Categories
Base Metals Energy Junior Mining

Skyharbour Expands High Grade Maverick East Zone with Drill Results of 0.72% U3O8 over 17.5m including 1.00% U3O8 over 10.0m; Additional Assays Pending


Click here

https://youtu.be/EV13Ds-AqX4

Jordan Trimble, President and CEO of Skyharbour Resources, stated: “Drill hole ML20-09 is a breakthrough hole for us at the Maverick East Zone as it is the longest continuously mineralized drill intercept the Company has reported and it is one of the best basement-hosted zones of mineralization discovered at the project. We are successfully increasing the size of the high grade uranium zones at the Maverick corridor and these results illustrate the notable discovery upside potential at the project especially in the basement rock feeder-zones which have had limited drill-testing historically. The remaining assay results from the program are pending with planning for additional drilling at Moore Lake currently underway.”

Spencer Coulter
Corporate Development and Communications
Skyharbour Resources Ltd.
Telephone: 604-639-3850
Toll Free: 800-567-8181
Facsimile: 604-687-3119
Email: info@skyharbourltd.com