a non-independent Qualified Person within the meaning of NI 43-101.

About Nevada Copper

Nevada Copper (TSX: NCU) is a copper producer and owner of the Pumpkin Hollow copper project. Located in Nevada, USA, Pumpkin Hollow has substantial reserves and resources including copper, gold and silver. Its two fully permitted projects include the high-grade Underground Mine and processing facility, which is now in the production stage, and a large-scale open pit project, which is advancing towards feasibility status.

Randy Buffington
President & CEO

For additional information, please see the Company’s website at www.nevadacopper.com, or contact:

Tracey Thom Vice President, IR and Community Relations
tthom@nevadacopper.com
+1 775 391 9029

Cautionary Language on Forward Looking Statements
This news release contains “forward-looking information” and “forward-looking statements” within the meaning of applicable Canadian securities laws. All statements in this news release, other than statements of historical facts, are forward-looking statements. Such forward-looking information and forward-looking statements specifically include, but are not limited to, statements that relate to the development plans for the Underground Mine and the expected results thereof.

Forward-looking statements and information include statements regarding the expectations and beliefs of management. Often, but not always, forward-looking statements and forward-looking information can be identified by the use of words such as “plans”, “expects”, “potential”, “is expected”, “anticipated”, “is targeted”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates”, or “believes” or the negatives thereof or variations of such words and phrases or statements that certain actions, events or results “may”, “could”, “would”, “might” or “will” be taken, occur or be achieved. Forward-looking statements or information should not be read as guarantees of future performance and results. They are subject to known and unknown risks, uncertainties and other factors which may cause the actual results and events to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements or information.

Such risks and uncertainties include, without limitation, those relating to: requirements for additional capital and no assurance can be given regarding the availability thereof; the outcome of discussions with creditors and vendors; the ability of the Company to complete the ramp-up of the Underground Mine within the expected cost estimates and timeframe; the impact of COVID-19 on the business and operations of the Company; the state of financial markets; history of losses; dilution; adverse events relating to milling operations, construction, development and ramp-up, including the ability of the Company to address underground development and process plant issues; ground conditions; cost overruns relating to development, construction and ramp-up of the Underground Mine; loss of material properties; interest rate increases; global economy; limited history of production; future metals price fluctuations; speculative nature of exploration activities; periodic interruptions to exploration, development and mining activities; environmental hazards and liability; industrial accidents; failure of processing and mining equipment to perform as expected; labour disputes; supply problems; uncertainty of production and cost estimates; the interpretation of drill results and the estimation of mineral resources and reserves; changes in project parameters as plans continue to be refined; possible variations in ore reserves, grade of mineralization or recovery rates from management’s expectations and the difference may be material; legal and regulatory proceedings and community actions; accidents; title matters; regulatory approvals and restrictions; increased costs and physical risks relating to climate change, including extreme weather events, and new or revised regulations relating to climate change; permitting and licensing; dependence on management information systems and cyber security risks; volatility of the market price of the Company’s securities; insurance; competition; hedging activities; currency fluctuations; loss of key employees; other risks of the mining industry as well as those risks discussed in the Company’s Management’s Discussion and Analysis in respect of the year ended December 31, 2021 and the quarter ended March 31, 2022 and in the section entitled “Risk Factors” in the Company’s Annual Information Form dated March 31, 2022. The forward-looking statements and information contained in this news release are based upon assumptions management believes to be reasonable, including, without limitation: no adverse developments in respect of the property or operations at the project; no material changes to applicable laws; the ramp-up of operations at the Underground Mine in accordance with management’s plans and expectations; no worsening of the current COVID-19 related work restrictions; reduced impacts of COVID-19 going forward; the Company will be able to obtain sufficient additional funding to complete the ramp-up, no material adverse change to the price of copper from current levels; and the absence of any other factors that could cause actions, events or results to differ from those anticipated, estimated or intended.

The forward-looking information and statements are stated as of the date hereof. The Company disclaims any intent or obligation to update forward-looking statements or information except as required by law. Although the Company has attempted to identify important factors that could cause actual actions, events, or results to differ materially from those described in forward-looking information and statements, there may be other factors that could cause actions, events or results not to be as anticipated, estimated or intended. Specific reference is made to “Risk Factors” in the Company’s Management’s Discussion and Analysis in respect of the year ended December 31, 2021 and the quarter ended March 31, 2022 and “Risk Factors” in the Company’s Annual Information Form dated March 31, 2022, for a discussion of factors that may affect forward-looking statements and information. Should one or more of these risks or uncertainties materialize, should other risks or uncertainties materialize or should underlying assumptions prove incorrect, actual results and events may vary materially from those described in forward-looking statements and information. For more information on the Company and the risks and challenges of its business, investors should review the Company’s filings that are available at www.sedar.com.

The Company provides no assurance that forward-looking statements and information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements or information. Accordingly, readers should not place undue reliance on forward-looking statements or information.

A photo accompanying this announcement is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/3d89cb97-1129-4757-aab3-d6866ec82a97

Categories
Base Metals Energy Junior Mining Nevada Copper

Nevada Copper Provides Operation and Financing Update

Nevada Copper Corp.
Nevada Copper Corp.

YERINGTON, Nev., Aug. 05, 2022 (GLOBE NEWSWIRE) — Nevada Copper (TSX: NCU) (OTC: NEVDF) (FSE: ZYTA) (“Nevada Copper” or the “Company”) provides an update on its operations and financing initiatives and activities at its Pumpkin Hollow copper mine (the “Underground Mine”) located in Yerington, Nevada.

Operational Restart Planning

During July, management has advanced its Underground Mine restart plans, which focus on the acceleration of key capital items followed by the development of a significant stope ore inventory in advance of a mill restart and completion of production ramp-up. The development of restart plans has allowed the Company to advance financing discussions with its key stakeholders. The commencement of restart activities is contingent on the Company obtaining long-term financing, as discussed below.

The Company continues to work with its creditors and vendors to defer payments and maintain the operation in a temporary suspension status, with only limited operational activities being undertaken to protect the Company’s assets, to minimize cash burn until closing of a restart funding package.

Restart Financing

The Company is engaged in active and ongoing discussions with its key financing partners with respect to a substantial funding package for the restart and ramp-up of the Underground Mine (as an alternative to the smaller financing package referred to in the Company’s July 4, 2022 press release which is no longer being pursued in that form).https://embed.fireplace.yahoo.com/embed?ctrl=Monalixa&m_id=monalixa&m_mode=document&site=sports&os=android&pageContext=%257B%2522ctopid%2522%253A%25221542500%253B1577000%2522%252C%2522hashtag%2522%253A%25221542500%253B1577000%2522%252C%2522wiki_topics%2522%253A%2522Company%253BYerington%252C_Nevada%253BBankruptcy%253BDebate%253BUnderground_hard-rock_mining%2522%252C%2522lmsid%2522%253A%2522a0770000002m0AbAAI%2522%252C%2522revsp%2522%253A%2522globenewswire.com%2522%252C%2522lpstaid%2522%253A%2522618b261d-7539-34cc-9b63-9cf83c3f5fd6%2522%252C%2522pageContentType%2522%253A%2522story%2522%257D

The Company has expended the full amount of the previously disclosed US$20 million promissory note from Pala Investments Limited (“Pala”), the Company’s largest shareholder. Pala has indicated that it is prepared to provide additional financing of up to US$20 million through further promissory notes (US$4 million of which has already been advanced) while the Company continues discussions with its financing partners. The Company will continue to require interim financing until a restart funding package is secured and closed. As previously disclosed, pending completion of a financing package, the Company has not made payments due to certain creditors and vendors and is in default of its obligations under certain financing agreements and other contractual arrangements.

There can be no assurance that the Company will obtain additional interim financing or that the longer-term restart funding package will be agreed or completed on terms satisfactory to the Company and within the required timeframe, or at all. In the absence of securing such arrangements or alternative financing arrangements, the Company will not be able to continue carrying on business in the ordinary course and may need to pursue proceedings for creditor protection. The Company’s creditors may also seek to commence enforcement action, including realizing on their security over the Company’s assets.

About Nevada Copper

Nevada Copper (TSX: NCU) is a copper producer and owner of the Pumpkin Hollow copper project. Located in Nevada, USA, Pumpkin Hollow has substantial reserves and resources including copper, gold and silver. Its two fully permitted projects include the high-grade Underground Mine and processing facility, which is now in the production stage, and a large-scale open pit project, which is advancing towards feasibility status.

Randy Buffington
President & CEO

For additional information, please see the Company’s website at www.nevadacopper.com, or contact:

Tracey Thom Vice President, IR and Community Relations
tthom@nevadacopper.com
+1 775 391 9029

Cautionary Language on Forward Looking Statements
This news release contains “forward-looking information” and “forward-looking statements” within the meaning of applicable Canadian securities laws. All statements in this news release, other than statements of historical facts, are forward-looking statements. Such forward-looking information and forward-looking statements specifically include, but are not limited to, statements that relate to mine planning, financing requirements, discussions with financing partners, and creditor protection proceedings.

Forward-looking statements and information include statements regarding the expectations and beliefs of management. Often, but not always, forward-looking statements and forward-looking information can be identified by the use of words such as “plans”, “expects”, “potential”, “is expected”, “anticipated”, “is targeted”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates”, or “believes” or the negatives thereof or variations of such words and phrases or statements that certain actions, events or results “may”, “could”, “would”, “might” or “will” be taken, occur or be achieved. Forward-looking statements or information should not be read as guarantees of future performance and results. They are subject to known and unknown risks, uncertainties and other factors which may cause the actual results and events to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements or information.

Such risks and uncertainties include, without limitation, those relating to: requirements for additional capital and no assurance can be given regarding the availability thereof; the outcome of discussions with creditors and vendors; potential creditor protection proceedings; the ability of the Company to complete the ramp-up of the Underground Mine within the expected cost estimates and timeframe; the impact of COVID-19 on the business and operations of the Company; the state of financial markets; history of losses; dilution; adverse events relating to milling operations, construction, development and ramp-up, including the ability of the Company to address underground development and process plant issues; ground conditions; cost overruns relating to development, construction and ramp-up of the Underground Mine; loss of material properties; interest rates increase; global economy; limited history of production; future metals price fluctuations; speculative nature of exploration activities; periodic interruptions to exploration, development and mining activities; environmental hazards and liability; industrial accidents; failure of processing and mining equipment to perform as expected; labour disputes; supply problems; uncertainty of production and cost estimates; the interpretation of drill results and the estimation of mineral resources and reserves; changes in project parameters as plans continue to be refined; possible variations in ore reserves, grade of mineralization or recovery rates from management’s expectations and the difference may be material; legal and regulatory proceedings and community actions; accidents; title matters; regulatory approvals and restrictions; increased costs and physical risks relating to climate change, including extreme weather events, and new or revised regulations relating to climate change; permitting and licensing; dependence on management information systems and cyber security risks; volatility of the market price of the Company’s securities; insurance; competition; hedging activities; currency fluctuations; loss of key employees; other risks of the mining industry as well as those risks discussed in the Company’s Management’s Discussion and Analysis in respect of the year ended December 31, 2021 and the quarter ended March 31, 2022 and in the section entitled “Risk Factors” in the Company’s Annual Information Form dated March 31, 2022. The forward-looking statements and information contained in this press release are based upon assumptions management believes to be reasonable, including, without limitation: no adverse developments in respect of the property or operations at the project; no material changes to applicable laws; the ramp-up of operations at the Underground Mine in accordance with management’s plans and expectations; no worsening of the current COVID-19 related work restrictions; reduced impacts of COVID-19 going forward; the Company will be able to obtain sufficient additional funding to complete the ramp-up, no material adverse change to the price of copper from current levels; and the absence of any other factors that could cause actions, events or results to differ from those anticipated, estimated or intended.

The forward-looking information and statements are stated as of the date hereof. The Company disclaims any intent or obligation to update forward-looking statements or information except as required by law. Although the Company has attempted to identify important factors that could cause actual actions, events, or results to differ materially from those described in forward-looking information and statements, there may be other factors that could cause actions, events or results not to be as anticipated, estimated or intended. Specific reference is made to “Risk Factors” in the Company’s Management’s Discussion and Analysis in respect of the year ended December 31, 2021 and the quarter ended March 31, 2022 and “Risk Factors” in the Company’s Annual Information Form dated March 31, 2022, for a discussion of factors that may affect forward-looking statements and information. Should one or more of these risks or uncertainties materialize, should other risks or uncertainties materialize or should underlying assumptions prove incorrect, actual results and events may vary materially from those described in forward-looking statements and information. For more information on the Company and the risks and challenges of its business, investors should review the Company’s filings that are available at www.sedar.com.

The Company provides no assurance that forward-looking statements and information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements or information. Accordingly, readers should not place undue reliance on forward-looking statements or information.

Categories
Base Metals Junior Mining Nevada Copper

Nevada Copper Achieves Key Development Milestones: Paste Plant Commissioning Underway, First Paste Filled Stope; Open Pit Resource Definition Drilling Program Commenced

YERINGTON, Nev., May 16, 2022 (GLOBE NEWSWIRE) — Nevada Copper (TSX: NCU) (OTC: NEVDF) (FSE: ZYTA) (“Nevada Copper” or the “Company”) today announced its first quarter 2022 financial and operating results as well as recent milestone achievements and updates on key development initiatives for its Pumpkin Hollow underground mine (the “Underground Mine”) and open pit project (the “Open Pit Project”). The Company has filed its interim financial statements and the related management’s discussion and analysis (“MD&A”) for the quarter ended March 31, 2022 with the Canadian securities regulatory authorities, which documents can be accessed under the Company’s profile on www.SEDAR.com.

Recent Developments

  • Underground Mine Ramp Up Continues: Underground production continues to ramp up with hoisting rates of a combination of stope ore and development material expected to increase to approximately 3,000 tons per day (“tpd”) in Q2 2022 and then further increasing to 4,000 to 4,500 tpd during Q3 2022.
  • Paste Plant Commissioning: The Underground Mine paste plant began wet commissioning and filling of the first stope with paste backfill in April 2022. Paste plant commissioning activities are ongoing with initial throughput capacity expected to be realized by the end of June 2022. It is expected that the implementation of paste backfilling will result in quicker stope turnover leading to improvements in hoisting and production rates going forward.
  • Surface Vent Installation and Third Ore Pass Construction: The dry commissioning of the surface ventilation fans was completed in early April. Initial excavation of the third ore pass is complete with construction activities scheduled for completion in Q3 2022.
  • Open Pit Drill Program Commenced: The 2022/23 drill program commenced with one drill arriving on site in late April and a second drill planned to arrive during the second quarter. The primary goals of the planned approximate 25,000-foot (“ft”) drill program are upgrading in-pit inferred mineral resources that are currently considered as waste in the 2019 Technical Report1, to a minimum of an indicated resource, and expanding mineral resources previously inaccessible for drilling. Drilling will also be used to advance the geotechnical and metallurgical understanding of the deposit. Condemnation drilling will be completed in areas planned for major infrastructure. Several holes are also planned to follow up geophysical and surface work and test the nearby Tedeboy porphyry target.
  • Open Pit Project Prefeasibility Study (“PFS”) Update on Track: The Open Pit Project PFS update is progressing well and is expected to be completed in Q3 2022, as planned. The PFS will include updated mineral reserves and resources and economics based on current metals prices, costs, project development strategy and the contemplated solar project, which is expected to have a positive impact on the long-term price expectations for power. The results of the drill program currently underway will not be included in the PFS, however, they are expected to be included in an open pit feasibility study planned for the second half of 2023. The Open Pit Project has all the material permits required at this time for mine construction and operations and proven and probable mineral reserves, as estimated in the 2019 Technical Report, were 3,590 million pounds of copper (385.7 million tons grading 0.47% copper).
  • Key Team Additions: Continued strengthening of the team with the hiring of experienced individuals in the following roles: VP Technical Services; VP Human Resources; VP Finance; VP Investor Relations and Community Relations; Director Safety & Health; Director Supply Chain; Chief Reliability Engineer; Underground Production Manager; Process Manager; IT Manager; and several critical hires in Process Maintenance.

Randy Buffington, President & CEO stated, “I am very pleased with the progress we are making on several fronts at Pumpkin Hollow. We have completed a number of key projects at site that are aimed at improving productivity, stope availability and equipment reliability for the Underground Mine. The prefeasibility study update for the fully permitted Open Pit Project is well underway and will include important sustainable initiatives such as the solar project. In addition, the commencement of our exploration program is an important step towards our longer-term growth strategy. We are laying the groundwork necessary to demonstrate the potential for this significant copper operation and assembling the right team to execute on these plans for the long-term benefit of our stakeholders.”

Q1 2022 Highlights

Underground Mine Operations

  • Underground Mining Operations – During Q1 2022, the Company hoisted approximately 97,518 tons of material, a 66% improvement over Q4 2021. Included in the material hoisted was approximately 32,025 tons at an average grade of 1.3% copper mined from 3 stopes including ore mined from stopes in the Sugar Cube zone.
  • Lateral Development – Lateral development rates improved 31% in Q1 2022 compared with Q4 2021, with 3,126 ft developed. Two additional loaders were lowered underground in April 2022 further increasing mucking capacity and an additional haul truck is scheduled to be hoisted in May 2022. Ore tons mined from development during Q1 2022 were 65,493 tons, at an average grade of 0.7% copper. As previously disclosed, the Company continues to advance across a water-bearing dike structure with the first crossing being completed and grouting activities underway on the second crossing to be followed by advancing development under steel sets through the dike. While there have been some challenges due to highly variable ground and water conditions, the Company is advancing development from Ramp 01 on the other side of the dike to maintain the production schedule. The Company expects to complete the second crossing in Q2 2022.
  • Processing Plant – During Q1 2022, 96,414 tons of ore were processed, a 76% increase over Q4 2021. Processing plant recovery improved by 5% to 84% from Q4 2021. Copper concentrate sales increased by 50% to approximately 2,099 tons of concentrate at an average copper grade of 23%, compared to 1,403 tons of concentrate at an average copper grade of 23% in Q4 2021. The Company continued to batch process ore during Q1 2022, however the number of operating days improved by 112% from 17 days in Q4 2021 to 36 days in Q1 2022.

Q1 2022 Financial Statements and MD&A

The Company has filed on SEDAR its condensed consolidated interim financial statements and the related management’s discussion and analysis for the quarter ended March 31, 2022. These documents are available on the Company’s website at www.nevadacopper.com and the Company’s SEDAR profile at www.sedar.com.

Management Team Changes

In April 2022, Tracey Thom joined the Company as Vice President, Investor Relations and Community Relations. Tracey’s primary roles include implementing and managing the ongoing investor and community relations strategy that aligns all stakeholder engagement with the Company’s vision and goals.

Tracey brings over 25 years of senior management and investor relations experience in the mining industry and joins Nevada Copper from Hycroft Mining Holding Corporation where she was Vice President, Investor Relations and Corporate Communication for over 13 years. Prior to that she held senior executive roles in single and dually listed companies ranging from exploration and development to multi-national operations including Andina Minerals, Kinross Gold Corporation, and TVX Gold Inc.

Effective May 23, 2022, Kris Sims will assume the role of Interim Chief Financial Officer (“CFO”) following the departure of Andre van Niekerk as Executive Vice President and CFO, who is leaving for personal reasons. Kris is a seasoned financial professional with over 30 years of experience in the mining industry in executive leadership roles with large operating and development companies in the precious and base metals sectors including Phelps Dodge Mining Company, Freeport McMoRan Copper and Gold and Kinross Gold Corporation. He focuses on establishing fiscal transparency and accountability, operational excellence, profitability, and sustainability for the companies he works with. He has also been an advocate for mining in Nevada and led the Nevada Mining Association as Chairman in 2015. Kris was previously employed with Nevada Copper as Project Manager and has a strong base of institutional knowledge that will be key to moving forward and transitioning the CFO role.

“On behalf of the Board and Nevada Copper team, our sincere appreciation for the strong leadership and commitment Andre provided during his tenure,” said Randy Buffington. “He has been an incredible asset and we wish him well in his future endeavors. I am glad we are able to seamlessly integrate Kris into this leadership role as his experience and institutional knowledge will be valuable during our ongoing ramp up.”

Qualified Persons

The technical information and data in this news release has been reviewed by Greg French, C.P.G., Vice President, Exploration and Steven Newman, Registered Member – SME, Vice President, Technical Services for Nevada Copper, who are non-independent Qualified Persons within the meaning of NI 43-101.

About Nevada Copper

Nevada Copper (TSX: NCU) is a copper producer and owner of the Pumpkin Hollow copper project. Located in Nevada, USA, Pumpkin Hollow has substantial reserves and resources including copper, gold and silver. Its two fully permitted projects include the high-grade underground mine and processing facility, which is now in the production stage, and a large-scale open pit project, which is advancing towards feasibility status.

Randy Buffington
President & CEO

For additional information, please see the Company’s website at www.nevadacopper.com, or contact:

Tracey Thom Vice President, IR and Community Relations
tthom@nevadacopper.com
+1 775 391 9029

Rich Matthews | Integrous Communications
rmatthews@integcom.us
+1 604 757 7179

____________
Technical Report, entitled “NI 43-101 Technical Report: Nevada Copper Corp. Pumpkin Hollow Project, Open Pit and Underground Mine Prefeasibility Study”, with an effective date of January 21st, 2019.

Cautionary Language on Forward Looking Statements
This news release contains “forward-looking information” and “forward-looking statements” within the meaning of applicable Canadian securities laws. All statements in this news release, other than statements of historical facts, are forward-looking statements. Such forward-looking information and forward-looking statements specifically include, but are not limited to, statements that relate to Underground Mine development, production and ramp-up expectations and objectives, future hoisting and production rates, equipment installation, expectations regarding the prefeasibility study update and the expected completion thereof and the other plans of the Company with respect to exploration, development, construction and commercial production.

Forward-looking statements and information include statements regarding the expectations and beliefs of management. Often, but not always, forward-looking statements and forward-looking information can be identified by the use of words such as “plans”, “expects”, “potential”, “is expected”, “anticipated”, “is targeted”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates”, or “believes” or the negatives thereof or variations of such words and phrases or statements that certain actions, events or results “may”, “could”, “would”, “might” or “will” be taken, occur or be achieved. Forward-looking statements or information should not be read as guarantees of future performance and results. They are subject to known and unknown risks, uncertainties and other factors which may cause the actual results and events to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements or information.

Such risks and uncertainties include, without limitation, those relating to: the ability of the Company to complete the ramp-up of the Underground Mine within the expected cost estimates and timeframe; requirements for additional capital and no assurance can be given regarding the availability thereof; the impact of COVID-19 on the business and operations of the Company; the state of financial markets; history of losses; dilution; adverse events relating to milling operations, construction, development and ramp-up, including the ability of the Company to address underground development and process plant issues; ground conditions; cost overruns relating to development, construction and ramp-up of the Underground Mine; loss of material properties; interest rates increase; global economy; limited history of production; future metals price fluctuations; speculative nature of exploration activities; periodic interruptions to exploration, development and mining activities; environmental hazards and liability; industrial accidents; failure of processing and mining equipment to perform as expected; labour disputes; supply problems; uncertainty of production and cost estimates; the interpretation of drill results and the estimation of mineral resources and reserves; changes in project parameters as plans continue to be refined; possible variations in ore reserves, grade of mineralization or recovery rates from management’s expectations and the difference may be material; legal and regulatory proceedings and community actions; accidents; title matters; regulatory approvals and restrictions; increased costs and physical risks relating to climate change, including extreme weather events, and new or revised regulations relating to climate change; permitting and licensing; dependence on management information systems and cyber security risks; volatility of the market price of the Company’s securities; insurance; competition; hedging activities; currency fluctuations; loss of key employees; other risks of the mining industry as well as those risks discussed in the Company’s Management’s Discussion and Analysis in respect of the year ended December 31, 2021 and the quarter ended March 31, 2022 and in the section entitled “Risk Factors” in the Company’s Annual Information Form dated March 31, 2022. The forward-looking statements and information contained in this press release are based upon assumptions management believes to be reasonable, including, without limitation: no adverse developments in respect of the property or operations at the project; no material changes to applicable laws; the ramp-up of operations at the underground mine in accordance with management’s plans and expectations; no worsening of the current COVID-19 related work restrictions; reduced impacts of COVID-19 going forward; the Company will be able to obtain sufficient additional funding to complete the ramp-up, no material adverse change to the price of copper from current levels; and the absence of any other factors that could cause actions, events or results to differ from those anticipated, estimated or intended.

The forward-looking information and statements are stated as of the date hereof. The Company disclaims any intent or obligation to update forward-looking statements or information except as required by law. Although the Company has attempted to identify important factors that could cause actual actions, events, or results to differ materially from those described in forward-looking information and statements, there may be other factors that could cause actions, events or results not to be as anticipated, estimated or intended. Specific reference is made to “Risk Factors” in the Company’s Management’s Discussion and Analysis in respect of the year ended December 31, 2021 and the quarter ended March 31, 2022 and “Risk Factors” in the Company’s Annual Information Form dated March 31, 2022, for a discussion of factors that may affect forward-looking statements and information. Should one or more of these risks or uncertainties materialize, should other risks or uncertainties materialize or should underlying assumptions prove incorrect, actual results and events may vary materially from those described in forward-looking statements and information. For more information on the Company and the risks and challenges of its business, investors should review the Company’s filings that are available at www.sedar.com.

The Company provides no assurance that forward-looking statements and information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements or information. Accordingly, readers should not place undue reliance on forward-looking statements or information.

Categories
Base Metals Energy Junior Mining Nevada Copper

Nevada Copper Announces Special Shareholder Meeting Results

YERINGTON, Nev., Jan. 25, 2022 (GLOBE NEWSWIRE) — Nevada Copper Corp. (TSX: NCU) (OTC: NEVDF) (FSE: ZYTA) (Nevada Copper” or “Company”) is pleased to announce the results from its Special Meeting of shareholders (the “Meeting”) that was held today. The Warrant Exercise Resolution (as defined below), the only item of business at the Meeting, was overwhelmingly approved by disinterested shareholders of the Company. Strong shareholder support for the Warrant Exercise Resolution was evidenced by approximately 99% of the disinterested shareholders who voted at the Meeting voting in favour of the Warrant Exercise Resolution.

Voting Details

At the Meeting, the disinterested shareholders of the Company, being all shareholders of the Company excluding Pala Investments Limited (“Pala”), the Company’s largest shareholder, and Pala’s associates and affiliates, approved an ordinary resolution authorizing (i) the exercise of 15,000,000 common share purchase warrants (the “Credit Facility Warrants”) that were issued to Pala on November 30, 2021 in connection with the amendment and restatement of the credit facility provided by Pala to the Company; and (ii) if some or all of the Credit Facility Warrants are exercised, the resulting issuance by the Company of common shares to Pala pursuant to the terms of the Credit Facility Warrants (the “Warrant Exercise Resolution”). The results of voting on the Warrant Exercise Resolution are provided below:

Votes For% Votes ForVotes Against% Votes Against
117,875,48498.93%1,275,9781.07%

About Nevada Copper

Nevada Copper (TSX: NCU) is a copper producer and owner of the Pumpkin Hollow copper project. Located in Nevada, USA, Pumpkin Hollow has substantial reserves and resources including copper, gold and silver. Its two fully permitted projects include the high-grade underground mine and processing facility, which is now in the production stage, and a large-scale open pit project, which is advancing towards feasibility status.

NEVADA COPPER CORP.
www.nevadacopper.com

Randy Buffington, President and CEO

For further information contact:
Rich Matthews, Investor Relations
Integrous Communications
rmatthews@integcom.us
+1 604 757 7179

Categories
Base Metals Energy Exclusive Interviews Junior Mining Nevada Copper

Andrew Hecht – Copper Fundamentals and Stock Pick

https://soundcloud.com/proven-and-probable/andrew-hecht-copper-fundamentals-and-stock-pick

Nevada Copper As We Head Into 2022

  • Copper reached a new high in 2021
  • Higher highs are on the horizon in 2022 for three critical reasons
  • A favorable jurisdiction in Nevada- Momentum build and the value proposition is improving
  • Two groups in the know have made significant investments
  • The shares continue to offer value, risk-reward favors the upside for Nevada Copper

The leading stock market indices have been bumpy over the past weeks. The prospects for higher interest rates and taxes in 2022, new COVID-19 variants, inflation at the highest level in decades, and other factors have created uncertainty, which tends to cause indigestion in the stock market. However, many leading stocks remain near or at record highs.

Copper is a bellwether commodity that many market participants look to for clues about the health and wellbeing of the global economy. Copper’s nickname is Dr. Copper because it tends to move higher during economic expansion and lower when the global economy contracts. In May 2021, copper rose to its highest price in history when nearby COMEX futures rose to just shy of $4.90 per pound, and LME forwards moved to over $10,700 per ton for the first time. Over the past year, copper has taken on a new role, increasing the demand side of its fundamental equation. The red nonferrous metal is a critical requirement for decarbonization, leading Goldman Sachs to call copper “the new oil.”

In the world of commodities, higher prices and growing demand lead to more production. However, the global copper market faces a challenge as it will take years for new supplies to come to market, creating deficits that push the price higher. While copper corrected since the May high, the price remained around $4.40 per pound level as of December 24.  

Locating value in the US stock market is not easy these days. Nevada Copper Corp. (NEVDF) is a promising emerging US producer. Two seasoned commodity groups recently invested in NEVDF, seeing tremendous value in the burgeoning producer.

Copper reached a new high in 2021 Copper closed 2020 at the $3.52 per pound level on the nearby COMEX futures contract and $7,757 per ton on the three-month LME forwards.

Source: CQG

The chart highlights COMEX copper futures move to a high of $4.8985 in May. With the active month March contract at the $4.40 level on December 24, the price moved 25% higher in 2021 with only one week until 2022.

Source: LME

Three-month copper forwards rose to a high of $10,724.50 in 2021 and was at the $9,568 level on December 24, 23.35% higher than at the end of 2020.

While copper is closing 2021 below the year’s high, the trend remains bullish with impressive gains since the end of last year.

Higher highs are on the horizon in 2022 for three critical reasons

Three reasons support higher highs and new all-time peaks in the copper market in 2022 and beyond:

  • Copper is critical for electric vehicles (EVs), wind turbines, and other clean energy initiatives. The red metal is a crucial ingredient for decarbonization, making the fundamental equation’s demand-side grow.
  • It takes eight to ten years to bring new copper production online from exploration to output. Copper is still in the early phases of expanding global production, with the leading mining companies scrambling to find new ore deposits. As demand increases, supplies will struggle to keep pace over the coming years.
  • Inflationary pressures will continue to rise, putting upward pressure on all commodities, and copper is no exception. At the latest December FOMC meeting, the US central bank forecast a 0.90% Fed funds rate for 2022 and a 1.60% rate for 2023. Even if inflationary pressures recede, real interest rates are likely to remain negative, which is bullish for raw material prices in the coming years.

Copper faces an almost perfect bullish storm for the coming years. Goldman Sachs’s forecast of $15,000 per ton by 2025 would put nearly COMEX futures over the $6.80 per pound level. While higher prices will encourage more production, existing mines cannot keep pace with the rising demand.

Chile is the world’s leading copper producer. The recent election of Gabriel Boric, a 35-year-old former student activist who carries a new generation’s socialist dreams to the presidential palace, threatens Chile’s capitalist economy fueled by copper output. Taxes are likely to rise along with wages and addressing climate change could cause a new wave of regulations that weigh on copper output over the coming years. Moreover, the new Chilean government could move to nationalize copper mines, which would impact output and efficiency. The bottom line is that a supply-demand deficit in the global copper market is likely to widen over the coming years, putting upward pressure on the red nonferrous metal’s price.

A favorable jurisdiction in Nevada- Momentum build and the value proposition is improving

The world’s leading copper producers are searching the globe for new reserves and output. Australian mining giant BHP recently said it is considering a challenging Democratic Republic of Congo copper project. The DRC is notorious for political and regulatory issues.

Meanwhile, the US remains a friendly mining environment, and Nevada is a state that supports the industry and is mineral-rich.

Nevada Copper (NEVDF) is an emerging producer with a lot going for it these days. The company mines copper in Nevada in the USA, and the Canadian Fraser Institute ranks the state as the world’s #1 mining jurisdiction. In 2021, momentum has been building for NEVDF:

  • Underground mine operation improvements have resulted in 100% growth in development rates.
  • New equipment in the second half of 2021 has accelerated development.
  • An operational efficiency plan took effect in the second half of 2021 and is forecasted to increase output in H1, 2022.

To put more meat on the bone, in a December 21 press release, the company provided updates on its Pumpkin Hollow underground mine project:

  • Nevada Copper is on track to advance over 1,100 lateral equivalent feet of development in December 2021.
  • Development is running at the highest rate for 2021, with December nearly 50% higher than November and almost 100% above the level in August 2021.
  • New equipment should enhance further development and growth in January 2022.
  • Ventilation fan infrastructure should be completed in Q1 2022.
  • Mining of the Sugar Cube, the first high-grade area in the East North Zone of the underground mine, is on schedule for Q1 2022.

In December, CEO Randy Buffington said, “We are on track to complete 1,100 feet of lateral development this month, which puts the Company in a position to mine the first stope of high-grade Sugar Cube as planned next month.

Accelerated development increases NEVDF’s value proposition:

  • The current enterprise value is less than the value of the company’s machinery and equipment.
  • NPV at current prices is close to the US $3 billion level.
  • The company will be cash-flow positive in 2022.
  • Open-pit mining development will accelerate in 2022.

The company’s prospects are compelling, leading two influential groups to invest in NEVDF.

Two groups in the know have made significant investments

Solway Investment Group is a private international mining and metals group with headquarters in Switzerland. Solway specializes in nickel production with mines and smelting plants in Guatemala, Ukraine, Russia, Indonesia, and Macedonia. The group has over 5,000 employees, is expanding its focus in battery metals, and recently invested US$30 million for a 10% stake in Nevada Copper.

Mercuria Energy Group Ltd. is a multinational commodity trading company active in global energy, metals, and agricultural markets. The company dates back to 2004 when two ex-Phibro executives, Marco Dunard and Daniel Jaeggi departed after Citigroup sold Phibro to Occidental Petroleum. The company recently closed an oversubscribed $2.2 billion multi-year secured borrowing base credit facility with a collection of international financial institutions. Mercuria is one of the world’s leading and growing commodities trading companies, with core exposure in energy. Mercuria’s goal is a 50% portfolio in renewable energy over the coming five years and invested US$30 million for a 10% stake in Nevada Copper.

Solway and Mercuria are top organizations in the international commodities business, with tentacles reaching across the globe. Both companies put their capital up as they see the compelling potential for Nevada Copper’s properties and business plan.

The shares continue to offer value, risk-reward favors the upside for Nevada Copper

Nevada Copper shares remain inexpensive at the end of December 2021. Aside from the Solway and Mercuria investments, insider buying is another bullish sign for the company. After a recent blackout period, CEO Randy Buffington purchased 200,000 shares, and the company’s directors have been buyers of the shares. Nevada Copper shares (NEVDF) peaked at $2.40 value in May when copper prices reached the high at nearly $4.90 per pound. Copper closed around the $4.40 level on December 23, and NEVDF shares having fallen dramatically in early December hitting yearly lows, could be a golden opportunity for investors that see the same potential as Solway and Mercuria.

Source: Barchart

The chart shows that NEVDF shares corrected to a low of 38.78 cents on October 1 as nearby copper futures moved to test the $4 per pound level. At 53.0 cents per share on December 23, Nevada Copper had a $236.328 million market cap.

Development companies are risky businesses as their future depends on delivering from their mines. The backing of two well-established commodities trading and investment companies, insider buying, and accelerated progress are positive signs for the company as we head into 2022.

New copper production is scarce, and mining companies are scouring the globe for new reserves. Nevada copper’s location, proven and probable reserves, management, progress, and investors bode well for the company’s future. Further progress could transform NEVDF from an emerging producer to a takeover candidate or established producer as the world’s leading miners are hungry for output. Risk is always a function of reward with any investment. At 53.0 cents per share, NEVDF’s potential compensates for the risk.

Any investment involves substantial risks, including, but not limited to, pricing volatility, inadequate liquidity, and the potential complete loss of principal. This document does not in any way constitute an offer or solicitation of an offer to buy or sell any investment, security, or commodity discussed herein, or any security in any jurisdiction in which such an offer would be unlawful under the securities laws of such jurisdiction.

Categories
Base Metals Energy Junior Mining Nevada Copper

Nevada Copper Operational Performance Continues to Accelerate

YERINGTON, Nev., Dec. 21, 2021 (GLOBE NEWSWIRE) — Nevada Copper Corp. (TSX: NCU) (OTC: NEVDF) (FSE: ZYTA) (“Nevada Copper” or the “Company”) today provided a further positive operations update at its underground mine at the Company’s Pumpkin Hollow Project (the “Underground Mine”).

December Underground Operations Highlights:

  • Development Achieves Record Rates
    • In line with the continued ramp-up, the Company is on track to advance over 1,100 lateral equivalent feet of development in December.
    • Development is running at the highest rate for 2021, and rates achieved month-to-date in December are almost 50% higher than November (representing almost a 100% increase since August 2021).
  • Additional Mobile Equipment Delivered and Commissioned
    • The first planned bolter has been delivered and is now operating underground, resulting in increased development rates and supporting further increases continuing into Q1 2022.
    • Two additional bolters are on track to be delivered to the underground mine in January enhancing further development rates.
  • First Delivery of Surface Ventilation Fans Arrived on Site
    • The first of three deliveries of the ventilation fan infrastructure has arrived on site, with full installation and commissioning continuing to be planned to be completed in Q1 2022.
    • The final package delivery is expected for the first week of January 2022.
  • Preparing to Mine Sugar Cube
    • Mining of the Sugar Cube, the first high-grade area in the East North Zone of the underground mine, continues to be planned for Q1 2022 (News Release, November 30, 2021).

“The Company continues to build on the operational improvements achieved over the past two quarters, providing further acceleration to the development and production ramp-up,” stated Randy Buffington, President and Chief Executive Officer. “The implementation of additional equipment, manpower and operational efficiencies led to the highest development rates attained this year. We are on track to complete 1,100 feet of lateral development this month, which puts the Company in a position to mine the first stope of the high-grade Sugar Cube as planned next month.”

Qualified Persons
The technical information and data in this news release was reviewed by Greg French, C.P.G., VP Head of Exploration of Nevada Copper, and Neil Schunke, P.Eng., a consultant to Nevada Copper, who are non-independent Qualified Persons within the meaning of NI 43-101.

About Nevada Copper
Nevada Copper (TSX: NCU) is a copper producer and owner of the Pumpkin Hollow copper project. Located in Nevada, USA, Pumpkin Hollow has substantial reserves and resources including copper, gold and silver. Its two fully permitted projects include the high-grade Underground Mine and processing facility, which is now in the production stage, and a large-scale open pit project, which is advancing towards feasibility status.

NEVADA COPPER CORP.
www.nevadacopper.com

Randy Buffington, President and CEO

For further information contact:
Rich Matthews, Investor Relations
Integrous Communications
rmatthews@integcom.us
+1 604 757 7179

Cautionary Language

This news release includes certain statements and information that constitute forward-looking information within the meaning of applicable Canadian securities laws. All statements in this news release, other than statements of historical facts are forward-looking statements. Such forward-looking statements and forward-looking information specifically include, but are not limited to, statements that relate to mine development, production and ramp-up objectives and equipment installation.

Forward-looking statements and information include statements regarding the expectations and beliefs of management. Often, but not always, forward-looking statements and forward-looking information can be identified by the use of words such as “plans”, “expects”, “potential”, “is expected”, “anticipated”, “is targeted”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates”, or “believes” or the negatives thereof or variations of such words and phrases or statements that certain actions, events or results “may”, “could”, “would”, “might” or “will” be taken, occur or be achieved. Forward-looking statements or information should not be read as guarantees of future performance and results. They are subject to known and unknown risks, uncertainties and other factors which may cause the actual results and events to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements or information.

Such risks and uncertainties include, without limitation, those relating to: the ability of the Company to complete the ramp-up of the Underground Mine within the expected cost estimates and timeframe; requirements for additional capital and no assurance can be given regarding the availability thereof; the impact of the COVID-19 pandemic on the business and operations of the Company; the state of financial markets; history of losses; dilution; adverse events relating to milling operations, construction, development and ramp-up, including the ability of the Company to address underground development and process plant issues; ground conditions; cost overruns relating to development, construction and ramp-up of the Underground Mine; loss of material properties; interest rates increase; global economy; limited history of production; future metals price fluctuations; speculative nature of exploration activities; periodic interruptions to exploration, development and mining activities; environmental hazards and liability; industrial accidents; failure of processing and mining equipment to perform as expected; labor disputes; supply problems; uncertainty of production and cost estimates; the interpretation of drill results and the estimation of mineral resources and reserves; changes in project parameters as plans continue to be refined; possible variations in ore reserves, grade of mineralization or recovery rates from management’s expectations and the difference may be material; legal and regulatory proceedings and community actions; accidents; title matters; regulatory approvals and restrictions; increased costs and physical risks relating to climate change, including extreme weather events, and new or revised regulations relating to climate change; permitting and licensing; volatility of the market price of the Company’s securities; insurance; competition; hedging activities; currency fluctuations; loss of key employees; other risks of the mining industry as well as those risks discussed in the Company’s Management’s Discussion and Analysis in respect of the year ended December 31, 2020 and in the section entitled “Risk Factors” in the Company’s Annual Information Form dated March 18, 2021. Should one or more of these risks or uncertainties materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those described in forward-looking statements or information. The forward-looking information or statements are stated as of the date hereof. Nevada Copper disclaims any intent or obligation to update forward-looking statements or information except as required by law. Readers are referred to the additional information regarding Nevada Copper’s business contained in Nevada Copper’s reports filed with the securities regulatory authorities in Canada. Although the Company has attempted to identify important factors that could cause actual actions, events, or results to differ materially from those described in forward-looking statements, there may be other factors that could cause actions, events or results not to be as anticipated, estimated or intended. For more information on Nevada Copper and the risks and challenges of its business, investors should review Nevada Copper’s filings that are available at www.sedar.com.

Nevada Copper provides no assurance that forward-looking statements and information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements or information. Accordingly, readers should not place undue reliance on forward-looking statements or information.

Categories
Base Metals Energy Junior Mining Nevada Copper

Nevada Copper Provides Update on Operational Advances

YERINGTON, Nev., Nov. 30, 2021 (GLOBE NEWSWIRE) — Nevada Copper Corp. (TSX: NCU) (OTC: NEVDF) (FSE: ZYTA) (“Nevada Copper” or the “Company”) today provided an update on its operations, including advances at the Company’s underground mine at its Pumpkin Hollow Project (the “Underground Mine”) and an update on its 2022 development plan.

Underground Mine Operations Highlights

  • Lateral Development Rates Continue to Rise. The Company has advanced approximately 760 lateral equivalent feet in the past 30 days, a 20% increase in average daily footage from the previous 30 days. Lateral development continues on multiple headings, providing access to ore mining zones in the East South orebody and advancing development towards the East North orebody.
  • Sugar Cube to be Blasted Shortly. The high-grade Sugar Cube zone is planned to be drilled in December and mining is expected to commence in early Q1 2022. This will be the first stope mined in the East North orebody, which is expected to have higher quality ground conditions and significantly larger stope sizes.
  • Processing Plant Operating Well. The mill continues to run at design specifications with the grinding, flotation, thickening, and concentrate filtration circuits performing well mechanically. The Company anticipates increased production and recovery rates with the addition of the Sugar Cube zone to the processing plant’s ore feed in Q1 2022.
  • Surface Ventilation Fans on Schedule. The surface ventilation fans are on schedule to arrive on site in approximately 3 weeks with installation and commissioning expected to be completed on time in line with the demands of the mine plan.

2022 Development Plan Update

  • Open Pit Drilling and Progressing. With additional funding received from the Company’s recent public equity offering, the Company intends to undertake an infill drilling campaign and to update its open pit studies to reflect opportunities for increased scale, larger resource and other optimization workstreams. Further updates on the Company’s 2022 development plan will be released shortly.

“I am pleased with the operational advances we have achieved this month, as we build on the progress from Q3,” stated Randy Buffington, President and Chief Executive Officer. “Our development rates continue to increase on a weekly basis and will soon provide access to the larger high-grade stopes, which is expected to result in increased ore feed delivered to our fully operational processing plant for a step further in our ramp-up progression.”

Qualified Persons
The technical information and data in this news release was reviewed by Greg French, C.P.G., VP Head of Exploration of Nevada Copper, and Neil Schunke, P.Eng., a consultant to Nevada Copper, who are non-independent Qualified Persons within the meaning of NI 43-101.

About Nevada Copper
Nevada Copper (TSX: NCU) is a copper producer and owner of the Pumpkin Hollow copper project. Located in Nevada, USA, Pumpkin Hollow has substantial reserves and resources including copper, gold and silver. Its two fully permitted projects include the high-grade Underground Mine and processing facility, which is now in the production stage, and a large-scale open pit project, which is advancing towards feasibility status.

NEVADA COPPER CORP.
www.nevadacopper.com

Randy Buffington, President and CEO

For further information contact:
Rich Matthews, Investor Relations
Integrous Communications
rmatthews@integcom.us
+1 604 757 7179

Cautionary Language

This news release includes certain statements and information that constitute forward-looking information within the meaning of applicable Canadian securities laws. All statements in this news release, other than statements of historical facts are forward-looking statements. Such forward-looking statements and forward-looking information specifically include, but are not limited to, statements that relate to mine development, production and ramp-up objectives, equipment installation, drilling programs and the completion of a new feasibility study.

Forward-looking statements and information include statements regarding the expectations and beliefs of management. Often, but not always, forward-looking statements and forward-looking information can be identified by the use of words such as “plans”, “expects”, “potential”, “is expected”, “anticipated”, “is targeted”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates”, or “believes” or the negatives thereof or variations of such words and phrases or statements that certain actions, events or results “may”, “could”, “would”, “might” or “will” be taken, occur or be achieved. Forward-looking statements or information should not be read as guarantees of future performance and results. They are subject to known and unknown risks, uncertainties and other factors which may cause the actual results and events to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements or information.

Such risks and uncertainties include, without limitation, those relating to: the ability of the Company to complete the ramp-up of the Underground Mine within the expected cost estimates and timeframe; requirements for additional capital and no assurance can be given regarding the availability thereof; the impact of the COVID-19 pandemic on the business and operations of the Company; the state of financial markets; history of losses; dilution; adverse events relating to milling operations, construction, development and ramp-up, including the ability of the Company to address underground development and process plant issues; ground conditions; cost overruns relating to development, construction and ramp-up of the Underground Mine; loss of material properties; interest rates increase; global economy; limited history of production; future metals price fluctuations; speculative nature of exploration activities; periodic interruptions to exploration, development and mining activities; environmental hazards and liability; industrial accidents; failure of processing and mining equipment to perform as expected; labor disputes; supply problems; uncertainty of production and cost estimates; the interpretation of drill results and the estimation of mineral resources and reserves; changes in project parameters as plans continue to be refined; possible variations in ore reserves, grade of mineralization or recovery rates from management’s expectations and the difference may be material; legal and regulatory proceedings and community actions; accidents; title matters; regulatory approvals and restrictions; increased costs and physical risks relating to climate change, including extreme weather events, and new or revised regulations relating to climate change; permitting and licensing; volatility of the market price of the Company’s securities; insurance; competition; hedging activities; currency fluctuations; loss of key employees; other risks of the mining industry as well as those risks discussed in the Company’s Management’s Discussion and Analysis in respect of the year ended December 31, 2020 and in the section entitled “Risk Factors” in the Company’s Annual Information Form dated March 18, 2021. Should one or more of these risks or uncertainties materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those described in forward-looking statements or information. The forward-looking information or statements are stated as of the date hereof. Nevada Copper disclaims any intent or obligation to update forward-looking statements or information except as required by law. Readers are referred to the additional information regarding Nevada Copper’s business contained in Nevada Copper’s reports filed with the securities regulatory authorities in Canada. Although the Company has attempted to identify important factors that could cause actual actions, events, or results to differ materially from those described in forward-looking statements, there may be other factors that could cause actions, events or results not to be as anticipated, estimated or intended. For more information on Nevada Copper and the risks and challenges of its business, investors should review Nevada Copper’s filings that are available at www.sedar.com.

Nevada Copper provides no assurance that forward-looking statements and information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements or information. Accordingly, readers should not place undue reliance on forward-looking statements or information.

Categories
Base Metals Energy Junior Mining

Nevada Copper Provides Underground Project Update; Releases 2020 Financials and MD&A


Press Relase


Corporate Presentation

We are very pleased to have recently completed both commissioning of the Main Shaft and electrical system upgrades, two important steps towards achieving nameplate production. The remaining step, ventilation upgrades, is progressing well, and we remain on target for steady state production of 5,000 tons per day in Q3 this year,stated Mike Ciricillo, Chief Executive Officer of Nevada Copper. “With the underground project expected to be ramped-up to full production in Q3, we look forward to advancing our other key growth opportunities, including our fully permitted Open Pit and property exploration targets.”

About Nevada Copper

Nevada Copper (TSX: NCU) is a copper producer and owner of the Pumpkin Hollow copper project. Located in Nevada, USA, Pumpkin Hollow has substantial reserves and resources including copper, gold and silver. Its two fully permitted projects include the high-grade underground mine and processing facility, which is now in the production stage, and a large-scale open pit project, which is advancing towards feasibility status.

NEVADA COPPER CORP.
www.nevadacopper.com

Mike Ciricillo, President and CEO

For further information contact:
Rich Matthews, Investor Relations
Integrous Communications
rmatthews@integcom.us
+1 604 757 7179

Proven and Probable